This is a turf specification document for the City of Dalton, Georgia's artificial turf baseball field installation project at Al Rollins Park, located at 521 Threadmill Road, Dalton, GA 30721. The project encompasses the installation of four artificial turf baseball fields, requiring contractors to supply and install stone base, storm drainage, nailers, artificial turf, infill, base inserts, field striping, and all associated materials and labor for complete installation. Attendance at a Pre-Proposal Meeting is mandatory, scheduled for August 25, 2026, at 2:00 P.M. at KRH Architects Inc., 855 Abutment Road Suite 4, Dalton, GA 30721, with a five-minute late arrival cutoff. Sealed proposals must be submitted to the City of Dalton Finance Department, 300 W. Waugh Street, Dalton, Georgia 30720, by 2:00 P.M. on September 8, 2026. The City will conduct short-list notifications by end of business on September 8th, with interviews and presentations scheduled for September 10th and 11th, 2026.
The City of Dalton will manage certain project components under a separate contract, including soil removal to sub-grade, provision of underdrainage system connection points, and installation of concrete perimeter curbing for wood nailers. The successful contractor will be responsible for coordinating with the City regarding scheduling, phasing, and installation of the artificial turf system. The evaluation process may include requests for additional information regarding contractor qualifications and proposals, with the City reserving the right to conduct interviews prior to final selection.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/15/2026
NEW ARTIFICIAL TURF BASEBALL FIELDS FOR:
AL ROLLINS PARK
Prepared for the:
CITY OF DALTON
By:
KRH Architects Inc.
855 Abutment Road
Suite 4
Dalton, GA 30721
TABLE OF CONTENTS
NEW ARTIFICIAL TURF BASEBALL FIELDS
FOR:
AL ROLLINS PARK
Drawings
C1, CT1.1, CT1.2, CT2, CT2.1, CT3, CT3.1, CT4, CT4.1
Specifications
Division 0 – Bid Requirements
00010 Request for Proposals
00020 Instructions to Proposers / Scope
00030 Contractor’s Qualifications
00040 E-Verify
Exhibit “J”
00080 Proposal Form
Exhibit “H”
00090 Form of Agreement
00110 Payment Bond
00120 Performance Bond
00130 Bid Bond
Exhibit “K”
Division 1 – General Requirements
01020 Allowances
01250 Contract Modification Procedures
01290 Payment Procedures
01310 Project Management and Coordination
01322 Photographic Documentation
01330 Submittal Procedures
01400 Quality Requirements
01420 References
01500 Temporary Facilities and Controls
01700 Execution Requirements
Division 2 – Sitework
02000 Erosion Control
02120 Civil Engineering General Conditions
02200 Earthwork
02510 Portland Cement Concrete Paving
02700 Storm Sewer
02900 Lawns Grassing Landscaping
5/15/2026 Al Rollins Turf 00010-1
SECTION 00010 - REQUEST FOR PROPOSALS
THE CITY OF DALTON (the “City”), pursuant to the provisions of O.C.G.A. § 36-91-1, et. seq., herein seeks competitive Proposals from contractors for the construction of: of “New Artificial Turf Baseball Fields For: Al Rollins Park”, located at 521 Threadmill Road Dalton GA 30721 (the “Project”).
In general, the project includes the installation of four artificial turf baseball fields at Al Rollins Park. The contractor will supply and install stone base, storm drainage, nailers, artificial turf, infill, base inserts, field striping and all other materials & labor required for a complete installation. The requirements for construction of the Project, and the duties and responsibilities of the contractor whose Proposal is accepted (“Successful Contractor”), are set forth in the Contract Documents which include the
Instructions to Proposers; the Contract for Construction and Incorporated General Conditions (the
“Contract”); any supplementary and other conditions; the drawings; the specifications; and any addenda issued by the Architect. The contractor will be required to coordinate with the City for the scheduling, phasing and installation of the artificial turf system. Under a separate contract, the City will remove soil to sub-grade as shown on the contract documents and provide a connection point for the contractor’s underdrainage system. The City will also provide a concrete perimeter curb for the installation of the wood nailer.
Any contractor submitting a Proposals must register with the City’s Vender Registry and download complete set of the Contract Documents.
Vender Registry is posted here: https://www.daltonga.gov/finance/page/vendor-packets .
Open Solicitations are posted here: https://www.daltonga.gov/rfps .
The Contractor is solely responsible for obtaining any addenda or further correspondence from the procurement website for this solicitation.
All documents are available for inspection by the public at the Architect’s office at 855 Abutment Road
Suite 4 Dalton, GA 30721. The Contract Documents require, among other things, the furnishing of all materials, labor, and equipment for construction of the Project. The City reserves the right to make available other relevant documents or information concerning the Project.
Any Contractor who intends to submit a Proposal is required to attend a Pre-Proposal Meeting, which will be held on the 25th day of August 2026, at 2:00 P.M. at the office of KRH Architects Inc., 855 Abutment Road Suite 4 Dalton, GA 30721. Any contractor arriving more than 5 minutes late will not be permitted to attend.
A Proposal must strictly comply with all requirements set forth in the Instructions to Proposers. A
Proposal must contain the completed Proposal Form which sets forth the Contractor’s proposed lump sum contract price for full and complete construction of the Project in conformity with all requirements of the
Contract Documents. A Proposal must also include the Contractor’s responses to each item listed in the
Instructions to Proposers, E-Verify form, and a fully executed Bid Bond in the amount of five percent
(5%) of the proposed lump sum contract price (exclusive of any alternates and unit prices) in the form required by the Instructions to Proposers.
Any contractor who intends to submit a Proposal is required to visit the Project Site and familiarize itself with the local conditions under which the required work is to be performed and include in its lump sum cost all necessary expenses required to perform and complete the Project.
In evaluating Proposals, the City may seek additional information from any contractor concerning such proposal or its qualifications to construct the Project. The City may elect to short-list firms and https://www.daltonga.gov/finance/page/vendor-packets https://www.daltonga.gov/rfps
5/15/2026 Al Rollins Turf 00010-2 conduct interviews prior to making a selection. Interviews / presentations will be scheduled for
September 10th and 11th. Short-listed firms will be notified by the end of day on September 8th.
The City intends to award the construction contract to the responsible and responsive contractor whose
Proposal is determined in writing to be the most advantageous to the City, take into consideration the following evaluation factors which are listed below:
A. General Background / Firm History (5 Points)
B. Financial Status and Bonding (5 Points)
C. Company Experience (15 Points)
D. Legal Proceedings (5 Points)
E. Proposed Turf System (25 Points)
F. Proposed Warranty (10 Points)
G. Proposed Maintenance Program (5 Points)
H. The Contractor’s proposed cost (25 Points).
I. The completeness and accuracy of proposal. (5 Points)
Sealed proposals will be received by the City of Dalton Finance Department located at 300 W.
Waugh Street, Dalton, Georgia 30720 until: 2:00 P.M. on the 8th day of September 2026.
All proposals must be sealed and plainly marked “New Artificial Turf Baseball Fields For: Al
Rollins Park”. All proposals must be sealed in an envelope or box and plainly marked “New Artificial
Turf Baseball Fields for Al Rollins Park”. A total of 2 proposals in bound notebooks are required. Please tab each section/form individually. Any Proposal received after said time will not be accepted. At the discretion of the City and in conformity with the applicable laws of the State of Georgia, the City may afford contractors an opportunity for subsequent discussion, negotiation, and revision of Proposals. The
City reserves the right to reject any or all Proposals and to waive any technicalities or formalities.
Each Contractor is responsible for ensuring its Proposal complies with Georgia law, including but not limited to all state and local laws, rules, regulations, ordinances, and policies. Each Proposal must include an affidavit meeting all requirements of O.C.G.A. § 13-10-91, verifying compliance with applicable Federal work authorization program. Any proposal must include an executed E-Verity
Affidavit. Proposals not including executed E-verify affidavit will be automatically rejected.
Contractors understand and agree that the Proposal it submits to the City for consideration shall remain open for acceptance by the City and same shall be honored by the contractor, for a period of sixty (60) days from the date set forth hereinabove for the receipt of Proposals.
Contractor must have minimum Worker’s Compensation and General Liability Insurance in full force and effect and submit evidence of such insurance policy to the satisfaction of the City. The City will not consider any Proposal that is not accompanied by satisfactory evidence that the contractor holds any and all necessary or required Federal, State, or local licenses and/or permits. The City’s acceptance of any such evidence of the applicable insurance policy or licenses or permits does not alter or change a contractor’s responsibility to comply with such specifications. Each contractor shall submit with its
Proposal a copy of its current Business License and/or Occupational Tax Certificate issued in the state in which the Contractor resides. If a contractor cannot provide such license, it will be required to obtain one from the City of Dalton / Whitfield County if it is awarded the construction contract for the Project.
5/15/2026 Al Rollins Turf 00010-3
End – Request for Proposals
5/15/2026 Al Rollins Turf 00020-1
SECTION 00020: INSTRUCTIONS TO PROPOSERS / SCOPE OF WORK
NAME OF PROJECT:
NEW ARTIFICIAL TURF BASEBALL FIELDS FOR: AL ROLLINS PARK.
NAME OF OWNER: THE CITY OF DALTON, GA
The City of Dalton, GA wishes to install four new artificial turf baseball fields at Al Rollins Park. The extent of work is described in the project specifications and shown on the associated drawings.
Schedule:
The following schedule is based upon completion of the prep work by the City under a separate contract by 2/1/2027.
Final Completion of each project shall be achieved no later than May 1, 2027.
Scope:
It is the Owner’s desire to install the highest quality, longest lasting synthetic turf system at these locations to facilitate year-round, daily use. The Contractor’s proposal shall include all information necessary to demonstrate why the installation of its product will provide the best available system for the intended use. The Turf Contractors are encouraged to provide as much pertinent information as possible to allow the owner to make a clear evaluation of the proposed system. At a minimum, the Turf
Contractor’s proposal shall include the following:
Synthetic Turf System:
The Contractor’s proposal shall include a detailed description of its proposed synthetic turf system meeting the minimum requirements listed below, including information on player safety, performance, realistic play, durability, cost of ownership, maintenance programs, blade material / thickness, pad (if recommended by Contractor), backing, seaming, drainage, infill material, warranty and installation. Also, please include options for addressing turf in high use areas. This may include higher wear rated products in these areas, means for easy replacement or other approaches. The field shall include two turf types/colors. One for the infield/warning track (clay) areas and one for the outfield/infield (grass) areas.
The turf shall also include all striping for baselines / foul lines, coaches boxes, batter’s box, on deck
5/15/2026 Al Rollins Turf 00020-2 circles, etc required for game play. Final field striping to be determined and approved during the shop drawing process.
Synthetic Turf Minimum Requirements:
Turf Type 1 - Infield/warning track:
Pile Height 1.75” with a “thatch layer” and a 50 oz face weight. Infill: 40% rubber 60% sand by volume.
Turf Type 2 - Outfield:
Pile Height 2” with a 46 oz face weight. Infill: 70% rubber, 30% sand by volume.
Fiber Type: Hybrid Slit Film & Monofilament
The Owner encourages each contractor to propose value added options as alternates to their proposal. See spaces for alternates provided on Exhibit I – Proposal Form.
Installer’s Qualifications: The Turf Contractor’s proposal shall include the qualifications of its installer.
Include a minimum of five similar installations in the southeastern united states. Provide Owner references, project values and locations and type of turf system. The proposal shall also include the installer’s certifications from the manufacturer and professional associations, i.e. ASBA, Certified Field
Builder, Synthetic Turf Council, etc. Synthetic Turf Contractor must provide references of at least 20 fields in the southeastern United States.
Warranty: The Turf Contractor’s proposal shall include the manufacturer’s warranty (min 10-years) along with any information/pricing on available extended warranties. Include a detailed description of the
Owner’s responsibilities or obligations throughout the warranty period. The proposal shall include the history of warranty issues and or recalls and how these have been addressed.
Maintenance: The Turf Contractor’s proposal shall include an alternate for an annual maintenance program for the life of the warranty. Include detailed description under Tab H and the proposed cost on the proposal form, Alternate No.1.
At a minimum, the annual cleaning shall include the following:
5/15/2026 Al Rollins Turf 00020-3
• Maintenance Program shall include one comprehensive cleaning session per year. This cleaning shall remove accumulated debris, organic matter, and any other foreign materials that may impact the appearance and playability of the synthetic turf.
• Alongside the annual cleaning, contractor’s maintenance team shall conduct a detailed inspection and evaluation of the entire synthetic turf surface to identify any potential issues, ensuring the field's safety and longevity. Inspection shall be turned into owner after completion.
• Contractor shall redistribute infill materials during the annual cleaning to maintain a consistent playing surface.
Lump Sum Price:
On the attached proposal form, provide the lump sum price for the complete installation of the artificial turf field in addition to all other work shown in the contract documents. Spaces have been provided for any additional proposed value-added options that the Contractor may want to include.
The contractor’s proposal shall include a Greens Groomer Model Number: 920HDE
End of Section
5/15/2026 Al Rollins Turf 00030-1
SECTION 00030 CONTRACTOR’S QUALIFICATIONS
NAME OF PROJECT: NEW ARTIFICIAL TURF BASEBALL FIELDS FOR: AL ROLLINS
PARK.
INSTRUCTIONS
(1). The Owner, the City of Dalton, (hereinafter “City”), its agents and representatives, shall be enti-tled to contact each and every reference listed in response to this questionnaire, and each entity referenced in any response to any question in this questionnaire. The Contractor, by completing this questionnaire, expressly agrees that any information concerning the Contractor in possession of said entities and references may be made available to the City.
(2). Only complete and accurate information shall be provided by the Contractor. The Contractor hereby warrants that, to the best of its knowledge and belief, the responses contained herein are true, accurate, and complete. The Contractor also acknowledges that the City is relying on the truth and accuracy of the responses contained herein. If it is later discovered that any material in-formation given in response to a question was provided by the Contractor, knowing it was false, it shall constitute grounds for immediate termination or rescission by the City of any subsequent agreement between the City and the Contractor. The City shall also have and retain any other remedies provided by law.
(3). All Questions shall be submitted to the City in writing and submitted by email to:
Steve Roberts sroberts@daltonga.gov .
Copy the project Architect, Kenneth Harless kharless@krharchitects.com
All questions must be received by the City no later than five (5) days prior to the hour set to re-ceive proposals. All answers to questions including any changes, additions, interpretations, or corrections, to or concerning the Contract Documents prior to the date for submission of Pro-posals will be issued as an Addendum by the Architect on the City’s Procurement Website at the address listed above. Only such written changes, additions, interpretations, or corrections by Ad-dendum shall be binding. Any changes, additions, interpretations, or corrections given by any other method shall not be valid and the Contractor shall not rely upon in any manner whatsoever any verbal statements, instructions, interpretations, corrections, or other information provided by the City or the Architect or their representatives. The Contractor is solely responsible for ob-taining any addenda or further correspondence from the procurement website for this solic-itation.
(4). The submission of a Proposal constitutes an acknowledgment and representation by the Contrac-tor that it has visited the Project site and has familiarized itself with the local conditions under which the required Work is to be performed and constitutes a representation by the Contractor that it has studied and examined the Contract Documents and such other information as may have been furnished by the City or the Architect. Furthermore, the submission of a Proposal consti-tutes a representation by the Contractor that it has no knowledge of any ambiguities, errors, omis-sions or other inaccuracies in any of the Contract Documents or material furnished by the City or mailto:sroberts@daltonga.gov mailto:kharless@krharchitects.com
5/15/2026 Al Rollins Turf 00030-2
Architect in connection with the Project. The response by the Contractor to this request for pro-posal, and its use by the Contractor, and its use by the City, shall not give rise to any liability on the part of the City to the Contractor or any third party or person. Upon submission, all Proposals shall become and remain the property of the City. The City shall have no liability arising out of the disclosure, dissemination, or publication of any Proposal or any information contained there-
in. At the discretion of the City, and in conformity with the applicable provisions of Georgia Law, the City may afford Contractors an opportunity for subsequent discussion, negotiation, and revi-sion of Proposals. The City reserves the right to reject any or all Proposals and to waive any technicalities or informalities. Incomplete or irregular Proposals, and Proposals submitted with-out the required Bid Bond, may be rejected by the City;
(5). Any Proposal submitted to the City shall remain open for acceptance by the City, and same shall be honored by the Contractor, for a period of sixty (60) days from the date set forth hereinabove for the receipt of Proposals. The City reserves the right to amend these Instructions, or clarify same by Addendum, within the time provided by Georgia Law. If such revisions or amendments are of such magnitude as to warrant, in the sole discretion of the City, the postponement for the date of the submission and receipt of Proposals, written notification shall be issued to any Con-tractor who has notified the City in writing of its intent to submit a Proposal pursuant to the
City’s Request for Proposals.
(6). Prior to commencing any Work on the Project, any Contractor selected by the City shall execute a written oath in accordance with the provisions of O.C.G.A. § 36-91-21(e) affirming that it has not prevented, or attempted to prevent, competition in connection with the submission of Proposals to the City by any means whatever nor has it prevented, or endeavored to prevent, anyone from submitting a Proposal by any means whatever nor has it caused or induced another to withdraw a
Proposal for the Work in issue
(7). The following questions are to be answered in full, without exception. Answer all information by attaching tabbed sheets into the contractor’s proposal as listed below.
A. GENERAL BACKGROUND – Include response as Tab “A”
a. Current Name and Address of Contractor:
b. Previous Name or Address of Contractor, if any:
c. Current President or Chief Executive Officer: Years in that Position
d. Number of Employees:
(Permanent)
e. Name and Addresses of Current Affiliated Companies (Parent, Subsidiary, Divisions):
f. Any additional information about the history of the firm the contractor wishes to include.
B. FINANCIAL STATUS AND BONDING– Include response as Tab “B”
a. Please attach Financial Statements for the past three (3) years for which they are com-plete. If such statements are not available, please furnish the following information:
1. Last Three Fiscal Years:
a. Revenues (Gross)
5/15/2026 Al Rollins Turf 00030-3
b. Expenditures (Gross)
c. Overhead & Admin. Cost (Gross)
d. Profit (Gross)
b. Bankruptcies
1. Has the Contractor, or any of its parents or subsidiaries, ever had a Bankruptcy
Petition filed in its name, voluntarily or involuntarily? (If yes, specify date, cir-cumstances, and resolution).
2. Has any Majority Shareholder ever had a Bankruptcy Petition filed in his/her name, voluntarily or involuntarily? (If yes, specify date, circumstances, and resolution).
c. Loans
1. Is this Contractor currently in default on any loan agreement or financing agree-ment with any bank, financial institution or other entity? (If yes, specify details, circumstances, and prospects for resolution).
d. Bonding
1. What is the Contractor’s current bonding capacity with a contract surety compa-ny?
2. Please identify the Contractor’s surety company and the current line of bonding credit that company has extended to the Contractor.
3. Please give the name, address, and telephone number of your current surety agent or underwriting contact.
4. Have Performance or Payment Bond claims ever been made to a surety for Con-tractor on any project, past or present?
5. If the answer to 4 (above) is yes, please describe the claim, the name of the com-pany or person making the claim, and the resolution of the claim.
6. In the past five (5) years, has any surety company refused to bond the Contractor on any project? (If answer is yes, specify the reasons given for such refusal, and the name and address of the surety company that refused to bond).
7. In the past five (5) years, has any surety company refused to bond the Contrac-tor’s parent, or subsidiaries, on any project? (If answer is yes, please specify the reasons given for such refusal, and the name and address of the surety company that refused to bond).
e. Mergers and Acquisitions
1. State whether or not the Contractor has been the subject of a corporate merger within the preceding three (3) years. If so, please identify all parties to such merger, provide the date of same, and a brief description of the transaction.
5/15/2026 Al Rollins Turf 00030-4
2. State whether or not the Contractor has acquired any other companies or entities in the preceding three (3) years. If so, please identify all companies or entities acquired, provide the date of acquisition, and a brief description of the business of the company or entity acquired.
C. COMPANY EXPERIENCE - SIMILAR PROJECTS - Include response as Tab “C”
List projects of reasonably similar nature, scope, and duration (similar to the City’s Project) per-formed by your company in the last ten (10) years. Inclusion of at least five (5) but no more than ten (10) projects is preferred. For purposes of this factor, the referenced projects are preferred to be no less than $250,000 and not more than $10,000,000 in scope. Provide the following infor-mation for each project along with any additional information that would be useful to demonstrate the Contractor’s Qualifications.
a. Project Name and Description
b. Location
c. Contract Price
d. Project Schedule – also include if the project was completed on time.
e. Client Representative (with contact information)
f. Design Professional (with contact information)
Of the projects listed in response to Subsection (A), identify any which was the subject of a sub-stantial claim or lawsuit by, or against, the Contractor. Please identify in your response the nature of such claim or lawsuit, the court in which the case was filed, and the details of its resolution.
D. LEGAL PROCEEDINGS - Include response as Tab “D”
a. Arbitrations
List all construction arbitration demands filed by, or against, the Contractor in the last five (5) years, and identify the nature of the claim, the amount in dispute, the parties, and the ultimate resolution of the proceeding.
b. Lawsuits
List all construction-related lawsuits (other than labor or personal injury litiga-tion) filed by, or against, the Contractor in the last five (5) years, and identify the nature of the claim, the amount in dispute, the parties, and the ultimate resolution of the lawsuit.
5/15/2026 Al Rollins Turf 00030-5
c. Other Proceedings
Identify any lawsuits, administrative proceedings, or hearings initiated by the Na-tional Labor Relations City or similar state agency in the past seven (7) years concerning any labor practices of the Contractor. Identify the nature of any pro-ceeding and its ultimate resolution.
Identify any lawsuits, administrative proceedings, or hearings initiated by the
Occupational Safety and Health Administration concerning the project safety practices of the Contractor in the last seven (7) years. Identify the nature of any proceeding and its ultimate resolution.
Identify any lawsuits, administrative proceedings, or hearings initiated by the In-ternal Revenue Service, or any state revenue department, concerning the tax lia-bility of the Contractor (other than audits) in the last seven (7) years. Identify the nature of any proceeding and its ultimate resolution.
Have any criminal proceedings or investigations been brought against the Con-tractor in the last ten (10) years? (If the answer is yes, please attach a complete and detailed report of the facts and circumstances concerning all such proceed-ings or investigations with your responses to this Questionnaire)
E. PROPOSED ARTIFICIAL TURF SYSTEM - Include response as Tab “E”
a. See Section 00020 for minimum Synthetic Turf Requirements. Provide description of proposed
Artificial Turf System.
F. WARRANTY - Include response as Tab “F”
a. See section 00020. Provide description of warranty.
G. PROPOSED MAINTENANCE PLAN Alternate No.1 - Include response as Tab “G”
b. See section 00020. Provide description of the Contractors / Manufacturer’s proposed maintenance plan. The cost for this proposed annual maintenance plan shall be entered on the proposal form as
Alternate No.1.
H. PROPOSAL FORM - Include forms and response as Tab “H”
a. See section 00080.
I. BID BOND - Include forms and response as Tab “I”
a. Any Proposal must include a fully executed Bid Bond in the form attached hereto as Exhibit / Tab
“I” in the amount of five percent (5%) of the lump sum contract price (exclusive of any price for
Alternates or unit prices). Required Payment and Performance Bond forms will be furnished by the Architect and are required to be submitted by the Contractor in accordance with the require-ments of the Contract Documents. Such Payment and Performance Bonds shall each be in the
5/15/2026 Al Rollins Turf 00030-6 amount of one hundred percent (100%) of the lump sum contract price as set forth in the Agree-ment between the City and the Contractor;
J. E-VERIFY FORM - Include form and response as Tab “J”
a. Any Proposal must include an executed E-Verify form, Exhibit L. Proposals not including exe-cuted E-verify affidavit will be automatically rejected.
End of Section
*Any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L.
99-603. As of the effective date of O.C.G.A. § 13-10-91, the applicable federal work authorization program is the “EEV/Basic Pilot Program” operated by the U.S. Citizenship and Immigration Services Bureau of the U.S.
Department of Homeland Security, in conjunction with the Social Security Administration.
STATE OF GEORGIA
WHITFIELD COUNTY
CITY OF DALTON
VENDOR AFFIDAVIT AND AGREEMENT (E-Verify)
COMES NOW before me, the undersigned officer duly authorized to administer oaths, the undersigned contractor, who, after being duly sworn, states as follows:
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91 and Georgia Department of Labor Rule 300-10-1-.02, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Dalton, Georgia has registered with and is participating in a federal work authorization program and will continue using the program throughout the contract period in accordance with the applicability provisions and deadlines established in O.C.G.A. § 13-10-91 and Georgia Department of Labor Rule 300-10-1-.02.
The undersigned contractor further agrees that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services pursuant to the contract with the City of Dalton, Georgia of which this affidavit is a part, the undersigned contractor will secure from such subcontractor(s) similar verification of compliance with O.C.G.A. § 13-10-91 and Georgia Department of Labor Rule 300-10-1-.02 through the subcontractor’s execution of the subcontractor affidavit required by Georgia Department of Labor Rule 300-10-1-.08 or a substantially similar subcontractor affidavit. The undersigned contractor further agrees to maintain records of such compliance and provide a copy of each such verification to the City of Dalton, Georgia at the time the subcontractor(s) is retained to perform such service.
FURTHER AFFIANT SAYETH NOT.
BY: Authorized Officer or Agent Date Authorization Date for EEV Program
Contractor Name Employment Eligibility (EEV) #
Title of Authorized Officer or Agent of Contractor
Printed Name of Authorized Officer or Agent
Sworn to and subscribed before me
This day of ____________, 20______
Notary Public
My Commission Expires: ___________________
*MUST BE NOTARIZED
EXHIBIT
SECTION 00 40 - E-VERIFY0
J
5/15/2026 Al Rollins Turf 00080-1
SECTION: 00080 PROPOSAL FORM
Exhibit H
NEW ARTIFICIAL TURF BASEBALL FIELDS FOR: AL ROLLINS PARK.
NAME OF PROPOSED
CONTRACTOR: ________________________________________________
(The “Contractor”)
THE CITY OF DALTON (the “City”), pursuant to the provisions of O.C.G.A. § 36-91-1, et. seq., herein seeks competitive Proposals from contractors for the construction of: of “New Artificial Turf Baseball
Fields For: Al Rollins Park”, located at 521 Threadmill Road Dalton GA 30721 (the “Project”).
This Proposal is submitted in response to the City’s Request for Proposals dated 8/7/2026.
This Proposal is for the full and complete construction of the Project in conformity with all requirements of the Contract Documents. The submission of this Proposal constitutes a representation by the Contractor that it has carefully studied and examined all of the Contract Documents furnished by
KRH Architects Inc. (the “Architect”) and such other information as may have been furnished by the City or the Architect including Addendum/Addenda No.______________. Contractor further represents that it has no knowledge of any ambiguities, errors, omissions or other inaccuracies in any of the Contract
Documents or other material furnished by the City or Architect in connection with the Project.
The Contractor submits herewith its duly executed affidavit in accordance with the applicable
Federal work authorization program. Contractor acknowledges that upon execution of any contract with the City, said affidavit shall be deemed a public record to the extent provided by Georgia law.
The Contractor acknowledges that the Contract Documents specifically provide for the assessment of liquidated damages against Contractor in the event of unexcused delay in achieving
Substantial Completion or Final Completion of any phase of the work. The liquidated damages to be assessed in the event of unexcused delay in achieving Substantial Completion are $_250.00__ per calendar day. The liquidated damages to assessed in the event of unexecuted delay in achieving Final
Completion of the Work are $_200.00_ per calendar day. The terms and conditions of liquidated damages provisions set for in the Contract Documents are herein incorporated by reference. The
5/15/2026 Al Rollins Turf 00080-2
Contractor further acknowledges that the Contract Documents provide no incentive provisions for early
Completion of the Work.
Attached hereto, and incorporated herein as part of this Proposal, the Contractor submits its qualifications and proposed Synthetic Turf System. The contractor acknowledges that the City may rely upon the truthfulness and accuracy of the responses set forth therein. In addition, Contractor has submitted herewith as part of this Proposal such documentation and information as Contractor deems appropriate to establish that it is a responsible and responsive Contractor and that its Proposal is the most advantageous to the City, taking into consideration the specific evaluation factors, listed in their order of relative importance, as set forth in the above-referenced Request for Proposals. Contractor acknowledges that the City may rely upon the truthfulness and accuracy of such documentation and information.
The Contractor proposes and agrees to commence actual construction (i.e, physical work) on site with adequate management, labor, materials and equipment within ten (10) days after receipt of Notice to
Proceed and prosecute the Work diligently and faithfully to completion within the required Contract
Time. Prior to commencing such Work, and prior to the issuance of the Notice to Proceed, Contractor shall furnish to the City duly executed Payment and Performance Bonds complying with all requirements of the Contract Documents along with Certificates of Insurance demonstrating that all required coverages are in place.
Contractor submits herewith its executed Bid Bond in accordance with the requirements of the City as set forth in the Instruction to Proposers.
Contractor herein acknowledges that this Proposal shall constitute an offer by Contractor to contract with the City for construction of the Project in conformity with all requirements of the Contract Documents for the lump sum contract price as set forth hereinabove. Said offer by Contractor is irrevocable and subject to acceptance by the City until the expiration of sixty (60) days following the date set forth in the Request for Proposals for receipt of Proposals by the City.
Continued
5/15/2026 Al Rollins Turf 00080-3
A. Lump Sum Proposal
The Contractor proposes to fully and completely construct the Project in conformity with all requirements of the Contract Documents and furnish all necessary labor, material and equipment for such construction, and, furthermore, to fully, completely, and strictly perform all obligations of the Contractor as set forth in the Contract Documents, for the following lump sum price.
____________________________________________________________________________dollars.
Included in the lump sum above is an Owner’s Contingency of $60,000 for additional work as directed by the Owner and Architect.
B. Subcontractors
1. List any major subcontractors for work not performed by the prime contractor.
a. _________________________________________
b. _________________________________________
c. _________________________________________
C. Alternates
1. Description: Include an alternate price to provide an annual deep cleaning maintenance program for each field as described in section 00020.
Add / Deduct (circle one) $ _____________________________
Optional Contractor’s Alternates - (attached a separate sheet if necessary)
2. Description:
3. Description:
5/15/2026 Al Rollins Turf 00080-4
4. Description:
If there are any questions concerning this proposal, please contact:
Name____________________________
Email____________________________
Phone____________________________
CONTRACTOR: ________________________
By: ____________________________________
Title: ___________________________________
Sworn and subscribed to before me this
______ day of _____________________, 2026.
NOTARY PUBLIC
Commission Expiration:
SECTION 00090
THE CONTRACT FOR CONSTRUCTION
AND INCORPORATED GENERAL CONDITIONS
TABLE OF CONTENTS
ARTICLE 1. THE CONTRACT AND THE CONTRACT DOCUMENTS
ARTICLE 2. THE WORK
ARTICLE 3. CONTRACT TIME
ARTICLE 4. CONTRACT PRICE
ARTICLE 5. PAYMENT OF THE CONTRACT PRICE
ARTICLE 6. THE OWNER
ARTICLE 7. THE CONTRACTOR
ARTICLE 8. CONTRACT ADMINISTRATION
ARTICLE 9. SUBCONTRACTORS
ARTICLE 10. CHANGES IN THE WORK
ARTICLE 11. UNCOVERING AND CORRECTING WORK
ARTICLE 12. CONTRACT TERMINATION
ARTICLE 13. OWNER’S RIGHT TO SUSPEND CONTRACTOR’S PERFORMANCE . 31
ARTICLE 14. INSURANCE
ARTICLE 15. MISCELLANEOUS
THE CONTRACT FOR CONSTRUCTION
AND INCORPORATED GENERAL CONDITIONS
This Contract is made by and between the City of Dalton, GA (the “Owner”) and _______________(the “Contractor”) under seal for construction of _________________(the “Project”). The Owner and the Contractor hereby agree as follows:
ARTICLE 1.
THE CONTRACT AND THE CONTRACT DOCUMENTS
1.1 The Contract
1.1.1 The Contract between the Owner and the Contractor, of which this Contract is a part, consists of the Contract Documents. It shall be effective on the date this Contract is executed by the last party to execute it.
1.2 The Contract Documents
1.2.1 The Contract Documents consist of this Contract, the Specifications, the Drawings, Supplemental Conditions, all Change Orders and Field Orders issued hereafter, any other amendments hereto executed by the parties hereafter, together with the following (if any):
1.2.2 The Contractor shall have a continuing duty to read, carefully study and compare each of the Contract Documents, the Shop Drawings and the Product Data, and shall give written notice to the Owner and the Architect of any inconsistency, ambiguity, error, or omission that the Contractor discovers regarding these documents before proceeding with the affected Work. The issuance or the express or implied approval by the Owner or the Architect of the Contract Documents, Shop Drawings, or Product Data shall not relieve the Contractor of the continuing duties imposed hereby, nor shall any such approval be evidence of the Contractor’s compliance with this Contract. The Owner has requested the Architect to only prepare documents for the Project, including the Drawings and Specifications, which are accurate, adequate, consistent, coordinated and sufficient for construction. HOWEVER, THE OWNER MAKES NO REPRESENTATION OR
WARRANTY OF ANY NATURE WHATSOEVER TO THE CONTRACTOR
CONCERNING SUCH DOCUMENTS. By the execution hereof, the Contractor acknowledges and represents that it has received, reviewed, and carefully examined such documents, has found them to be complete, accurate, adequate, consistent, coordinated and sufficient for construction, and that the Contractor has not, does not, and will not rely upon any representation or warranties by the Owner concerning such documents as no such representation or warranties have been or are hereby made.
1.2.3 The Contractor herein acknowledges and represents that prior to the submission of its bid, and prior to its execution of this Contract, it visited and carefully examined the Project site and any and all structures located thereon, and it thoroughly correlated the results of such visit and examination with the requirements of the Contract Documents.
The Contractor further acknowledges that it has become familiar with the local conditions under which the Work is to be performed, and the cost of properly addressing such conditions during performance of the Work is included in the Contract Price.
1.2.4 Neither the organization of any of the Contract Documents into divisions, sections, paragraphs, articles, or other categories nor the organization or arrangement of the Design shall control the Contractor in dividing the Work or in establishing the extent or scope of the Work to be performed by Subcontractors. Unless otherwise provided herein, a reference to “Article” or “Section” shall include all sections, subsections, and other subdivisions of such Section or Article.
1.3 Ownership of Contract Documents
1.3.1 The Contract Documents, and each of them, shall remain the property of the Owner. The Contractor shall have the right to keep one record set of the Contract Documents upon completion of the Project. However, in no event shall Contractor use, or permit to be used, any or all of such Contract Documents on other projects without the Owner’s prior written authorization.
1.4 Hierarchy of Contract Documents
1.4.1 In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents, the following hierarchy shall control: (a) as between figures given on Drawings and the scaled measurements, the figures shall govern; (b) as between large scale drawings and small scale drawings, the large scale shall govern; (c) as between Drawings and Specifications, the requirements of the Specifications shall govern; (d) as between the Contract for Construction and Incorporated General Conditions and the Specifications, the requirements of the Contract for Construction and Incorporated General Conditions shall govern; (e) as between any Supplemental Conditions and the Contract for Construction and Incorporated General Conditions, the requirements of the Supplemental Conditions shall govern. As set forth hereinabove, any and all conflicts, discrepancies, or inconsistencies shall be immediately reported to the Owner and the Architect in writing by the Contractor.
ARTICLE 2.
THE WORK
2.1 The Contractor shall perform all of the Work required, implied or reasonably inferable from, this Contract.
2.2 The term “Work” shall mean whatever is done by or required of the Contractor to perform and complete its duties under this Contract, including the following:
(i) construction of the whole or a designated part of the Project; (ii) furnishing of any required surety bonds and insurance; and (iii) the provision or furnishing of labor, supervision, services, materials, supplies, equipment, fixtures, appliances, facilities, tools, transportation, storage, power, permits and licenses required of the Contractor. Fuel, heat, light, cooling and all other utilities as required by this Contract shall also be deemed part of the Work. The Work to be performed by the Contractor is generally described as follows:
ARTICLE 3.
CONTRACT TIME
3.1 Time and Damages for Delay
3.1.1 The Contractor shall commence the Work on and shall achieve Substantial Completion of the Work no later than . The number of calendar days from the date on which the Work is permitted to proceed, through the date set forth for Substantial Completion, shall constitute the “Contract Time.”
3.1.2 The Contractor shall pay the Owner the sum of $250 per day for each and every calendar day of delay in achieving Substantial Completion beyond the date set forth herein for Substantial Completion of the Work. Any sums due and payable under this Section shall be payable not as a penalty but as liquidated damages representing an estimate of delay damages likely to be sustained by the Owner, estimated at or before the time of executing this Contract. When the Owner reasonably believes that Substantial Completion will be delayed, the Owner shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the Owner to be adequate to cover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Substantial Completion, or any part thereof, for which the Owner has withheld payment, the Owner shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages.
Notwithstanding any other provision of this Section, the Owner and the Contractor expressly agree that the liquidated damages set forth herein do not contemplate, nor do they cover, any Funding Delay Damages as identified in Section 5.6.1.2. Any such Funding Delay Damages shall be in addition to the liquidated damages allowed pursuant to this Section.
3.2 Substantial Completion
3.2.1 “Substantial Completion” shall mean that stage in the completion of the Work when the Work is sufficiently complete in accordance with this Contract such that the Owner can enjoy beneficial use and occupancy of the Work, can utilize the Work for its intended purpose, and a Certificate of Occupancy has been issued allowing full and complete occupancy of the entire Project. Additionally, the Work shall not be deemed to be Substantially Complete until all nonconforming Work specifically rejected by the Architect has been properly completed as required by the Contract and until all operational manuals, “marked-up” drawings, and similar required documents are delivered to the Architect for transmission to the Owner. However, the mere issuance of a Certificate of Occupancy will not, by itself, constitute Substantial Completion. Ordinary and customary punchlist items shall be completed after Substantial Completion as provided by Section
5.5. Partial use or occupancy of the Project shall not result in the Project being deemed Substantially Complete, and such partial use or occupancy shall not be evidence of Substantial Completion.
3.2.2 In addition to the requirements for Substantial Completion as set forth in Section
3.2.1, as an express condition for Substantial Completion, the Contractor shall furnish to the Owner and the Architect, in writing, a detailed list of all incomplete and deficient Work which must be completed and corrected prior to Final Completion of the Project. THIS
LIST SHALL BE IN ADDITION TO ALL PUNCHLISTS REQUIRED ELSEWHERE BY
THIS CONTRACT. Furthermore, notwithstanding any other provision of this Contract, an express condition for Substantial Completion is the submission by the Contractor to
Owner and Architect of any warranties, manuals, drawings, forms, or other documents or things, of any kind or nature, as may be required for Substantial Completion by any of the
Contract Documents. In the event the Contract Documents require the submission of any such documents or things in order for the Project to be considered Substantially
Complete, receipt of same by Owner and Architect is an express condition precedent to any duty by Owner to make any payment otherwise due Contractor upon Substantial
Completion.
3.3 Time is of the Essence
3.3.1 All limitations of time set forth in the Contract Documents are of the essence of this Contract.
ARTICLE 4.
CONTRACT PRICE
4.1 The Contract Price
4.1.1 The Owner shall pay, and the Contractor shall accept, as full and complete payment for all of the Work, the fixed sum of . The sum set forth in this Section shall constitute the Contract Price and shall not be modified except by Change Order as provided in this Contract. The fixed sum includes the following:
ARTICLE 5.
PAYMENT OF THE CONTRACT PRICE
5.1 Schedule of Values
5.1.1 Within ten (10) calendar days after the effective date hereof, the Contractor shall submit to the Owner and to the Architect a Schedule of Values allocating the Contract
Price among the various portions of the Work. The Contractor’s Schedule of Values shall be prepared in such form, with such detail, and supported by such data as the Architect or the Owner may require to substantiate its accuracy. The Contractor shall not imbalance the Schedule of Values or artificially inflate any element thereof. The violation of this provision by the Contractor shall constitute a material breach of this Contract. The Schedule of Values shall be used only as a basis for the Contractor’s Applications for Payment and shall only constitute such basis after it has been acknowledged in writing by the Architect and the Owner. Receipt of the Schedule of Values as required herein is a condition precedent to payment of any sums due the Contractor.
5.1.2 In the event any Work is to be performed under a unit-price agreement, the Contractor acknowledges and represents that it has not imbalanced or artificially inflated the unit prices, and if requested by the Owner or the Architect, the Contractor shall provide such data and supporting documentation as may be requested to support the reasonableness and accuracy of such unit prices. Unit prices establish the complete and total sum to be paid for the unit price work, and such unit prices include any and all applicable overhead, profit, and mark-up of every kind and nature.
5.2 Payment Procedure
5.2.1 The Owner shall pay the Contract Price to the Contractor as provided in Section 5.2.
5.2.2 Progress Payments. Based upon the Contractor’s Applications for Payment submitted to the Architect and upon Certificates for Payment subsequently issued to the Owner by the Architect, the Owner shall make progress payments to the Contractor on account of the Contract Price.
5.2.2.1 On or before the 5th day of each month after commencement of the Work, the Contractor shall submit an Application for Payment for the period ending the 30th day of the preceding month to the Architect in such form and manner, and with such supporting data and content, as the Owner or the Architect may require.
5.2.2.2 Each Application for Payment may request payment for ninety-five percent (95%) of that portion of the Contract Price properly allocable in the Schedule of Values to Contract requirements properly performed and labor, materials, and equipment properly incorporated in the Work plus ninety-five percent (95%) of that portion of the Contract Price properly allocable in the Schedule of Values to materials or equipment properly stored on-site for subsequent incorporation in the Work, less the total amount of previous payments. Payment for stored materials and equipment shall be conditioned upon the Contractor’s proof satisfactory to the Owner, that the Owner has title to such materials and equipment, and shall include proof of required insurance.
5.2.2.3 Each Application for Payment shall be signed by the Contractor, which shall constitute the Contractor’s representation that the Work has progressed to the level for which payment is requested in accordance with the Schedule of Values, that the Work has been properly installed or performed in full accordance with this Contract, and that the Contractor knows of no reason why payment should not be made as requested.
5.2.2.4 The Architect will review the Application for Payment and may also review the Work at the Project site or elsewhere to determine whether the quantity and quality of the Work is as represented in the Application for Payment and is as required by this Contract.