Airpot_Fiber_Replacement_Plans_Final.pdf
PDF 19 MB Posted
- Solicitation number
- 2024-RFB-029-PR
- Issued by
- Dane County, Wisconsin
About this file
The document is a set of construction and engineering plans for the Dane County Regional Airport Perimeter Fiber Project in Wisconsin. The project involves replacing and upgrading the existing fiber optic cable infrastructure across the airport campus, specifically focusing on removing existing 12-count fiber optic cables and installing new 48-count fiber optic cables along various conduit routes. The plans detail comprehensive fiber optic network improvements, including the installation of new handholes, splice enclosures, termination panels, and conduits across multiple locations within the airport's perimeter.
The project scope includes detailed technical specifications for fiber optic cable replacement at multiple sites, such as vehicle gates, field cabinets, communication rooms, and other strategic locations. The plans specify furnishing and installing 2" HDPE conduits, 48-count fiber optic cables, above-ground splice enclosure cabinets, and associated termination equipment. Notably, the project requires careful coordination, with specific instructions to minimize downtime (not exceeding two hours between gate sections) and special considerations for working in areas like the National Guard property. The documents also emphasize the contractor's responsibility for locating existing infrastructure, protecting environmentally sensitive areas, and coordinating with airport engineering staff during the implementation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dane_County_Regional_Airport_Perimeter_Fiber_Project_(Addendum_#3_Revision).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNOR
NELSON
T
T
C
M
M
Sun Prairie
Middleton
Monona
Waunakee
Maple Bluff
Shorewood
Creek Token
Burke
WESTPORT
BURKE
BLOOMING
GROVE
9 4 5
Madison
17 16
CV
BB AB
TT
138 240
135 97
102132
Lake Monona
Lake Mendota
Ya ha ra
R.
Mile Cr.
Cr.
Toke n
Title General Notes and Legend Estimate of Quantities Miscellaneous Quantities Right of Way Plat Plan and Profile Standard Detail Drawings Sign Plates Structure Plans Computer Earthwork Data Cross Sections
ORDER OF SHEETS
LAYOUT
SCALE
CORPORATE LIMITS
PROPERTY LINE
LOT LINE
EXISTING RIGHT OF WAY
SLOPE INTERCEPT
COMBUSTIBLE FLUIDS
POWER POLE
TELEPHONE POLE
ORIGINAL GROUND
MARSH OR ROCK PROFILE
UTILITY PEDESTAL
GAS
ELECTRIC
G
E
T
PROPOSED OR NEW R/W LINE
CAUTION
WOODED OR SHRUB AREA
MARSH AREA
EXISTING CULVERT
PROPOSED CULVERT
(Box or Pipe)
CULVERT (Profile View)
CONVENTIONAL SYMBOLS
ROCK
(To be noted as such)
SS
W
SANSANITARY SEWER
STORM SEWER
WATER
COUNTY:
PLOT NAME : H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TITLE - GENERAL NOTES - PLAN SHEETS.DWGFILE NAME : 1/25/2024 11:21 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
FOFIBER OPTIC
UTILITIESREFERENCE LINE
GRADE LINE
PROFILE
TELEPHONE
SPECIAL DITCH LABELLIMITED HIGHWAY EASEMENT
TOTAL SHEETS = 16
GRADE ELEVATION 95
.3
PLAN
Section No.
Section No.
Section No.
Section No.
Section No.
Section No.
Section No.
Section No.
Section No.
Section No.
Section No.
300'EB'
COORDINATES ON THIS PLAN ARE REFERENCED TO THE WISCONSIN
COUNTY COORDINATE SYSTEM, DANE COUNTY.
PROJECT LOCATION
DANE COUNTY REGIONAL AIRPORT
DANE COUNTY
2.0 MI.
E
DANE
WISDOT/CADDS SHEET 42
ECOUNTY: DANE
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TITLE - GENERAL NOTES - PLAN SHEETS.DWGFILE NAME : 1/25/2024 11:21 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:100 FT
GENERAL NOTES
LAYOUT NAME - General Notes
DIGGERS HOTLINE
Dial or (800)242-8511 www.DiggersHotline.com
COMMUNICATIONS
THESE PLANS AND THE ASSOCIATED SPECIAL PROVISIONS REFLECT CONDITIONS KNOWN DURING THE DEVELOPMENT OF THE PLANS AND SPECIAL PROVISIONS. THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE APPLICATION OF ALL WORK SHOWN IN THE PLANS TO THE ACTUAL PHYSICAL FIELD CONDITIONS IN ORDER TO PROVIDE A COMPLETE AND ACCEPTED PROJECT. IN THE EVENT THAT ACTUAL PHYSICAL FIELD CONDITIONS AFFECT OR PREVENT THE APPLICATION OR PROGRESSION OF ANY WORK SHOWN IN THE PLANS OR SPECIAL PROVISIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY, PRIOR TO ANY FURTHER
WORK BEING PERFORMED.
ANY CHANGES TO THE WORK SHOWN IN THE PLANS SHALL BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO THE WORK
BEING PERFORMED.
THE LOCATIONS OF EXISTING AND PROPOSED UTILITY INSTALLATIONS SHOWN ON THE PLANS ARE APPROXIMATE. THERE MAY BE
OTHER UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN.
THE CONTRACTOR SHALL CONTACT DIGGERS HOTLINE TO LOCATE ALL PUBLIC UTILITIES. PUBLIC UTILITY LOCATORS WILL REQUIRE AN ESCORT WHILE INSIDE THE PERIMETER FENCE. FOR PRIVATE AND FAA UTILITY LOCATES, THE CONTRACTOR SHALL
COORDINATE WITH THE AIRPORT ENGINEER.
ALL EXISTING UNDERGROUND AND ABOVE GROUND STRUCTURES AND FACILITIES WITHIN THE SCOPE OF THIS PROJECT MAY NOT BE SHOWN IN THE PLANS. THE CONTRACTOR IS FULLY RESPONSIBLE FOR LOCATING ALL UNDERGROUND AND ABOVE GROUND
STRUCTURES AND FACILITIES.
TYPICAL EQUIPMENT FOR THIS WORK INCLUDES A PICKUP TRUCK, MINI EXCAVATOR, CONDUIT PLOW, BORING MACHINE, AND A
FIBER SPLICING TRAILER.
NOTIFY THE ENGINEER (PRIMARY 608-241-1064, SECONDARY 763-452-4714) AT LEAST TWO WEEKS PRIOR TO STAKING ANY
DEVICE LOCATIONS.
NOTIFY THE ENGINEER (PRIMARY 608-241-1064, SECONDARY 763-452-4714) AT LEAST FORTY-EIGHT HOURS PRIOR TO
PENETRATING BUILDINGS.
NOTIFY THE ENGINEER (PRIMARY 608-241-1064, SECONDARY 763-452-4714) AT LEAST FORTY-EIGHT HOURS IN ADVANCE OF ANY WORK ON CITY OF MADISON OWNED OR MAINTAINED FACILITIES TO ARRANGE FOR AN INSPECTOR TO BE PRESENT DURING ALL SUCH WORK. WORK SHALL NOT COMMENCE UNTIL THE CITY TRAFFIC ENGINEERING INSPECTOR IS PRESENT.
CALL MIKE BENZSCHAWEL (608-235-3649) AT THE CITY OF MADISON TRAFFIC ENGINEERING SHOP AT LEAST TWENTY-FOUR
HOURS IN ADVANCE OF WORK WITHIN THE CITY OF MADISON RIGHT-OF-WAY.
HAND DIG TRENCHES NEAR EXISTING CONDUITS AND CABLES. VERIFY DEPTHS OF EXISTING CONDUITS AND CABLES PRIOR TO
CROSSING BY DIRECTIONAL BORE.
ALL CABLE PULLING AND SPLICING OPERATIONS SHALL OCCUR AT ACCESS POINTS (HANDHOLES, COMMUNICATION VAULTS, ETC.)
SHOWN IN THE PLANS.
ALL SPLICING OPERATIONS SHALL BE COORDINATED WITH THE AIRPORT ENGINEER. THE FIBER NETWORK SHALL HAVE A
MAXIMUM DOWNTIME OF TWO HOURS OR AS APPROVED BY THE AIRPORT ENGINEER.
ALL FIBER OPTIC CONNECTORS SHALL BE LC UNLESS SPECIFIED OTHERWISE.
WETLANDS, WATERWAYS, AND OTHER ENVIRONMENTALLY SENSITIVE AREAS SHALL BE PROTECTED AT ALL TIMES. DO NOT STORE
EQUIPMENT OR MATERIALS NEAR THESE SITES UNLESS APPROVED BY THE ENGINEER.
NO TREES OR SHRUBS ARE TO BE REMOVED WITHOUT APPROVAL OF THE ENGINEER.
AREAS WITHIN THE RIGHT-OF-WAY DISTURBED DUE TO CONSTRUCTION OPERATIONS ARE TO BE RESTORED TO THE ORIGINAL CONDITION WITH TOPSOIL, FERTILIZER, SEED, AND MULCH. NO PAYMENT WILL BE MADE FOR RESTORING AREAS DISTURBED DUE
TO CONSTRUCTION OPERATIONS.
DANE COUNTY REGIONAL AIRPORT
JASON PEARCY
608-241-1064
PEARCY.JASON@MSNAIRPORT.COM
4000 INTERNATIONAL LANE
MADISON, WI 53704
SRF CONSULTING GROUP
ALYSSA SEGALL
763-452-4714
ASEGALL@SRFCONSULTING.COM
ERIK MINGE
763-249-6739
EMINGE@SRFCONSULTING.COM
3701 WAYZATA BLVD
MINNEAPOLIS, MN 55416-3791
STANDARD ABBREVIATIONS
EX ----- EXISTING
FO ----- FIBER OPTIC
HH ----- HANDHOLE
QP ----- QUANTITY POINT
SM ----- SINGLE MODE
SC ----- SPLICE/PATCH PANEL ENCLOSURE
LEGEND
DESCRIPTION SYMBOL
HANDHOLE -----------------------------------
SPLICE ENCLOSURE -----------------------
FIELD CABINET ------------------------------
CONDUIT -------------------------------------
QUANTITY POINT ---------------------------
VECHILE GATE -------------------------------
CCTV CAMERA -------------------------------
GENERAL NOTES
PLOT SCALE : 1 IN:1000 FT
WISDOT/CADDS SHEET 44
ECOUNTY: DANE
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\PO.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET PROJECT OVERVIEW
LAYOUT NAME - Project Overview
I-94
PROJECT LOCATION
US-151
I-90
W I-113
U S-51
SCALE
0 1,000 FT
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:50 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
COMMUNICATION SCHEMATICS
LAYOUT NAME - FO1
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:54 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
COMMUNICATION SCHEMATICS
LAYOUT NAME - FO2
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
COMMUNICATION SCHEMATICS
LAYOUT NAME - FO3
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
COMMUNICATION SCHEMATICS
LAYOUT NAME - FO4
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
COMMUNICATION SCHEMATICS
LAYOUT NAME - FO5
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
LAYOUT NAME - FO6
9COMMUNICATION SCHEMATICS
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
LAYOUT NAME - FO7
10COMMUNICATION SCHEMATICS
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\TYPE V HH.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : Custom
LAYOUT NAME - FO8
11COMMUNICATION SCHEMATICS
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\CONSTRUCTION DETAIL PLAN SHEET.DWGFILE NAME : 1/25/2024 11:22 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:100 FT
CONSTRUCTION PLANS
LAYOUT NAME - Construction Plans
M
ATCH
LIN
E A
MATCHLINE B
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
EXISTING:
CHILLER PLANT
COMMUNICATION ROOM 10
FURNISH & INSTALL:
1 FIBER OPTIC PANEL
24-FIBER OPTIC TERMINATIONS
14-FIBER OPTIC PATCH CORDS
ADD 50 FEET FIBER FOR
CONNECTION TO CHILLER PLANT
EXISTING:
1-4" CONDUIT
FIBER OPTIC CABLE 48-CT
COORDINATE WITH SOUTH TERMINAL
EXPANSION PROJECT ENGINEER FOR
EXACT CONDUIT LOCATION
NOTES:
1. EXISTING FIBER TO BE REMOVED BETWEEN ONE SET OF GATES AT A
TIME. DOWN TIME SHALL NOT EXCEED TWO HOURS.
2. SEE SPLICE/ PATCH PANEL DETAIL.
3. THIS AREA IS PROPERTY OF THE NATIONAL GUARD. PRIOR TO
BEGINNING WORK IN THIS AREA OR ACCESSING THIS AREA,
CONTRACTOR SHALL COORDINATE WITH THE AIRPORT AND THE
NATIONAL GUARD.
4. ALL EXISTING HAND HOLES WITHIN THE SCOPE OF THIS PROJECT
MAY NOT BE SHOWN IN THE PLANS. THE CONTRACTOR IS FULLY
RESPONSIBLE FOR LOCATING HAND HOLES.
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
2-FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
SEE NOTE 3
SCALE
0 400FT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2-FIBER OPTIC CABLE 48-CT
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\CONSTRUCTION DETAIL PLAN SHEET.DWGFILE NAME : 1/25/2024 11:32 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:100 FT
CONSTRUCTION PLANS
LAYOUT NAME - Construction Plans (2)
MATCHLINE C
M
AT
CH
LI
N E
A
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
SEE NOTE 3
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-2" HDPE CONDUITS
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
STAIR A J-BOX
FURNISH & INSTALL:
50' OF FIBER FOR
CONNECTION TO TERMINAL
EXISTING:
1 CCTV CAMERA
(POLE MOUNTED)
EXISTING:
FIELD WEST CABINET
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
NOTES:
1. EXISTING FIBER TO BE REMOVED BETWEEN ONE SET OF GATES AT A
TIME. DOWN TIME SHALL NOT EXCEED TWO HOURS.
2. SEE SPLICE/ PATCH PANEL DETAIL.
3. CABINET IS INSIDE LAV. CART BUILDING AND CONNECTS TO VG-6.
4. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO
MOUNTING THE NEW SPLICE/PATCH PANEL ENCLOSURE INSIDE THE
LAV. CART BUILDING
5. ALL EXISTING HAND HOLES WITHIN THE SCOPE OF THIS PROJECT
MAY NOT BE SHOWN IN THE PLANS. THE CONTRACTOR IS FULLY
RESPONSIBLE FOR LOCATING HAND HOLES.
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTES 2 & 4
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
SCALE
0 400FT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
FURNISH & INSTALL:
2" HDPE CONDUIT
2-FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\CONSTRUCTION DETAIL PLAN SHEET.DWGFILE NAME : 1/25/2024 12:30 PMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:100 FT
CONSTRUCTION PLANS
LAYOUT NAME - Construction Plans (3)
M
AT
CH
LI
N E
D
MATCHLINE C
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FURNISH & INSTALL:
2-FIBER OPTIC CABLE 48-CT
EXISTING:
1 CCTV CAMERA (POLE MOUNTED)
EXISTING:
FIELD NORTH CABINET
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
NOTES:
1. EXISTING FIBER TO BE REMOVED BETWEEN ONE SET OF GATES AT A
TIME. DOWN TIME SHALL NOT EXCEED TWO HOURS.
2. SEE SPLICE/ PATCH PANEL DETAIL.
3. ALL EXISTING HAND HOLES WITHIN THE SCOPE OF THIS PROJECT
MAY NOT BE SHOWN IN THE PLANS. THE CONTRACTOR IS FULLY
RESPONSIBLE FOR LOCATING HAND HOLES.
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
2-FIBER OPTIC CABLE 48-CT
SCALE
0 400FT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2-FIBER OPTIC CABLE 48-CT
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
FURNISH & INSTALL:
2-FIBER OPTIC CABLE 48-CT
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\CONSTRUCTION DETAIL PLAN SHEET.DWGFILE NAME : 1/25/2024 11:23 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY AIRPORT
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:100 FT
CONSTRUCTION PLANS
LAYOUT NAME - Construction Plans (4)
MATCHLINE B
M
ATCH
LIN
E D
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
SEE NOTE 3
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
EXISTING:
CONTROLLED VEHICLE GATE
VEHICLE GATE CABINET
FURNISH AND INSTALL:
TERMINATION PANEL
FURNISH & INSTALL:
ABOVE-GROUND SPLICE ENCLOSURE
CABINET
SEE NOTE 2
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
NOTES:
1. EXISTING FIBER TO BE REMOVED BETWEEN ONE SET OF GATES AT A
TIME. DOWN TIME SHALL NOT EXCEED TWO HOURS.
2. SEE SPLICE/ PATCH PANEL DETAIL.
3. THIS AREA IS PROPERTY OF THE NATIONAL GUARD. PRIOR TO
BEGINNING WORK IN THIS AREA OR ACCESSING THIS AREA,
CONTRACTOR SHALL COORDINATE WITH THE AIRPORT AND THE
NATIONAL GUARD.
4. ALL EXISTING HAND HOLES WITHIN THE SCOPE OF THIS PROJECT
MAY NOT BE SHOWN IN THE PLANS. THE CONTRACTOR IS FULLY
RESPONSIBLE FOR LOCATING HAND HOLES.
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
SCALE
0 400FT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
2" HDPE CONDUIT
FIBER OPTIC CABLE 48-CT
EXISTING:
2-1.5" HDPE CONDUITS
FIBER OPTIC CABLE 12-CT
REMOVE:
FIBER OPTIC CABLE 12-CT
FURNISH & INSTALL:
FIBER OPTIC CABLE 48-CT
PLOT SCALE : 1 IN:5 FT
ECOUNTY: DANE
H:\PROJECTS\12000\12598\CAD_BIM\SHEETSPLAN\AIRPORT\SPLICE-PATCH PANEL ENCLOSURE DETAIL.DWGFILE NAME : 1/25/2024 11:23 AMPLOT DATE : PLOT BY : BRENT BOKEMPER
PROJECT: DANE COUNTY REGIONAL AIRPORT
PLOT NAME :
SHEET FIBER SPLICE/PATCH PANEL ENCLOSURE DETAIL
LAYOUT NAME - Project Overview
NOTES:
1. WHERE POSSIBLE, THE CONTRACTOR SHALL ADD BRACKETS TO THE MOUNTING STRUCTURE.
CONTRACTOR SHALL MOUNT ENCLOSURE TO ADDED BRACKETS. IF THIS IS NOT FEASIBLE,
CONTRACTOR SHALL PROPOSE A DIFFERENT MOUNTING LOCATION AND RECIEVE APPROVAL FROM
THE ENGINEER.
2. SEE COMMUNICATION SCHEMATICS FOR SPLICING AND TERMINATION DETAILS.
3. CONTRACTOR SHALL CONNECT THE NEW CONDUIT BY CREATING NEW PENETRATION IN THE
BOTTOM OF THE EXISTING CABINET. CONTRACTOR SHALL SECURE CONDUIT TO THE CABINET AND
CREATE A WATERTIGHT SEAL. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND
REPLACING ANY INFRASTRUCTURE DAMAGED DURING THE CONDUIT INSTALLATION.
4. CONTRACTOR SHALL CONNECT CONDUIT TO ENCLOSURE AND UTILIZE A RUBBER GROMMET OR
OTHER METHOD APPROVED BY THE ENGINEER TO CREATE A WATERTIGHT CONNECTION.
5. THIS IS AN EXAMPLE OF SITE CONDITIONS THAT MAY BE ENCOUNTERED. SITES MAY DIFFER.
6. SITES WITH CCTV CABINET WILL UTILIZE EXISTING CONDUIT SYSTEM FOR FURNISH AND INSTALL
'GATOR' OR SIMILAR CABLE WITH INTEGRATED PATCH PANEL FOR CCTV. SEE COMMUNICATION
SCHEMATICS.
FURNISH & INSTALL:
1 - FIBER OPTIC
SPLICE/PATCH PANEL
ENCLOSURE
SEE NOTES 1 & 2.
SEE NOTE 1
SEE NOTE 3
SEE NOTE 4
FURNISH & INSTALL:
1 - 2" FLEXIBLE METAL CONDUIT
1 - GATOR OR SIMILAR INTEGRATED
PATCH CABLE
FURNISH & INSTALL:
1 - 2" HDPE CONDUIT
2 - FIBER OPTIC CABLE 48-CT
SCALE
0 5FT
REMOVE:
EXISTING FIBER OPTIC CABLE 12-CT
SEE NOTE 6
| Sheets and Views |
| 1 Title - General Notes - Plan Sheets - Title |
| 2 Title - General Notes - Plan Sheets - General Notes |
| 3 PO - Project Overview |
| 4 Type V HH - CS |
| 5 Type V HH - CS (2) |
| 6 Type V HH - CS (3) |
| 7 Type V HH - CS (4) |
| 8 Type V HH - CS (5) |
| 9 Type V HH - CS (6) |
| 10 Type V HH - CS (7) |
| 11 Type V HH - CS (8) |
| 12 Construction Detail Plan Sheet - Construction Plans |
| OLE1 |
| 13 Construction Detail Plan Sheet - Construction Plans (2) |
| OLE1 |
| 14 Construction Detail Plan Sheet - Construction Plans (3) |
| OLE1 |
| 15 Construction Detail Plan Sheet - Construction Plans (4) |
| OLE1 |
16 Splice-Patch Panel Enclosure Detail - Project Overview
File details come from the government source that posted it. Updated .