EWP - Streambank Stabilization - Woodridge/Lincolnshire Site, Wood County, WV
Solicitation number
AG-SPEC-S-16-0031
Issued by

About this file

Questions and Answers from Site Showing

View the file

Other files

File Type Posted
Sign_In_Sheet_-_Scanned.pdf PDF
Drawings_-_Wood_Co.pdf PDF
Specifications_-_Wood_County.pdf PDF
SF1442_Solicitation_Package.pdf PDF
Construction_Wage_Rate_WV160079.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Showing July 18, 2016

Solicitation AG-SPEC-S-16-0031 Mineral Wells – Lincolnshire/Woodridge

Wood County, WV Questions and Answers

1. Question- Do we recommend getting the stone from anywhere specific?

Answer- No. Just as long as it meets specifications.

2. Question- Does the stone have to be limestone for the job?

Answer- No, as long as the rock comes from a quarry with current WV DOH approval or it needs to be shown that it meets Material Specification 523, Rock for

Riprap, Type I.

3. Question- How far are the constructions limits?

Answer- 100 linear feet of stream bank on each side is what will be armored, approximately 50 feet upstream and downstream from center of existing road.

4. Question- Is it ok to lay stone from both sides of the stream?

Answer- Yes.

5. Question- Are there access roads to get equipment and rock hauled to both sides of the work site?

Answer- Yes.

6. Question- Can you cross the stream with equipment or does it have to be hauled around on the road?

Answer- Equipment must be hauled around and is not permitted in the stream.

7. Question- How long does it take to get payment?

Answer- 14 Days.