Site_Showing_QA.pdf
PDF 86 KB Posted
- Solicitation number
- AG-SPEC-S-16-0031
About this file
Questions and Answers from Site Showing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign_In_Sheet_-_Scanned.pdf | ||
| Drawings_-_Wood_Co.pdf | ||
| Specifications_-_Wood_County.pdf | ||
| SF1442_Solicitation_Package.pdf | ||
| Construction_Wage_Rate_WV160079.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Showing July 18, 2016
Solicitation AG-SPEC-S-16-0031 Mineral Wells – Lincolnshire/Woodridge
Wood County, WV Questions and Answers
1. Question- Do we recommend getting the stone from anywhere specific?
Answer- No. Just as long as it meets specifications.
2. Question- Does the stone have to be limestone for the job?
Answer- No, as long as the rock comes from a quarry with current WV DOH approval or it needs to be shown that it meets Material Specification 523, Rock for
Riprap, Type I.
3. Question- How far are the constructions limits?
Answer- 100 linear feet of stream bank on each side is what will be armored, approximately 50 feet upstream and downstream from center of existing road.
4. Question- Is it ok to lay stone from both sides of the stream?
Answer- Yes.
5. Question- Are there access roads to get equipment and rock hauled to both sides of the work site?
Answer- Yes.
6. Question- Can you cross the stream with equipment or does it have to be hauled around on the road?
Answer- Equipment must be hauled around and is not permitted in the stream.
7. Question- How long does it take to get payment?
Answer- 14 Days.