This notice solicits capability statements for on-call emergency spill response services at Altus Air Force Base in Oklahoma. The selected contractor must be able to respond within five hours if heavy equipment is required or within four hours for other spills, and must ensure personnel are available at all times to initiate spill response activities. The contractor will provide personnel, equipment, and materials to respond to spills as defined in Altus' Spill Prevention Control and Countermeasure Plan and Facility Response Plan, including recovering and disposing of spilled materials, cleaning affected areas and equipment, and sampling to verify sites are sufficiently remediated. Capability statements must include technical data and cost information demonstrating the ability to meet these requirements, and are due by February 27, 2024. The 97th Contracting Squadron at Altus Air Force Base will issue a blanket purchase agreement for these services.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

On-Call Emergency Spill Response Services

For

Altus Air Force Base, Oklahoma

1.0. GENERAL

This is a non-personnel services contract to provide specialized environmental work at Altus Air Force Bases (AFB). The Government shall not exercise any supervision or control over the contractor, their sub-contractors or suppliers performing the services herein. Sub-contractors and suppliers shall be accountable solely to the contractor who, in turn, is responsible to the Government.

1.1 STORM WATER COMPLIANCE/WATER QUALITY

1.1.1. On-Call Spill Response

The contractor shall provide all manpower, equipment, and materials necessary to provide emergency and post-emergency response support for Altus’ Spill Response Team. Critical response capabilities specific to Altus AFB include but are not limited to incidents involving fuel, hydrazine, PCBs, sewage spills, sanitary sewer overflows. The contractor shall provide appropriate equipment including, but not limited to, vacuum trucks and heavy equipment to include diaphragm pumps, floating skimmer, metal 25 cubic yard roll-off containers, fully equipped response vans and/or trailers, etc. The contractor must be equipped and qualified to handle these issues/situations.

The contractor shall provide personnel, equipment, and materials to respond to Altus within five hours of notification if heavy duty equipment (e.g. a vacuum truck) is required. The contractor shall respond to other spills within four hours of notification. The contractor shall ensure that there is someone available to initiate spill response activities at all times.

A list of Altus AFB personnel authorized to initiate a response action by the contractor will be provided to the contractor and all relevant emergency response organizations. Upon receipt of a request to respond to a spill, the contractor shall call the Contracting Officer and provide their name, organization, the name of the person requesting the response action, reason given for response action request, time of request, name of lead individual responding, and contact telephone number. If a spill occurs after hours and Contracting Officer approval or authorization is not needed in regard to exceeding the expenditure limit, voice mail messages are acceptable.

The contractor shall respond to spills as defined in the Altus Spill Prevention Control and Countermeasure (SPCC) and Facility Response Plan (FRP), including neutralizing, deactivating, and/or adsorbing any remaining spilled material as appropriate, and then recovering and cleaning up the spilled material and materials contaminated by the spill. Spilled materials shall be recovered for reuse/recycling when possible. The contractor shall containerize contaminated soil or other media, clean exposed surfaces, decontaminate materials and equipment contaminated by the spill, and take other immediate actions intended to mitigate or eliminate long term impacts to the environment and to permit government workers to resume normal work activities near the spill site.

The contractor shall ensure that wastes that may be incompatible with the released material are not treated, stored, or disposed of in the affected area until the clean-up procedures are completed. All response action material, equipment, and debris that cannot be decontaminated shall be collected and containerized for disposal. The Government will be responsible for disposal costs. The contractor shall sample containerized material, soils, and other possibly affected media such as air, ground water, or drinking water, as necessary to determine if the spill site is clean.

Upon completion of the response action, the contractor shall provide a brief report describing the actions taken including the timeframe for these actions. A separate section shall be appended to the report containing recommendations for changes in procedures or facilities that may mitigate impacts in future events. The contractor may be required to attend a meeting to brief the Altus AFB Project Manager, Contracting Officer, Senior Fire Official/Incident Commander, and/or other personnel, to ensure transfer of all pertinent information relating to the response action to Altus AFB personnel. Costs for completing this task will be agreed to in advanced (via confirmation notices) on a fixed price basis.