About this file

Alanson Public Schools Roof Replacement - Addendum #1

This addendum document pertains to a partial roof replacement project for Alanson Public Schools in Alanson, Michigan, issued by architect Anthony Esson and Moore-Trosper Construction Company. The project encompasses the reroofing of gymnasium and elementary school sections of the building located at 7400 North Street. Addendum No. 1, issued August 17, 2020, provides modifications and clarifications to the original bidding documents dated July 10, 2020. The bid due date remained Thursday, August 27, 2020, at 11:00 a.m., with post-bid interviews scheduled for August 31, 2020, and September 1, 2020, from 10:00 a.m. to 2:00 p.m., conducted via Zoom and/or phone. The addendum includes 157 pages of supplemental documentation, including revised architectural drawings, shop drawing requirements, an RFI log, a mandatory pre-bid meeting sign-in sheet with two attendee pages, and a comprehensive 148-page asbestos inspection report.

The asbestos inspection report, completed by Otwell Mawby on August 5, 2020, identified eight asbestos-containing building materials (ACBMs) through laboratory analysis of 243 bulk samples collected from 116 homogeneous areas, including chrysotile asbestos in pipe insulation, caulk, mastic, and roof drain insulation. Five additional materials were assumed to contain asbestos without sampling due to inaccessibility or integrity concerns. The project requires all submittals in clean PDF format (not scanned documents) through Citrix Sharefile, with strict requirements for shop drawings, product data, and three physical samples per specification section. Prior to commencing any work affecting identified ACBMs, the school must engage a qualified and licensed asbestos abatement contractor licensed by the Michigan Department of Licensing and Regulatory Affairs, with a required 10-day state notification period.

View the file

Other files

File Type Posted
Alanson Public Schools Roof Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4224 Keller Road P.O. Box 217 Holt, Michigan 48842

Phone: (517) 694-6310 Fax: (517) 694-1173 info@mooretrosper.com

A NATIVE AMERICAN OWNED COMPANY

www.mooretrosper.com ● info@mooretrosper.com

ALANSON PUBLIC SCHOOLS

ROOF REPLACEMENT

ADDENDUM NO. 1

Addendum 1 is being issued to inform bidders of modifications/clarifications to the bid documents and/or the specifications and/or the plans and/or any additional information provided.

Documents included with Addendum: - 157 pages

▪ Addendum Cover – 1 page

▪ Architect’s supplemental information dated August 17, 2020 – 2 pages

▪ 013323 - Shop Drawings, Project Data and Samples – 3 pages

▪ RFI Log – 1 page

▪ Mandatory Pre-Bid Meeting Sign In Sheet – 2 pages

▪ Asbestos Inspection Report – 148 pages

Additional Information

▪ Bid Due Date remains the same. Bids are due Thursday, August 27, 2020 at 11:00 a.m.

▪ The schedule for the post bid interviews will be August 31, 2020 and September 1, 2020 from 10:00 am to 2:00 pm. Interviews will be conducted via zoom and/or phone.

END OF ADDENDUM NO. 1

Alanson Public Schools; Partial Reroofing Addendum No. 1 – page 1

Anthony Esson, Architect Alanson Public Schools PO Box 479 Partial Reroofing Gaylord, Michigan 49734 Alanson, Michigan

August 17, 2020 Project No. 276-20A

ADDENDUM NO. 1

This Addendum is being issued for the purpose of modifying and/or clarifying the original Bidding Documents dated July 10, 2020 and shall take precedence over them.

All work included herein shall be in accordance with the general requirements of the original bidding documents, except as specifically noted herein.

This Addendum is being sent to all known plan holders, suppliers, plan rooms, and governmental agencies having received Bidding Documents.

Supplemental Documents Issued: Revised Sheet 1/1 dated August 17, 2020

Item No. 1: Refer to revised Sheet 1/1; Typical Roof Edge Detail: Note that the assumed 2x6

Subfascia is existing and not new.

Item No. 2: Refer to revised Sheet 1/1: Note that Keynote R5 at the west end of the Gymnasium

(Area D) has been revised to keynote R6 and references work to be done at the AHU Room door.

END OF ADDENDUM NO. 1

SECTION 013323

SUBMITTALS

MOORE-TROSPER CONSTRUCTION CO.

Section 013323 - Page 1 of 3

Definitions

Shop drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Trade Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

Product data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Trade Contractor to illustrate a material, product or system for some portion of the Work.

Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.

Clean. pdf’s are documents that originated in a digital format and HAVE NOT been printed and scanned to create a .pdf file. The reason for the clean .pdf requirement is to allow the viewer to be able to search a document to find certain keywords or highlight key items. It also offers a much more professional finished product.

Submission Requirements

Shop Drawings

a. Trade Contractor shall furnish all shop drawings digitally through Sharefile.

b. Shop drawings shall follow or be keyed to the nomenclature, terminology and symbolism of the Contract Documents and shall be identified by the Bid Category designation.

c. NO SCANNED DOCUMENTS WILL BE ACCEPTED, only clean .pdf’s.

d. A copy of the shop drawings will be returned with review comments to the Trade

Contractor through Citrix Sharefile with an e-mail alerting that the review is complete.

Product data

a. Submit manufacturer’s product data, catalogs, and brochures for the Owner, Architect, and Construction Manager’s review through Citrix Sharefile. No color selections will be performed digitally. See samples below.

b. NO SCANNED DOCUMENTS WILL BE ACCEPTED, only clean .pdf’s.

c. Submittals shall be identified by the CSI Specification section, location within the building and a descriptive explanation as to the materials intended use.

d. A copy of submitted product data will be returned to the Trade Contractor through Citrix

Sharefile with review comments.

Samples

a. Submit three (3) physical samples to illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing Work. One (1) of the three (3) samples will be retained by the Architect.

b. Submit physical samples of finishes from the full range of manufacturer’s standard (u.n.o.) colors, textures and patterns for Architect’s selection.

c. Include identification on each sample, with full project information.

d. Reviewed samples which may be used in the Work are indicated in individual

Specification sections.

Manufacturer’s Installation Instructions

When specified in individual Specification sections, submit manufacturer’s instructions for delivery, storage, assembly, installation, start-up, adjusting and finishing, digitally. NO SCANNED DOCUMENTS WILL BE ACCEPTED, only clean .pdf’s.

Indicate special procedures, perimeter conditions requiring special attention and special environmental criteria required for application or installation.

Section 013323 - Page 2 of 3

Manufacturer’s Certificates

When specified in individual Specification sections, submit manufacturer’s certificate for review, in quantities specified for product data.

Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits and certifications as appropriate.

Certificates may be recent or previous test results on material or product, but must be acceptable to the Architect.

Trade Contractor Responsibilities

All submittals will have a digital cover letter attached that indicates what items are being submitted as well as the specification section the product is from.

When submitting product data that contains several choices as options, the option being submitted on needs to be clearly indicated. Submittals that contain unchecked options will be returned as

“REJECTED”.

In addition to the cover letter, if more than one product is being submitted on, a separator sheet will be included before each product indicating the specification section and product that is being submitted on.

All submittals will contain a digital stamp indicating that the contractor has reviewed the submittals and agrees that they meet the specifications. The digital stamp will contain a signature or initials of the reviewer.

The Trade Contractor shall review, check, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the Work of the Owner or any separate Contractor, all shop drawings, product data and samples required by the Contract Documents.

If any of the above items are not included the submittal will be returned as “REJECTED” until all the requirements have been met.

By approving and submitting shop drawings, product data and samples the Trade Contractor represents that he has determined and verified all materials, field measurements and field construction criteria related thereto, or will do so, and that he has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

Trade Contractors shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Owner, Architect, or Construction Manager’s review of shop drawings, product data or samples unless the Trade Contractor has specifically informed the Owner, Architect, and Construction Manager in writing of such deviation at the time of submission and the Architect/Engineer has given written approval to the specific deviation.

The Trade Contractor shall not be relieved from responsibility for error or omissions in the shop drawings, product data or samples by the Owner, Architect, and/or Construction Manager’s review thereof.

The Trade Contractor shall direct specific attention, in writing or on resubmitted shop drawings, product data or samples, to revisions other than those requested by the Owner, Architect, and/or Construction Manager on previous submittals.

No portion of the Work requiring submission of a shop drawing, product data or sample shall be commenced until the submittal has been approved by the Architect/Engineer. All such portions of the Work shall be in accordance with approved submittals.

The requirements that corrections be made on shop drawings, or delay in resubmittal of shop drawings, shall not be justification for delay of the progress of the Work and Project Schedule.

Section 013323 - Page 3 of 3

Extreme care is to be used in distribution of all drawings, shop drawings, equipment cuts and operating instructions to protect the Owner. These items shall be kept in strict confidence and all copies shall be accounted for.

Architect’s Action

Except for submittals for the record and similar purposes, where action and return on submittals is required or requested, the Architect will review each submittal, mark with appropriate “action” and return as soon as possible. Where the submittal must be held for coordination, the Owner, Architect, and/or Construction Manager will so advise the Trade Contractor.

The architect will stamp each submittal to be returned with a uniform, self-explanatory action stamp, appropriately marked.

END OF SECTION

RFI LOG

RFI # DATE QUESTION

ANSWER

DATE

ANSWER

001 07/21/20 Will the plans and specs be submitted to LARA for plan review and permits? 07/21/20 The plans have not been submitted as LARA BCC does not require plan review for a re-roofing. Permits will be required, but they can be applied for without a Plan Review.

002 07/21/20 Will permits be pulled locally or through LARA BCC (State)? 07/21/20 Currently, it is BCC LARA 003 08/17/20 The asbestos report indicates on page 3 that sample number 111A roof drain insulation (white) is considered asbestos (4% Chrysotile). Will the roofers be disturbing this during the strainer replacement? Will the roofers need to hire an abatement company to remedy this?

08/17/20 I do not believe that the roofers will be disturbing any insulation on the roof drain conductors.

Page 1 of 1 Last Updated: 8/20/2020

HeatherPlace Text Box Ted Moore Moore Trosper Construction Co.

HeatherPlace Text Box 517-694-6310 info@mooretrosper.com

309 East Front Street Traverse City, Michigan 49684 231.946.5200 Fax: 231.946.5216 www.otwellmawby.com

Environmental ■ Brownfield ■ Asbestos ■ Materials Testing

Otwell Mawby, P.C.

Consulting Engineers

August 5, 2020

Ms. Rachelle Cook Superintendent/ K-12 Principal Alanson Public Schools 7400 North Street Alanson, MI 49706

RE: ASBESTOS INSPECTION REPORT

ALANSON PUBLIC SCHOOL BUILINDG

7400 NORTH STREET, ALANSON, EMMET COUNTY, MICHIGAN

OTWELL MAWBY PROJECT NUMBER : 20-251

Dear Rachelle:

At your request, Otwell Mawby, P.C. (Otwell Mawby) conducted a building material inspection to evaluate for the potential presence of asbestos-containing building materials (ACBMs) within the Alanson Public School building located at 7400 North First Street in Alanson, Emmet County, Michigan (hereafter referenced as the subject property). The primary purpose of the inspection was to identify suspect ACBMs on the interior of the building for compliance with the Asbestos Hazard Emergency Response Act (AHERA). As part of the of operation of the building as a school the United States Environmental Protection Agency (USEPA) requires an asbestos inspection be in place that is in compliance with the AHERA. Compliance with AHERA required an initial inspection be completed in 1988 (the date AHERA was enacted) followed by a re-inspection is required to be completed every three years. Reportedly, a historical asbestos inspection was completed but was unable to be located by school staff, prompting their request for a new inspection to be completed.

Asbestos inspections that are completed for AHERA compliance typically include only interior building components. Our inspection also included two areas of exterior roofing components and exterior windows and doors as these materials are planned for future renovation (replacement), as a result, these components were inspected for compliance with the National Emission Standards for Hazardous Air Pollutants (NESHAPs). The components that were inspected included the roofing components that are located over the gymnasium, the vertical wall between the gymnasium and the cafeteria and the elementary school portions of the building. The roofing areas included within the inspection are depicted on the attached Figure 1. Additionally, the window and door systems on the exterior of the building were also evaluated.

The following sections provide a summary of the known historical asbestos related activities completed for the subject property, the sampling and analytical procedures employed for completion of this inspection, a summary of the laboratory analytical results of the collected samples, a hazard assessment of the identified ACBMs, and recommendations based on the identified ACBMs.

Asbestos Inspection Report Otwell Mawby, PC Alanson Public School Building August 5, 2020 7400 North First Street, Alanson, Emmet County, Michigan Page 2

Previous Asbestos Inspection Documentation Historically, Alanson Public Schools, reportedly, had completed an inspection to identify suspect ACBMs and some reports indicate that some ACBMs were abated, however, documentation of the inspection and limited records related to abatement activities were retained by the school prompting the inspection activities described within this writing.

Collection Protocol Otwell Mawby personnel conducted the inspection and sampling on July 8, 16, 17 and 24, 2020.

During the inspection 116 homogeneous areas (HAs), representing the same or similar materials were identified and sampled. Non-suspect ACBMs were not assigned HAs. Bulk samples were categorized into one of three types of materials: surfacing material, thermal system insulation, or miscellaneous materials. Per the USEPA Asbestos Hazard Emergency Response Act (AHERA), bulk sample collection was conducted using the following criteria:

A list of the 116 identified HAs are provided on the chain-of-custody documentation attached as Appendix A. From the 116 HAs, 243 samples were collected from the identified suspect ACBMs at the subject property. Samples were collected at the first location where each individual material was encountered. If a material was to be sampled more than once, the material was sampled at the second location encountered and so on. If a material was only encountered within one area, bulk samples were collected from different areas within the location where the material was encountered. Additionally, the bulk samples were collected in accordance with USEPA standards and protocols, fiberglass insulation, as determined by the accredited inspector, was not sampled per the USEPA AHERA guidance. The sampled materials are listed on the chain of custody documentation contained within Appendix A.

Analytical Protocol The bulk samples collected during the inspection were analyzed by Environmental Enterprise Group (EEG) of Russellville, Arkansas using Polarized Light Microscopy (PLM). EEG is accredited by the National Voluntary Laboratory Accreditation Program (NVLAP) for the analysis of ACM in bulk samples using PLM (NVLAP Lab Code 101587-0). The laboratory was instructed to stop at the first sample determined to be positive for asbestos content from each respective HA (test-to-positive criteria). Per USEPA protocol, a positive finding of asbestos in a sample from an individual HA indicates the entire HA is positive for asbestos content.

Type of Material Minimum Number of Samples Required

Surfacing Material with Area < 1,000-ft² 3

Surfacing Material with Area > 1,000-ft² but < 5,000-ft²

Surfacing Material with Area > 5,000-ft² 7

Thermal System Insulation (TSI) 3

Miscellaneous Materials Sample in a manner sufficient to determine if material is or is not ACM, at discretion of Inspector

7400 North First Street, Alanson, Emmet County, Michigan Page 3

Summary of Analytical Results Of the 243 samples collected from the 116 HAs, the laboratory (utilizing the test to positive criteria) analyzed 261 samples. Twenty-four of the analyzed samples represented a separable layer of material identified by the laboratory from one of the original 243 samples. These layers were analyzed individually to determine their potential asbestos content. Of the 261 samples analyzed by the laboratory, eight were identified to be ACBMs by PLM, as indicated in the following table. Based on the test-to-positive criteria, samples 30B, 57B, 58B, 58C, 66B, 72B, 72C, 72D were not analyzed.

Sample Number

Material Description

(HA)

Sampling Location Laboratory

Analytical Result Approximate Quantity Identified and

Location(s)

16B Caulk - White

Old Wing, Northeast Corner, 2-Pane Window, Silver Frame

4% Chrysotile ~0.5-ft², Southeast Wall (1 Window)

~2-ft², North Wall (2 Windows) ~0.5-ft², Southwest Wall (1 Window)

30A Pipe Insulation - Gray Women’s Locker

Room, Above Ceiling 2% Chrysotile

~3-ft², 6 Hangers, Debris; Women’s Locker Room

~3-ft², 6 Hangers, 4 Fittings, Debris;

Men’s Locker Room

(Possibly more fittings, limited access and visibility)

53B Mastic - Black South Hall Floor by

Room 201 2% Chrysotile

3,200 ft², East Wing Hallway 1,500 ft², North Wing Hallway

57A Caulk - Black Pantry, Walk-in Freezer 8% Chrysotile 5 ft², Walk-in refrigerator and freezer

(Seems and Penetrations)

58A Pipe Insulation - White Pantry, Above Ceiling, On Fittings 2% Chrysotile

~9 ft², 13 Fittings, 4 Hangers; Pantry ~1.5 ft², 2 Fittings, 1 Hanger; Kitchen ~2 ft², 1 Fitting 3 Hangers; Cafeteria

66A Mastic - Tan Room 305, Floor 2% Chrysotile 640 ft², Room 305

50 ft², Closet across from Room 213 50 ft², North Wing Janitor's Closet:

72A Carpet Mastic –

Tan/ Black Superintendent’s Office, Floor 2% Chrysotile

400 ft², Superintendent's Office 850 ft², East Offices

1,200 ft², Elementary Offices 900 ft², Room 203 900 ft², Room 204 900 ft², Room 210 900 ft², Room 211 900 ft², Room 212 900 ft², Room 213

1,100 ft², Room 301 1,200 ft², Room 304

111A Roof Drain Insulation –

White Entrance by Cafeteria, Above Ceiling 4% Chrysotile 2 ft², Entrance by Cafeteria

Additional details regarding the materials, their locations and assessments of their potential hazards are indicated in the attached Tables 1 and 2. The analytical laboratory results and the associated chain-of-custodies are attached as Appendix A.

7400 North First Street, Alanson, Emmet County, Michigan Page 4

Materials Assumed to be Asbestos Containing In addition to the materials noted above that have been determined to contain asbestos, the materials listed in the following table have been assumed to contain asbestos as sampling the materials would compromise their integrity and/ or potentially cause a health and safety issue.

Material Description Estimated Quantity and Location Reason for Not

Sampling

Fire Door 163 Doors, Refer to the attached Table 1 for details of their locations Fire Protection Factor could be Compromised

Fire Door Frames 140 Door Frames, Refer to the attached Table 1 for details of their locations Fire Protection Factor could be Compromised

East Gymnasium Floor Underlayment or Mastic

6,700-ft², Gymnasium Sampling Would Result in Potential Damage

West Gymnasium Floor Underlayment or Mastic

3,500-ft², Gymnasium Sampling Would Result in Potential Damage

Mastic Behind White Boards/Cork Board

100 ft², North Wing Hallway 80-ft², Room 201 80-ft², Room 202 80-ft², Room 203 80-ft², Room 204 175-ft², Room 205 175-ft², Room 206 175-ft², Room 207 175-ft², Room 208 175-ft², Room 209 175-ft², Room 210 80-ft², Room 211 80-ft², Room 212

130-ft², East Wing Hallway 80-ft², Room 301 80-ft², Room 302 80-ft², Room 303 160-ft², Room 304 80-ft², Room 305

40-ft², Superintendent's Office 40-ft², East Offices

90-ft², Elementary Offices 10-ft², Cafeteria

20-ft², Coach's Office 40-ft², Weight Room

140-ft², West Wing Hallways 50-ft², West Wing Office

80-ft², Library 40-ft², West Wing Break Room

100-ft², Room 100 100-ft², Room 101 100-ft², Room 102 100-ft², Room 103 120-ft², Room 104

Sampling Would Results in Potential Damage and Product Reestablishment

7400 North First Street, Alanson, Emmet County, Michigan Page 5

Continued from previous page:

Material Description Estimated Quantity and Location Reason for Not

Sampling

Mastic Behind White Boards/Cork Board

120-ft², Room 105 120-ft², Room 106 120-ft², Room 107 100-ft², Room 108 100-ft², Room 109 100-ft², Room 110 100-ft², Room 111 140-ft², Room 112 40-ft², Room 113 40-ft², Room 114

60-ft², West Wing Computer Room 40-ft², Char Em Room

Sampling Would Results in Potential Damage and Product Reestablishment

Inaccessible Areas/Limitations To the extent possible, Otwell Mawby inspected all accessible interior areas of the structure (accessible areas only). Limited areas of roofing components, identified on the attached Figure 1, and the exterior window and door systems were also inspected. Areas below the foundation were not inspected. Limited evaluation of other areas including within wall cavities, pipe chases, below top covering flooring materials and roofing materials was completed. It is possible ACBMs that have not been identified could be located within these areas. Pipes, drains, ducting, and caulk on the East Gym ceiling could not be accessed due to the ceiling height. Materials above the West Gym ceiling tiles could not be accessed due to the ceiling height. No areas that were not readily accessible were inspected, including within wall cavities, above solid ceilings, etc. No exterior areas, except where noted, were inspected.

Summary/ Recommendations Otwell Mawby completed an inspection to identify potential ACBMs on the interior and select areas on the exterior of the building utilizing a combination of nondestructive and destructive surveying and sampling techniques. The interior inspection was completed for compliance with the AHERA requirements for schools to identify potential ACBMs. Two areas of the roof and exterior doors and windows were also inspected for NESHAPs compliance in preparation for planned renovation activities (partial roof and window replacement).

Bulk samples of suspect ACBMs were collected and submitted to a third party laboratory for analysis. Laboratory analytical results indicated that eight materials were identified as ACBMs.

Five materials have been assumed to contain asbestos as they were inaccessible and/ or sampling would compromise their integrity and/ or potentially cause a health and safety issue. If the materials that have been assumed to contain asbestos are to be impacted as part of a maintenance, renovation or demolition activity, they should be sampled prior to their disturbance to determine their potential to be asbestos containing.

All bulk sample collection that was performed by Otwell Mawby was completed by Mr. Steve Hemstreet. Mr. Hemstreet is accredited in the State of Michigan as an Asbestos Inspector.

7400 North First Street, Alanson, Emmet County, Michigan Page 6

The inspection was limited to accessible areas within the interior of the building, the two areas of roofing materials and exterior window and door components. In the event areas not identified within this report are to be accessed as part of future renovation or demolition activities they should be inspected prior to their disturbance.

Prior to the commencement of the planned renovation or demolition activities that could impact the identified ACBMs or assumed ACBMs, Otwell Mawby recommends the ACBMs be removed by a qualified and licensed asbestos abatement professional following all applicable local, state, and federal laws prior to their disturbance. Removal of the ACBMs should be performed by a qualified asbestos abatement contractor licensed by the State of Michigan, Department of Licensing and Regulatory Affairs (LARA), Asbestos Program. The asbestos contractor should visit the site and verify the approximated ACBM quantities provided by Otwell Mawby, prior to providing a cost for the abatement project. A 10-day (business day) notification to the State of Michigan may be required prior to the commencement of the work activities. A 10-day (business day) notification to the State of Michigan is also likely required for renovation or demolition, including select demolition of the building.

Otwell Mawby recommends that during renovation or demolition the personnel doing so are trained to identify potential ACBMs and if identified they should be tested to determine their asbestos content or be assumed to be ACBMs and handled as such. Suspect ACBMs or ACBMs should be handled by qualified and licensed asbestos abatement professionals following all applicable local, state, and federal laws.

For compliance with AHERA, a three year reinspection is required to be completed after the Local Education Agency Management Plan goes into effect. The Management Plan details the management and control of ACBMs within the building. As of the date of this report, Otwell Mawby is also concurrently issuing a Management Plan.

7400 North First Street, Alanson, Emmet County, Michigan Page 7

If you have any questions regarding this Report, please feel free to contact the undersigned at

(231) 946-5200. We appreciate the opportunity to provide these services and thank you for your confidence in Otwell Mawby.

Sincerely, OTWELL MAWBY, P.C.

James A. Jackson II State of MI, Asbestos Inspector #A31826

Steve Hemstreet State of MI, Asbestos Inspector #A54086

Attachments Figure 1 – Roof Inspection Area Map Table 1 – Homogeneous Area Table Table 2 – Hazard Assessment Summary Table Appendix A – Bulk Sampling Chain-of-Custodies and Laboratory Results Appendix B – Asbestos Survey Related Definitions

FIGURES

Figure 1 – Site Plan

Alanson Public School Property 7400 North First Street Alanson, Emmet County, Michigan

Figure 1:

Roof Inspection Area Map

Otwell Mawby, PC Traverse City, Michigan

Project No:

20-251

Date:

7/20/20

Source:

Anthony P. Esson Architect

Roof Inspection Areas

TABLES

Table 1 – Homogeneous Area Table

Table 2 – Hazard Assessment Summary Table

Table 1 Homogeneous Area Summary Table

Alanson Public Schools Building 7400 North Street, Alanson, Emmet County, Michigan

Otwell Mawby Project # - 20-251

Homogeneous Area (HA) Name/ Identification HA# Samples Room #/ Location HA Classificaiton (SM, TSI, Misc.)

Known (K) or Assumed

(A) Asbestos Containing

Building Material

Estimated Amount of Material Present (SF/ LF or

Number of Pipe Fittings) Notes

Roof Membrane - white 1 AB East Gym (roof) Misc. 7,600 Felt - black 2 AB East Gym (roof) Misc. 7,600

Caulk - white 3 AB East Gym (roof vents) Misc. 2 Caulk - black 4 AB East Gym (roof overflow spouts) Misc. 2 Caulk - white 5 AB East Gym / Cafeteria Joint (roof edge) Misc. 4 Caulk - black 6 AB East Gym / Cafeteria Joint (roof edge) Misc. 8 Caulk - white 7 A East Gym / Cafeteria Joint (roof edge) Misc. 1

Roof Membrane - white 8 AB Elementary (roof) Misc. 30,000 Vent Boot - white 9 AB Elementary (roof) Misc. 100

Caulk - clear 10 AB Elementary (roof vents) Misc. 5 Caulk - light gray 11 AB Elementary (roof seams) Misc. 20 Roof Tar - black 12 A Elementary (patches) Misc. 10

Window Gasket - black 13 AB East Wing - Exterior (windows) Misc. 5 Caulk - tan 14 AB East Wing - Exterior (windows) Misc. 12

Caulk - white 15 AB West Wing - exterior (windows) Misc. 20 Caulk - white 16 AB North Wing - exterior (windows) Misc. K 6 SF (6 windows)

Window Gasket - black 17 AB Entrance by Cafeteria - exterior (windows) Misc. 4 Caulk - light gray 18 AB Entrance by Cafeteria - exterior (windows) Misc. 6 Baseboard - black 19 AB Gym - along edge of floor Misc. 110

Mastic - Tan 20 AB Gym - along edge of floor Misc. 110 Located on HA# 19 Caulk - Brown 21 ABC North Wing All Exterior Doors, East Wing All Exterior Doors Misc. 30 Control Joint 22 AB Gym - walls Misc. 16 Caulk - White 23 A Gym - door to kitchen Misc. 2

Tile - 12x12 - white w/brown streaks 24 AB Weight Room (310) - floor Misc. 2,000 Mastic - tan 25 AB Weight Room (310) - floor Misc. 2,000 Located on HA# 24

Cove Base - 4" - brown 26 AB Weight Room (310) - along edge of floor Misc. 65 Mastic - tan 27 AB Weight Room (310) - along edge of floor Misc. 65 Located on HA# 26

Ceiling Tile - 2x4 - White - Fissure and Pin Hole 28 AB Weight Room (310) - ceiling Misc. 1,500 Ceiling Tile - 2x4 - White - small pin hole 29 AB Weight Room (310) - ceiling Misc. 500

Pipe Insulation - gray 30 AB Women's Locker Room (above ceiling) TSI K 6 hangers + debris Possibly more fittings, limited access/ visibility

Pipe Insulation - gray 30 AB Men's locker room, (above ceiling) TSI K 6 hangers, 4 fittings + debris Possibly more fittings, limited access/ visibility

Drywall 31 AB Women's Locker Room - ceiling, Men's Locker Room ceiling Misc. 1,200 Tile - 12x12 - white w/tan streaks 32 AB Women's Locker Room - floor, Men's Locker Room - floor, Janitor's Closet Misc. 700

Mastic - tan 33 AB Women's Locker Room - floor, Men's Locker Room - floor, Janitor's Closet Misc. 700 Located on HA# 32 Cove Base - 4" - brown 34 AB Women's Locker Room - floor Misc. 60

Mastic - tan 35 AB Women's Locker Room - floor Misc. 60 Located on HA# 34 Cove Base - 4" - gray 36 AB Women's Locker Room - floor Misc. 40

Mastic - tan 37 AB Women's Locker Room - floor Misc. 40 Located on HA# 36 Cove Base - 4" - dark gray 38 AB Men's Locker Room - floor Misc. 100

Mastic - tan 39 AB Men's Locker Room - floor Misc. 100 Located on HA# 38

Tile - 12x12 white w/blue streaks 40 ABCDE

Cafeteria, Cafeteria Men's Room, Cafeteria Women's Room, Room 303, Room 302, Central Staff bathroom, East Offices, 201/202 Shared Closet, Room 202, 204/203 Shared Closet, Room 209, Room 210 Closet, Room 210 Closet, Room 208 Closet, Room 209 Closet, Room 205 Closet, Room 206

Closet, Room 207 Closet (floor)

Misc. 5,000

Mastic - tan 41 ABCDE

Cafeteria, Cafeteria Men's Room, Cafeteria Women's Room, Room 303, Room 302, Central Staff bathroom, East Offices, 201/202 Shared Closet, Room 202, 204/203 Shared Closet, Room 209, Room 210 Closet, Room 210 Closet, Room 208 Closet, Room 209 Closet, Room 205 Closet, Room 206

Closet, Room 207 Closet (floor)

Misc. 5,000 Located on HA# 25

Ceiling Tile 2x2 - white - pinhole 42 AB Cafeteria - Ceiling Misc. 2,500 Joint Compound - gray 43 AB Cafeteria - above Ceiling - on duct, Women's Locker Room - above Ceiling - TSI 15 Cove Base - 4" - teal 44 AB Cafeteria Men's Room - floor, Cafeteria Women's Room - floor Misc. 20

Mastic - tan 45 AB Cafeteria Men's Room - floor, Cafeteria Women's Room - floor Misc. 20 Located on HA# 44 Ceiling Tile 2x2 - white - pinhole 46 AB Cafeteria Men's Room, Cafeteria Women's Room (ceiling) Misc. 300

Caulk - gray 47 AB Cafeteria Entryway - on windows Misc. 5

Ceiling Tile - 2x4 - White - Fissure and Pin Hole 48 ABCDE

Cafeteria Entryway, South Hallway, Room 305, Room 301, Central staff bathroom, East-Central Entryway, Room 201, Room 213, Room 203, Room

212, Room 204, Room 211, North Wing Hallway, Room 209, Room 210, North Wing Janitor Closet, Room 208, Room 209, Room 205, Room 206, Room 207, North Wing Break Room (ceiling)

Misc. 23,000

Cove Base - 4" - light gray 49 ABCD East Wing Hallway, Room 303, Room 302, Room 301, Central Staff

Bathroom, Central Men's Room, Central Women's Room, East Offices, Room 201, Room 304, North Wing Hallway (floor edge)

Misc. 400

Notes:

SM - Surfacing Material TSI - Thermal System Insulation Misc - Miscellaneous Material SF- Square Feet/Foot LF - Linear Feet/Foor

Alanson Public Schools Building 7400 North Street, Alanson, Emmet County, Michigan

Otwell Mawby Project # - 20-251

Homogeneous Area (HA) Name/ Identification HA# Samples Room #/ Location HA Classificaiton (SM, TSI, Misc.)

Known (K) or Assumed

(A) Asbestos Containing

Building Material

Estimated Amount of Material Present (SF/ LF or

Number of Pipe Fittings) Notes

Mastic - tan 50 ABCD East Wing Hallway, Room 303, Room 302, Room 301, Central Staff

Bathroom, Central Men's Room, Central Women's Room, East Offices, Room 201, Room 304, North Wing Hallway (floor edge)

Misc. 400

Tile - 12x12 - tan 51 AB East Wing Hallway, North Wing Hallway - floor Misc. 4,700 Located Under Carpet Mastic - green 52 AB East Wing Hallway, North Wing Hallway - floor Misc. 4,700 Located on HA# 36; Carpet Mastic Mastic - black 53 AB East Wing Hallway Misc. K East Wing Hallway: 3,200 Located on HA# 36; Floor Tile Mastic Mastic - black 53 AB North wing Hallway Misc. K North Wing Hallway: 1,500 Located on HA# 36; Floor Tile Mastic

Cove Base - 4" - Black 54 AB Kitchen, Pantry (floor edge) Misc. 50 Mastic - tan 55 AB Kitchen, Pantry (floor edge) Misc. 50 Located on HA# 54

Ceiling Tile - 2x4 - white - smooth 56 AB Kitchen, Pantry (ceiling) Misc. 750 Caulk - Black 57 AB Pantry - walk in refrigerator/freezer Misc. K 5 Panel Seems and Penetrations

Pipe Insulation - white 58 ABC Kitchen (above ceiling) TSI K Kitchen: 2 fittings, 1 hanger Pipe Fittings

Pipe Insulation - white 58 ABC Pantry (above ceiling) TSI K Pantry: 13 fittings, 4 hangers Pipe Fittings

Pipe Insulation - white 58 ABC Cafeteria (above ceiling) TSI K Cafeteria: 1 fitting 3 hangers Pipe Fittings

Tile - 12x12 - white w/blue streaks 59 AB Kitchen - floor , Pantry - floor Misc. 750 Mastic - tan 60 AB Kitchen - floor , Pantry - floor Misc. 750 Located on HA# 59

Spray on insulation - white 61 ABC Room 303 - Ceiling SM 900 Drywall 62 AB Room 303 - dark room (wall) Misc. 500

Ceiling tile - 2x2 - black 63 AB Room 303 - dark room (ceiling) Misc. 100

Ceiling tile - 2x2 - white - small pinhole 64 ABCD Room 302, Superintendent's Office, Central Men's Room, Central Women's Room, East Offices, Room 304, Room 202, North Wing Locker Area, North

Wing Bathrooms (ceiling) Misc. 5,500

Tile - 12x12 - white w/tan streaks 65 ABCD Room 305, Closet across from 213, North Wing Janitor Closet (floor) Misc. 740 Mastic - tan 66 ABCD Room 305 Misc. K 640 Located on HA# 65 Mastic - tan 66 ABCD Closet Across from 231 Misc. K 50 Located on HA# 65 Mastic - tan 66 ABCD North Wing Janitors Closet Misc. K 50 Located on HA# 65

Cove Base - 4" - black 67 AB Room 305 (floor edge) Misc. 35 Mastic - tan 68 AB Room 305 (floor edge) Misc. 35 Located on HA# 67

Glue - brown 69 A Room 305 (wall) Misc. 1 Glue - black 70 A Room 305 (wall) Misc. 1 drywall 71 ABC

Room 301, Superintendent's Office, Central Staff Bathroom, East Offices, Room 201, Room 213, Room 304, Room 305, Room 202, Room 203, Room

212, Room 204, Room 211, North Wing East Entrance, North Wing West Entrance (wall)

Misc. 3,300

Carpet Mastic - tan/black 72 ABCD Superintendent's Office Misc. K 400 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 304 Misc. K 1,200 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 301 Misc. K 1,100 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 213 Misc. K 900 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD East Offices Misc. K 850 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Elementary Offices Misc. K 1,200 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 203 Misc. K 900 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 212 Misc. K 900 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 204 Misc. K 900 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 211 Misc. K 900 Located Below Carpeting Carpet Mastic - tan/black 72 ABCD Room 201 Misc. K 900 Located Below Carpeting

Cove base - 4" - blue 73 AB Superintendent's Office (floor edge) Misc. 30 Mastic - tan 74 AB Superintendent's Office (floor edge) Misc. 30 Located on HA# 73

Linoleum - gray 75 AB Central Men's Room, Central Women's Room, Elementary Offices Bathroom, Room 212 Bathroom, Room 211 Bathroom(floor) Misc. 900

Mastic - tan 76 AB Central Men's Room, Central Women's Room, Elementary Offices Bathroom, Room 212 Bathroom, Room 211 Bathroom(floor) Misc. 900 Located on HA# 75

Caulk - white 77 AB Central Men's Room, Central Women's Room (floor) Misc. 10

Cove Base - 4" - gray 78 ABC Elementary Offices, Room 213, Room 202, Room 203, Room 212, Room

204, Room 211, Room 209, Room 210 , Room 208, Room 209, Room 205, Room 206, Room 207, North Wing Break Room (floor edge)

Misc. 500

Mastic - tan 79 ABC Elementary Offices, Room 213, Room 202, Room 203, Room 212, Room

204, Room 211, Room 209, Room 210 , Room 208, Room 209, Room 205, Room 206, Room 207, North Wing Break Room (floor edge)

Misc. 500 Located on HA# 78

Ceiling Tile - 2x2 - white - rough 80 A Elementary Offices (ceiling) Misc. 20 Replacement Ceiling Tiles Cove base - 4" - brown 81 AB Closet across from 213, North Wing Janitor Closet (floor edge) Misc. 25

Mastic - tan 82 AB Closet across from 213, North Wing Janitor Closet (floor edge) Misc. 25 Located on HA# 81 Caulk - white 83 AB East Wing Hallway (wall) Misc. 10

Notes:

SM - Surfacing Material TSI - Thermal System Insulation Misc - Miscellaneous Material

Alanson Public Schools Building 7400 North Street, Alanson, Emmet County, Michigan

Otwell Mawby Project # - 20-251

Homogeneous Area (HA) Name/ Identification HA# Samples Room #/ Location HA Classificaiton (SM, TSI, Misc.)

Known (K) or Assumed

(A) Asbestos Containing

Building Material

Estimated Amount of Material Present (SF/ LF or

Number of Pipe Fittings) Notes

Sink undercoating-gray 84 AB Room 211, Room 212, Room 201, Room 202, Room 203, Room 204, Room 205, Room 206, Room 207, Room 208, Room 209, Room 210 (sink) Misc. 48

Tile - 12x12 - white w/tan spots 85 AB North Wing Men's Room (floor) Misc. 170 Tile - 12x12 - light blue w/gray spots 86 AB North Wing Women's Room (floor) Misc. 170

Cove Base - 4" - Black 87 AB North Wing Bathrooms (floor edge) Misc. 20 Mastic - tan 88 AB North Wing Bathrooms (floor edge) Misc. 20 Located on HA# 87

Caulk - white 89 AB North Wing Bathrooms (floor edge) Misc. 5

Carpet Mastic - tan 90 ABC North Wing Locker Area, Room 210, Room 208, Room 209, Room 205, Room 206, Room 207, North Wing Break Room (floor) Misc. 6,500 Located Under Carpet

Ceiling Tile 2x2 - white - fiber swirls 91 ABC West Wing Hallways, West Wing Bathrooms, West Wing Gym (ceilings) Misc. 7,000 Caulk - tan 92 AB West Wing (doors and windows) Misc. 50

Drywall 93 AB West Wing Office, West Wing Library (walls) Misc. 1,500

Tile - 12x12 - white w/blue and pink spots 94 ABC West Wing Office Bathroom, Rooms 100-112 (floor), Gym Equipment Storage Room Misc. 3,000 Main tile with a few colored tiles mixed in, approx. 1/4 of the rooms are tile and the rest is carpet

Mastic - tan 95 ABC West Wing Office Bathroom, Rooms 100-112 (floor), Gym Equipment Storage Room Misc. 3,000 Located on HA# 94

Carpet Mastic - tan 96 ABC West Wing Office, Rooms 100-114, Library (floor) Misc. 16,000 Some rooms are partially tiled, see HA# 94 Cove Base - 4" - gray 97 ABC Entire West Wing (edge of floor) Misc. 1,200 mastic - white 98 ABC Entire West Wing (edge of floor) Misc. 1,200 Located on HA# 97 Ceiling Tile - 2x2 - white - coarse texture 99 ABC West Wing Office, Rooms 100-114 (ceiling) Misc. 16,000

Sink undercoating-gray 100 AB West Wing Library, Room 100-112 (sink) Misc. 55 Caulk - white 101 AB West Wing (expansion joints) Misc. 25

Tile - 12x12 - blue 102 AB Rooms 100-103 (floor) Misc. 120 Mastic - tan 103 AB Rooms 100-103 (floor) Misc. 120 Located on HA# 102

Tile - 12x12 - white w/tan streaks 104 A Room 101 Bathroom (floor) Misc. 20 Mastic - tan 105 A Room 101 Bathroom (floor) Misc. 20 linoleum - blue 106 A West Wing Staff Bathroom (floor) Misc. 50 Mastic - tan 107 A West Wing Staff Bathroom (floor) Misc. 50 Located on HA# 106

Tile - 12x12 - purple 108 AB Rooms 104-107 (floor) Misc. 120 Tile - 12x12 - green 109 AB Rooms 108-112 (floor) Misc. 120

Stove Hood Insulation 110 AB Kitchen (above stove) Misc. 45 Roof Drain Insulation 111 A Entrance by Cafeteria Misc. K 1 drain (2 sq. ft)

Fire Door 112 None North Wing Entrance Misc. A 4 Fire Door 112 None North Wing West Entrance Misc. A 4 Fire Door 112 None Room 201 Misc. A 2 Fire Door 112 None Room 202 Misc. A 2 Fire Door 112 None Room 203 Misc. A 2 Fire Door 112 None Room 204 Misc. A 2 Fire Door 112 None Room 205 Misc. A 2 Fire Door 112 None Room 206 Misc. A 2 Fire Door 112 None Room 207 Misc. A 2 Fire Door 112 None Room 208 Misc. A 2 Fire Door 112 None Room 209 Misc. A 2 Fire Door 112 None Room 210 Misc. A 2 Fire Door 112 None Room 211 Misc. A 2 Fire Door 112 None Room 212 Misc. A 2 Fire Door 112 None North Wing Janitors Closet Misc. A 1 Fire Door 112 None East Wing Hallway Misc. A 6 Fire Door 112 None Room 301 Misc. A 2 Fire Door 112 None Room 302 Misc. A 2 Fire Door 112 None Room 303 Misc. A 2 Fire Door 112 None Room 304 Misc. A 4 Fire Door 112 None Room 305 Misc. A 2 Fire Door 112 None Closet across from 213 Misc. A 1 Fire Door 112 None Superintendents Office Misc. A 2 Fire Door 112 None East Offices Misc. A 4 Fire Door 112 None Elementary Offices Misc. A 10 Fire Door 112 None Central Men's Room Misc. A 1 Fire Door 112 None Central Women's Room Misc. A 1 Fire Door 112 None Central Staff Bathroom Misc. A 1 Fire Door 112 None Entrance by Cafeteria Misc. A 2 Fire Door 112 None Kitchen Misc. A 1 Fire Door 112 None Coach's Office Misc. A 1 Fire Door 112 None Weight Room Misc. A 1

Notes:

SM - Surfacing Material TSI - Thermal System Insulation Misc - Miscellaneous Material

Alanson Public Schools Building 7400 North Street, Alanson, Emmet County, Michigan

Otwell Mawby Project # - 20-251

Homogeneous Area (HA) Name/ Identification HA# Samples Room #/ Location HA Classificaiton (SM, TSI, Misc.)

Known (K) or Assumed

(A) Asbestos Containing

Building Material

Estimated Amount of Material Present (SF/ LF or

Number of Pipe Fittings) Notes

Fire Door 112 None Cafeteria Misc. A 9 Fire Door 112 None Cafeteria Men's Room Misc. A 1 Fire Door 112 None Cafeteria Women's Room Misc. A 1 Fire Door 112 None Cafeteria Janitors Closet Misc. A 1 Fire Door 112 None Women's Locker room Misc. A 1 Fire Door 112 None Men's Locker room Misc. A 2 Fire Door 112 None West Wing Hallways Misc. A 6 Fire Door 112 None West Wing Office Misc. A 4 Fire Door 112 None Library Misc. A 6 Fire Door 112 None West Wing Breakroom Misc. A 3 Fire Door 112 None Room 100 Misc. A 5 Fire Door 112 None Room 101 Misc. A 3 Fire Door 112 None Room 102 Misc. A 5 Fire Door 112 None Room 103 Misc. A 3 Fire Door 112 None Room 104 Misc. A 4 Fire Door 112 None Room 105 Misc. A 2 Fire Door 112 None Room 106 Misc. A 4 Fire Door 112 None Room 107 Misc. A 2 Fire Door 112 None Room 108 Misc. A 4 Fire Door 112 None Room 109 Misc. A 2 Fire Door 112 None Room 110 Misc. A 4 Fire Door 112 None Room 111 Misc. A 2 Fire Door 112 None Room 112 Misc. A 3 Fire Door 112 None Room 113 Misc. A 1 Fire Door 112 None Room 114 Misc. A 2 Fire Door 112 None West Wing Computer Room Misc. A 2 Fire Door 112 None Char Em Room Misc. A 1 Fire Door 112 None Boiler Room Misc. A 1 Fire Door 112 None West Wing Equipment Room Misc. A 2 Fire Door 112 None West Wing Janitors Closet Misc. A 1

Fire Door Frame 113 None North Wing East Entrance Misc. A 2 Fire Door Frame 113 None North Wing West Entrance Misc. A 2 Fire Door Frame 113 None Room 201 Misc. A 2 Fire Door Frame 113 None Room 202 Misc. A 2 Fire Door Frame 113 None Room 203 Misc. A 2 Fire Door Frame 113 None Room 204 Misc. A 2 Fire Door Frame 113 None Room 205 Misc. A 2 Fire Door Frame 113 None Room 206 Misc. A 2 Fire Door Frame 113 None Room 207 Misc. A 2 Fire Door Frame 113 None Room 208 Misc. A 2 Fire Door Frame 113 None Room 209 Misc. A 2 Fire Door Frame 113 None Room 210 Misc. A 2 Fire Door Frame 113 None Room 211 Misc. A 2 Fire Door Frame 113 None Room 212 Misc. A 2 Fire Door Frame 113 None North Wing Janitors Closet Misc. A 1 Fire Door Frame 113 None East Wing Hallway Misc. A 3 Fire Door Frame 113 None Room 301 Misc. A 2 Fire Door Frame 113 None Room 302 Misc. A 2 Fire Door Frame 113 None Room 303 Misc. A 2 Fire Door Frame 113 None Room 304 Misc. A 4 Fire Door Frame 113 None Room 305 Misc. A 2 Fire Door Frame 113 None Closet Across from 213 Misc. A 1 Fire Door Frame 113 None Superintendents Office Misc. A 2 Fire Door Frame 113 None East Offices Misc. A 4 Fire Door Frame 113 None Elementary Offices Misc. A 10 Fire Door Frame 113 None Central Men's Room Misc. A 1 Fire Door Frame 113 None Central Women's Room Misc. A 1 Fire Door Frame 113 None Central Staff Bathroom Misc. A 1 Fire Door Frame 113 None Entrance by Cafeteria Misc. A 1 Fire Door Frame 113 None Kitchen Misc. A 1 Fire Door Frame 113 None Coaches Office Misc. A 1 Fire Door Frame 113 None Weight Room Misc. A 1 Fire Door Frame 113 None Cafeteria Misc. A 5 Fire Door Frame 113 None Cafeteria Men's Room Misc. A 1 Fire Door Frame 113 None Cafeteria Women's Room Misc. A 1

Notes:

SM - Surfacing Material TSI - Thermal System Insulation Misc - Miscellaneous Material

Alanson Public Schools Building 7400 North Street, Alanson, Emmet County, Michigan

Otwell Mawby Project # - 20-251

Homogeneous Area (HA) Name/ Identification HA# Samples Room #/ Location HA Classificaiton (SM, TSI, Misc.)

Known (K) or Assumed

(A) Asbestos Containing

Building Material

Estimated Amount of Material Present (SF/ LF or

Number of Pipe Fittings) Notes

Fire Door Frame 113 None Cafeteria Janitors Closet Misc. A 1 Fire Door Frame 113 None Women's Locker Room Misc. A 1 Fire Door Frame 113 None Men's Locker Room Misc. A 2 Fire Door Frame 113 None West Wing Hallways Misc. A 3 Fire Door Frame 113 None West Wing Office Misc. A 4 Fire Door Frame 113 None Library Misc. A 4 Fire Door Frame 113 None West Wing Break Room Misc. A 3 Fire Door Frame 113 None Room 100 Misc. A 4 Fire Door Frame 113 None Room 101 Misc. A 3 Fire Door Frame 113 None Room 102 Misc. A 4 Fire Door Frame 113 None Room 103 Misc. A 3 Fire Door Frame 113 None Room 104 Misc. A 3 Fire Door Frame 113 None Room 105 Misc. A 2 Fire Door Frame 113 None Room 106 Misc. A 3 Fire Door Frame 113 None Room 107 Misc. A 2 Fire Door Frame 113 None Room 108 Misc. A 3 Fire Door Frame 113 None Room 109 Misc. A 2 Fire Door Frame 113 None Room 110 Misc. A 3 Fire Door Frame 113 None Room 111 Misc. A 2 Fire Door Frame 113 None Room 112 Misc. A 3 Fire Door Frame 113 None Room 113 Misc. A 1 Fire Door Frame 113 None Room 114 Misc. A 2 Fire Door Frame 113 None West Wing Computer Room Misc. A 2 Fire Door Frame 113 None Char En Room Misc. A 1 Fire Door Frame 113 None Boiler Room Misc. A 1 Fire Door Frame 113 None West Wing Equipment Room Misc. A 2 Fire Door Frame 113 None West Wing Janitors Closet Misc. A 1

Mastic Behind Whiteboards/Corkboards 114 None North Wing Hallway Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 201 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 202 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 203 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 204 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 205 Misc. A 175 Mastic Behind Whiteboards/Corkboards 114 None Room 206 Misc. A 175 Mastic Behind Whiteboards/Corkboards 114 None Room 207 Misc. A 175 Mastic Behind Whiteboards/Corkboards 114 None Room 208 Misc. A 175 Mastic Behind Whiteboards/Corkboards 114 None Room 209 Misc. A 175 Mastic Behind Whiteboards/Corkboards 114 None Room 210 Misc. A 175 Mastic Behind Whiteboards/Corkboards 114 None Room 211 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 212 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None East Wing Hallway Misc. A 130 Mastic Behind Whiteboards/Corkboards 114 None Room 301 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 302 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 303 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Room 304 Misc. A 160 Mastic Behind Whiteboards/Corkboards 114 None Room 305 Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None Superintendents Office Misc. A 40 Mastic Behind Whiteboards/Corkboards 114 None East Offices Misc. A 40 Mastic Behind Whiteboards/Corkboards 114 None Elementary Offices Misc. A 90 Mastic Behind Whiteboards/Corkboards 114 None Cafeteria Misc. A 10 Mastic Behind Whiteboards/Corkboards 114 None Coaches Office Misc. A 20 Mastic Behind Whiteboards/Corkboards 114 None Weight Room Misc. A 40 Mastic Behind Whiteboards/Corkboards 114 None West Wing Hallways Misc. A 140 Mastic Behind Whiteboards/Corkboards 114 None West Wing Office Misc. A 50 Mastic Behind Whiteboards/Corkboards 114 None Library Misc. A 80 Mastic Behind Whiteboards/Corkboards 114 None West Wing Break Room Misc. A 40 Mastic Behind Whiteboards/Corkboards 114 None Room 100 Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 101 Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 102 Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 103 Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 104 Misc. A 120 Mastic Behind Whiteboards/Corkboards 114 None Room 105 Misc. A 120 Mastic Behind Whiteboards/Corkboards 114 None Room 106 Misc. A 120 Mastic Behind Whiteboards/Corkboards 114 None Room 107 Misc. A 120 Mastic Behind Whiteboards/Corkboards 114 None Room 108 Misc. A 100

Notes:

SM - Surfacing Material TSI - Thermal System Insulation Misc - Miscellaneous Material

Alanson Public Schools Building 7400 North Street, Alanson, Emmet County, Michigan

Otwell Mawby Project # - 20-251

Homogeneous Area (HA) Name/ Identification HA# Samples Room #/ Location HA Classificaiton (SM, TSI, Misc.)

Known (K) or Assumed

(A) Asbestos Containing

Building Material

Estimated Amount of Material Present (SF/ LF or

Number of Pipe Fittings) Notes

Mastic Behind Whiteboards/Corkboards 114 None Room 109 Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 110 Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 111 Misc. A 100 Mastic Behind Whiteboards/Corkboards 114 None Room 112 Misc. A 140 Mastic Behind Whiteboards/Corkboards 114 None Room 113 Misc. A 40 Mastic Behind Whiteboards/Corkboards 114 None Room 114 Misc. A 40 Mastic Behind Whiteboards/Corkboards 114 None West Wing Computer Room Misc. A 60 Mastic Behind Whiteboards/Corkboards 114 None Char Em Room Misc. A 40

East Wing Gym Floor 115 None Gymnasium Misc.

This is the start of the file's text. The full file is on GovTribe.