ALBENI FALLS STAIRS DESIGN DRAWINGS (final).pdf
PDF 1 MB Posted
- Attached to
- AFD Powerhouse Access Stair Manufacturing Federal contract opportunity
- Solicitation number
- W912DW24Q0025
About this file
This document package includes structural design drawings and notes for a rolling access stair to be installed at Albeni Falls Dam. Key details include specifications for galvanized structural steel, grating, and handrails for the stair assembly. Dimensions and connection details are provided for the stair stringers, landings, and supporting structure, including lift points, tie bars, and diagonal bracing. The related federal contract opportunity is solicitation number W912DW24Q0025 from the U.S. Army Corps of Engineers to manufacture and deliver one rolling access stair to the Albeni Falls Dam site in Oldtown, Idaho. The solicitation window and award date are not stated.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW24Q0025 AFD PH Access Stairs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL STEEL
1. THESE NOTES, AND OTHER DRAWING DETAILS AND NOTES, CONTAINED WITHIN,
ARE PROVIDED TO MEET SPECIFIC REQUIREMENTS.
2. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURERS' WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS
NOTED OTHERWISE.
3. ELEVATION DATUM PER EXISTING DRAWINGS. NOTIFY THE CONTRACTING
OFFICER OF ANY DISCREPANCIES BETWEEN THE STRUCTURAL DRAWINGS AND
EXISTING CONDITIONS.
4. USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL EXISTING CONDITIONS,
COORDINATE WORK OF ALL TRADES. THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING SUCH REQUIREMENTS PRIOR TO FABRICATION OR ERECTION OF
THE STRUCTURE. PENETRATIONS THROUGH THE EXISTING STRUCTURE ARE
NOT PERMITTED WITHOUT WRITTEN APPROVAL BY THE CONTRACTING OFFICER.
5. THE STRUCTURAL DRAWINGS GOVERN THE WORK FOR STRUCTURAL
FEATURES, UNLESS OTHERWISE NOTED, DIMENSIONS SHOWN ON PLANS,
SECTIONS, AND DETAILS ARE TO GOVERN THE STRUCTURAL WORK.
6. REPRODUCTION OF CONTRACT DRAWINGS SHALL NOT BE USED AS SHOP
DRAWINGS UNDER ANY CIRCUMSTANCE.
7. SUBMIT FOR GOVERNMENT REVIEW AND ACCEPTANCE ALL STRUCTURAL
FEATURES FOUND WITHIN THIS DRAWING SET (INCLUDING BUT NOT LIMITED TO:
STRUCTURAL STEEL, BOLTS, POST-INSTALLED ANCHOR SELECTION, HANDRAIL
DETAILING, WHEELS, LEVELING COMPONENTS, ETC)
1. THE PROJECT SHALL BE DESIGNED PRIMARILY UNDER UFC CRITERIA AND
INDUSTRY STANDARDS AS MODIFIED BY THE UFC. STRUCTURAL DESIGN,
FABRICATION, AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
GOVERNING CODE EDITIONS OF THE IBC AND ENGINEERING MANUALS,
INCLUDING BUT NOT LIMITED TO:
A. ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE
B. AISC MANUAL OF STEEL CONSTRUCTION (15th EDITION)
C. ASCE 7-16 AMERICAN SOCIETY OF CIVIL ENGINEERS MINIMUM DESIGN
LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER
STRUCTURES
D. AWS D1.1 2017 STRUCTURAL WELDING CODE - STEEL
E. INTERNATIONAL BUILDING CODE (IBC) 2021
F. UFC 1-200-01, CHANGE 1, 1 OCT 2020, DOD BUILDING CODE
G. UFC 3-301-01, CHANGE 1, 4 FEB 2022, STRUCTURAL ENGINEERING
2. DESIGN LOADS:
A. RISK CATEGORY = II
B. DEAD LOADS:
1. SELF WEIGHT OF STEEL AND GRATING
C. LIVE LOADS:
1. UNIFORM STAIR LOAD = 100 PSF
D. SNOW LOAD:
1. SNOW LOAD = 50 PSF (NON-CONCURRENT WITH LIVE LOAD)
E. WIND LOAD:
1. ULTIMATE DESIGN WIND SPEED = 103 MPH 3-SECOND GUST
2. EXPOSURE CATEGORY = C
3. CONDITION = OPEN
A. GCpi = +/-0.18
4. TOPOGRAPHIC FACTOR = 1.0
3. SEISMIC LOAD:
A. MAXIMUM CONSIDERED EARTHQUAKE SPECTRAL RESPONSE
ACCELERATIONS:
1. Ss = 0.329g
2. S1 = 0.113g
B. DESIGN EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS:
1. SDS = 0.337g
C. SITE CLASS = D
D. SEISMIC DESIGN CATEGORY = D
E. IMPORTANCE FACTOR = 1.0
F. SEISMIC FORCE RESISTING SYSTEM = ORDINARY CONCENTRIC BRACED
FRAME
1. R = 3.25
2. Ω = 2
3. Cd = 3.25
G. ANALYSIS PROCEDURE = EQUIVALENT LATERAL FORCE
DESIGN STANDARDS & LOADS
1. ALL STEEL SHALL BE "BUY AMERICAN" STEEL.
2. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH
AISC STEEL CONSTRUCTION MANUAL.
3. ALL STEEL SHALL BE HOT DIPPED GALVANIZED UNLESS NOTED OTHERWISE.
4. WIDE FLANGE SHAPES AND TEES:
A. ASTM A992, Fy = 50 KSI
5. PLATES, CHANNELS, AND ANGLES:
A. ASTM A36, Fy = 36 KSI
6. OTHER SHAPES AND THREADED RODS:
A. ASTM A36, Fy = 36 KSI, UNLESS NOTED OTHERWISE
7. SQUARE AND RECTANGULAR HOLLOW STRUCTURAL SECTIONS:
A. ASTM A500 GRADE C, Fy = 50 KSI
8. ROUND HOLLOW STRUCTURAL SECTIONS:
A. ASTM A500 GRADE C, Fy = 46 KSI
9. BOLTS:
A. 3/4"Ø ASTM F3125, TYPE N, TYPICAL UNLESS NOTED OTHERWISE
FRAMING CONNECTIONS:
1. PRETENSIONED JOINTS WITH STANDARD HOLES, UNLESS NOTED
OTHERWISE
10. WELD IN ACCORDANCE WITH AWS D1.1 USING E70 ELECTRODE WITH LOW
HYDROGEN.
11. DRAINAGE HOLES:
A. DRILL ADEQUATE DRAINAGE HOLES TO ELIMINATE WATER TRAPS. HOLE
DIAMETER MUST BE 1/2 INCH AND LOCATION INDICATED ON THE DETAIL
DRAWINGS. HOLE SIZE AND LOCATIONS MUST NOT AFFECT THE
STRUCTURAL INTEGRITY. PROVIDE ¼” CAP PLATE AT TOP OF COLUMN.
12. LIFT POINTS SHALL BE MARKED WITH LETTER AND WORDING INDICATING THE
DESIGNATED LIFT POINTS.
GENERAL NOTES
GRATING & STAIR
1. PROVIDE 1.5" GRATING, I-BAR CONFIGURATION MADE OF PULTRUDED
FIBERGLASS REINFORCED POLYMER (FRP), DARK GRAY.
2. GRATING CENTERS SHALL BE 1" WITH 40% OPEN AREA CAPABLE OF SPANNING 48"
3. CONNECT PER MANUFACTURERS SPECIFIC CONNECTIONS TO STRUCTURAL
STEEL
4. VERIFY GALVANIC COMPATIBILITY
5. HORIZONTAL DIMENSIONS CAN BE ADJUSTED PER THE ACTUAL TREAD/RISER
LAYOUT
6. BOTTOM TREAD SHALL HAVE REFLECTIVE YELLOW TAPE ON FRONT EDGE
BEARING PAD
1. PROVIDE 1/4" ELASTOMERIC BEARING PAD CUT TO FIT HINGED PLATE BEARING
ON EXISTING ROOF
2. DUROMETER REQUIRMENT = 55A
NOTES FOR ALBENI FALLS DAM PERSONNEL
1. INSTALLATION
ALBENI FALLD DAM PERSONNEL IS REPONSIBLE FOR THE STAIR INSTALLATION.
2. FIELD PRIMING
FIELD PRIME STEEL EXPOSED TO THE WEATHER. THE FIELD BOLT HEADS AND
NUTS, FIELD WELDS, AND ANY ABRASIONS IN THE SHOP COAT MUST BE CLEANED
AND PRIMED WITH PAINT OF THE SAME QUALITY AS THAT USED FOR THE SHOP
COAT.
3. GALVANIZING REPAIR
REPAIR DAMAGE TO GALVANIZED COATINGS USING ASTM A780/A780M ZINC RICH
PAINT FOR GALVANIZING DAMAGED BY HANDLING, TRANSPORTING, CUTTING,
WELDING, OR BOLTING. DO NOT HEAT SURFACES TO WHICH REPAIR PAINT HAS
BEEN APPLIED.
4. CONTRACT DRAWINGS REPRESENT THE FINISHED STRUCTURE. ALBENI FALLS
PERSONNNEL IS RESPONSIBLE FOR ALL MEANS AND METHODS OF
CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING, TEMPORARY
CONSTRUCTION LOADS, AND TEMPORARY BRACING.
5. POST-INSTALLED ANCHOR INSTALLATION SHALL BE IN CONFORMANCE WITH
MANUFACTURER'S PRINTED LITERATURE, AND AS INDICATED IN THE DRAWINGS.
6. GENERAL ANCHOR REQUIREMENTS:
A. ALL ANCHORS SHALL BE APPROVED FOR USE WITH THE GOVERNING
EDITION OF THE IBC
B. DRILL HOLES WITH A PERCUSSION-TYPE DRILL AND REMOVE ALL
CUTTINGS FROM THE HOLES
C. DO NOT CORE DRILL, DO NOT CUT REINFORCING
D. DRILL HOLES STRAIGHT AND TRUE AT RIGHT ANGLES TO THE FACE, UNO
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
Y:\Kelvin\Revit Model\Albeni Falls Stair\Albeni Falls Stair_Struct_FEB 9TH NEW.rvt
3/4/2024 2:47:49 PM
S-001
S T
R U
C T
U R
A L
G E
N E
R A
L N
O T
E S
K C
H A
N
K C
H A
N
J M
C C
A R
T Y
F
E B
R U
A R
Y
100% SUBMITTAL
A L
B E
N I
F A
L L
S S
T A
IR
S8 S5 S4 S2
SS4
SS2
S10
S6 S4.8
A7
S-301
D4
S-301 D3
S-301
D1
S-301
D8
S-301
D6
S-301 C6
S-301
3' - 10" 6' - 6" 5' - 5" 0' - 8" 4' - 0"
C12X20.7
H
SS4X
4X 1/
(T
YPIC
AL)
C X
.3
C X
.3
C X
.3
C12X20.7
C12X20.7
C12X20.7
C X
.7
C12X20.7
C12X20.7
1ST LANDING w/
1.5" GRATING
2ND LANDING w/
1.5" GRATING
ANCHOR POINT ON
EXISTING CONCRETE
WALL AT LANDING ELEV.
10"x3'-0"x1/4" PLATE
ON 3 HINGES
C X
.3
C12X20.7
S3.2
4' - 0" 6' - 11"
C12X20.7
11" WIDTH x 1.5" (DARK
GRAY) TREAD (NOT ALL
SHOWN FOR CLARITY)
(TYP.)
DIAPHRAGM
SEE SHEET
S-302
STRINGER (TYP.)
STRINGER (TYP.)
(ADJ FOR ACTUAL THE
TREAD LAYOUT)
(ADJ FOR ACTUAL THE
TREAD LAYOUT)
GROUND
0' - 0"
2ND LANDING
15' - 4 1/2"
1ST LANDING
7' - 7"
S8 S5 S4 S2S10 S6 S4.8
D4
S-301
D3
S-301
D1
S-301
(FIELD VERIFY)
5' - 0"
D6
S-301
C6
S-301
HSS 4x4x3/8 (HORIZ)HSS 4x4x3/8
(HORIZ)
HSS 4x4x3/8
(HORIZ)
L3X3X1/4
1' - 2"
SLIDE STAIR IN PLACE
(FIELD ADJUST)
3' - 10" 6' - 6" 5' - 5"
S
T E
P S
S
T E
P
6.678"
0' - 8"
L3 X 3X
1/
ADD'L NOTES SEE
/D8 S-301
HSS 4x4x3/8
(HORIZ)
HSS 4x4x3/8
(HORIZ)
S3.2
A6
S-301
4' - 0" 4' - 0"
/2
DIAPHRAGM
SEE SHEET
S-302
K
IC
K E R
D
IA
G O
N
AL
(T
YP.)
D
IA
G O
N A L
(T Y P
RAILING ARE FOR GRAHIC ONLY,
ACUTAL RAILING LAYOUT PER
FABRCIATOR COORDINATING w/
CODE REQUIREMENT
LIFT POINTS
(HSS4x4x1/4)
PAINT WHITE (TYP.)
LIFT PT
LIFT PT
6' - 11"
(ADJ FOR ACTUAL THE
TREAD LAYOUT)
(ADJ FOR ACTUAL THE
TREAD LAYOUT)
T O
W H
E E
L B
A S
E
GROUND
0' - 0"
2ND LANDING
15' - 4 1/2"
1ST LANDING
7' - 7"
SS4SS2
A7
S-301
D8
S-301
(HORIZ)
STRINGER
C10
L3x3x1/4
(DIAGONAL TYP.)
HSS4x4 LIFT PT
GROUND
0' - 0"
2ND LANDING
15' - 4 1/2"
1ST LANDING
7' - 7"
SS4SS2
A7
S-301
D8
S-301
L4X4X3/8
L4X4X3/8
(HORIZ)
STRINGER
L3x3x1/4
(DIAGONAL TYP.)
GROUND
0' - 0"
2ND LANDING
15' - 4 1/2"
1ST LANDING
7' - 7"
SS4SS2
A7
S-301
D8
S-301
L4X4X3/8
L4X4X3/8
L4X4X3/8
HORIZ
L3x3x1/4
(DIAGONAL TYP.)
STRINGER
C10
HSS4x4 LIFT PT
GROUND
0' - 0"
2ND LANDING
15' - 4 1/2"
1ST LANDING
7' - 7"
S8 S5 S4 S2S10 S6 S4.8
D4
S-301D3
S-301
D1
S-301
D6
S-301
C6
S-301
HSS 4x4x3/8
(HORIZ) (TYP.)
HSS 4x4x3/8
(HORIZ)
HSS 4x4x3/8
(HORIZ)
L4X4X3/8
1' - 2"
SLIDE STAIR IN PLACE
(FIELD ADJUST)
S
T E
P S
S
T E
P
6.678"
3' - 10"
0' - 7 1/8"
0' - 10 3/4"
/4
HSS 4x4x3/8 (HORIZ) HSS 4x4x3/8
(HORIZ)
S3.2
A6
S-301
6' - 6" 5' - 5" 0' - 8" 4' - 0" 4' - 0" 6' - 11"
/2
DIAPHRAGM SEE
SHEET S-302
KIC
KER
L3x3x1/4
(DIAGONAL TYP.)
RAILING ARE FOR GRAHIC ONLY,
ACUTAL RAILING LAYOUT PER
FABRCIATOR COORDINATING w/
CODE REQUIREMENT
LIFT POINTS
(HSS4x4x1/4)
PAINT WHITE(TYP.)
LIFT PT LIFT PT
/2
/2
L3x3x1/4 (TIE BAR
TO CONC . 3-
LOCATIONS)
TIE BAR
TIE BAR
(ADJ FOR ACTUAL THE
TREAD LAYOUT)
(ADJ FOR ACTUAL THE
TREAD LAYOUT)
T O
W H
E E
L B
A S
E
GROUND
0' - 0"
1ST LANDING
7' - 7"
SS4SS2
A7
S-301
D8
S-301
C12
L3x3x1/4
(DIAGONAL TYP.)
HORIZ
HSS4x4 LIFT PT (TYP.)
GROUND
0' - 0"
1ST LANDING
7' - 7"
SS4SS2
A7
S-301
D8
S-301
L4X4X3/8
(HORIZ)
C10
L3x3x1/4
(DIAGONAL TYP.)
GROUND
0' - 0"
1ST LANDING
7' - 7"
SS4SS2
A7
S-301
D8
S-301
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
Y:\Kelvin\Revit Model\Albeni Falls Stair\Albeni Falls Stair_Struct_FEB 9TH NEW.rvt
3/4/2024 2:47:50 PM
S-301
P L
A N
V
IE
W
K C
H A
N
T S
N Y
D E
R
J M
C C
A R
T Y
F
E B
R U
A R
Y
100% SUBMITTAL
A L
B E
N I
F A
L L
S S
T A
IR
S
E A
T T
L E
D
IS
T R
IC
T
S E
A T
T L E
W
A
1/4" = 1'-0"S-301
A1 STAIR PLAN VIEW
1/4" = 1'-0"S-301
A7 ELEVATION LONGITUDINAL D-D
1/4" = 1'-0"S-301
D4 ELEVATION D-D'
1/4" = 1'-0"S-301
D3 ELEVATION E-E'
1/4" = 1'-0"S-301
D1 ELEVATION F-F'
1/4" = 1'-0"S-301
D8 ELEVATION LONGITUDINAL E-E
1/4" = 1'-0"S-301
D6 ELEVATION C-C'
1/4" = 1'-0"S-301
C6 ELEVATION B-B'
1/4" = 1'-0"S-301
A6 ELEVATION A-A'
S8 S5 S4 S2
SS4
SS2
S10 S6
S4.8
S3.2
HIDE STRINGER FOR
CLARITY (TYP.)
L X
X
/4
L2 -1
/2 X
2- 1/
2X 3/
L4X4X3/8L4X4X3/8
L4X4X3/8
(T Y
P
(T Y P
(HORIZ TYP.)
(HORIZ TYP.) (HORIZ TYP.)
L x x /4
T
Y P
TOWER TWO TOWER ONE
S8 S5 S4 S2
SS4
SS2
S6 S4.8 S3.2
HIDE STRINGER FOR
CLARITY (TYP.)
C X
.3
C X
.3
C X
.3
L X
X
/8
L4X4X3/8
L4X4X3/8
L2 -1
/2 X2-
1/ 2X
3/
L2-1/2X2-1/2X3/16
L2-1/2X 2-1/2X
3/16
(TYP.)
(TYP.)
L2
-1 /2
X 2-
1/ 2X
3/
L4x4x3/8 (LOWER)
L4x4x3/8 (LOWER)
LO
W
E R
H S
S L
IF
T
P T
H S
S L
IF
T
P T
H S
S L
IF
T
P T
TOWER TWO TOWER ONE
S8 S5 S4 S2
SS4
SS2
S10 S6 S4.8
3' - 9"
1' - 3"
S3.2
HIDE STRINGER FOR
CLARITY (TYP.)
L X
X
/8
L2-1 /2
X2-1 /2
X3/1
L2-1/2X2-1/2X3/16
L4X4X3/8
L4X4X3/8
C X
.7
C10X15.3
L4X4X3/8
KICKER
KICKER
L X
X
/8
(LOWER)
(LOWER)
(L O
W E
R
(L
OW
ER)
(LOWER)
HSS LIFT PT
TIE BAR TO WALL (TYP.)
GROUND
0' - 0"
2ND LANDING
15' - 4 1/2"
1ST LANDING
7' - 7"
S8 S5 S4 S2S10 S6 S4.8 S3.2
SLIDE STAIR IN PLACE
(FIELD ADJUST)
ADD'L NOTES SEE
/D8 S-301
DIAPHRAGM AT 2ND LANDING
DIAPHRAGM AT 1ST LANDING
DIAPHRAGM AT GROUND LEVEL
DIAPHRAGM AT WHEEL LEVEL
LOWER LOWER
LOWER
TOWER TWO
TOWER ONE
S8 S5 S4 S2
SS4
SS2
S10 S6
S4.8
S3.2
CASTER (TYP.)
L X
X
/8
L X
X
/8
L X
X
/8
L X
X
/8
L X
X
/8
L X
X
/8
(T
IE
(T
Y P
TOWER TWO TOWER ONE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
Y:\Kelvin\Revit Model\Albeni Falls Stair\Albeni Falls Stair_Struct_FEB 9TH NEW.rvt
3/4/2024 2:47:51 PM
S-302
D
IA
P H
R A
G M
A T
D
IF
F E
R E
N T
L E
V E
L S
K C
H A
N
A u th o r
J M
C C
A R
T Y
F
E B
R U
A R
Y
100% SUBMITTAL
A L
B E
N I
F A
L L
S S
T A
IR
1/4" = 1'-0"S-302
B1 GROUND DIAPHRAGM
1/4" = 1'-0"S-302
C1 1ST LANDING DIAPHRAGM
1/4" = 1'-0"S-302
D1 2ND LANDING DIAPHRAGM
1/4" = 1'-0"S-302
E7
ELEVATION LONGITUDINAL FOR
DIAPHRAGM
1/4" = 1'-0"S-302
A1 WHEEL LEVEL DIAPHRAGM
3"
SEE PLAN
(S E E
P
LA
N
SEE PLAN
SEE PLAN
(S E E
P
LA
N
3"
(S E
E P
L A
N
(SEE PLAN)
6"
(SEE PLAN)
1 / 2
53/4"
1 / 2
6"
1 / 4
11/2"
1 / 2
SEE PLAN
10"
1 / 2
(S E E
P
LA
N
3"
"1
1 / 2
"4
HSS COLUMN (SEE PLAN)
10"x7"x1/2" B PL w/ WASHER
L BRACE (SEE PLAN)
COLUMN BASE (TYPICAL)
COLUMN BASE W/ DIAG
BRACE (TYPICAL)
BRACE DETAIL SEE
OPPOSITE DETAIL
MULIT SPAN
HORIZ LONG BRACE
(SEE PLAN)
ALL MEMBER LABEL (HORIZ)
AT FACE OF HSS COLUMN
MULIT SPAN
HORIZ LONG BRACE
(SEE PLAN)
GRATING
1/2" THICK WASHER
1" DIA x8" BOLT w/
3" LONG NUT
1/4" THRU PLATES
WELD TO 3" LONG
NUT @ 4 SIDES
ALL MEMBER LABEL
(BRACE)
AT CENTER OF HSS
COLUMN
(HORIZ)
(T
IE
(HORIZ)
(B R
A C
E
(B R
A C
E
(B R
A C
E
(BRACE)
(BRACE) NOT SHOWN
FOR CLARITY
(BRACE)
(B R
A C
E
(B R
A C
E
(HORIZ)
(HORIZ)
3/4" DIA. BOLT WELD
TO FACE OF HSS COLUMN (TYP.)
1.5" HORIZ SLOT ON L4x4 (TYP.)
AT SURFACE MOUNT
C12 STRINGER
C10 BEAM w/ (2)- 3/4" DIA BOLTS
RAILING DETAIL BY
SUPPLIER &
SHALL FOLLOW OSHA &
EM 385-1-1 REQ
1/4" PLATE SHOP WELD
TO HSS COLUMN (TYP.)
C12 STRINGER
C12
C10
GRID
GRIDGRID
GRID
C12
TREAD
TREAD
(B R
A C
E
GRID
L4x4
C12 STRINGER
(B R
A C
E
(BRACE) NOT SHOWN
FOR CLARITY
C12 STRINGER
C10 BEAM w/ (2)- 3/4" DIA BOLTS
GRID
C12 STRINGER
GRID
1/4" END CAP
EXISTING SLABEXISTING SLABEXISTING SLAB
C12
(B R
A C
E
GRATING
RAILING DETAIL BY
SUPPLIER &
SHALL FOLLOW OSHA OSHA
AND EM 385-1-1 REQ
(B R
A C
E
(B R
A C
E
(BRACE)
GRID
(HORIZ)(HORIZ) (HORIZ)
1'-2"x6"x1/2" B PL
1'-0" (HORIZ)
1'-0" (HORIZ)
@ BOTH SIDE
OF FRAME
(4 LOCATIONS)
C12
TREAD
TREAD
E X
IS
T
IN
G
C O
N C
R E
T E
W A
L L
UPPER STRINGER w/
COLUMN
LOWER LANDING w/ UPPER
STRINGER
LOWER LANDING w/ LOWER
STRINGER
TIE BAR AT EXISTING CONCRETE WALLBRACES AT COLUMN
UPPER LANDING
1/2" PLATE w/ (2)- 5/8" DIA
WEDGE ANCHOR (HILTI
TITEN HD)
1/4" x4"x4" PL
L3x3x1/4" TIE BAR
GRID
CASTER ASSEMBLY (TYPICAL)
OUTSIDE
INSIDE STAIR
GRID
GRID
GRID GRID GRID
(HORIZ)
F.F.
F.F.
F.F. F.F. F.F.F.F.
6"DIAx3" STEEL CASTER
(CAP = 2.5 KIPS)
ELEV VIEW
CASTER
CASTER ASSEMBLY
1/4" STIFF (SHOP WELD TO COL.)
1/2" PLATE (SHOP
WELD TO COL.)
1/2" PLATE
1/4" STIFF
GRID
C10
C12 STRINGER
CASTER IS REMOVED FROM
THIS SECTION FOR CLARITY
CASTER (TYP.)
CASTER (TYP.)
CASTER (TYP.)
1/4" PLATE ON 3
HINGES
C10
1.5" THICK TREADS/GRATING, MAX
SPAN 48". (TYP.) SEE GEN NOTE
L2X2X8" CLIP
SHOP WELD
TO STRINGER
SADLE CLIPS HOLD
DOWNS (MIN TWO
PER MFR)
TREADS/GRATING
CONNECTION (TYPICAL)
TRIM TREAD
AROUND HSS COL
(TYP.)
TRIM TREAD
AROUND HSS COL
(TYP.)
BOT OF COLUMN
WHEEL
BOT OF COLUMN
WHEEL
BOT OF COLUMN
SHIM (IF REQ'D)
HSS4x4 LIFT POINT
(ACROSS COLUMNS)
HSS4x4 LIFT POINT
(ACROSS COLUMNS)
1.5" HORIZ SLOT
ON L4x4 (TYP.)
1/4" PLATE
(SHOP WELD
TO STRINGER
HSS4x4 LIFT POINT
(ACROSS COLUMN)
TYP
1/4
C12 STRINGER
TYP COLUMN TO
STRINGER CONN
(HORIZ)
HSS4x4 LIFT POINT
(ACROSS COLUMNS)
TREADS/GRATING
LIFT PT
WHEEL BASE LEVEL
(TIE)
(TIE)
(TIE) (TIE)
L2.5x2.5 DIAGONAL (TYP.) COPE VERT LEG CONNECT TO (HORIZ) w/
3/8" DIA BOLT (TYP.)
(TIE)
L2.5x2.5 DIAGONAL
1/4" CAP (TYP.)
1/2" DIA BOLT (TYP.)
RAILING (SEE PLAN)
TIE BAR
TO CONC
WALL
WHEEL
(2)- 3/4" DIA BOLTS (TYP.)
L3x3x1/4" TIE BAR (SHIP LONG AT
3'-0" FOR FIELD CUT/FITTING)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
Y:\Kelvin\Revit Model\Albeni Falls Stair\Albeni Falls Stair_Struct_FEB 9TH NEW.rvt
3/4/2024 2:47:52 PM
S-303
S E
C T
IO
N
A N
D D
E T
A
IL
S
K C
H A
N
T S
N Y
D E
R
J M
C C
A R
T Y
F
E B
R U
A R
Y
100% SUBMITTAL
A L
B E
N I
F A
L L
S S
T A
IR
S
E A
T T
L E
D
IS
T R
IC
T
S E
A T
T L E
W
A
3/4" = 1'-0"S-303
A1 STAIR CONNNECTION AT BASE
S-303
E8 ISOMETRIC VIEW
L5X5X1/4x8" AT SUPPORT
(2) 3/4"Ø BOLTS, CENTER
ON ANGLE LEG
/2
T O
T O
P O
F H
A N
D R
A
IL
T O
P O
F A
N G
L E
3/16
ALL EDGES
PIPE TO
ANGLE, PIPE
SHALL BE CUT
AND
CENTERED ON
ANGLE
TOP OF ANGLE
REFERENCE
P
IP
E
.5
S T
A N
D A
R D
G A
G E
/2
/2
CONNECTION TO CHANNEL
RAILING AT END OF STAIR TO ROOF - "B"
1' - 10"
FACE OF TECH SERVICES
BUIDLING CONCRETE
1' - 6" 5' - 2" MAX 1' - 6"
3" GAP
TYPICAL RAILING SECTION - STRAIGHT RUN "A"
ADJACENT
RAILINGS
NOTE:
1. SEE PLAN FOR SEGMENTS DESIGNATED
2. FOLLOW OSHA AND EM 385-1-1 FOR HANDRAIL
REQUIREMENT.
NOTE: SEGMENTS ALONG RAILING RUN
SHALL BE EQUALLY SPACED, SEE PLAN
TY
P1'
5"
AND MID LANDING
2' - 8" AT TOP
3" GAP
TYP
1' - 0" 1' - 0"
1 1/2" GAP
1' - 0"
TYP
2' - 3"
INTERMEDIATE "MID"
AND TOP LANDING
RISE
RAILING MAIN RISE - "C"
GROOVE WELD ALL AROUND (SEAL, 1/8" MIN),
TYP AT PIPE TO PIPE 90° JOINT
ANGLED MITER
WELD ALL AROUND,
GRIND SMOOTH, TYP
AT CORNERS
GROOVE WELD ALL
AROUND (SEAL, 1/8" MIN),
TYP AT PIPE TO PIPE
HORIZONTAL/VERTICAL
JOINT
0' - 3 7/8"
0'
1/
4"
STAIR TREAD/CONN.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
Y:\Kelvin\Revit Model\Albeni Falls Stair\Albeni Falls Stair_Struct_FEB 9TH NEW.rvt
3/4/2024 2:47:52 PM
S-304
S T
A
IR
H A
N D
R A
IL
D
E T
A
IL
S
K C
H A
N
A u th o r
J M
C C
A R
T Y
F
E B
R U
A R
Y
100% SUBMITTAL
A L
B E
N I
F A
L L
S S
T A
IR
1" = 1'-0"S-304
A1 Stair Handrail
| Sheets |
| S-001 - STRUCTURAL GENERAL NOTES |
| S-301 - PLAN VIEW |
| S-302 - DIAPHRAGM AT DIFFERENT LEVELS |
| S-303 - SECTION AND DETAILS |
| S-304 - STAIR HANDRAIL DETAILS |
File details come from the government source that posted it. Updated .