About this file

Summary of AL 21st Century Specs

This is a Specifications document for the Alabama 21st Century Authority (Department of Finance) detailing chemical site preparation work required on a 40+/- acre clearcut tract located on Blue Springs Road, north of the Honda plant in Talladega County, Alabama. The project involves herbicide application to prepare the site for future forestry management following late 2025 timber harvesting. The specifications outline detailed requirements for chemical application methods, equipment specifications, safety protocols, and environmental compliance measures necessary to execute the site preparation work during the summer season.

The document provides comprehensive technical specifications for the herbicide spraying operation, including product requirements, application rates, equipment standards, and quality assurance procedures. Specific pricing terms, bid amounts, and contract award dates are not detailed within the specifications document itself, as this file serves as the technical foundation for the procurement process rather than the bid solicitation notice. The specifications establish the performance standards and operational parameters that prospective bidders must meet when submitting proposals for this site preparation project.

View the file

Other files

File Type Posted
AL21stCentury40acMaps - from Forestry.pdf PDF
DOPQQBPV4.08.26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Following are the specifications for requesting Quick-Quote bids for chemical site prep work needed on a 40+/- acre site north of Lincoln owned by the Alabama 21st Century Authority.

The Alabama 21st Century Authority (Dept. of Finance) has a 40+/- acre cutover tract which needs chemical site prep work done this summer. Lump-sum bids are requested. This tract was clearcut in late 2025. Maps of the tract are attached.

Location: 40+/- acres on Blue Springs Road, just north of the Honda plant, in portions of Section 19, T16S, R5E, Talladega County, AL, as shown on the attached maps.

Specifications: Chemical to be foliar applied via ground application using the following mix: Per 100 gallons of water: 2.5 gallons of Garlon XRT (or equivalent), 1 gallon of Chopper Gen II (or equivalent), 16 ounces of Milestone (or equivalent), plus 64 ounces of surfactant. All vegetation is to be covered or treated as per normal practice with this type of work. Treatment is to be completed between August 1, 2026, and October 15, 2026. Vendor will supply all materials and labor.