About this file
This is a 100% submittal structural plans document prepared by Mott MacDonald for Escambia County, Florida, detailing the bridge replacement project on Alger Road over Unnamed Branch (Bridge No. 484322) in the Town of Century. The project involves replacement of an existing double corrugated metal pipe (CMP) culvert structure with a new prestressed concrete slab beam bridge featuring a 27'-10" span and 58'-0" overall length with approach slabs. The bridge will be supported by helical pile foundations at two bents, with 32 total piles distributed across four rows (8 piles per row per bent). The structure plans include detailed specifications for 5 prestressed slab units, guardrails (TL-2 roadway rating for speeds of 45 mph and less), riprap protection, sheet pile abutment walls, and utility support details for an existing 6-inch water line passing beneath the structure. Concrete strength requirements include f'c = 8.5 ksi for precast slab units, f'c = 5.5 ksi for pile caps and keyways, and f'c = 4.5 ksi for approach slabs, with design loadings based on HL-93 live loads and AASHTO LRFD methodology. The plans reference a 0.73 square-mile drainage area with a design flood discharge of 403 cfs at 100-year frequency and include comprehensive foundation layout, abutment sections, bearing details, and expansion joint specifications.
The project includes significant infrastructure components: 88 cubic yards of channel excavation, 315 tons of riprap rubble for bank and shore protection, 126 tons of bedding stone, 83.5 linear feet of prestressed slab beams, 4,351 pounds of reinforcing steel for approach slabs, 940 pounds for substructure, 339 pounds of post-tension bars, 2,452 square feet of permanent sheet piling, and 187.5 linear feet of TL-2 guardrail. The document specifies compliance with FDOT Standard Specifications for Road and Bridge Construction (FY 2026-27), Escambia County technical specifications, and AASHTO LRFD Bridge Design Specifications (9th Edition). All work shall conform to design temperatures ranging from 70°F mean with ±35°F variation and wind load design of 170 mph basic speed. The plans were completed in August 2026 and prepared under Consultant Project No. 502101595 by registered professional engineer Bart F. Hendricks, P.E., with registration number 51391, indicating these are final construction documents for the federally-funded CDBG-DR HS019 project with proposals due September 14, 2026.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
Miles
0 0.5 11 reproduction.
Note: The scale of these plans may have changed due to
CONSULTANT PROJECT NO. 502101595
Registry #155
Vendor No. 591294824004
(850)484-6011
Pensacola, Florida 32502
Suite 700
220 West Garden Street
Mott MacDonald
PLANS PREPARED BY:
PENSACOLA
NAVAL AIR
STATION
SHERMAN
FIELD
STATION
CORRY
NTTC
FIELD
SAUFLEY
PENSACOLA
REGIONAL
AIRPORT
McDAVID
ISLAND
ONO PERDIDO
KEY
TO
MOBILE
A
L
A
A
FLOWER
A
B
M
HillWalnut
L
ATMORE
A A B
SANTA
ROSA
CANTONMENT
PENSACOLA
TALLAHASSEE
BASE LINE
TO MILTON
QUINTETTE
INOMOL
CENTURY
A M
FLOMATON
TO
Pensacola Beach
SANTA
ROSA
COUNTY
ISLAND
TO MILTON
d
B a y d i o
Per
TRACOASTAL
NI
WATERWAY
INTRACOASTAL
WATERWAY
B A L D
W
IN
C
O U
N T Y
R i v e r
P e r d i d o
B a y
E s c a m b i a
O F
P e n s a c o l a
G U
L F
M E
X I C
O
E a s t
B a y
E s c a m b i a
R i v e r
B a y
ESCAMBIA COUNTY
A
C O
U N
T Y
S A
N T
A
R O
S A
10 9
27 28
29 31
2 1
3 2
14 13
11 12
18 16
11 12
5 4
29 28
31 9
53 2
3 5
36 31
15 14
22 23
18 17
3 2
1 6
13 18
4 3
20 21
16 15
13 18
2 1
8 9
1814 13
34 35
2119 20
31 32
24 19
27 26 25
14 13
4 3
8 9
20 21
6 5
31 32
8 9
3 2
20 22
23 24
30 29
19 20
18 17
19 20
31 32
3534 3136 32 33 34
31 32 3433 36
33 34
T R
A N S
C S
X
C S
X
S S
S Y S
T E
M
S E
A B
O A
R D
ST. L.S.F. RY.
RY.LST SF
R O
A D
I L
R A
R Y
.S F
L S
T
R R
R R
R A I L
W A
Y F
R A
N C I S
C O
S A
N A
N D
S T
L O
U I S
4A
4A
4A
99A
99A
97A
97A
97A
297A
297A
Power
I psco
Eagle
Goulding dgeE
Big
Power
I psco
Eagle
Goulding dgeE
Big
SHEET DESCRIPTIONSHEET NO.
INDEX OF STRUCTURE PLANS
PROJECT SITE
ENGINEERING DEPARTMENT
ESCAMBIA COUNTY, FLORIDA
THE TOWN OF CENTURY
PLANS PROPOSED FOR
(BRIDGE NO. 484322)
STRUCTURE PLANS
This drawing is the property of Mott MacDonald Florida, LLC., and may not be reproduced without written permission. This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Mott MacDonald was commissioned. Mott MacDonald accepts no responsibility for this document to any party other than the person or entity by whom it was commissioned.
N O
T I C
E
T H
E O
F F
I C
I A
L R
E C
O R
D O
F T
H I S
S H
E E
T I
S T
H E
E L
E C
T R
O N
I C
F I L
E D
I G
I T
A L
L Y
S I G
N E
D A
N D
S E
A L
E D
U N
D E
R R
U L
E
G
.0
F
.A .C
PROJECT MANAGER:
REG. FL ENG. NO:
SECTION/TOWNSHIP/RANGE:DISTRICT:
PROJECT ENGINEER:
SIGNATURE: DATE:
51391BART F. HENDRICKS, P.E.
SHEET NUMBER:
5 / 5N / 30W
R U
S
/5
/2
:5
:5
A
M Z
S
T R
U C
T \5
C
D B
G \A lg e r \D r a w in g s \S tr u c t\
B
K e y s h e e t.
d g n
30.979 N, 87.260 W
Bridge Location
R
R
B-01
T o M cD a vi d
To Jay
T 5 N T 5 N
T o
F lo m a to n
BRIDGE REPLACEMENT
ALGER ROAD OVER UNNAMED BRANCH
STANDARD INDEX DESCRIPTIONINDEX NO.
STANDARD PLANS FOR BRIDGE CONSTRUCTION
GUARDRAIL536-001
BORING LOGS (2 OF 2) (for information only)B1-20
BORING LOGS (1 OF 2) (for information only)B1-19
BRIDGE LOAD RATINGB1-18
SHEET PILE WALL NOTESB1-17
UTILITY SUPPORT DETAILSB1-16
GUARDRAIL DETAILS (2 OF 2)B1-15
GUARDRAIL DETAILS (1 OF 2)B1-14
FRAMING PLANB1-13
TABLE OF VARIABLES - SLAB UNITSB1-12
PRESTRESSED BEAM SECTIONSB1-11
TYPICAL SECTION AND APPROACH SLAB DETAILSB1-10
ABUTMENT SECTIONS AND DETAILSB1-09
PILE CAP SECTIONS AND DETAILSB1-08
ABUTMENT WALL ELEVATIONB1-07
RIPRAP DETAILSB1-06
PIPE PROTECTION DETAILSB1-05
ABUTMENT PLAN AND ELEVATIONB1-04
FOUNDATION LAYOUTB1-03
BRIDGE HYDRAULIC RECOMMENDATIONSB1-02
PLAN AND ELEVATIONB1-01
SUMMARY OF STRUCTURE QUANTITIESBQ1-01
GENERAL NOTESB-02
BRIDGE KEYSHEET & INDEX OF DRAWINGSB-01
AUGUST 2026
100% SUBMITTAL
R
MIKE SEGARS
2025.084/.085
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K E
D
B Y
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T
IO
N e ll o w
H ig h li g h te r)
C H
E C
K E
R
R P
(R e d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q o rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A S
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q
(B lu e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
2"Prestressed Slab Units
3"Pile Caps
3"Approach Slabs Bottom
2"Approach Slabs Top & Sides
B-02
G E
N E
R A
L N
O T
E S
A L
G E
R R
O A
D B
R
ID
G E
Designation
Size
Quantity
CONCRETE STRENGTH TABLE
CONCRETE CLASS
Superstructure Substructure
Concrete Steel
IN STRUCTURE
LOCATION OF CONCRETE
STRENGTH (PSI)
COMPRESSIVE
MIN 28-DAY
Aggressive
Slightly
GENERAL NOTES
Unless Otherwise NotedUON
TypicalTyp.
Right of WayR/W
Normal High WaterNHW
Minimum Vertical ClearanceMVC
Minimum Horizontal ClearanceMHC
MemberMbr.
Front Face Of BackwallFFBW
Soil: pH = 5.27 Moderately Aggressive Extremely Aggressive
Class �: (Bridge Deck) f'c=4.5 ksi Approach Slabs for opening to loads.
and may be increased to reduce time to reach critical strength requirements
Concrete strength shown in the Concrete Strength Table is minimum required
346. Precast concrete shall conform with ALDOT Specifications Section 512.
All Cast-in-Place Concrete Shall Conform with FDOT Specifications Section
Concrete:2.
Typical Reinforcing Bars Are Designated As: 4~4A1
Reinforcing Steel: Grade 60 Carbon steel per Specifications Section 9311.
MATERIALS:H.
Exempt per Structures Design Guidelines 2.3.1
Seismic5.
wind speed of 170 mph
As per AASHTO and as modified by Structures Design Guidelines with a basic
Wind Load4.
Concrete Cover: (minimum unless otherwise noted)3.
or vertically unless otherwise noted.
All dimensions in these plans are measured in feet either horizontally
PLAN DIMENSIONS:I.
accordance with AASHTO M-232 unless otherwise noted.
All steel bolts and hardware shall be ASTM A307 galvanized in a.
Steel Hardware5.
allow post-tensioning within 7 days after placing keyway concrete.
compressive strength of 4.5 ksi. Adjust concrete mix design to
c. Stress Post-Tension bars after keyway concrete reaches a compressive strength of 3.0 ksi.
concrete reaches initial set until the concrete reaches a
b. The concrete beams should not be disturbed from the time keyway keyways with concrete.
a. Pressure wash precast slab unit keyways just prior to filling
Keyway Concrete4.
dimension is noted to face of concrete.
location of reinforcing steel are to centerline of bar except where clear
Section 415 for allowable tolerances. All dimensions pertaining to the fabrication tolerances unless shown as "minimum cover". See Specifications
Concrete cover dimensions shown in the plans do not include placement and
WithW/
Top ofT/
Edge of PavementEOP
ElevationEL.
Expansion JointEJ
Each FaceE.F.
Design High WaterDHW
Counter SinkCSK
Bridge NumberBN
Bottom ofB/
ABBREVIATIONS:
slab concrete.
specifications a minimum of (2) weeks prior to placing approach
Perform backfill and compaction in accordance with the
Q. BACKFILL:
absorption.
M153 or AASHTO M213 modified to allow a maximum of 25% water expansion joint material shall meet the requirements of AASHTO instructions and the joint details shown in the plans. Pre-formed as Dow Corning 890-SL. Install using the manufacturer's written
Joint Sealant shall be a low-modulus, self-leveling silicone such
P. JOINT SEALANT:
Other Concrete Surfaces - Class 3 Surface Finish.
Riding Surfaces - Broomed Finish
O. CONCRETE SURFACE FINISH:
Alger Road will be closed for construction.
TRAFFIC CONTROL:N.
and Elevation for the existing pipe locations.
Existing pipe culverts shall be Demolished and Disposed. See Plan
M. EXISTING STRUCTURES:
to those shown shall require approval of the Engineer.
indicated in the plans. Additional construction joints or alterations
Construction joints will be permitted only at the locations
JOINTS IN CONCRETE:L.
Number: 484322 accordance with the Traffic Railing Standard Plans:
Place the following bridge number on the traffic railings in
BRIDGE NAME AND NUMBER:K.
disposition of utilities.
See the Roadway plans for Utility Owner information and 3.
locations. Locate utilities prior to installing piles.
The utilities shown in the Bridge Plans are at approximate 2.
For locations of existing utilities, See Plan and Elevation Sheet. 1.
UTILITIES:J.
Concrete Thermal Coefficient: 0.000006 per °F
Range: 70 °F
Fall From Mean: -35 °F
Rise From Mean: +35 °F
Mean: 70 °F
3. Design Temperatures properties.
thickness in the dead load but omitted from the design of the section
None. The beam depth includes a 1/2" sacrificial Future Wearing Surface
150 pcfReinforced Concrete
13 plfTraffic Railings
Dead Loads:2.
FL-120 for load rating
HL-93 with Dynamic Load Allowance
1. Live Loads:
DESIGN LOADINGS:G.
LEAPBridge Concrete V20.00.00.58
STAAD Pro V8i SS5
STRUCTURAL ANALYSIS PROGRAMS: F.
equations.
AASHTO Bridge Design Specifications (9th Edition) Live Load Distribution and fatigue limit states. Live Load distribution factors determined from
Load and Resistance Factor Design (LRFD) method using strength, service
DESIGN METHODOLOGY:E.
ENVIRONMENT
ITEM COVERENVIRONMENT:D.
adjustment, and are expressed in U.S. Survey Feet.
Elevations shown are referenced to NAVD 88 Vertical Datum, 1991
VERTICAL DATUM:C.
most expensive of the contract documents options.
identified prior to bid shall be controlled and constructed according to the in writing to the engineer of record prior to bid. Conflicts which are not
Report conflicts between plans, specifications, and other contract documents 4 provide no less quality than a comparable APL product.
be accepted if they meet all the requirements of the Specifications and
(APL) or as referenced in the Specifications. Substitute products will only
e. Approved material refers to a product on the FDOT Approved Products List applicable.
d. Testing requirements that exceed the requirements of the County are not
c. FDOT Submittal requirements are not applicable.
b. Methods of payment and Pay Item Numbers are not applicable.
applicable.
a. Division I General Requirements & Covenants shall be excluded and not following exceptions:
Specifications for Road and Bridge Construction (latest edition) with the
All work, unless otherwise indicated, shall conform to the FDOT Standard 3.
http://co.escambia.fl.us/Bureaus/ PublicWorks/Engineering.html
Escambia County General Paving and Drainage Technical Specifications. 2.
Implemented/SpecBooks/default.shtm
Documents. http://www.dot.state.fl.us/programmanagement/
Specifications for Road and Bridge Construction, as amended by Contract revised Index Drawings as appended herein, and FY 2026-27 Standard
Florida Department of Transportation, FY 2026-27 Standard Plans and 1.
GOVERNING STANDARDS AND CONSTRUCTION SPECIFICATIONS:B.
FDOT Design Manual dated January 2026.3.
and all subsequent interims.
Load and Resistance Factor (LRFD) Bridge Design Specifications, [9th] Edition
American Association of State Highway and Transportation Officials (AASHTO) 2.
FDOT Structures Manual dated January 2026.1.
DESIGN SPECIFICATIONS:A.
f'c=5.5 ksiClass IV CIP Pile Caps, Keyways f'c=8.5 ksiClass VI Precast Slab Units
Moderately AggressiveSlightly AggressiveWater: pH = 6.22
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
SUMMARY OF STRUCTURE QUANTITIES
NO.
PAY ITEM
PAY ITEM DESCRIPTION LOCATION UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F P F
B1 Channel Excavation CY 88.0 88.0
B2
B3
B4
B5
B6
Riprap, Rubble - Bank and Shore TN 315.0 315.0
B7
Bedding Stone TN 126.0 126.0
Helical Pile EA 32.0 32.0
B8
Prestressed Slab Beams - Interior LF 83.5 83.5
55.7
Keyway
Concrete Class IV, Superstructures -
CY 2.4 2.4
38.5
B14
Post-Tension Bars LB 339.0 339.0
B15
Reinforcing Steel - Approach Slab LB 4351.0 4351.0
B22
Reinforcing Steel - Substructure LB 940.0 940.0
Sheet Piling Steel, F&I Permanent SF 2452.0 2452.0
Neoprene Bearing Pads CF 1.0 1.0
Bridge Deck Expansion Joint LF 48.0 48.0
Plastic Filter Fabric SY 240.0 240.0
Geotextile Fabric SY 375.0 375.0
Bridge Deck Grooving SY 148.0 148.0
Bridge Deck Planing SY 148.0 148.0
Utility Hangers EA 4.0 4.0
TL-2
Guardrail - Roadway, General / Low Speed
LF 187.5 187.5
Structure Mount
Special Guardrail Post - Concrete
Anchorage
Guardrail End Treatment - Trailing
EA 18.0 18.0
Prestressed Slab Beams - Exterior
B9
Concrete Class II, Approach Slabs
B12
CY 38.5
B17
Approach Terminal
Guardrail End Treatment - Parallel
B18
B19
B20
B21
B23
B24
LF 55.7
Concrete Class IV, Substructure
B13
CY 9.3 9.3
2.02.0EA
2.02.0EA
B16
Reinforcing Steel - Keyway LB 114.0 114.0
B10
B11
B25
BQ1-01
S U
M M
A R
Y O
F S
T R
U C
T U
R E
S Q
U A
N T
IT
IE
S
A L
G E
R R
O A
D B
R
ID
G
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
S
71 72
9 68
71 72
NOTES:
1. See sheet B1-04 for sheet piling details.
2. See sheet B1-03 for foundation layout and Helical Pile specifications.
3. See sheets B1-19 and B1-20 for Soil Boring Logs.
Legend
Sanitary Sewer Line
Wetland Limits
Direction of Traffic
Direction of Flow
Existing Riprap
Existing Structure (to be removed)
Existing Water Line (to be replaced)
WARNING:
WATER MAIN, GAS MAIN,
GRAVITY SEWER, AND
OVERHEAD POWER LINES IN
THE AREA OF CONSTRUCTION
Design High WaterDHW
Expansion JointEJ
B e g in B r id g e
S ta
.0
E L
.7
E n d B r id g e
S ta
.8
E L
.7
Existing Overhead Electrical Wire
Existing Telephone Pole
1+00.00
B e g in
V P
I
S ta
.5
E L
.3
E n d V
P I
S ta
.5
E L
.5
1.10% 1.10%
NE: 81°33'59.32"
Approximate Soil Boring Location
Existing Gas Line (to be abandoned)
Excavation
Proposed Riprap
B1-01
P L
A N
A N
D E
L E
V A
T
IO
N
A L
G E
R R
O A
D B
R
ID
G E
L a n e
L a n e
3'-0"3'-0"
Min. Clr.
2'-0"
Overall Bridge Length
Sta. 0+70.92
Begin Approach
Sta. 0+86.00
Begin Bridge
Sta. 1+13.83
End Bridge Sta. 1+28.92
End Approach
Sta. 1+49.91
Begin Guardrail
Sta. 0+49.92
Begin Guardrail
Sta. 1+43.67
End Guardrail
Sta. 0+56.16
End Guardrail
EJ EJ
Approach Slab
15'-0"
Span
27'-10"
Approach Slab
15'-0"
Min. Horiz. Cl. = 21'-10"
Out to Out Bridge Length
58'-0"
+ Bridge
� Alger Rd
� Helical Piles
� Helical Piles
Limits
Riprap Rubble
Culvert
Exist. CMP Guardrail
Existing
PLAN
Exist. Telephone Pole
R/W
R/W
25'-0" 25'-0"
25'-0"25'-0" ditches. Typ. all (4) corners maintain flow from existing
Place Riprap to form ditch &
B-3
B-4
Direction of Stationing
DHW: 72.50'
ELEVATION
Culvert
Exist. CMP
Bent 2
End Bridge
Bent 1
Begin Bridge
Helical Piles
Wall
Sheet Pile
Rubble Limits
Riprap
Riprap
Stone
Bedding
Utility Line
Proposed
Sewer Line
Exist.
Guardrail
W-Beam
Structure
Exist.
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
S
71 72
THE AREA OF CONSTRUCTION
OVERHEAD POWER LINES IN
GRAVITY SEWER, AND
WATER MAIN, GAS MAIN,
WARNING:
1+00.00
NE: 81°33'59.32"
B-4
B-3
B1-02
B R
ID
G
E H
Y D
R A
U L
IC
R
E C
O M
M E
N D
A T
IO
N
S
A L
G E
R R
O A
D B
R
ID
G E
Min. Horiz. Cl.
21'-10"
Sta. 1+28.92
End Approach
Sta. 1+13.83
End Bridge
(to be Removed)
Existing Culverts
Sta. 0+86.00
Begin Bridge
Sta. 0+70.92
Begin Approach
Wetlands Line
Approx
Direction of Stationing
Wetlands Line
Approx
Alger Road
Sta. 1+13.83
End Bridge
0.73 Sq. Mi.
Drainage Area
Project Location
BRIDGE NO. 484322
STRUCTURE
PROPOSED
NOTE:
STAGE ELEV. NAVD (ft)
FLOOD DATA:
DISCHARGE (cfs)
AVERAGE VELOCITY (f/s)
EXCEEDANCE PROB. (%)
FREQUENCY (yr.)
MAX. EVENT OF RECORD DESIGN FLOOD BASE FLOOD GREATEST FLOOD
OVERTOPPING or
TOTAL SCOUR ELEVATION
PIER INFORMATION LONG TERM
SCOUR ELEV.
WORST CASE ≤ 100 yr.
FREQ. (yr.) FREQ. (yr.)
HYDRAULIC RECOMMENDATIONS
BEGIN BRIDGE STATION1.
2.
3.
4.
CLEARANCE PROVIDED:
MINIMUM CLEARANCE:
ABUTMENTS:
NAV: HORIZ.
NAV: HORIZ.
VERT.
VERT.
END BRIDGE STATION
ABOVE EL.
ABOVE EL.
DRIFT: HORIZ.
DRIFT: HORIZ.
VERT.
VERT.
ABOVE EL.
ABOVE EL.
END BRIDGEBEGIN BRIDGE
RUBBLE GRADE:
SLOPE:
BURIED OR NON-BURIED HORIZ. TOE:
TOE HORIZ. DISTANCE:
LIMIT OF PROTECTION:
DECK DRAINAGE:5.
REMARKS:
AREA OF OPENING@D.F.
HYDRAULIC DESIGN DATA
EXISTING STRUCTURES
SKEW ANGLE
SIZE AND TYPENUMBERS
ELEV. LOW MEMBER
BRIDGE WIDTH
TYPE CONSTRUCTION
SPAN LENGTH
OVERALL LENGTH
FOUNDATION
(REFERENCE)
WORST CASE ≤ 500 yr.
TERMS:
WATER SURFACE ELEVATIONS: N.H.W. (Non-Tidal)
CONTROL (Non-Tidal)
M.H.W. (Tidal)
M.L.W. (Tidal)
(to be Removed)
Existing Culverts
Existing Grade
EL: 72.50
DHW
EL: 69.96
OHW
Sta. 0+86.00
Begin Bridge
( 1 ) ( 2 ) ( 3 ) ( 4 )
SCOUR PREDICTIONS FOR PROPOSED STRUCTURE DESCRIBED ABOVE:
design stages, feet-NAVD 1988.
cautioned against the assumption of precision for the discharge rates, units are in cubic feet per second and the
This hydraulic data is a summary of design calculations and is provided for informational purposes only. The user is
Greatest Flood: The most severe that can be predicted where overtopping is not practicable.
Overtopping Flood: Causes flow over the highway, over a watershed divide, or thru emergency relief structures.
Base Flood: Has a 1% chance of being exceeded in any given year (100 year frequency)
Design Flood: Utilized to assure a desired level of hydraulic performance.
N/A
28'-0"
N/A
DOUBLE CMP
9.82 SF
N/A
69.13
CONCRETE
27'-10"
27'-10"
CONCRETE
97.11 SF
22'-11"
74.58
N/A
Unknown
Unknown
Unknown
Unknown
Unknown
72.50
7.63
4.0
73.32
8.95
0+86.00 1+13.83 0 DEG.
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
Bank & Shore
1:2
Buried
N/A
N/A
Bank & Shore
1:2
Buried
N/A
N/A
Runoff from the bridge will drain to the east and west side of the bridge
NOTE:
Do not use the information on this sheet for construction purposes. This sheet is in the plans for documentation and to assist construction personnel with drainage concerns.
N/A N/A
N/A
74.41
9.54
0.2
N/A
28'-4"
N/A
CMP CULVERT
1.77 SF
N/A
68.45
N/A
27'-5"
N/A
CMP CULVERT
4.91 SF
N/A
68.90
BENTS 1 & 2 " � HELICAL PILES8
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
FOUNDATION LAYOUT PLAN
LEGEND
Direction of Traffic
Existing Sanitary
Sewer Line
Existing Water Line
Proposed Helical Pile
Existing Structure
NOTES:
1. All pile spacing is dimensioned along the centerline of the pile.
2.All piles shall be steel helical piles with a service design life of 75 years.
3.Piles 6 and 14 at both bents are installed adjacent to an existing
PVC sewer line. Excavate beside the sewer line to place the auger plates below the pipe prior to starting the installation procedure for these piles.
4.Piles on Rows 1 & 4 are Helicon 2 8"� double helix 10"x12" with a
30' embedment depth to reach suitable soil for minimum 12 Kips service load.
5.Piles on Rows 2 & 3 are Helicon 27 8"� triple helix 10"x12"x14" with a 30' embedment depth to reach suitable soil for minimum 22 Kips service load.
6.Submit alternate helical piles to EOR for approval.
Wetland Limits
WARNING:
GAS MAIN AT AREA
OF CONSTRUCTION
OVERHEAD POWER
LINES AT AREA OF
CONSTRUCTION
ROW PILE
SERVICE
LOAD
K
FACTORED
LOAD
K
PILE CAP
PLATE
EL
1 1 - 8 12 17
2 9-16 22 31
3 1 - 8 22 31
4 9-16 12 17
PILE LOAD TABLE
70.88
70.88
70.88
70.88
9 6
SEWER LINE AT
AREA OF
CONSTRUCTION
B1-03
F O
U N
D A
T
IO
N L
A Y
O U
T A
L G
E R
R O
A D
B R
ID
G
E
Typ.
Helical Piles
Existing Culvert
� Alger Rd
Sta. 0+86.00
End Bent 1
Begin Bridge
Sta. 0+87.33
� Row 2
Sta. 0+84.33
� Row 1
1'-4"1'-8"
Sta. 1+13.83
End Bent 2
End Bridge
Sta. 1+15.50
� Row 4
Sta. 1+12.50
� Row 3
1'-8"1'-4"
3'-0"
3'-0"
2 10
4 12
5 13
6 14
7 15
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
B1-04
A B
U T
M E
N T
P L
A N
A N
D E
L E
V A
T
IO
N
A L
G E
R R
O A
D B
R
ID
G E
"2
23'-9
"8
8'-7 "8
8'-72'-5" 2'-5"
9"
"2
23'-6
Cap
Wall
New 6"� Waterline
Typ.
GRS Reinforcement
Sta. 0+86.00
Begin Bridge
Bridge Beams
� Bearing Line
Superstructure
Right Coping
Superstructure
Left Coping
� Alger Rd
Beam Seat
Approach Slab
Sta. 0+71.00
Begin Approach
Wall Typ.
Sheet Pile
GRS ABUTMENT ELEVATION
GRS ABUTMENT PLAN
WARNING:
THE AREA OF CONSTRUCTION
OVERHEAD POWER LINES IN
GRAVITY SEWER, AND
WATER MAIN, GAS MAIN,
piles are used)
Wall Cap = C12x25 (or MC13x31.8 if cold-formed 4.
with OSHA requirements.
identify and mark lines to aid in complying lines. Coordinate with Gulf Power to installed underneath overhead electrical
3. Sheet piles and precast beams are to be and required properties.
See Sheet B1-17 for sheet pile wall notes2.
pipe thru sheet pile details.
See Sheet B1-05 for pipe protection details and
See Sheet B1-08 for pile cap details.
See Sheet B1-07 for abutment wall elevation.
See Sheet B1-09 for sections and details.1.
NOTES:
B/RSF, EL. 71.42
EL. 70.50
B/Excavation
EL. 53.54
B/Sheet Pile, EL. 73.57
T/Wall Cap
Waterline
New 6"� T/RSF, EL. 74.77
Sheet Pile Details
Seal with Pipe Thru
Exist. Sewer Line
Cut piles for
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
PIPE THRU SHEET PILE - SECTION A-A
RIPRAP OVER PIPE DETAIL
B1-05
P
IP
E P
R O
T E
C T
IO
N
D E
T A
IL
S
A L
G E
R R
O A
D B
R
ID
G E
6"
3"
6" 6"
Adjacent un-cut sheet pile Adjacent un-cut sheet pile
Each Side Typ.
at 6" below the top sheet pile measured beyond edge of non-cut
Extend Conc. 6" min.
clearance around pipe
Cut sheets to provide 6" min.
8"� PVC Pipe
Wrap Pipe
1" Thick Foam
Ea. Side Wall
2~#5 bars
M in
T/Conc. Collar
3" min.
� Pipe
Foam Pipe Wrap if wet and soft
Cover W/Filter fabric
Undisturbed Soil
� Pipe to expose pipe
Excavation line
Pipe
6" min. 6" min.
Cut Sheet Pile
Cut Sheet Pile
2~#5 Bars Ea. Side
Collar
Conc.
PLAN - PIPE PASSING THRU SHEET PILE WALL
� Pipe
6"6"
1:1 Typ.
8"� PVC Pipe
Filter Fabric over pipe
Use smaller stones
Riprap over Pipe
Reduce to 6" Thick
Bedding Stone pipe cover and riprap surface before placing
Excavate to expose pipe or sand deleterious materials
Exist soil w/out
A A
Sheet Piles
NOTES:
1. Locate and protect the existing sewer pipe line during demolition and construction.
2. Use the details on this sheet to place sheet piles and riprap over the existing pipe.
3. The cost of installing sheet piles around the pipe and installing the concrete collar is incidental to the cost of the sheet piles.
4. The cost of providing a sand/soil cushion over the pipe and adjusting the bedding stone and riprap is incidental to the cost of the bedding stone.
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
B1-06
R
IP
R A
P D
E T
A
IL
S
A L
G E
R R
O A
D B
R
ID
G E
10'-0"
2'-0"
" 3'-0"
M in
M in
"8
3'-0
TYPICAL RIPRAP ELEVATION
SECTION A-A SECTION B-B
M in
M in
Begin/End Bridge
Overlap
2'-0" Min.
Wall Face
Sheet Pile
25'-0" accept flow
Form ditch to
Wall Face
Sheet Pile
Overlap
2'-0" Min.
Natural Grade Surface
Natural Grade Surface
Filter Fabric Typ.
Stone
Bedding
Riprap Rubble
2 min.
channel width between walls
Place riprap over full
T/Riprap El. 70.00'
T/Approach Slab
(Railing Not Shown)
T/Bridge Slab
2 min.
A
A
Bedding Stone
Riprap Rubble
Filter Fabric Typ.
B
B
Filter Fabric Typ.
Riprap Rubble
Bedding Stone
NOTES:
1. Filter fabric shall be Type D-2, in accordance with
Specifications Section 985. Overlap length and method shall be in accordance with Specifications Section 514.
2. The cost of de-watering, excavation necessary to shape the slope and natural grade to place the bedding stone, and filter fabric is incidental to the cost of the bedding stone.
3. Riprap shall be FDOT Rubble Riprap, Bank and Shore
(Class IV or larger).
4. Protect the existing sewer line passing underneath the bedding stone using the Riprap Over Pipe Detail.
5. Place riprap and bedding stone carefully against walls to avoid damage to walls and wall coatings. All damage will be repaired at no expense.
6. Shape riprap placed in line with existing ditches to form channels to convey water to the channel. Do not block flow. Ditches within the R/W limits may be shaped as needed to ease the riprap placement.
Not Shown)
(Utility Support
ABUTMENT WALL ELEVATION
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
B1-07
A B
U T
M E
N T
W A
L L
E L
E V
A T
IO
N
A L
G E
R R
O A
D B
R
ID
G E
22'-11"
Slab Unit 1
4'-3" 5" 5" 5" 5"
Slab Unit 2
4'-3"
Slab Unit 3
4'-3"
Slab Unit 4
4'-3"
Slab Unit 5
4'-3"
M in
� Alger Rd
Flat Slab Units Typ.
Precast Prestressed
EL: 71.78
details.
See Sheet B1-06 for riprap 5.
walls.
elevation on each side of the maximum 3'-6" differential fill wall backfill together with
Install riprap and sheet pile 4.
piles.
stone prior to installing sheet elevation to install bedding
Excavate to required 3.
unit details.
for precast prestressed slab
See Slab Unit Details sheets 2.
B1-04 and B1-09.
Work this sheet with Sheets 1.
NOTES:
Helical Pile
Reinf.
GRS Backfill
Section 985
Specification
Type D-2 or D-3
Filter Fabric
Pile Cap
T/Pile Cap
Sheet Piling
Wall
Sheet Pile
5'-9"
Compacted soil
Wall
Sheet Pile
"4
4'-11
Helical Pile Helical Pile
Compacted soil
Helical Pile
Helical Pile
3"
3"
Sheet Pile Wall
Rod welded to
" � Threaded 8
5'-9"
"8 35'-0
A
O .C
T o p
B o tt o m
2025.084/.085
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B -B
-F
C C
F
A G
F C
E N
T U
R Y
B R
ID
G
E R
E P
L A
C E
M E
N T
H
S O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y B lu ff
R o a d
N a v a rr e F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e llo w H ig h lig h te r)
C H
E C
K E
R
R d P e n X
-O u t to
D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t (G re e n H ig h li g h te
r) C h a n g e
R e d P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e
H ig h lig h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e
H ig h lig h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t (P in k H ig h lig h te r)
D A
T E
D A
T E
D A
T E
B1-08
P
IL
E C
A P
S E
C T
IO
N
S A
N D
D E
T A
IL
S
A L G
E R
R O
A D
B R
ID
G
E
SECTION A-A
SECTION B-B
Substructure Concrete
Steel Reinforcement
Item Description Unit Quantity Notes
CY 4.54
LB 467
Estimated Quantities
Class IV, 5.5 ksi
Grade 60
Bill of Reinforcing Steel
Mark Size No. Req'd Length Location Bending
A1 5 44 4'-6" Pile Cap Straight
A2 5 4 22'-0" Pile Cap Straight
A3 5 2 21'-6" Pile Cap Straight
A4 5 4 22'-10" Pile Cap Straight
NOTE:
1. All quantities are for one pile cap.
2.Do not place loads on or adjacent to the pile caps until the concrete has reached a minimum strength of 3 ksi as demonstrated by concrete test cylinder breaks
TR 5 11 2'-6" Pile Cap Straight
A
B
A
B
PILE CAP PLAN VIEW
to maintain 3" cover on all sides.
Way. Adjust spacing as needed
Use 1'-0" Typical Spacing, Ea.
pile wall
Sheet
2~5A2 T&B
1~5A3 T&B 1~5A4 T&B around " fillet weld all-16
3w/ sheet pile wall threaded rods welded to x2'-6" long "�8
511~
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T
B1-09
A B
U T
M E
N T
S E
C T
IO
N
S A
N D
D E
T A
IL
S
A L
G E
R R
O A
D B
R
ID
G E
"2 x d e e p s lo tt e d h o le
7"
3'-0"9"
" Joint2
"2
1"5"
3'-0"
Filed Drill into Precast Footing
"� x 3" Exp. Bolts @48" O.C.8
Typ 1 4 2-24
Wall Cap Typ.
C12x25
4 2
In s ta ll E a E x p
B o lt a t T
/h o le
3L7x4x
� Bridge Beam Bearing
Begin/End Bridge
Stop 3" from ends
Typ. Reinf.
Typ Ea
Sheet Leg
4 2
Typ Ea
Sheet Leg
Wall Cap
C12x25
4 2
Typ Ea
Sheet Leg Wall Cap Typ.
C12x25
Beam Seat
Cheekwall
Slab Beam
Approach Slab
Wing Sheet Pile
Wing Sheet Pile
Precast Footing
4~Layers x 12'-0"
GRS Reinf. Layers
(GRS Reinf. Not Shown)
(GRS Reinf. Not Shown)
(FFSW)
Sheet Pile
Abutment Face angle leg at ends
Continue sealant full height " Exp Jt Material2
1Over 3"x
Silicon Sealant w/Backer Rod w/Backer Rod
Joint Sealant for polymer nosing wide min. section w/blockout
Asphalt, 3" deep x 12"
Polymer Joint Nosing
GAB
Slab
Approach
Approach
Begin/End
Exp. Jt. Material " x 4" deep2
Exp. Polystyrene
NOTES:
1. Work this sheet with Abutment Plan and Elevation sheets.
2. Furnish Poured Joint with Backer Rod Expansion Joint System in accordance with FDOT Specification Section 458 and 932 as supplemented and modified by these details. Furnish joint system consisting of Poured Joint Material, Foam Backer Rods, and all associated miscellaneous components. Dow XJS Expansion Joint System with 902 RCS Joint Sealant is the preferred joint system.
3. Submit material product information and joint details which modify or complete the information shown here prior to installation.
4. Install the joint sealant when the ambient temperature is between 55° F and 85° F and will be rising for the next three hours.
5. Joint sealant shall be a Type D silicone sealant material that meets the specifications and is on the APL. (Dow 902 RCS is preferred)
6. Backer rod material shall be a soft type, low-density extruded polyethylene with a skin-like outer texture that will not bond to the silicone sealant as recommended by the joint sealant manufacturer. Size as required by joint manufacturer.
7. Joint nosing material shall be either a polymer mortar or elastomeric concrete designed and tested by the manufacturer to be used with the sealant to produce a bridge deck joint sealant system. The system shall have a 2-year warranty.
8. The joint shall be installed in accordance with the manufacturer's written instructions.
9. Block-out newly placed asphalt to allow placement of the nosing material after the asphalt has cooled to less than 98° F.
10. Install the nosing material and allow it to cure properly. Remove the joint width form and create the chamfer as recommended by the manufacturer. Seal any cold joints placed in the nosing material. Prime the joint faces, install the backer rod, and install the sealant material as recommended by the manufacturer.
Joint Sealant w/Backer Rod Approach Slab
Approach Slab Turndown
Turndown (Beyond)
Approach Slab full length of Wall Cap
@24" max along "� Threaded Bar8
Typ.
SHEET PILE WING SECTION AT FOOTINGS
DETAIL A, SHEET PILE ABUTMENT SECTION
SHEET PILE WING SECTION
APPROACH EXPANSION JOINT DETAIL
Begin/End Bridge
Pile Cap
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
Keyway Concrete
B1-10
T Y
P
IC
A L
S E
C T
IO
N
A N
D A
P P
R O
A C
H S
L A
B D
E T
A
IL
S
A L
G E
R R
O A
D B
R
ID
G E
15'-0" 1'-9"
"2
12'-8 "2
1'-2 2'-10"
22'-11"
4'-3"
� Alger Rd
9'-4"9'-4"3
5A1 @ 1'-0" O.C.
5B1 @ 1'-0" O.C.
5A2 @ 1'-0" O.C.
5B2 @ 1'-0" O.C.
5A1 @ 1'-0" O.C.5A2 @ 1'-0" O.C.
5B1 @ 1'-0" O.C.5B2 @ 1'-0" O.C.
5A3 @ 1'-0" O.C.
Beam Seat (Beyond)
(Beyond)
Turndown
Approach Slab
Ea. Side
3~5B3
5B4 @ 1'-0" O.C.5B4 @ 1'-0" O.C.
16'-9"
1'-10" "2 11'-2
3~5B1
5A4 @ 1'-0" O.C.
2'-6"
"4 39 "2
110 "4
1'-6"
Insert Pocket "2
12~5"x5"x
4"
CHEEKWALL SECTION
Details
See Cheekwall
See Cheekwall Details
A
4A8
4A7
4~4A5@5"
* 34"�x1'-6" Long Threaded Rebar Splicer
W/3#4"� Bolt
2'-0"9'-0"9'-0"2'-1"
Out to Out Bridge
23'-6"±
� Alger Rd
PT Duct
4A5
A
3~4A6@4"
See Detail
Poured Concrete Keyway
KEYWAY DETAIL
PT Duct
C lr
1~5A9 Per Keyway
14'-6"
"4 312'-6 "4
32'-1"2 11'-2
3'-0"
5A2
5A4
"4 31'-51'-4"3'-0"
5B4
5B2
A
A
APPROACH SLAB SECTION
SECTION A-A
NOTES:
1. Quantities are for one approach slab and one cheekwall.
2.Cheekwall may be precast as shown or constructed as CIP with approach slab.
3.Adjust cheekwall rebar spacing as needed to avoid conflict with threaded rod insert pocket.
Maintain 11 2" cover on all sides.
CHEEKWALL ELEVATION
Bill of Reinforcing Steel
Mark Size No. Req'd Length Location Bending
A1 5 18 22'-5" Appr. Slab Straight
A2 5 24 16'-0" Appr. Slab See Diag.
A3 5 24 2'-0" Appr. Slab Straight
B1 5 16 22'-5" Appr. Slab Straight
B2 5 24 16'-9" Appr. Slab See Diag.
B3 5 6 16'-3" Appr. Slab Straight
B4 5 26 6'-4" Appr. Slab See Diag.
5 30 4'-6" Appr. Slab See Diag.A4
A5
A6
A7
A8
1'-11"
1'-0"
1'-3"
2'-3"
Cheekwall
Cheekwall
Cheekwall
Cheekwall
Straight
Straight
Straight
Straight
Estimated Quantities
Item Description
Substructure Concrete
Steel Reinforcement LB
Unit
CY
19.18
Quantity Notes
Class II, 4.5 ksi
Grade 60
Slope: 0.02 Ft/Ft Slope: 0.02 Ft/Ft
Lane Lane ShoulderShoulder
TYPICAL SECTION 5" Typ.
A9 5 4 27'-4" Keyway Straight
5A2 & 5A4
5B2 & 5B4
BAR BENDING DIAGRAMS
A
A
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
(Omit 4C1 or 4C2 conflicting with PT Duct)
TYPICAL SECTION - SLAB UNITS 1 AND 5 TYPICAL SECTION - SLAB UNITS 2 THRU 4
ELEVATION AT END OF SLAB UNITS 2 THRU 4
ELEVATION AT END OF SLAB UNIT 1
NOTES:
1. Post-Tension (PT) Bars shall be 1"� ASTM A722 150 ksi All-Thread.
2. Coat PT bars with corrosion inhibiting grease just prior to placing in the inner duct.
Install inner duct and PT bar together.
3. Simultaneously Tension the Post-Tension Bar at both ends.
4. Begin Post-Tensioning at midspan of bridge and proceed tensioning towards either Begin or End of Bridge.
5. Use Torque Tensioning to achieve initial tension of 0.6fy = 90 ksi (76.5 kips).
6. A Post-Tension Bar total elongation measurement of 13#4" verifies proper tensioning. (7#8" Ea. End)
7. Field Cutting of Post-Tension Bar shall be done with an abrasive wheel or band saw.
8. Bearing Plate shall be ASTM A36 or better.
9. PT End Cap shall be fiber reinforced nylon, friction fitted into slab unit.
Coat bearing plate and PT assembly with corrosion inhibiting grease prior to placing end cap.
10. 2 months after the bridge is complete, remove End Caps and re-tension PT bars by turning all R73 Hex Nuts by one quarter turn to account for keyway concrete shrinkage.
ELEVATION
REINFORCEMENT DETAIL
SECTION X-X
BEARING PLATE DETAILS
BENDING DIAGRAMS
B1-11
P R
E S
T R
E S
S E
D B
E A
M S
E C
T
IO
N S
A L G
E R
R O
A D
B R
ID
G
E
2'-0" Min. Lap
5~6C1
1~6C2
4C1 4C1
� Unit
Symmetrical about � Unit
Transverse PT Spacing
4C1
1~6C2
1'-0"
2'-0"
"2 12'-104C1
2'-0"
"2
" Chamfer, Typ4
I n n e r D u c t
O u te r D u c t
R73 Hex Nut, R9F Hardened Washer
R73 Hex Nut
ASTM Part Number
F436
A29 or A576
R9F-11-436
R73-10
4"
"� Hole4
"8
ELEVATION
PLAN
PT COMPONENT TABLE
PT Component
See PT Component Table
Bearing Plate, 1"� Post-Tension Bar
A722 R71-08Post-Tension Bar
P o s t-
T e n s io n B a r
¡ PT Duct & Bar
See Bearing Plate Detail
Casting Length = L
Top of Beam
Duct from
6" to ¡ PT
Symmetrical about � Unit
Spacing 4C1 or 4C2 Pairs and Dim. R to compensate for elastic and time dependent shortening effects) including length increase as required for unit placed on grade, (Overall length of Prestressed Slab Unit along ¡ unit, ¡ PT Duct
Top of Beam
Top of Beam 3"� Schedule 40 PVC, Outer Duct, Cast-in-Beam
2"� Schedule 40 PVC, Inner Duct, Cast-in-Beam
3"� Schedule 40 PVC, Outer Duct, Cast-in-Beam
See PT Component Table
R9F Hardened Washer, Strands
Strands
Strands
Strands
End Cap
See Reinforcement Detail
6C2
Note: Shift Stirrups to Miss PT Ducts & Recesses as Req'd
2"
2"
� Unit
Symmetrical about � Unit
Transverse PT Spacing 5'-0", Typ
Casting Length = L
Symmetrical about � Unit
Spacing 4C1 or 4C2 Pairs conflicting with PT Duct)
(Omit 4C1 or 4C2 and Dim. R to compensate for elastic and time dependent shortening effects) including length increase as required for unit placed on grade, (Overall length of Prestressed Slab Unit along ¡ unit, Strands
Strands with Epoxy
Coat Beam Ends
Note: Shift Stirrups to Miss PT Ducts as Req'd
1~6C3 5~6C1
2~6C3
5~6C1
See Details
4'-3"
2'-0" Min. Lap
5~6C1
1~6C2
4C1 4C11~6C2
"2
"4 3 "4
"2
" Chamfer, Typ4
6" to ¡ PT Duct from Top of Beam
Strands
Strands
4'-3"
7"
"6
2~4A1 (@ Ea PT Recess)2
5" 3"
2~4A1 (@ Ea PT Recess)
"2
3"
" Chamfer, Typ4 with Epoxy
Coat Beam Ends
8 Sp. @ 3" 6 Sp. @ 6" 8 Sp. @ 8" 4 Sp. @ 1'-0" 4 Sp. @ 1'-0"8 Sp. @ 8"6 Sp. @ 6"8 Sp. @ 3"
" Chamfer, Typ4
1~6C2
6C3
Details, This Sheet
See Post-Tensioning
Details, This Sheet
See Post-Tensioning
2'-8"
"2
6C1
6C2, 6C3
2'-8"
" Max2
"4
"4
"2
5"
3'-9" 5'-0" Typ. 3'-8"
POST-TENSIONING DETAILS
X
X
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
Direction of Stationing
SCHEMATIC PLAN VIEW AT SLAB ENDS - CASE 1
STRAND DEBONDING LEGEND
B1-12
T A
B L
E O
F V
A R
IA
B
L E
S
S L
A B
U N
IT
S
A L
G E
R R
O A
D B
R
ID
G E
END 1 END 2
J
K1
J
K2
L
"8
6 "8
"4
3'-2" = 4
17 Spa. @ 2
2"
W
"8
"4
3'-2" = 4
17 Spa. @ 2
W
"8
- fully bonded strands.
STRAND PATTERNS
ANGLE Ø ANGLE Ø
End Bridge
� Slab Unit
Begin Bridge � Bearing� Bearing the bottom of the slab unit.
are measured perpendicular to � Bearing along
** End of slab unit bearing dimensions "J" and "K" slab unit.
Dimension "R" is calculated at mid-height of the the top of unit at the centerline of slab unit.
sheet with a single asterisk (*) are measured along
* All longitudinal slab unit dimensions shown on this
DIMENSION NOTES:
TABLE OF VARIABLES - PRESTRESSED CUSTOM WIDTH SLAB UNITS
DIM R
DIMENSIONS *
UNIT
DIM L
W
DIM
DIM K2DIM K1DIM J
END OF UNIT **
END 2END 1
ANGLE Ø
END 2END 1
CASE
PLAN VIEWSTND.
PTRN.
TYPERelease28 Day
STRENGTHS (psi)
CONCRETE PROPERTIES
CLASS
SLAB UNIT
LOCATION
SPAN
NO. NO.(S) / TYPE
Table Date 01-01-12
9" O
O
901118500 6000VI1 9" 9" 27'-10"4'-3"
1 VI 8500 6000 2 1 1
O
O
90 9" 9" 9" 4'-3" 27'-10"
1 & 5 / 12"x51"
2-4 / 12"x51"
REQUIRED
UNITS
NO. OF
3"16
"16
Top row strands stressed at 10.0 kips each. Bottom row strands stressed at 43.9 kips each.
" Diameter, Grade 270, Low Relaxation Strands. Area per strand equals 0.217 sq. in.10
6 STRAND DESCRIPTION: Use
TYPE 2 22 STRANDSTYPE 1 22 STRANDS
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
B1-13
F R
A M
IN
G
P L
A N
A L
G E
R R
O A
D B
R
ID
G E
15'-0" 27'-10" 15'-0"
1"
2'-8"2'-8"
1"
3'-9" 3'-9"5'-0"5'-0"5'-0"
� Alger Rd
Slab Unit Number#
Sta. 0+70.92
Begin Approach
Sta. 1+28.92
End Approach
Post-Tensioning Recess, Typ (see details sheet)
Sta. 1+13.83
End Bridge
Sta. 0+86.00
Begin Bridge
NOTES:
1. Slabs have been design with an additional 0.5" thick topping to allow planing to offset differential camber. If the differential camber between slabs exceeds 0.75", apply load to the beam with the higher camber to bring the differential camber to within
0.75". Leave the load in place until lateral post-tensioning is installed.
2. Bridge railing is not shown.
FRAMING PLAN
P.T. Duct Typ.
Typ.
Keyway
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
A U
G U
S T
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
M
IK
E S
E G
A R
S
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. 484322
100% Plans
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h li g h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g re e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
ROADWAY ELEVATION OF RAIL
� Bridge Span
Sym. about � Bridge Span
B1-14
G U
A R
D R
A
IL
D E
T A
IL
S
O F
A L G
E R
R O
A D
B R
ID
G
E
" 2
B a c k e r
Projection
" Bolt8
"8
P o s t
"8
6"
(Typ.)
"2 13'-1
(Typ.)
"2 13'-1
(Typ.)
2'-3"
4'-0"
25'-0" Nominal Rail Section ~ one 25'-0" W-Beam or two 12'-6" W-Beams (Typ)
(Typ.) & (Max.)
6'-3"
(Typ.) & (Max.)
6'-3"
(T y p
(Typ.)
"8
(Min.)
9"
(Typ.)
"8
� W-Beam
Signage
Base ¢
W-Beam
Slab Beam
RAIL SECTION
¡ 516" Dia. x 21 2" Hex Head Bolt
ASTM-A307 with one Regular
Washer and one Regular Lock
Washer placed under two
H…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .