Webster-Package1-Specs.pdf

PDF 4 MB Posted

Attached to
EWP - Streambank Stabilization - 5 Sites - Webster County, West Virginia Federal contract opportunity
Solicitation number
AG-SPEC-S-17-0049
Issued by
Department of Agriculture National Resources Conservation Service Headquarters

About this file

Construction and Material Specifications

View the file

Other files for this federal contract opportunity

Other files attached to EWP - Streambank Stabilization - 5 Sites - Webster County, West Virginia, newest first.
File Type Posted
Amend_001.pdf PDF
Webster-Package1-Drawings--REV-6-9-17_SignedCover.pdf PDF
Wage_Determination_WV170061.pdf PDF
Solicitation_AG-SPEC-S-17-0049.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction and Material Specification List

WV EWP Streambank Stabilization 2016 Webster Package 1 Webster County, WV

Rodebaugh, Bergoo, & Camp Caesar Sites

No.

Date

1/14

Title

CONSTRUCTION SPECIFICATIONS

Pollution Control 6 1/14 Seeding, Sprigging, and Mulching 8 5/01 Mobilization & Demobilization 11 5/01 Removal of Water

21 1/09 Excavation

1/09 Earthfill 34 1/14 Steel Reinforcement 61 1/14 Rock Riprap 64 1/14 Wire-Mesh Gabion Baskets 94 1/09 Contractor Quality Control 95 1/14 Geotextile 401 Obstruction Removal

MATERIAL SPECIFICATIONS

523 1/14 Rock for Riprap 539 1/14 Steel Reinforcement 592 1/14 Geotextile

Chapter 2 National Standard Construction Specifications Part 642 National Engineering Handbook

Construction Specification 5—Pollution Control

1. Scope The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.

The following BioPreferred® product categories are applicable to this specification: — mulch and compost materials erosion control materials fertilizers dust suppressants agricultural spray adjuvants

2. Material

Silt fence shall conform to the requirement of Materials Specification 592, Geotextile. All other material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.

3. Erosion and sediment control measures and works

The measures and works shall include, but are not limited to, the following:

Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.

Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.

Mulching—Mulching to provide temporary protection of the soil surface from erosion.

Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.

Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.

Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.

Sediment filters—Straw bale filters or geotextile silt fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. Silt fences shall be installed and maintained in accordance with ASTM D6462. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.

Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.

Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.

(210-VI-NEH, January 2014) 5-1

4. Chemical pollution The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. Pollutants shall be disposed of in accordance with appropriate state and Federal regulations.

At the completion of the construction work, tanks, barrels, and sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.

Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.

5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.

Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.

All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.

6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.

7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.

Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.

Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.

All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary.

Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.

(210-VI-NEH, January 2014) 5-2

8. Items of work and construction details

Items of work to be performed in conformance with this specification and construction details therefore are:

a. Subsidiary Item, Pollution Control

(1) The contractor shall exercise precaution throughout the duration of the Contract to prevent the pollution of rivers and streams. Chemicals, fuels, lubricants, raw sewage, and other harmful wastes shall not be discharged into or alongside any river, stream, or natural or man-made waterway leading thereto. Materials identified as chemical pollutants in Section 4 of this Specification shall be removed from the site and disposed of in compliance with applicable state and federal regulations. Any chemical pollutant spills shall be reported to the State Center for Pollution, Toxic Chemical and Oil Spills hotline at 1-(800)-642-3074.

(2) The contractor shall schedule clearing and grubbing operations in a manner which will minimize the amount of erodible surface soil exposed at any time. Areas shall not be cleared and grubbed until immediately prior to actual need or use of the area.

(3) Pollution control measures shall be installed in a timely manner to protect against erosion from areas to be exposed by excavation and fill operations.

(4) Equipment shall not be operated in live streams except as may be required to construct stream bank stabilization measures and temporary structures located in live streams. Frequent fording of live streams with construction equipment will not be permitted.

Temporary bridges, culverts, or other structures shall be installed wherever an appreciable number of stream crossings are necessary.

(5) Protective cover shall be applied to disturbed areas as soon as work has been completed in the area, and/or whenever work in the disturbed area will be delayed or stopped more than five (5) continuous days. Areas to be provided with protective cover will be staked and/or flagged in the field by the engineer. Protective cover shall be applied to disturbed areas by mulching with straw. Materials and workmanship for providing protective cover shall be in accordance with Construction Specification 6, Seeding, Sprigging and Mulching.

Straw mulch shall be applied uniformly to disturbed areas at the rate of 2 tons per acre.

(6) Section 7, Measurement and Payment shall not apply. No separate payment will be made for Pollution Control. Compensation for Pollution Control will be made under Bid Item 2, Loose Rock Riprap and/or Bid Item 3, Wire Mesh Gabions.

NRCS – EWP

Webster County, WV 5-3

Construction Specification 6—Seeding, Sprigging, and Mulching

1. Scope The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.

The following BioPreferred® product categories are applicable to this specification:

— mulch and compost materials

— erosion control materials

— fertilizers

— agricultural spray adjuvants

2. Material Seed—All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available. It shall meet or exceed the standard for purity and germination listed in section 7.

Seed shall be labeled in accordance with the state laws and the U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed will be accepted with a test date of more than 9 months before the delivery date to the site.

Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable shall be as defined in the current State laws relating to agricultural seeds. Each type of seed shall be delivered in separate sealed containers and fully tagged unless exception is granted in writing by the contracting officer.

Fertilizer—Unless otherwise specified, the fertilizer shall be a commercial grade fertilizer. It shall meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight. When required by the contract, a representative sample of the fertilizer shall be furnished to the contracting officer for chemical analysis.

Inoculants—The inoculant for treating legume seeds shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and shall not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, shall be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer shall be used except four times the amount shall be used when seed is applied using a hydraulic seeder. Seed shall be sown within 24 hours of treatment and shall not remain in the hydraulic seeder longer than 4 hours.

Lime and other soil amendments—Lime shall consist of standard ground agriculture limestone, or approved equivalent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State Department of Agriculture.

Other soil amendments shall meet quality criteria and application requirements specified in section 7.

Mulch tackifiers—Asphalt emulsion tackifiers shall conform to the requirements of ASTM D 977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations shall be as specified in section 7.

Straw mulch material—Straw mulch shall consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 7. The mulch material shall be air-dry, reasonably light in color, and shall not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted. The contractor shall provide a method satisfactory to the contracting officer for determining weight of mulch furnished.

Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh, are other mulching materials that may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer's recommendations for methods of application.

(210-VI-NEH, January 2014) 6-1

3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting shall be as shown on the plans or as specified in section 7.

4. Seedbed preparation and treatment Areas to be treated shall be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed shall be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and moisture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equipment cannot operate safely, the seedbed shall be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.

If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.

Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or maintenance operations shall be removed or disposed of as specified in section 7.

Seedbed preparation shall be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the contracting officer's technical representative (COTR).

5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations shall be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application shall be as specified in section 7. Unless otherwise specified, seeding or sprigging shall be accomplished within 2 days after final grading is completed and approved.

Fertilizer, lime, and other soil amendments shall be applied as specified in section 7. When specified, the fertilizer and soil amendments shall be thoroughly incorporated into the soil immediately following surface application.

The rate, amount, and kind of mulching or mesh shall be as specified in section 7. Mulches shall be applied uniformly to the designated areas. They shall be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material shall be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier.

When the mulch crimper or equivalent anchoring tool is used, it shall have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it shall be operated on the contour.

Hand methods shall be used where equipment cannot safely operate to perform the work required.

The tackifier shall be applied uniformly over the mulch material at the specified rate, or it shall be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials shall be applied smoothly, but loosely on the designated areas. The edges of these materials shall be buried or securely anchored using spikes or staples as specified in section 7.

The contractor shall maintain the mesh or netting areas until all work under the contract has been completed and accepted.

Maintenance shall consist of the repair of areas damaged by water erosion, wind, fire, or other causes. Such areas shall be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas shall be refertilized, reseeded, and remulched before the new application of the mesh or netting.

6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each area treated is measured as specified in section 7 and the area calculated to the nearest 0.1 acre. Payment for treatment is made at the contract unit price for the designated treatment, which will constitute full compensation for completion of the work.

When specified as an item of work, mesh or netting is measured to the nearest square yard of surface area covered and accepted.

Payment is made at the contract unit price and will constitute full compensation for completion of the work.

(210-VI-NEH, January 2014) 6-2

Method 2—For items of work for which specific lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for this item is made at the contract lump sum price for the item and will constitute full compensation for the completion of the work.

Method 3—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds.

Progress payments will be determined as specified in section 7. Payment of the lump sum contract price will constitute full compensation for completion of the work.

All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the item(s) to which they are made subsidiary are identified in section 7.

(210-VI-NEH, January 2014) 6-3

7. Items of work and construction details

The items of work and construction details to be performed in conformance with this specification are:

a. General Requirements

(1) No permanent seeding shall be done between October 1 and December 1 unless otherwise approved by the Contracting Officer.

(2) The approved lines and grades for permanent seeding at the time of permanent seeding shall be maintained during and after the seeding and mulching operation. Any area that has been damaged or had part or all of the seeding material removed by any means shall be repaired before acceptance will be made. The area to be repaired shall be filled and/or graded as needed to bring it back to neat lines, fertilized, seedbed prepared, and then seeded and mulched at the specified rates.

(3) Lime shall be applied at an application rate of 2 tons per acre.

(4) The following minimum amounts of fertilizer shall be applied per acre prior to seeding:

(a) Nitrogen (N) 40 Lb.

Phosphoric Acid (P2O5) 80 Lb.

Potash (K2O) 80 Lb.

(b) The required application can be achieved by applying fertilizer having an analysis of 10-20-20 at the rate of 400 pounds per acre or 9 pounds per 1000 square feet.

(5) Seedbed Preparation.

(a) Lime and fertilizer shall be applied prior to final seedbed preparation.

(b) Seeding shall be accomplished immediately after achieving final grade. Seedbed preparation shall only be required on compacted, polished, or freshly cut soil surfaces. Where special seedbed preparation is required, the hardened soil shall be loosened to a depth of 1½ inches; either by equipment or manual methods.

(6) Seed.

(a) Each seed species shall comply with the West Virginia Department of Agriculture’s standards for purity and germination. The seed mixtures and application rates are:

Seed Rate,lb/ac.

Bluegrass 8 Kentucky 31 Tall Fescue 10 Annual Ryegrass 15 Red Fescue 5 Perennial Ryegrass 5

(b) When seeding is performed between April 15-August 1 or December 1-March 1, the specified rates of seed per acre shall be increased by 50 percent.

Webster County, WV 6-4

(7) Mulch material shall be wheat, oat or rye straw only. Mulch shall be applied uniformly over all seeded areas at the specified rate per acre. Application shall be within 24 hours after seeding. A mechanical blower may be used to apply the mulch. Application rates and material requirements shall be in accordance with the following table:

Time Period vs. Mulching Requirements for Revegetation of Construction

Sites

Time Period

Suitability

Mulch

Application tons/acre

March 1 – April 15 August 1 – October 1

Best Seeding Periods

Small grain straw* 2

April 15 – August 1

High Risk Period

Small grain straw

2.5

October 1 – December 1

Do Not Seed

2.0

December 1 – March 1

Good Seeding Period

2.5

* Small grain straw shall consist of wheat, oat, or rye straw.

b. Subsidiary Item, Seeding and Mulching

(1) This item shall consist of seeding and mulching to permanent cover all disturbed areas due to work associated with the job.

(2) Section 6, Measurement and Payment shall not apply. No separate payment will be made for Seeding, Sprigging, and Mulching. Compensation for Seeding, Sprigging, and Mulching will be made under Bid Item 2, Loose Rock Riprap and/or Bid Item 3, Wire Mesh Gabion Baskets.

Webster County, WV 6-5

Construction Specification 8 - Mobilization and Demobilization

1. Scope

The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.

2. Equipment and Material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.

Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.

This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.

3. Payment

Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.

Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.

(210-VI-NEH, May 2001) 8-1

4. Items of Work and Construction Details

The items of work and construction details to be performed in conformance with this specification are:

a. Bid Item 1, Mobilization and Demobilization

(1) This item shall consist of the mobilization and demobilization of all work forces, materials, and equipment necessary to complete the work under this Bid Schedule.

(2) The contractor shall contact MISS Utility before work on each site begins. The contractor shall provide the MISS Utility conformation number for the site to the engineer before commencement of the work.

(3) Prior to construction the contractor shall verify that all utilities have been disconnected at each site.

(4) The Contractor may use a portable sign for public notice and for posting documents as required by the permits and this contract. Signage may be prepared to accommodate frequent revisions for use at multiple sites.

Webster County, WV 8-2

Construction Specification 11—Removal of Water

The work consists of the removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It shall include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.

2. Diverting surface water The contractor shall install, maintain, and operate all cofferdams, channels, flumes, sumps, and all other temporary diversion and protective works needed to divert streamflow and other surface water through or around the construction site. Control of surface water shall be continuous during the period that damage to construction work could occur. Unless otherwise specified and/or approved, the diversion outlet shall be into the same drainageway that the water would have reached before being diverted.

The contractor shall furnish the contracting officer, in writing, a proposed plan for diverting surface water before beginning any construction activities for which a diversion is required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities related to this activity during the process of completing the work as specified.

3. Dewatering the construction site Foundations, cutoff trenches, and all other parts of the construction site shall be dewatered and kept free of standing water and muddy conditions as necessary for the proper execution of the work. The contractor shall furnish, install, operate, and maintain all drains, sumps, pumps, casings, well points, and all other equipment required to properly dewater the site as specified. Dewatering systems that cause a loss of soil fines from the foundation areas will not be permitted.

The contractor shall furnish the contracting officer, in writing, a proposed plan for dewatering before commencing with any construction activity for which dewatering may be required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities for completing the specified work.

4. Dewatering borrow areas The contractor shall maintain all borrow areas free of surface water or otherwise provide for timely and effective removal of surface and subsurface water that accumulates within the borrow area, unless waived in section 8 of this specification. Borrow material shall be processed as necessary to achieve proper and uniform moisture content at the time of placement.

If pumping to dewater borrow areas is included as a bid item of work in the bid schedule, each pump discharge pipe shall be equipped with a water meter. The meter shall be such that the measured quantity of water is accurate within 3 percent of the true quantity. The contractor shall provide necessary support to perform accuracy tests of the water meter when requested by the contracting officer.

(210-VI-NEH, May 2001) 11-1

5. Erosion and pollution control Removal of water from the construction site, including the borrow areas, shall be accomplished so that erosion and the transporting of sediment and other pollutants are minimized. Dewatering activities shall be accomplished in a manner that the water table water quality is not altered. Pollution control activities shall not conflict with the requirements of Construction Specification 5, Pollution Control, if it is a part of this contract.

6. Removal of temporary works When temporary works are no longer needed, the contractor shall remove and return the area to a condition similar to that which existed before construction. Areas where temporary works were located shall be graded for sightly appearance with no obstruction to natural surface waterflows or the proper functioning and access to the works of improvement installed. The contractor shall exercise extreme care during the removal stages to minimize the loss of soil sediment and debris that was trapped during construction.

Pipes, casings, and any other material used to dewater the site shall be removed from temporary wells. The wells shall be filled to ground level with clean gravel or other suitable material approved by the contracting officer. The contractor shall exercise extreme care to prevent pollution of the ground water by these actions.

7. Measurement and payment Method 1—Items of work listed in the bid schedule for removal of water, diverting surface water, and dewatering construction sites and borrow areas are paid for at the contract lump sum prices. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.

Method 2—Items of work listed in the bid schedule for removal of water, diverting surface water, dewatering construction sites, and dewatering borrow areas are paid for at the contract lump sum prices. Such payment will constitute full compensation for furnishing, installing, operating, and maintaining the necessary trenches, drains, sumps, pumps, and piping and for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work. The exception is that additional payment for pumping to dewater borrow areas and the removal of water will be made as described in the following paragraph.

If pumping to dewater borrow areas is a contract bid item, payment is made at the contract unit price, which shall be the price per 1,000 gallons shown in the bid schedule. Such payment will constitute full compensation for pumping only. Compensation for equipment and preparation and for other costs associated with pumping is included in the lump sum payment for removal of water or the lump sum payment for dewatering the borrow areas. Payment is made only for pumping that is necessary to dewater borrow areas that cannot be effectively drained by gravity or that must have the water table lowered to be usable as a suitable borrow source. Pumping for other purposes will not be included for payment under this item.

All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the contract line item to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 8 of this specification.

(210-VI-NEH, May 2001) 11-2

Items of work to be performed according to this specification and the construction details are:

a. Subsidiary Item, Removal of Water

(1) This item shall consist of all work necessary to divert surface waters and dewater the work areas as required to perform the work.

(2) Submittal of written plans for diverting surface water and dewatering the site are not required.

(3) Section 7, Measurement and Payment shall not apply. No separate payment will be made for

Removal of Water. Compensation for this item will be included in the payment for Bid Item 2, L o o s e R o c k R i p r a p a n d / o r B i d I t e m 3 , Wire Mesh Gabions.

Webster County, WV 11-3

Construction Specification 21-Excavation

Theworkshallconsistoftheexcavationrequiredbythedrawingsandspecificationsanddisposaloftheexcavated materials.

2. Classification Excavationisclassifiedascommonexcavation,rockexcavation,orunclassifiedexcavationinaccordancewiththe following definitions or is designated as unclassified.

Common excavation is defined as the excavation of all materials that <;an be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by excavators having arated capacity ofone cubic yard or larger and equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.

Rockexcavationis definedas theexcavationofallhard, compacted, orcementedmaterials that require blasting ortheuse of rippingandexcavatingequipmentlargerthandefinedforcommonexcavation. Theexcavationand removalofisolated boulders orrockfragmentslargerthan 1 cubic yard encountered in materials otherwise con- forming to the definition of common excavation shall be classified as rock excavation. The presence ofisolated boulders or rock fragments larger than 1 cubic yard is not in itself sufficient cause to change the classification of the surrounding material.

For the purpose of these classifications, the following definitions shall apply:

Heavy ripping equipment is a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a track type tractor having a powerratingofatleast250flywheelhorsepowerunlessotherwisespecifiedinsectionl0.

Wheeltractor-scraperisaself-loading(notelevating)andunloadingscraperhavingastruckbowlcapacityofat least 12 cubic yards.

Pushertractorisatracktypetractorhavingapowerratingofatleast250flywheelhorsepowerequippedwithap- propriate attachments.

Unclassified excavation is defined as the excavation of all materials encountered, including rock materials, regard- less of their nature or the manner in which they are removed.

3. Unclassified excavation Excavation designated as unclassified excavation shall include all materials encountered regardless of their nature or the manner in which they are removed. When excavation is unclassified, none of the definitionsorclassifications stated in Section 2, Classification, shall apply.

4. Blasting The transportation, handling, storage, and use of dynamite and other explosives shall be directed and supervised byaperson(s) of proven experience and ability who is authorized and qualified to conduct blasting operations. Bias ting shall be done ina manner as topreventdamageto theworkorunnecessaryfracturing oftheunderlying rockmaterials and shall conform to any special requirements in section 1 Oofthisspecification. Whenspecified in section 10, the contractor shall furnish the engineer, in writing, a blasting plan before blasting operations begin.

21-1

5. Use of excavated material Method 1-Totheextenttheyareneeded, allsuitablematerial from the specified excavations shall be used in the construction of required permanent earthfill or rockfill. The suitability of material for specific purposes is deter- mined bytheengineer. The contractorshallnotwasteorotherwisedisposeofsuitableexcavatedmaterial.

Method 2- Suitablematerial from the specified excavations may be used in the construction ofrequired earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer.

6. Disposal of waste materials Method 1-Allsurplusorunsuitableexcavatedmaterialsaredesignatedaswasteandshallbedisposedofatthe locationsshown on the drawings.

Method 2-All surplus orunsuitableexcavated materials are designated as waste and shall be disposed ofbythe contractor at sitesofhis own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate local rules and regulations.

7. Excavation limits Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition through- outthetotalconstruction phase. Structureandtrenchexcavationsshallbecompletedtothespecifiedelevations and to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary fortheinstallationofthework. Excavations outside thelinesandlimitsshownonthedrawingsorspecifiedherein required to meet safety requirements shall be the responsibility of the contractor in constructing and maintaining a safe and stable excavation.

8. Borrow excavation When the quantities of suitable material obtained from specified excavations are insufficient to construct the speci- fied earthfills and earth backfills, additional material shall be obtained from the designated borrow areas. The extentanddepthofborrowpits withinthelimitsofthedesignatedborrowareasshallbeasspecifiedinsection 10 orasapprovedbytheengineer.

Borrowpits shall be excavated and finally dressed to blend with the existing topography and sloped to prevent ponding and to provide drainage.

9. Overexcavation Excavationinrock beyond the specified lines and grades shall be corrected by filling the resulting voids with portland cement concrete made of materials andmix proportions approved by the engineer. Concrete that will be exposed to the atmosphere when construction is completed shall meet the requirements ofconcrete selected for use under Construction Specification 3 I , Concrete for Major Structures, or 32, Structure Concrete, as appropriate.

Concrete that will be permanently covered shall contain notless than five bags ofcement per cubic yard. The con- crete shall be placed and cured as specified by the engineer.

Excavationinearthbeyondthespecifiedlinesandgradesshallbecorrectedbyfillingtheresultingvoidswithap- proved, compacted earthfill. The exception to this is that if the earth is to become the sub grade for rip rap, rockfill, sand or gravel bedding,ordrainfill, thevoidsmaybefilled withmaterialconfonning to the specifications for the riprap, rockfill, bedding, or drainfill. Before correcting an overexcavation condition, the contractor shall review the planned corrective action with the engineer and obtain approval of the corrective measures.

(210-Vl- NEH, May 2001) 21- 2

10. Measurement and payment For items of work for which specific unit prices are established in the contract, the volume of each type and class ofexcavation within the specified pay limits is measured and computed to the nearest cubic yard by the method of average cross-sectional end areasorbymethodsoutlinedinsectionlOofthisspecification.Regardlessofquanti- tiesexcavated,themeasurementfor paymentismadetothespecifiedpaylirnitsexceptthatexcavationoutsidethe specified lines and grades directed by the engineer to remove unsuitable material is included. Excavation required because unsuitable conditions result from the contractor's improper construction operations, as determined by the engineer, is not included for measurement and payment.

Method 1-Thepaylimitsshall be as designated on the drawings.

Method 2-Thepay limits shall be defined as follows:

Theupperlimitshallbetheoriginalgroundsurfaceasitexistedbeforethestartofconstructionoperations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earth- fill .

Thelowerandlaterallimitsshallbetheneatlinesandgradesshownonthedrawings.

Method 3-Thepaylimitsshallbedefinedasfollows:

a. Theupperlimitshallbetheoriginalgroundsurfaceasitexistedbeforethestartofconstructionoperations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earth- fill.

b. The lower and lateral limits shall be the true surface of the completed excavation as directed by the engi- neer.

Method4-Thepaylimitsshallbedefinedasfollows:

a. The upper limit shall be theoriginalgroundsurfaceas it existed beforethestartofconstructionoperations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earth- fill.

b. The lower limit shall be at the bottom surface of the proposed structure.

c. The laterallimits shall be 18 inches outside of the outside surfaceofthe proposed structure or shall be verti- cal planes 18 inches outside of and parallel to the footings, whichevergivesthelargerpayquantity,except as provided ind below.

d. F ortrapezoidal channel liningsorsimilarstructures thatare to be supported upon the sidesofthe excava- ti on without intervening forms, the lateral limits shall be at the underside of the proposed lining or struc- ture.

e. F orthepurposes of the definitions in b, c, and d, above, any specified bedding or drainfill directly beneath or beside the structure will be considered to be a part of the structure.

All methods-The following provisions applyto all methods of measurement and payment.

Paymentforeachtypeandclassofexcavationismadeatthecontractunitpriceforthattypeandclassofexcava- tion. Such payment will constitute full compensation for all labor, materials, equipment, and all other items neces- saryandincidental to theperformanceoftheworkexcept that extra payment for backfilling overexcavation will be made in accordance with the following provisions.

(210-Vl-NEH, May 2001) 21- 3

Paymentforbackfillingoverexcavation,asspecifiedinsection8ofthisspecification,ismadeonlyiftheexcavation outside specified lines and grades is directed by the engineer to remove unsuitable material and ifthe unsuitable conditionisnotaresult of the contractor'simproperconstructionoperationsas determined bytheengineer.

Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made sub- sidiary are identified in section 10 of this specification.

(210-VI-NEH, May 2001) 21-4

11. Items of work and construction details

b. Subsidiary Item. Excavation

(I) This item shall consist of all excavation necessary to install the stream bank protection, complete foundation preparation, perform the obstruction removal, and sub-channel construction as shown on the drawings and staked in the field.

(2) All excavation shall be unclassified.

(3) Section 10, Measurement and payment, shall not apply. Compensation for Excavation will be made under Bid Item 2, Loose Rock Riprap and/or Bid Item 3, Wire Mesh Gabions

(210-VI-NEH, May 2001) 21-S

Construction Specification 23—Earthfill

1. Scope The work consists of the construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications.

Earthfill is composed of natural earth materials that can be placed and compacted by construction equipment operated in a conventional manner.

Earth backfill is composed of natural earth material placed and compacted in confined spaces or adjacent to structures (including pipes) by hand tamping, manually directed power tampers or vibrating plates, or their equivalent.

2. Material All fill material shall be obtained from required excavations and designated borrow areas. The selection, blending, routing, and disposition of material in the various fills shall be subject to approval by the engineer.

Fill materials shall contain no frozen soil, sod, brush, roots, or other perishable material. Rock particles larger than the maximum size specified for each type of fill shall be removed prior to compaction of the fill.

The types of material used in the various fills shall be as listed and described in the specifications and drawings.

3. Foundation preparation Foundations for earthfill shall be stripped to remove vegetation and other unsuitable material or shall be excavated as specified.

Except as otherwise specified, earth foundation surfaces shall be graded to remove surface irregularities and shall be scarified parallel to the axis of the fill or otherwise acceptably scored and loosened to a minimum depth of 2 inches.

The moisture content of the loosened material shall be controlled as specified for the earthfill, and the surface material of the foundation shall be compacted and bonded with the first layer of earthfill as specified for subsequent layers of earthfill.

Earth abutment surfaces shall be free of loose, uncompacted earth in excess of 2 inches in depth normal to the slope and shall be at such a moisture content that the earthfill can be compacted against them to produce a good bond between the fill and the abutments.

Rock foundation and abutment surfaces shall be cleared of all loose material by hand or other effective means and shall be free of standing water when fill is placed upon them. Occasional rock outcrops in earth foundations for earthfill, except in dams and other structures designed to restrain the movement of water, shall not require special treatment if they do not interfere with compaction of the foundation and initial layers of the fill or the bond between the foundation and the fill.

Foundation and abutment surfaces shall be no steeper than one horizontal to one vertical unless otherwise specified.

Test pits or other cavities shall be filled with compacted earthfill conforming to the specifications for the earthfill to be placed upon the foundation.

4. Placement Earthfill shall not be placed until the required excavation and foundation preparation have been completed and the foundation has been inspected and approved by the engineer. Earthfill shall not be placed upon a frozen surface nor shall snow, ice, or frozen material be incorporated in the earthfill matrix.

Earthfill shall be placed in approximately horizontal layers. The thickness of each layer before compaction shall not exceed the maximum thickness specified in section 10 or shown on the drawings. Materials placed by dumping in piles or windrows shall be spread uniformly to not more than the specified thickness before being compacted.

(210-VI-NEH, January 2009) 23-1

Hand compacted earth backfill shall be placed in layers whose thickness before compaction does not exceed the maximum thickness specified for layers of earth backfill compacted by manually directed power tampers.

Earth backfill shall be placed in a manner that prevents damage to the structures and allows the structures to assume the loads from the earth backfill gradually and uniformly. The height of the earth backfill adjacent to a structure shall be increased at approximately the same rate on all sides of the structure.

Earthfill and earth backfill in dams, levees, and other structures designed to restrain the movement of water shall be placed to meet the following additional requirements:

(a) The distribution of materials throughout each zone shall be essentially uniform, and the earthfill shall be free from lenses, pockets, streaks, or layers of material differing substantially in texture, moisture content, or gradation from the surrounding material. Zone earthfills shall be constructed concurrently unless otherwise specified.

(b) The surface of each layer shall be scarified parallel to the axis of the fill to a depth of not less than 2 inches before the next layer is placed.

(c) The top surface of embankments shall be maintained approximately level during construction with two exceptions: A crown or cross-slope of about 2 percent shall be maintained to ensure effective drainage, or as otherwise specified for drainfill or sectional zones.

(d) Dam embankments shall be constructed in continuous layers from abutment to abutment except where openings to facilitate construction or to allow the passage of streamflow during construction are specifically authorized in the contract.

(e) Embankments built at different levels as described under (c) or (d) above shall be constructed so that the slope of the bonding surfaces between embankment in place and embankment to be placed…

This is the start of the file's text. The full file is on GovTribe.