ALUMINUM_TRAFFIC_LEGEND_STENCILS_(METRIC)_AND_HIVISIBILITY_REFLECTIVE_VINYL_ROAD_CONSTRUCTION_SIGNS.pdf
PDF 595 KB Posted
- Attached to
- ALUMINUM TRAFFIC LEGEND STENCILS AND HIVISIBILITY REFLECTIVE VINYL ROAD CONSTRUCTION SIGNS
- Solicitation number
- IFB-080-3080504-DS
- Issued by
- Orange County, San Francisco City, California
About this file
This is a competitive bid solicitation document from the County of Orange, California, Public Works Department, requesting qualified vendors to supply aluminum traffic legend stencils (metric) and high-visibility reflective vinyl road construction signs. The solicitation is conducted entirely through the County's electronic eProcurement Portal, with bids submitted exclusively through this online system; no alternative submission methods are permitted. Bidders are required to carefully review all solicitation documents, including the model contract, scope of work, and supporting exhibits, and must submit any questions or requests for clarification through the solicitation's Question & Answer section rather than contacting County personnel directly. The County assumes no responsibility for providing additional information beyond what is included in the solicitation, placing the burden on bidders to conduct thorough due diligence prior to bid submission.
The solicitation does not specify item quantities, response or due dates, scheduled bidder conferences, site visits, award timelines, or contract term and renewal options in the available documentation. Pricing terms, set-asides, incumbent contractor information, funding sources, and budget amounts are not detailed in this summary document. Interested bidders requiring technical assistance with the eProcurement Portal submission process should contact procurement-support@opengov.com or consult the help resources available at https://help.procurement.opengov.com/en/. The awarded contract will be executed between the County of Orange and the selected Contractor under the terms and conditions specified in the model contract and solicitation attachments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
County of Orange, OC Public Works
Invitation for Bid for ALUMINUM TRAFFIC LEGEND STENCILS (METRIC) AND HIVISIBILITY REFLECTIVE
VINYL ROAD CONSTRUCTION SIGNS IFB # IFB-080-3080504-DS
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/ocgov
COUNTY OF ORANGE
OC Public Works
PROCUREMENT SERVICES
601 N. Ross St.
Santa Ana, CA
92701
Date: Wednesday, July 22, 2026
INVITATION FOR BIDS
FOR: ALUMINUM TRAFFIC LEGEND STENCILS (METRIC) AND HIVISIBILITY
REFLECTIVE VINYL ROAD CONSTRUCTION SIGNS
BID MUST BE RECEIVED BEFORE:
August 19, 2026 / 2:00 pm
IFB # IFB-080-3080504-DS
Procurement Services Regular Office Hours:
8:00 AM to 5:00 PM
Monday through Friday
The office is closed between 12:00 PM and 1:00 PM
Table Of Contents
1. General Information
2. General Instructions
3. Protest Procedures
4. Scope of Work
5. OCLSB and DVBE Preference Policies Certification Requirements
6. Electronic Fund Transfer (EFT)
7. Pricing
8. Vendor Responses
Attachments:
A - IFB-080-3080504 Model Contract
Invitation for Bid for ALUMINUM TRAFFIC LEGEND STENCILS (METRIC) AND HIVISIBILITY
REFLECTIVE VINYL ROAD CONSTRUCTION SIGNS
County of Orange IFB
OC Public Works - ALUMINUM TRAFFIC LEGEND STENCILS (METRIC) AND HIVISIBILITY REFLECTIVE VINYL
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 3 of 31
SECTION 1. General Information
1.1 BACKGROUND
This Contract is for the purchase and delivery of Aluminum Traffic Legend Stencils (Metric)
And Hivisibility Reflective Vinyl Road Construction Signs for use at various County of Orange locations. Contractor shall supply County with Aluminum Traffic Legend Stencils (Metric) And
Hivisibility Reflective Vinyl Road Construction Signs on an “as-needed” basis for the entire contract term for various facilities and job sites.
1.2 IMPORTANT NOTICE
The County has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. If any person contemplating submitting a bid in response to this IFB is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they must submit a written request for clarification/interpretation to the County Deputy Procurement Agent
(DPA), Derek Savosh, via the County’s online biding system.
1.3 CLARIFICATION/INTERPRETATION
If clarification or interpretation of this solicitation is considered necessary by County, a written addendum shall be issued and the information will be posted on County’s online bid system. Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the County DPA. All addenda will be submitted and posted on the County’s online bidding system. It is the responsibility of each Bidder to periodically check the County’s online biding system to ensure that they have received and reviewed any and all addenda to this solicitation. The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any oral information.
All questions or requests for interpretation must be received within this solicitation's Question &
Answer section by Wednesday, August 5, 2026 before 2:00 pm.
1.4 COMMUNICATION
Bidders are not to contact other County personnel with any questions or clarifications concerning this
Invitation for Bid (IFB). All questions regarding this solicitation must be submitted via the Question &
Answer section of this solicitation within the County’s eProcurement Portal at:
https://procurement.opengov.com/portal/ocgov. Any County response relevant to this IFB other than through or approved by County is unauthorized and will be considered invalid.
County's Deputy Procurement Agent, Derek Savosh, derek.savosh2@pw.oc.gov, will provide all official communication concerning this IFB.
1.5 BID VALIDITY
Bids will be valid for a period of 120 days after IFB closing date.
1.6 LOBBYISTS
County of Orange does not require and neither encourages or discourages the use of lobbyists or other consultants for the purpose of securing business.
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 4 of 31
ORANGE COUNTY BOARD OF SUPERVISORS
AND COUNTY AGENCY OFFICERS
Board of Supervisors
Janet Nguyen, First District Vicente Sarmiento, Second District Donald P. Wagner, Third District
Doug Chaffee, Fourth District Katrina Foley, Fifth District
County Agency Officers
Claude Parrish, Assessor Hugh Nguyen, Clerk-Recorder
Todd Spitzer, District Attorney-Public Administrator Don Barnes, Sheriff-Coroner
Shari L. Freidenrich, Treasurer-Tax Collector Andrew Hamilton, Auditor-Controller
SECTION 2. General Instructions
2.1 REVIEW
Before submitting a bid, Bidders shall carefully review the General Instructions and examine the solicitation contents, including the Model Contract Terms, Conditions and Scope of Work. Bidders shall include in their bid response a monetary sum to cover the cost of all items included in the Contract. The Model
Contract contained in this solicitation is the Contract proposed for execution. Upon award, awarded Bidder will be required to sign and submit Contract for execution.
2.2 RESPONSIVENESS
Responsive bids shall include completed submittals/attachments provided in the Vendor Responses.
2.3 BID SUBMISSION
Electronic Bids shall be submitted via the County’s online bidding system via the following link https://procurement.opengov.com/portal/ocgov. All required sections of the IFB as listed above, must be submitted via the County’s eProurement Portal. Bidder is solely responsible for “on time” submission of their electronic bid. The County will not accept late bids and no exceptions shall be made. County will only receive those bids that were transmitted successfully.
Note: Electronic Bids cannot be viewed by County until after the solicitation deadline. If you encounter any problems with your registration, system, bid submission, or other system issues, please contact OpenGov’s support staff via the live chat option or via email at procurement-support@opengov.com.
2.4 PRICING
A. Bid Prices: The bid prices quoted on this solicitation shall be firm for the entire contract term of the awarded Contract.
mailto:procurement-support@opengov.com
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 5 of 31
B. Addenda: Bid prices offered shall reflect all addenda issued by County.
C. Scope of Work: Bids shall be submitted only for the items and/or services as stated in the Scope of
Work, Attachment A of Model Contract; bids for other than the items and/or services listed will not be considered.
D. Firm Prices: The County will only consider firm price bids.
E. Profit: The net amount of profit will remain firm for the entire term of the Contract. Contract adjustments which increase Contractor’s profit will not be allowed.
F. Price Decreases: All price/rate decreases will automatically be extended to the County. Please reference Paragraph – Price Increase/Decrease provision for additional information.
G. Acceptance: Bids must be provided for each item separately, “all-or-none” bids will not be accepted unless in the best interest of the County.
2.5 NO SUBSTITUTIONS
The bidder is required to meet all specifications and requirements contained in this solicitation. No substitutions will be accepted, unless prior County written approval is received.
2.6 DISCREPANCIES
Bidder shall take all responsibility for any errors or omissions in their bids. Any discrepancies in numbers or calculations shall be interpreted to reflect the lowest price to the County.
If prior to contract award, a Bidder discovers a mistake in their bid which renders the Bidder unwilling to perform under any resulting contract, the Bidder must immediately notify the buyer and request to withdraw the bid. It shall be solely within the County's discretion as to whether withdrawal will be permitted. If the solicitation contemplated evaluation and award of "all or none" of the items, then any withdrawal must be for the entire bid.
If the solicitation provided for evaluation and award on a line item or combination of items basis, the County may consider permitting withdrawal of specific line item(s) or combination of items.
2.7 BID EXPENSES
The County shall not be liable for any expenses incurred by potential Contractors in the preparation or submission of their bids. Pre-contractual expenses are not to be included in the Contractor’s Pricing Sheet. Pre-contractual expenses are defined as, including but not limited to, expenses incurred by Bidder in:
A. Preparing its bid in response to this IFB.
B. Submitting that bid to the County.
C. Negotiating with the County any matter related to the bid; and, D. Any other expenses incurred by the Bidder prior to the date of the award and execution, if any, of the
Contract.
2.8 AWARD
Upon recommendation of Contract award, Bidder will be required to submit the following documents within seven (7) days of County notification, unless otherwise specified in the solicitation:
A. Insurance: Certificate(s) of Insurance, including additional Insured Endorsement(s); refer to Model
Contract, Article-Insurance
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 6 of 31
B. W-9 Form: Current signed W-9 (Taxpayer ID No & Certification), which includes Contractor’s
Legal Business Name(s). Out of State Vendors are required to submit a 587/590 Form.
2.9 ACCEPTANCE/REJECTION/AWARD
A. Bids submitted in response to this IFB may become subject to public disclosure under the California
Public Records Act, and other applicable law. The County shall not be liable in any way for disclosure of any such records. Additionally, all bids shall become the property of the County.
B. The lowest responsive, responsible Bidder will be recommended for contract award.
C. Bids will be reviewed by the County for responsiveness to all requirements. The County has the right to reject any bid deemed unresponsive or lacking the resources or experience to adequately perform the services described herein.
D. Only those responsible, responsive bids meeting all solicitation requirements and specifications shall be further reviewed for consideration for award. Award shall be based on the lowest, responsive, responsible bid.
E. Please take notice, non-acceptance of the County of Orange terms and conditions, incorporated in model contract, may deem a bid non-responsive. County may not accept any other terms, conditions, or provisions contrary to those contained within this solicitation.
F. Final award determination shall be based upon the lowest responsive, responsible bid, and may also include a review of Bidder’s ability to meet the requirements and perform the services specified in this solicitation; Bidder’s references and past performance; and Bidder’s acceptance of County of Orange terms and conditions.
G. By submitting a response to this solicitation, Bidders agree to accept the decision of the County DPA as final.
H. Awarded Bidder will be required to sign a contract upon award. If Bidder is a corporation, signature will be provided in accordance with the corporation’s code as specified in this solicitation.
2.10 RIGHTS RESERVED TO COUNTY
The County reserves the right to:
A. Request a sample for determining equality with the specified brand.
B. Waive, at its discretion, any non-material defects, irregularity, or informality, which County deems correctable or otherwise not warranting rejection of the bid that do not result in any unfair competitive advantage.
C. Verify and validate any information prior to Contract Award and during the entire term of the
Contract.
D. Make multiple awards to Bidders for services requested in this solicitation, at its sole discretion, to serve the best interests of the County
E. Accept or reject in whole or in part any or all bids received as a result of this solicitation at its sole discretion and to solicit for new bids, as the best interest of the County may require.
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 7 of 31
F. Negotiate the final Contract with the lowest, responsive and responsible Bidder or Bidders as necessary to serve the best interests of the County.
G. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representation that any contract will be awarded to any Bidder responding to this solicitation.
H. Award its total requirements to one Bidder or to apportion those requirements among two or more
Bidders as the County may deem to be in its best interests; therefore, bids must be provided for each item separately; “all-or-none” bids will not be accepted unless in the best interest of the
County.
I. Defer award of this Contract for a period of 180 days after the Bid opening. During this period, Bidders shall guarantee the prices quoted in their Bids. County and the lowest responsive, responsible Bidder may mutually agree in writing to extend this deferral period.
2.11 JOINT BIDS
Where two or more Bidders desire to submit a single bid in response to a solicitation, they must do so on a prime/subcontractor basis rather than as a joint venture. The County intends to contract with a single firm or multiple firms, but not with multiple firms doing business as a joint venture.
2.12 UNFAIR PRACTICES AND OTHER LAWS
Bidder warrants that its bid complies with the Unfair Practices Act (Business and Professions Code Section
17000 et seq.) and all applicable County, State and Federal laws and regulations.
2.13 INDEPENDENCE OF BID
By submitting a bid, Bidder swears under penalty of perjury that it did not conspire with any other supplier to set prices in violation of anti-trust laws.
2.14 AMERICANS WITH DISABILITY ACT (ADA)
To comply with the non-discrimination requirements of the ADA, it is the policy of the County to make every effort to ensure that its programs, activities and services are available to all persons, including persons with disabilities. For persons with a disability needing a reasonable modification to participate in the procurement process, or for persons having questions regarding reasonable modifications for the procurement process, you must contact the buyer listed in the solicitation.
2.15 DUNS NUMBER
The County requires a valid D-U-N-S number prior to Contract Award. If needed, your company may obtain one at no cost at www.dnb.com. If you are unable to provide/obtain a D-U-N-S number, please indicate so in your bid submission response.
2.16 UNIQUE ENTITY IDENTIFIER NUMBER (UEI)
The County requires a valid UEI number prior to Contract Award. If needed, your company may obtain one at no cost at www.usfcr.com. If you are unable to provide/obtain a UEI number, please indicate so in your bid submission response.
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 8 of 31
SECTION 3. Protest Procedures
Any actual or prospective bidder or respondent who alleges an error or impropriety in the solicitation or award of a contract may submit a grievance or protest to Derek Savosh at derek.savosh2@pw.oc.gov, as set forth herein.
PROTEST PROCEDURES
All protests shall be typed under the protestor’s letterhead and submitted in accordance with the provisions stated herein. All protests shall include at a minimum the following information:
A. The name, address, and telephone number of the protestor;
B. The signature of the protestor or the protestor’s representative;
C. The solicitation or contract number;
D. A detailed statement of the legal and/or factual grounds for the protest; and, E. The form of relief requested.
Protest of Solicitation Specifications:
A. All protests related to solicitation specifications must be submitted to the Deputy Procurement
Agent (DPA), Derek Savosh at derek.savosh2@pw.oc.gov, no later than five (5) business days prior to the Closing Date of the solicitation. Protests received after the five (5) business-day deadline will not be considered by the County.
B. In the event the protest of specifications is denied, and the protestor wishes to continue in the solicitation process, the protestor must still submit a bid/response prior to the close of the solicitation in accordance with the solicitation submittal procedures provided in this solicitation.
Protest of Award of Contract:
A. Protests related to the award of a contract must be submitted to the Deputy Procurement
Agent, Derek Savosh at derek.savosh2@pw.oc.gov, no later than five (5) business days after the
Notice of Solicitation Ranking Results is provided by the DPA.
B. Protests relating to a proposed contract award received after the five (5) business day deadline will not be considered by the County.
C. If the five (5) business day period expires without the receipt of a protest, the department may move forward with the contract award or if necessary, file the item for approval by the Board of
Supervisors.
Protest Process
A. In the event of a timely protest, the County shall not proceed with the solicitation or award of the contract until the DPA issues a decision on the protest.
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 9 of 31
B. Upon receipt of a timely protest, the DPA will, within ten (10) business days of receipt of the protest, issue a decision in writing which shall state the reasons for the actions taken.
C. The County may, after providing written justification, make the determination that an immediate award of the contract is necessary to protect the substantial interests of the County. The award of a contract shall in no way compromise the protester’s right to the protest procedures outlined herein.
D. If the protestor disagrees with the decision of the DPA, the protestor may submit a written appeal to the County Procurement Officer requesting an appeal to the Procurement Appeals Board, in accordance with the process stated below.
APPEALS PROCESS
A. If the protestor wishes to appeal the protest decision of the Deputy Procurement Agent, the protestor must submit, within three (3) business days from receipt of the Deputy Procurement
Agent’s decision, a written appeal to the Office of the County Procurement Officer.
Written appeals must be sent by mail to the address below with a courtesy copy by email;
County of Orange/County Executive Office
County Procurement Office
400 W. Civic Center Drive, 5th Floor
Santa Ana, CA 92701
Attn: County Procurement Officer
CPOAppeals@ceo.oc.gov
B. Within fifteen (15) business days, the County Procurement Officer will review all materials in connection with the appeal, assess the merits of the protest and provide a written determination that shall contain his or her decision on whether the appeal shall be forwarded to the Procurement
Appeals Board.
C. The decision of the County Procurement Officer on whether to allow the appeal to go forward will be final and there shall be no right to any administrative appeals of this decision.
SECTION 4. Scope of Work
4.1 SCOPE OF WORK
I. SCOPE OF WORK:
This Contract is for the purchase and delivery of Aluminum Traffic Legend Stencils (Metric) and Hi-
Visibility Reflective Vinyl Road Construction Signs for use by County of Orange, OC Public
Works/Operations & Maintenance. Contractor shall supply County with Aluminum Traffic Legend mailto:CPOAppeals@ocgov.com
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 10 of 31
Stencils (Metric) and Hi-Visibility Reflective Vinyl Road Construction Signs on an “as-needed” basis for the entire contract term as requested by County.
II. MINIMUM CONTRACT REQUIREMENTS:
1. Road Construction Signs in Temporary Traffic Control (TTC) zones are utilized to warn approaching road users of specific situations or conditions on or adjacent to a roadway. This includes regulatory signs within, or adjacent to the activity site.
2. All material must be new and unopened.
3. Any faulty material shall be immediately replaced by Contractor without any cost to County when all applicable data is supplied.
4. Notify County of any delays on requested items at the time the order is placed.
5. All deliveries must be signed for by a County employee. NO EXCEPTIONS.
6. Any transportation charges and/or delivery charges shall be fully prepaid by Contractor, F.O.B.
Destination.
7. Special rush orders shall be allowed and any freight is to be prepaid and added to invoice(s). A copy of prepaid freight must accompany invoice(s). All fees must have prior approval by
County’s Project Manager.
8. All deliveries/shipments must be received Monday through Thursday, between 7:00 A.M. and 3:00 P.M; excluding County holidays.
9. Deliveries may be required at various locations throughout Orange County as needed, upon request.
10. Contractor must be able to deliver the order within two weeks of the order being placed.
11. Contractor may be required to furnish Stencil and Traffic Sign samples, of which quotes are submitted on, at the request of the County. Samples will be properly stored at OC Public
Works/O&M 222 E. Bristol Lane, Orange, CA 92865. DO NOT SEND SAMPLES UNLESS
DIRECTED TO DO SO BY THE COUNTY PROJECT MANAGER.
III. SPECIFICATIONS - HI-VISIBILITY REFLECTIVE VINYL ROAD CONSTRUCTION SIGNS, STANDS AND
RELATED HARDWARE:
1. Road Construction Signs in Temporary Traffic Control (TTC) zones are utilized to warn approaching road users of specific situations or conditions on or adjacent to a roadway. This includes regulatory signs within, or adjacent to the activity site.
2. Signs must be Reflective Vinyl for day or night use, fluorescent orange for high visibility, made of durable vinyl, feature a gray back and measure 48”x48”. Signs should have sewn pockets and stands should be Dicke Safety Products model SDL1000P post and tube sign holder.
3. All reflective signs are to be in conformance with current State of California Standard
Specifications and the California Department of Transportation Uniform Sign Chart pertaining to Regulatory Signs, Warning Signs, Guide Signs Special Blanks, and Hardware.
Specifications can be found at:
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 11 of 31
• https://dot.ca.gov/programs/safety-programs/sign-specs
• https://mutcd.fhwa.dot.gov/pdfs/11th_Editionr1/mutcd11theditionr1hl.pdf
Sign stands must also comply with MUTCD standards and feature the following:
• Fast and easy deployment with the kick release system.
• Legs that lock into position when fully extended.
• Display 48” reflective signs
• All aluminum and steel construction.
• Telescoping aluminum legs with two-position height adjustment and anti-skid foot pads.
• Minimum height from ground to bottom of panel: 12”
IV. SPECIFICATIONS ALUMINUM TRAFFIC LEGEND STENCILS (METRIC):
See attached Exhibits A, B and C
1. As specified in the MUTCD, markings on highways and roads open to public travel have important functions in providing guidance and information for road users. Major marking types include pavement and curb markings, delineators, colored pavements, channelizing devices and islands.
2. In some cases, markings are used to supplement other traffic control devices such as signs, signals, and other markings. In other instances, markings are used alone to effectively convey regulations, guidance, or warnings in ways not obtainable by the use of other devices.
3. Stencils must be in conformance with current State of California and California Department of
Transportation Standard Specifications
4. Stencil letters and numbers shall measure 16”x8’(see Spec.), with a 2" border and rolled edges;
Bars shall measure 1’x10’, inside measurement with a 4" border and rolled edges.
Specifications can be found at:
California MUTCD
• http://www.dot.ca.gov
• https://dot.ca.gov/-/media/dot-media/programs/safety-programs/documents/ca-mutcd/2026/camutcd-2026-all.pdf
5. DELIVERY LOCATION/INSTRUCTIONS:
OC Public Works/Operations & Maintenance Warehouse #04
222 E. Bristol Street Orange, CA 92865
6. Contractor is required to make delivery arrangements at least 24 hours in advance to ensure the availability of a forklift if required.
7. Receiving hours: Monday – Thursday 7:00 A.M. – 3:00 P.M (No Delivery on Fridays)
8. Other delivery locations may be required during the Contract term as requested by County’s
Project Manager.
V. ITEM LIST:
Contractor shall provide the following items on an as needed basis.
https://dot.ca.gov/programs/safety-programs/sign-specs https://mutcd.fhwa.dot.gov/pdfs/11th_Editionr1/mutcd11theditionr1hl.pdf http://www.dot.ca.gov/ https://dot.ca.gov/-/media/dot-media/programs/safety-programs/documents/ca-mutcd/2026/camutcd-2026-all.pdf https://dot.ca.gov/-/media/dot-media/programs/safety-programs/documents/ca-mutcd/2026/camutcd-2026-all.pdf
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 12 of 31
ITEM DESCRIPTION SIZE UNIT
Hi-Visibility Reflective Vinyl Road
Construction Signs, Stands and Related
Hardware
1. Lane Closed Ahead w/Velcro Right, Left, Center
48” X 48” EACH
2. Road Work Ahead 48” X 48” EACH
3. Road Construction Ahead 48” X 48” EACH
4. Flagman Ahead 48” X 48” EACH
5. Flagman Symbol 48” X 48” EACH
6. Sandblasting Ahead 48” X 48” EACH
7. Striping Work Ahead 48” X 48” EACH
8. Bike Lane Closed 48” X 48” EACH
9. Fiberglass Crosspiece (sign) EACH
10. Metal/Aluminum Stand, Orange, Telescoping Legs, Locking
EACH
Aluminum Stencils, Metric
11. Letter - A 16” X 8’ EACH
12. Letter - B 16” X 8’ EACH
13. Letter - C 16” X 8’ EACH
14. Letter - D 16” X 8’ EACH
15. Letter - E 16” X 8’ EACH
16. Letter - F 16” X 8’ EACH
17. Letter - G 16” X 8’ EACH
18. Letter - H 16” X 8’ EACH
19. Letter - I 16” X 8’ EACH
20. Letter - J 16” X 8’ EACH
21. Letter - K 16” X 8’ EACH
22. Letter - L 16” X 8’ EACH
23. Letter - M 16” X 8’ EACH
24. Letter - N 16” X 8’ EACH
25. Letter - O 16” X 8’ EACH
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 13 of 31
26. Letter - P 16” X 8’ EACH
27. Letter - Q 16” X 8’ EACH
28. Letter - R 16” X 8’ EACH
29. Letter - S 16” X 8’ EACH
30. Letter - T 16” X 8’ EACH
31. Letter - U 16” X 8’ EACH
32. Letter - V 16” X 8’ EACH
33. Letter - W 16” X 8’ EACH
34. Letter - X 16” X 8’ EACH
35. Letter - Y 16” X 8’ EACH
36. Letter - Z 16” X 8’ EACH
37. Number - 0 16” X 8’ EACH
38. Number - 1 16” X 8’ EACH
39. Number - 2 16” X 8’ EACH
40. Number - 3 16” X 8’ EACH
41. Number - 4 16” X 8’ EACH
42. Number - 5 16” X 8’ EACH
43. Number - 6 16” X 8’ EACH
44. Number - 7 16” X 8’ EACH
45. Number - 8 16” X 8’ EACH
46. Number - 9 16” X 8’ EACH
47. Stencil Bars 1’ x 10’ EACH
48. Type IV (L) (R) Arrow Head 6’ X 3’ EACH
49. Type IV (L) (R) Arrow Stem 6’ X 4’ EACH
50. Type VI Arrow 18’ X 5’6” EACH
51. Type I Arrow 9’ X 3’6” EACH
52. Bike Lane Arrow 1’9” X 5’ EACH
53. Bike lane Symbol Without Person 6’ X 3’4” EACH
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 14 of 31
54. Bike Lane Symbol With Person 6’ 6” X 3’4”
EACH
55. Shared Roadway Bicycle Marking 9’3” X 3’3” EACH
56. International Symbol of Accessibility (ISA) Marking
4’5” X 4’5” EACH
57. BIKE Stencil 2’8” X 4’ EACH
58. LANE Stencil 3’2” X 4’ EACH
VI. MISCELLANEOUS ITEMS:
1. Upon County request, Contractor shall submit supplemental proposals for Miscellaneous like items not specified under the Scope of Work of this Contract. Contractor must obtain County’s
Project Manager’s written approval prior to providing any Miscellaneous Items.
2. County reserves the right to obtain supplemental proposals from, and use, alternate sources for the purchase of Miscellaneous Items and to utilize the data provided under this Contract to obtain necessary items.
SECTION 5. OCLSB and DVBE Preference Policies Certification Requirements
County of Orange Local Small Business (OCLSB) Preference and Disabled Veteran Business
Enterprise (DVBE) Preference Policies Certification Requirements
5.1 OCLSB:
Effective January 1, 2020, County of Orange Board of Supervisors adopted the OCLSB Preference policy. Implementation of the OCLSB Preference policy supports local businesses, the local economy and the development of the County’s tax base.
To be certified as a Local Small Business by the County of Orange, a business shall meet (1) and (2) below:
A. Local Business Requirements:
1. Maintains their principal center of operations (i.e. headquarters) within Orange County, and:
2. Has:
a. A business address located in the County of Orange that is not a post office box, or
b. A valid business license or certificate of occupancy issued by the County of Orange or by an Orange County city, or other documentation acceptable to the County of Orange.
B. Small Business Requirements:
1. Must be certified as a Small Business by the State of California Department of General
Services (DGS): and, C. Above requirements must be valid at the time of proposal submittal through the time of award of the contract. The terms and conditions of the contract shall additionally require the contractor to
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 15 of 31 remain in compliance with the Local Business requirements (pursuant to subsection (a) above) through the term of the contract, including any extensions or renewals, and shall provide that contractor’s failure to comply may be construed by County as a material breach of the contract.
5.2 DVBE:
Effective January 1, 2021, County of Orange Board of Supervisors adopted the DVBE Preference policy.
The DVBE Preference policy supports local business opportunity, economy and the development of
County’s tax base, and in addition recognizes the service and sacrifice given by the men and women of our
Armed Forces.
To be certified as a Disabled Veteran Business Enterprise by the County of Orange, a business shall meet
(A) and (B) below:
A. Must be certified as a DVBE by the State of California Department of General Services (DGS);
and, B. DGS DVBE requirements must be valid at the time of bid/proposal submittal through the time of award of the contract.
To participate as an OCLSB and/or DVBE please read and follow the process outlined in COUNTY OF
ORANGE LOCAL SMALL BUSINESS (OCLSB) AND DISABLED VETERAN BUSINESS
ENTERPRISE (DVBE) CERTIFICATION REQUIREMENTS in the SUPPLIER RESPONSES.
*NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E
CONSTRUCTION PROJECTS.
5.3 OCLSB/DVBE CERTIFICATION REQUIREMENTS:
County Of Orange Local Small Business (OCLSB) Preference And Disabled Veteran Business
Enterprise (DVBE) Certification Requirements
A. To participate as an OCLSB and/or DVBE the following requirements must be met:
1. Must be certified with State of California the Department of General Services (DGS) as a
Small Business. - https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
2. Must be certified with DGS as a DVBE. - https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
3. Maintains their principal center of operations (i.e. headquarters) within Orange County.
4. Certification must be valid at the date/time solicitation is closed, and it shall remain in effect at the time of contract award. County reserves the right to verify and/or reject incomplete documents.
5. Complete and sign the Affirmation form attached herein. The signed Affirmation form and the OCLSB Certification are required and must be returned with the solicitation response.
B. OCLSB or DVBE Preference provides for the following:
1. Invitation for Bid – IFB
A five percent (5%) deduction in the original bid price shall be applied to all confirmed https://caleprocure.ca.gov/pages/sbdvbe-index.aspx https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 16 of 31
OCLSB or DVBE bidders for evaluation purposes. If the lowest bidder is a certified OCLSB or DVBE bidder, the contract will be awarded at the certified OCLSB or DVBE’s original bid price. The maximum allowable preference deduction is $100,000.
2. Request for Proposal - RFP
a. No Cost - Any Request for Proposals that does not include cost as a scoring criteria shall instead apply the five percent (5%) or eight percent (8%) preference percentage pursuant to the eligibility requirements above to a scoring criteria in the RFP that makes up no more than twenty percent (20%) of the total RFP.
b. With Cost - An additional five percent (5%) shall be applied to the total cost of each certified OCLSB or DVBE to obtain their final score. If the final score of any OCLSB or
DVBE matches the final score of a respondent who is not an OCLSB or DVBE, preference shall be given to the certified OCLSB or DVBE. If two or more OCLSBs and/or DVBEs have the same final score, the County shall determine the contract award based on the County’s best interests. Notwithstanding these preference procedures, the
Orange County Board of Supervisors reserves the right to award contracts in any other permissible manner in consideration of the County’s best interests.
C. Dual OCLSB and DVBE Preference provides for the following:
1. Business Certified as OCLSB and DVBE
If a State-certified OCLSB is also a State-certified DVBE, the preference given to that business shall be 8% instead of 5%.
D. Subcontractors
If bidder is submitting subcontractors to qualify for the OCLSB or DVBE preference, bidder must demonstrate through the Staffing Plan that 20% of the total bid amount is allocated to the OCLSB and/or DVBE subcontractor(s).
*NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E
CONSTRUCTION PROJECTS.
SECTION 6. Electronic Fund Transfer (EFT)
If awarded, the County offers Bidder the option of receiving payment directly to its bank account via an
Electronic Fund Transfer (EFT) process in lieu of a check payment. Payment made via EFT shall also receive an Electronic Remittance Advice with the payment details via e-mail. An e-mail address shall need to be provided to County via an EFT Authorization Form. A copy of the EFT form is attached as an Exhibit to this solicitation.
SECTION 7. Pricing
HI-VISIBILITY REFLECTIVE VINYL ROAD CONSTRUCTION SIGNS, STANDS AND
RELATED HARDWARE
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 17 of 31
Line Item Description Size Quantity Unit of
Measure Unit Cost Total
1 Lane Closed Ahead w/Velcro Right, Left, Center
48” X 48” 1 Each
2 Road Work Ahead 48” X 48” 1 Each
3 Road Construction
Ahead 48” X 48” 1 Each
4 Flagman Ahead 48” X 48” 1 Each
5 Flagman Symbol 48” X 48” 1 Each
6 Sandblasting Ahead 48” X 48” 1 Each
7 Striping Work Ahead 48” X 48” 1 Each
8 Bike Lane Closed 48” X 48” 1 Each
9 Fiberglass Crosspiece
(sign) 1 Each
10 Metal/Aluminum
Stand, Orange, Telescoping Legs, Locking
1 Each
TOTAL
ALUMINUM STENCILS, METRIC
Line Item Description Size Quantity Unit of
Measure Unit Cost Total
11 Letter - A 16” X 8’ 1 EACH
12 Letter - B 16” X 8’ 1 EACH
13 Letter - C 16” X 8’ 1 EACH
14 Letter - D 16” X 8’ 1 EACH
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 18 of 31
Line Item Description Size Quantity Unit of
Measure Unit Cost Total
15 Letter - E 16” X 8’ 1 EACH
16 Letter - F 16” X 8’ 1 EACH
17 Letter - G 16” X 8’ 1 EACH
18 Letter - H 16” X 8’ 1 EACH
19 Letter - I 16” X 8’ 1 EACH
20 Letter - J 16” X 8’ 1 EACH
21 Letter - K 16” X 8’ 1 EACH
22 Letter - L 16” X 8’ 1 EACH
23 Letter - M 16” X 8’ 1 EACH
24 Letter - N 16” X 8’ 1 EACH
25 Letter - O 16” X 8’ 1 EACH
26 Letter - P 16” X 8’ 1 EACH
27 Letter - Q 16” X 8’ 1 EACH
28 Letter - R 16” X 8’ 1 EACH
29 Letter - S 16” X 8’ 1 EACH
30 Letter - T 16” X 8’ 1 EACH
31 Letter - U 16” X 8’ 1 EACH
32 Letter - V 16” X 8’ 1 EACH
33 Letter - W 16” X 8’ 1 EACH
34 Letter - X 16” X 8’ 1 EACH
35 Letter - Y 16” X 8’ 1 EACH
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 19 of 31
Line Item Description Size Quantity Unit of
Measure Unit Cost Total
36 Letter - Z 16” X 8’ 1 EACH
37 Number - 0 16” X 8’ 1 EACH
38 Number - 1 16” X 8’ 1 EACH
39 Number - 2 16” X 8’ 1 EACH
40 Number - 3 16” X 8’ 1 EACH
41 Number - 4 16” X 8’ 1 EACH
42 Number - 5 16” X 8’ 1 EACH
43 Number - 6 16” X 8’ 1 EACH
44 Number - 7 16” X 8’ 1 EACH
45 Number - 8 16” X 8’ 1 EACH
46 Number - 9 16” X 8’ 1 EACH
47 Stencil Bars 1’ x 10’ 1 EACH
48 Type IV (L) (R) Arrow
Head
6’ X 3’ 1 EACH
49 Type IV (L) (R) Arrow
Stem
6’ X 4’ 1 EACH
50 Type VI Arrow 18’ X 5’6” 1 EACH
51 Type I Arrow 9’ X 3’6” 1 EACH
52 Bike Lane Arrow 1’9” X 5’ 1 EACH
53 Bike lane Symbol
Without Person
6’ X 3’4” 1 EACH
54 Bike Lane Symbol
With Person
6’ 6” X 3’4” 1 EACH
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 20 of 31
Line Item Description Size Quantity Unit of
Measure Unit Cost Total
55 Shared Roadway
Bicycle Marking
9’3” X 3’3” 1 EACH
56 International Symbol of
Accessibility (ISA)
Marking
4’5” X 4’5” 1 EACH
57 BIKE Stencil 2’8” X 4’ 1 EACH
58 LANE Stencil 3’2” X 4’ 1 EACH
TOTAL
SECTION 8. Vendor Responses
8.1 BID VALIDITY: *
Bids will be valid for a period of 120 days after the solicitation closing date.
☐ Please confirm
*Response required
8.2 CONTRACTOR INFORMATION
8.2.1 Name of Bidder*
Please state the Name of Bidder here.
If Bidder is a corporation, the legal name of the corporation shall be set forth in this section as the Name of Bidder and the name, title, and person authorized to sign contracts on behalf of the corporation shall be stated as well.
If Bidder is a partnership or joint venture, the true name of the firm shall be set forth as the Name of
Bidder and the name of the partner authorized to sign contracts on behalf of the partnership or joint venture shall be stated as well.
If submittal of this bid or signature of any document submitted with this bid is by an agent other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with County prior to Bid opening, or must be submitted with the Bid; otherwise, the Bid may be rejected as non-responsive. You may upload this power of attorney under Additional Information later in this bid response.
*Response required
8.3 COMPANY PROFILE & REFERENCES
8.3.1 Company Legal Name*
*Response required
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 21 of 31
8.3.2 Company Legal Status*
Please state the status here (Corporation, Partnership, Sole Proprietor, etc.)
*Response required
8.3.3 Unique Entity Identifier Number (UEI)*
The County requires a valid UEI number with active registration status. Your company may obtain one at no cost at https://sam.gov/entity-registration.
*Response required
8.3.4 California Secretary of State registration - active and in good standing * Please upload your active certificate from the California Secretary of State.
CA Sec. of State Verification Link = https://bizfileonline.sos.ca.gov/search/business
*Response required
8.3.5 D-U-N-S Number*
Please provide your company's DUNS number.
The County requires a valid D-U-N-S number prior to Contract Award. If needed, your company may obtain one at no cost at www.dnb.com. If you are unable to provide/obtain a D-U-N-S number, please indicate so in lieu of the number.
*Response required
8.3.6 Federal Taxpayer ID Number*
*Response required
8.3.7 California Department of Justice, Office of Attorney General active registration* For Non-Profit and/or Charitable organizations, please provide your active (registration status is current). All others enter N/A.
• RCT Registration Number
• Renewal/Expiration Date
DOJ Verification Link - https://rct.doj.ca.gov/Verification/Web/Search.aspx?facility=Y
*Response required
8.3.8 Active Licenses*
Please state all active licenses issued by the California State Contractor's License Board to the company whose legal name is above.
*Response required
8.3.9 Corporate Office Address*
What is the address of the company's corporate office? Please provide the full street/mailing address.
*Response required
8.3.10 Local Business Address(es)*
https://sam.gov/entity-registration https://bizfileonline.sos.ca.gov/search/business http://www.dnb.com/ https://rct.doj.ca.gov/Verification/Web/Search.aspx?facility=Y
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 22 of 31
Please provide the local business address for the company named above. If there are multiple local addresses then please provide all.
• Full address:
• Telephone Number:
• E-mail Address:
*Response required
8.3.11 Length of Time Firm Has Been In Business*
Please clearly state, in months and years, how long your firm has been in business.
*Response required
8.3.12 Length of Time At Current Location*
Please clearly state, in months and years, how long your firm has been in business at its current location.
*Response required
8.3.13 Regular Business Hours*
*Response required
8.3.14 Regular Holidays and Hours When Business Is Closed*
*Response required
8.3.15 Corporation?*
Is your firm incorporated?
☐ Yes
☐ No
*Response required
When equals "Yes"
8.3.16 State of Incorporation?*
You have indicated that your firm is incorporated. Please provide the name of the State of
Incorporation.
*Response required
When equals "Yes"
8.3.17 Contract Signature Authority - Executive Signature*
If incorporated, please provide the name, contact number, and email of the person who would provide this signature authority. The Executive Signer Authority comes from the President, Vice-President, or
Chairperson of the Board.
• Contact Full Name:
• Contact Number:
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 23 of 31
• E-mail Address:
*Response required
When equals "Yes"
8.3.18 Contract Signature Authority - Financial Signature*
If incorporated, please provide the name, contact number, and email of the person who would provide this signature authority. The Financial Signer Authority comes from the Secretary, Assistant
Secretary, Chief Financial Officer, or Treasurer.
• Contact Full Name:
• Contact Number:
• E-mail Address:
*Response required
When equals "No"
8.3.19 Contract Signature Authority*
If not incorporated, please provide the name, contact number, and email of the person who has the binding and signature authority of this contract.
• Contact Full Name:
• Contact Title:
• Contact Number:
• E-mail Address:
*Response required
8.3.20 Sole Proprietor Under Different Name?*
Is your firm a sole proprietor doing business under a different name?
☐ Yes
☐ No
*Response required
When equals "Yes"
8.3.21 Sole Proprietor's Name*
You have indicated that your firm is a sole proprietorship doing business under a different name.
Please provide the sole proprietor's name and the name you are doing business under.
*Response required
8.3.22 Contact Person for Solicitation*
Please provide the following in relation to the point of contact for this solicitation:
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 24 of 31
• Contact Person Full Name
• Contact Person Telephone Number
• Contact Person Email Address
*Response required
8.3.23 Project Manager*
Please provide the following regarding who will be your project manager for this project:
• Project Manager Full Name
• Project Manager Telephone Number
• Project Manager Email Address
*Response required
8.3.24 Contact Person for Accounting*
Please provide the following in relation to the point of contact for Accounting:
• Contact Person Full Name
• Contact Person Telephone Number
• Contact Person Email Address
*Response required
8.3.25 Emergency Contact*
In the event of an emergency of declared disaster, the following is required:
• Contact Person Full Name (during non-business hours)
• Contact Person Telephone/Cellphone Number
• Contact Person Email Address
*Response required
8.3.26 References*
Do you have letters from at least three references (not including County of Orange References) that include:
• Reference Names
• Addresses of site where work was performed
• Contact Name
• Telephone Number of Contact
• Contact Email Address
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 25 of 31
• Contract Effective Dates
• Contract Amount
• Brief Contract Descriptions
If you do not have letters you will be able to provide the same information electronically in the next question by answering "No" here.
☐ Yes
☐ No
*Response required
When equals "Yes"
8.3.27 References - Letters*
Please upload your letters from at least three references (not including County of Orange References) that include:
• Reference Names
• Addresses of site where work was performed
• Contact Name
• Contact Email Address
• Telephone Number of Contact
• Contract Effective Dates
• Contract Amount
• Brief Contract Descriptions
*Response required
When equals "No"
8.3.28 References - Information*
Please provide the following information regarding at least three references (not including County of
Orange References):
• Reference Names
• Addresses of site where work was performed
• Contact Name
• Telephone Number of Contact
• Contact Email Address
• Contract Effective Dates
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 26 of 31
• Contract Amount
• Brief Contract Descriptions
The references will be contacted for verification, and these contacts must be current and able to respond promptly.
*Response required
8.4 BIDDER CERTIFICATION
8.4.1 Conflict of Interest*
Bidder must certify either Yes or No below:
Bidder certifies current/past financial, business or other relationship(s) with the County exist/existed as follows:
A. (Yes) Disclose any financial, business or other relationship with the County of Orange, any other entity that the Orange County Board of Supervisors governs*, or any Orange County Board member, officer or employee, which could affect or influence award of the contract for the services you propose to provide.
B. (No) Bidder certifies that no relationships exist/existed as outlined in item I above.
*Orange County Board of Supervisors govern: All Assessment Districts, All Community Facilities
Districts, All Reassessment Districts, Housing and Community Development Commission, Housing
Successor Agency to the Orange County Development Agency, In-Home Supportive Services Public
Authority, Industrial Development Authority For Orange County, Local Redevelopment Authority
Marine Corp Air Station (MCAS) El Toro, Orange County Financing Authority, Orange County
Flood Control District, Orange County Housing Authority, Orange County Housing Authority
Acting As the Housing Successor Agency, Orange County Public Financing Authority, Orange
County Special Financing Authority, South Orange County Public Financing Authority, and the
Successor Agency to the Orange County Development Agency
☐ Yes
☐ No
*Response required
When equals "Yes"
8.4.2 Disclose any financial, business or other relationship with the County of
Orange, any other entity that the Orange County Board of Supervisors governs*, or any
Orange County Board member, officer or employee, which could affect or influence award of the contract for the services you propose to provide.* *Response required
8.4.3 Litigation*
Bidder must certify either Yes or No below:
Bidder certifies current/past litigation as follows:
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 27 of 31
A. (Yes) Bidder shall provide detailed information regarding litigation (court and case number), liens, or claims involving Bidder, or any company that holds a controlling interest in Bidder, against the County of Orange in the past seven (7) years.
B. (No) Bidder certifies that Bidder or any proposed subcontractors do not have any past or current litigation.
☐ Yes
☐ No
*Response required
When equals "Yes"
8.4.4 Bidder shall provide detailed information regarding litigation (court and case number), liens, or claims involving any proposed subcontractors, or any company that holds a controlling interest in subcontractor firm(s), against the County of Orange in the past seven (7) years.* *Response required
8.4.5 Name/Ownership Changes:*
Respondent must certify either Yes or No below:
A. (Yes) Respondent certifies past company name changes and/or ownership changes, for
Respondent’s firm and any proposed subcontractor firm, as follows:
1. Respondent shall provide detailed information regarding any company name changes
(including legal business names) in the past seven (7) years.
B. (No) Respondent certifies that Respondent or any proposed subcontractors have not had any company name change or ownership changes in the past seven (7) years.
☐ Yes
☐ No
*Response required
When equals "Yes"
8.4.6 Bidder shall provide detailed information regarding any company ownership changes (including legal business names) in the past seven (7) years. * *Response required
8.4.7 Is your firm a County Of Orange Local Small Business (OCLSB) or a Disabled
Veteran Business Enterprise (DVBE)?* To participate as an OCLSB and/or DVBE, the requirements in the OCLSB AND DVBE PREFERENCE
POLICIES CERTIFICATION REQUIREMENTS section must be met.
☐ Yes
☐ No
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 28 of 31
When equals "Yes"
8.4.8 County of Orange Local Small Business (OCLSB) and/or Disabled Veteran
Business Enterprise (DVBE) Affirmation* Please download the below documents, complete, and upload.
• Local_Small_Business_(OCLSB...
*Response required
When equals "Yes"
8.4.9 DVBE Certification Number*
To be certified as a Disabled Veteran Business Enterprise by the County of Orange, a business shall meet (1) and (2) below:
A. Must be certified as a DVBE by the State of California Department of General Services (DGS);
and, B. DGS DVBE requirements must be valid at the time of bid/proposal submittal.
Enter your DVBE Certification Number. If you do not have it then please state "N/A" here.
*Response required
8.4.10 SBA Certification Number*
If you do not have an Small Business Administration (SBA) Certification Number then please state "N/A" here.
*Response required
8.4.11 Statement of Compliance*
A. (Yes): Bidder certifies it is in strict compliance with this solicitation, including, but not limited to the terms and conditions set forth in the Model Contract and its Attachments and Exhibits, and no exceptions are proposed.
B. (No): Bidder certifies it is in strict compliance with this solicitation, including the terms and conditions set forth in the Model Contract and its Attachments and Exhibits, except for those exceptions expressly listed as required by this IFB and attached hereto. Attachments for each proposed exception to this IFB, including, but not limited to the Model Contract, must include:
1. The complete provision Bidder is taking exception to;
2. The IFB page number and section of the provision Bidder is taking exception to;
3. The suggested rewording (i.e., Microsoft Word track changes);
4. Reason(s) for submitting the proposed exception; and
5. Any impact the proposed exception may have on the services to be provided.
https://government-project.s3.us-west-2.amazonaws.com/132866/87d0a77d-34df-4ffa-9038-a809ea7e6d21_Local_Small_Business_%28OCLSB%29_Preference_and_Disabled_Veterans_Business_Enterprise_%28DVBE%29_Affirmation.docx
ROAD CONSTRUCTION SIGNS, IFB-080-3080504-DS Page 29 of 31
☐ Yes
☐ No
*Response required
When equals "No"
8.4.12 Provide exceptions to the requirements of this solicitation including the terms…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .