Air Comp. 90121 SOW 23.pdf

PDF 80 KB Posted

Attached to
Air Compressor - Bldg. 90113, Hurlburt Field Federal contract opportunity
Solicitation number
FA441724Q0158
Issued by
Department of the Air Force Special Operations Command

About this file

This document is a Statement of Work (SOW) for an air compressor installation project at Hurlburt Field in Florida.

The SOW requires the contractor to provide and install a KAISHAN air compressor with specific technical requirements, including an airflow of 40.6 ACFM, 175 PSI pressure, and a maximum sound level of 71 dB. The contractor must disconnect the existing system, provide professional installation and electrical services, and complete the work within 7 calendar days. No government-furnished property or services will be provided. The contractor must obtain base access for its employees and comply with all base regulations. The related federal contract opportunity is a Request for Quote (RFQ) solicitation for the air compressor installation, issued by the Department of the Air Force Special Operations Command.

View the file

Other files for this federal contract opportunity

Other files attached to Air Compressor - Bldg. 90113, Hurlburt Field, newest first.
File Type Posted
RFQ - FA441724Q0158 - Air Compressor .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Air Compressor

1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide and install an air compressor on the outside east of building 90113, Hurlburt Field, FL. The contractor will be required to disconnect existing system. User will dispose of old system once disconnected.

1.1. BASIC SERVICES.

1.1.1. Provide and install a KAISHAN Compressor and accessories described in the Statement of

Work (SOW). The contractor shall provide any mounting stations, equipment, and material necessary to completely install the new complete system on a level surface.

1.1.2. Equivalent products must meet the requirements detailed below:

1.1.2.1. Flow of ACFM of 40.6.

1.1.2.2. A pressure of 175psig.

1.1.2.3. Sound should be no more than 71db.

1.1.2.4. Dimensions 40”x26”x42 L/W/H

1.1.2.5. Voltage required is 208/3/60

1.1.2.6. Outlet for air ¾” NPT-M reducible to a 3/8 hose.

1.1.2.7. System will feature belt driven with rotary screw compressor

1.1.2.8. Water resistant Electrical Enclosure with Full voltage starter (5-7.5) with a Wye-Delta (8-

8-50) HP A Microprocessor Controller.

1.1.2.9. A 90-amp breaker will be installed in the breaker box to replace current 60-amp breaker.

Wiring will be upgraded to NEC.

2. The contractor shall provide professional installation and electrical services to install/connect compressor to existing breaker. Located inside the detail bay building 90121 south end of facility.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. There will be no

Government Furnished Property or Services provided for this effort.

4. HOURS OF OPERATION.

4.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: MON-FRI 0630 to 1600, except for federal holidays. The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the government. Dates and times of installation must be coordinated and approved in advance by 1SOLRS personnel.

4.2. Recognized Holidays. The contractor is not required to provide service on the following days:

New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on

Monday.

4.3 The installation shall not last more than 7 calendar days from start of the project. The contractor shall uncrate/unpack all new items and perform required assembly in accordance with the manufacturer’s instructions. Contractor shall remove and dispose of packing material at an off-base location.

5. BASE ACCESS

5.1 Contractor, Employee Base Pass and Identification, Special Clearances, and Vehicle

Passes. The contractor shall obtain base identification and vehicle passes, if required, for all

Contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor employees are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation. The contractor shall submit the employee listing the Contracting Officer no less than 3 days prior to the performance start date and at least one day prior as changes occur. Employees with active warrants or felonies will not be granted access to the base.

5.2 The Contractor Employee List. This form shall list every employee requiring base access. Every time employees change; it shall be updated to reflect additions and/or deletions. Identify those individuals you wish to have escort authority by including the word

“escort” or “E” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e., one or two). For work locations use building numbers or specify as base wide if applicable. Once completed, email the list to the Contracting Office representative in

EXCEL format. The Contracting Officer will then prepare, attach a cover letter, and forward the

Employee List to the Visitor Control Center.

5.3 Upon notification of the employee listing being forwarded to the Visitor Control Center

(VCC), all contractor employees shall report to the VCC to complete the required documentation for base access. Contractor employees shall be required to provide two (2) forms of identification. If an employee will be driving on Hurlburt Field they are required to provide a valid driver’s license, vehicle registration, and proof of insurance. NOTE: The section of

Commercial gate Control Center administrating this function is closed after 1800 (6:00 p.m.), therefore, employees must arrive prior to this time in order for their documentation to be processed.

5.4 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

5.5 WEAPONS, FIREARMS AND AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms or ammunition on themselves or within their contractor-owned or privately owned vehicle while on Hurlburt Field, FL.

5.6 DRIVING LICENSE/ON-BASE REQUIREMENTS. The contractor and employees shall comply with base traffic regulations at all sites. The contractor shall ensure employees have a current and valid state/country driver’s license for the type of vehicle being driven before allowing the employee to operate a personal vehicle on Hurlburt Field, Florida.

File details come from the government source that posted it. Updated .