ALR_Alligatorweed_QASP.pdf

PDF 135 KB Posted

Attached to
Herbicide Treatment of AlligatorweedOn Alligator
Solicitation number
140FS323Q0222
Issued by

About this file

This Quality Assurance Surveillance Plan outlines monitoring requirements for a ground herbicide treatment contract to control Phragmites. The contractor will be required to use only approved chemicals applied at the proper rates and in adherence with best management practices. Monitoring will include verification of approved water and chemical sources prior to spraying, as well as proper mixing, handling, and spill equipment. Notification must be provided 48 hours before each application. The contracting officer's representative will monitor application areas and plant response two to four weeks after treatment through on-site observations and GPS/GIS comparisons to contractor-supplied treatment polygons. Adherence to application requirements, coordination procedures, and achievement of control objectives will be assessed.

View the file

Other files

File Type Posted
PWS_Alligatorweed_Spraying.pdf PDF
Sol_140FS323Q0222.pdf PDF
Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

GROUND HERBICIDE TREATMENT OF PHRAGMITES

CONTRACT NO.: Specify contract number

CONTRACTOR: Specify name of contractor

CONTRACTING OFFICER: Specify name of Contracting Officer

INSPECTOR(S): Kelley Van Druten

TASK /

DESCRIPTION

WHAT

WHO

WHEN

WHERE

METHOD

Provide clean water • Water supply POC • Prior to start of spraying

• Staging site • direct observation;

random selection Use of approved chemicals

• Brand

• Rate

• Adherence to

BMPs

POC • Prior to start of spraying

• Prior to start of spraying

• Random during application

• Staging site

• Verbally

• Treatment site

• Direct observation;

random selection

• Direct observation

• Direct observation;

random selection

Proper mixing and handling

• Spill equipment Tank cleanliness

POC Prior to start of spraying

Staging site Direct observation

Coordination Notification prior to spraying

POC 48 hours prior to application

Verbal or phone text

Direct observation

Herbicide application Area Treated/ Plant response

POC 2-4 weeks after treatment

Treatment sites Direct observation and measurement with GPS/GIS; comparison to contractor supplied treatment polygons

File details come from the government source that posted it. Updated .