Agency_Specific_Requirements_1MD2275.pdf
PDF 892 KB Posted
- Solicitation number
- 1MD2275
About this file
This is a design guide specification document for the U.S. Trustee Program office and meeting room relocation project in Greenbelt, MD. The document details requirements for a 3,186 square foot office space that must be located within two blocks of the United States Bankruptcy Court and have access to public transportation.
The specifications include detailed requirements for security systems (duress alarms, CCTV, card readers), communication infrastructure (Cat 6A cabling throughout), and architectural elements (STC 45 sound rating for specific rooms, bullet-resistant materials in waiting areas). The space must include specific room types like conference rooms, waiting areas, and file storage, with prescribed finishes and materials. Key technical requirements include dedicated HVAC for the communication closet, specific electrical requirements including dedicated circuits for equipment, and detailed specifications for doors, hardware and security features. The design must accommodate 12 staff members (4 male, 8 female) and include one reserved structured parking space for the Assistant U.S. Trustee when only the District Office is present, or two spaces when both Regional and District offices are collocated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR 52.204-24 Representation (Nov. 2021).pdf | ||
| Form_3516A_1MD2275.pdf | ||
| Form_3517A_1MD2275.pdf | ||
| GSA12000.pdf | ||
| RLP_1MD2275_final.pdf | ||
| L100A_1MD2275.pdf | ||
| FSL2_Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF JUSTICE
Executive Office for United States Trustees
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
Final Version (06/15/2020)
UNITED STATES TRUSTEE PROGRAM
OFFICE AND MEETING ROOM RELOCATION
GREENBELT, MD 20770
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
TABLE OF CONTENTS
SECTION PAGE
I. INTRODUCTION 3
II. SPACE REQUIREMENTS 3
III. GENERAL REQUIREMENTS 3
IV. SERVICES AND UTILITIES 4
V. FIRE AND LIFE SAFETY 4
VI. SECURITY 4
VII. SPECIAL REQUIREMENTS 6
VIII. ARCHITECTURAL 7
IX. STRUCTURAL 11
X. MECHANICAL AND ELECTRICAL 11
XI. COMMUNICATION CLOSET, TELEPHONE AND DATA 12
XII. USEFUL WEBSITES AND TYPICAL SET-UPS 15
This document is intended to serve as a guide for developing design and construction documents for all United States Trustee Program (USTP) Offices. It is the responsibility of the local Project Architect, Engineer and/or General Contractor to interpret the specifications stated herein and to adapt and modify them as required, complying with all local codes and construction methods. Not all information specified herein will necessarily apply to all projects.
If any information contained within this document is deemed outdated or inaccurate, including all proposed changes and requests for clarifications, please contact the Executive Office for U.S. Trustees, Facilities Management Division, at:
Executive Office for US Trustees, Suite 6150 441 G St. NW Washington, DC 20530 Attn: Scott Odle, Branch Chief, Facilities and Security Management Branch/ and Security Programs Manager
Telephone: 202-353-7165 Fax: 202-616-1383
(Note: You may also contact the Facility Management Specialist assigned to this project.)
USTP CONTACTS
Executive Office
Scott Odle Scott.Odle@usdoj.gov
Facilities and Security Management Branch Security Programs Manager
202.353.7165
Jeffrey J. Choi Jeffrey.J.Choi@usdoj.gov
Facilities Management Specialist 202.616.1015
LaShawn Smith LaShawn.B.Smith-Elliott@usdoj.gov
Facilities and Admin. Services Specialist 202.616.1057
Zlatko Jovanovic Zlatko.Jovanovic@usdoj.gov
Facilities Management Specialist (Contractor) 202.305.3894
Roland Stanard Roland.Stanard@usdoj.gov
Facilities Management Specialist 202.514.0721 mailto:Scott.Odle@usdoj.gov mailto:Jeffrey.J.Choi@usdoj.gov mailto:LaShawn.B.Smith-Elliott@usdoj.gov mailto:Zlatko.Jovanovic@usdoj.gov mailto:Roland.Stanard@usdoj.gov
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
SECTION I. INTRODUCTION
Agency
UNITED STATES DEPARTMENT OF JUSTICE
OFFICE OF THE UNITED STATES TRUSTEE
Location Greenbelt, MD
Date Required Prior to lease expiration
Delineated Area
IF POSSIBLE, THE OFFICE SHALL BE COLLOCATED WITH THE UNITED
STATES BANKRUPTCY COURT, OR NO FURTHER AWAY THAN TWO
(2) CITY BLOCKS.
Justification: This limited delineated area is necessary due to the close interaction that is required by the United States Trustee staff and its clientele (public debtors, creditors, attorneys and interested parties) who must traverse between the offices of the United States Trustee and the United States Bankruptcy Court on a frequent basis.
SECTION II. SPACE AND PARKING REQUIREMENTS
Number of Occupants Usable Square Feet
Male : 4 Office & Support Space 3,186
Female : 8 Office & Support Space
Total 3,186
*The number of occupants does not include members of the public attending hearings in the meeting rooms.
1. PARKING REQUIREMENTS
A. The US Trustees shall be provided with one (1) structured parking space in the building it occupies when the office space is for the District Office only, and shall be marked “RESERVED” for use by the Assistant U.S. Trustee (AUST).
B. The US Trustees shall be provided with two (2) structured parking spaces in the building it occupies when the office space is for the Regional and the District Offices, and shall be marked “RESERVED” for use by the U.S. Trustee (UST) and the Assistant US Trustee (AUST).
2. SPACE REQUIREMENTS
Detailed space requirements were provided on 05/26/2020.
SECTION III. GENERAL REQUIREMENTS
1. Office and Support Space shall be referred to as the “Office”. The Office shall be located on one (1) floor, above ground level, and in contiguous space is a first and foremost priority. Non-contiguous space may be considered, as an alternative. Final space determination and acceptance is subject to the approval by the Executive Office for United States Trustees (EOUST).
2. Access to public bus and/or rail transportation is required and shall have a stop within two (2) blocks.
3. A loading dock and freight elevator are required.
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
Final Version (06/15/2020)
4. The building shall have a secured lobby (i.e. have a security guard/station).
5. Other than the main entrance to the suite for the public, a secondary entrance/emergency egress is required.
6. During a space action, the General Services Administration (GSA) shall limit the number of office support. A “space action” is defined as when relocation within the same building currently occupied is planned.
SECTION IV. SERVICES AND UTILITIES
1. Normal hours of operation shall be from 8:00 am until 5:00 pm, excluding weekends and Government holidays.
2. Access by the USTP staff to the building/Office and the utilities for the use of office equipment (i.e.
lighting, power, etc.) shall be provided/be made available during other than normal hours of operation, at no additional charge. Building mechanical systems (HVAC), during other than normal hours of operation, shall be made available upon request and only with advance approval and funding from the Executive Office for US Trustees.
3. Custodial services shall be provided during normal hours of operation.
4. GSA shall ensure all Lessor’s/GSA staff that may/will require access to all US Trustee occupied space, during and/or after normal business hours, including weekends, such as the Property Manager, Building Engineer, maintenance personnel, custodial staff, etc., are HSPD 12 compliant.
The Lessor, through GSA, shall provide Certificate of Investigation (COI) to show proof of compliance. GSA shall be responsible for coordinating and processing necessary application documents and fingerprint cards for all individuals.
5. For after-hour access to the space, for any emergency, Office staff must be contacted before entry. A contact/call list, with phone numbers, will be provided by the Trustees. A suite master will also be provided and shall be kept in a sealed envelope and used only for emergency access. If the staff on the call list are unreachable, the Office shall be notified at the beginning the following day.
SECTION V. FIRE AND LIFE SAFETY
1. Please refer to the latest edition of the Facilities Standards for the Public Buildings Service PBS-
P100, published by the General Services Administration.
(https://www.gsa.gov/cdnstatic/2017_Facilities_Standards_%28P100%29%C2%A0.pdf)
SECTION VI. SECURITY
1. Office Duress Alarm System:
A. If the building is secured by the US Marshals Service (USMS), the US Trustee Program (USTP) may be given permission to install a duress alarm activation button from main reception area and the conference room, to the USMS’s security panel for monitoring. The button, conduit (if necessary), and wiring shall be furnished, installed and tested by the General Contractor.
https://www.gsa.gov/cdnstatic/2017_Facilities_Standards_%28P100%29%C2%A0.pdf
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
B. In all other cases, the General Contractor shall furnish and install the following (no substitutions):
a) BOSCH Control Panel (D7412GV4) – Mounted in the communication closet on the plywood backboard.
(https://commerce.boschsecurity.com/us/en/D7412GV4-Control-Panel/p/2495670155/)
b) BOSCH Remote Key Pad (D1255) – Mounted near the reception area, as shown on the DID’s.
c) Duress Button – Cylinder slide with key reset, no noise, hardwired (Honeywell Hold-up Device, model number 270R or UST approved equal. The number of duress buttons required: conference room and main reception area. Wireless type duress buttons are not permitted.
d) Strobe light - When a District or Regional office is collocated with a Meeting Room, in the same building, the General Contractor shall furnish and install same color strobe lights within the office space to alert office staff when an alarm is activated in the meeting room(s) and a different color strobe lights to announce duress button activation within the Office. Strobe light shall be SECO-LARM Model #SL-126, color blue for meeting rooms & orange for Office space.
e) Intrusion Detection System (IDS) shall be installed at each suite entry door and tied into the duress alarm system panel with a keypad override.
f) Motion sensors shall be installed at each suite entry doors and tied into the duress alarm panel. Motion sensor shall automatically release the electric strike upon exiting.
g) If any of the suite entry points have glass (in the door or a sidelite), glass breakage sensors shall also be added and tied into the duress alarm panel.
C. The alarm system shall be wired to capture a dedicated, analog telephone line. The dedicated phone line should be terminated in an RJ-11 jack on the plywood backboard in the communication closet. The alarm should be connected to the Department of Homeland Security, Federal Protective Service Regional Control Center. When the alarm is activated, the DHS/FPS center will dispatch an FPS Officer or local Police Department to respond to the alarm.
Simultaneously, the strobe lights shall be activated and announced on the remote keypad. The keypad shall be programmed to display the specific zone where the alarm is activated.
D. Functional equivalent equipment may be used and is compatible with the system(s) used by the
Department of Homeland Security, Federal Protective Service. Equipment and component substitutions shall be submitted for approval to the Trustees Project Manager.
E. The General Contractor shall assist in filling out the DHS/FPS Mega Center Alarm Requirements
(MAR) package. The alarm system shall be programmed and tested seven (7) days prior to physical move/occupancy of new space. The installer shall be present/on site during testing and be able to make any adjustments/corrections during testing and assist with the testing.
2. Furnish and install stand-alone CCTV where shown on plans. Control panel shall be installed in the Communication Closet. System shall be capable of recording, for a minimum of 30 day, in digital format.
https://commerce.boschsecurity.com/us/en/D7412GV4-Control-Panel/p/2495670155/
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
3. Furnish and install a complete and functional stand-alone card reader system. Below is a schedule of key components required:
Product Description
Manufacturer
Part Number
QTY
A/U
ACCESS CONTROL - HEADEND EQUIPMENT
Controller 6000 High Spec - PIV Gallagher C305101 1 EA
8H Module - PIV Gallagher C300182 1 EA
HBUS 16 IN 16 OUT BOARD - PIV Gallagher C300688 1 EA
LSP CABINET E4 LARGE Gallagher C305721 1 EA
Controller Mounting Bracket (3rd Party Product) Gallagher C305760 2 EA
PIV Command Centre - License (Incl. 16 PIV Door Licenses)
Gallagher C201611 1 EA
PACS Workstation Monitor, PIV, Keyboard, & Mouse Dell Dell Workstation
1 EA
ACCESS CONTROL -FIELD EQUIPMENT
T21 PIV Reader - Multi Tech Black Gallagher C305510 2 EA
T11 PIV Reader - Multi Tech - Black Gallagher C305430 1 EA
PIR REX BOSCH DS160 3 EA
Recessed Door Contact UTC 1078-N 4 EA
Hold Up Latch mount Honeywell 269R 3 EA
6-24VDC Blue light Strobe Seco SL-126- A24Q/B
3 EA
LSP C8 Lock Controller Module, 8 output (Third Party Product)
Gallagher C305741 1 EA
18/4 Unshielded Stranded Plenum Cable Keystone PMC1804/7
24/4pr Category 6 Plenum Cable Keystone CMPIC004C
AT6
SECTION VII. SPECIAL REQUIREMENTS
1. GSA shall use the Quality Solicitation for Offers to ensure all space is finished to "class A" standards.
2. New technology and program needs may dictate a change in the requirements and specifications.
Therefore, prior to contract award, GSA shall confirm all requirements and specifications with the USTP Project Officer.
3. GSA shall provide the USTP Project Officer with a draft copy of the Solicitation for Offers for review/approval, prior to distribution to prospective Offerors.
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
4. The Lessor/GSA shall provide the USTP Project Officer with a set of as-built drawing (standard units) in AutoCAD Architecture 2016, which accurately depicts all architectural features including building common elements and adjacent tenants.
5. The Lessor/GSA shall conduct a weekly inspection of the construction site to monitor progress. GSA shall keep the USTP Project Officer informed of any significant changes. Bi-weekly progress meetings shall be conducted. Submission of bi-weekly agenda and construction progress photos (minimum of 6, jpg format) shall be submitted 3 days prior to the scheduled meeting.
SECTION VIII. ARCHITECTURAL
1. Initially, the Lessor/GSA’s Architect shall prepare a minimum of 3 color/finish boards (for each submission) for review and approval (carpet, paint, base, laminate, chair rail, accent colors, etc.).
The proposed schemes shall be mounted on presentation boards with one copy forwarded to the local Office and one copy to the USTP Executive Office. It shall be expected that, at a minimum of 2 subsequent submissions will be required until final color/finish scheme is accepted/approved.
Prior to generating any color/finish boards, the local staff shall be consulted regarding preference.
2. Standard Office Finish Schedule & Finishes Standards:
TYPICAL
FINISHES
SCHEDULE C
P
T -1
C P
T -2
C P
T -3
P T
-1
P T
-2
P T
-3
P L
-1
P L
-2
C R
-1
V C
T -1
V C
T -2
V C
T -3
B
-1 NOTES
ROOM FUNCTION
WAITING ROOM X X X X X West wall
CONFERENCE ROOM X X X X X West wall
OPEN SPACE X X X X West wall
AUDITOR OFFICE X X X
COPY/MAIL ROOM X X X X X X X Behind millwork
BREAK ROOM X X X X X X X X East wall
ATTORNEY OFFICE X X X
COMMUNICATION
CLOSET
X X X
AUST OFFICE X X X
WORK ROOM X X X
VISITING ATTORNEY X X X
STORAGE ROOM X X X X
CORRIDOR 1 X X X X X Entire east wall
CORRIDOR 2 X X X X X X PT-2 behind millwork
CASE FILE ROOM X X X X X X PT-2 behind millwork
CRIMINAL CASE FILE X X X X X X PT-2 behind millwork
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
3. Walls:
A. All walls shall receive level 4 finish.
B. All walls shall be painted with a minimum of one prime coat and two finish coats unless otherwise indicated.
C. The following offices/rooms shall be constructed slab-to-slab w/ STC 45 sound level rating:
a. All suite demising walls
b. US Trustee office (UST)
c. Assistant US Trustee office (AUST)
d. Bankruptcy Fraud Criminal Coordinator office
e. Copier room
f. Break room
g. Conference room
h. Office waiting room
i. Communication closet
D. All other walls shall be constructed ceiling high w/ STC 40 sound level rating.
E. Walls surrounding the waiting room shall receive Level 1 ballistic material, extending from the floor to the ceiling.
F. Furnish and install paint grade wood chair rail in the conference, waiting and break rooms. Chair rail shall be mounted 32” from center of the rail to the finished floor.
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
4. Transaction Window:
A. In the Office reception area, furnish and install a 72"x42" Insulgard Transaction Window, model SVPT/L1 (level I) Window Rating and Wall Bullet Resisting Rating UL 752 Level 1, with 18” x 18” Package Exchanger, dip tray and a 16" black laminated counter, No substitutions.
https://www.insulgard.com/product/svpt-transaction-window/
5. Doors:
A. All doors shall be solid core and fit well to minimize the transmission of sound.
B. All office, conference room and work room doors shall have a sound gasket system installed.
C. The office and meeting room suites shall be keyed to one sub-Master.
D. Each lock within the office shall be uniquely keyed, but to Office sub-master.
E. Provide four (4) master keys and two (2) keys per lock to the Administrative Officer or designated official. Additional keys will be required for the staff who will not be assigned an office. All keys shall be stamped “DO NOT DUPLICATE”.
F. All doors in the waiting room excluding the main building corridor door shall have Bullet Resisting Rating UL 752 Level 1.
G. Hardware and equipment schedule will be included as part of the DID set. Typical hardware schedule is as follows: (see next page).
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
Final Version (06/15/2020)
TYPICAL DOOR
HARDWARE
SCHEDULE
B U
IL
D
IN
G
S T
A N
D A
R D
L O
C K
S E
T
(I N
D
IV
ID
U
A L
L Y
K E
Y E
D
B U
IL
D
IN
G
S T
A N
D A
R D
P A
IC
H A
R D
W A
R E
C O
R R
ID
O
R F
U N
C T
IO
D
A D
B O
L T
W
IT
H L
A T
C H
G U
A R
D
S C
H L
A G
E L
B U
IL
D
IN
G
S T
A N
D A
R D
P A
S S
A G
S
T
S
IM
P L
E X
C
IP
H E
R L
O C
K
L
/K
E Y
B Y
-P A
S S
W
IT
H
K
Y
O V
E R
ID
E
S
IM
P L
E X
C
IP
H E
R L
O C
K
W /K
E Y
B Y
-P A
S S
L
A T
C H
G U
A R
D
E L
E C
T R
IC
S
T R
IK
E
R
E L
E A
B U
T T
O N
L O
C A
T E
D A
R
C E
P T
IO
N
W
IN
D O
W W
O
K
A T
IO
N
E L
E C
T R
IC
S
T R
IK
E
M E
C H
A N
IC
A
L D
O O
R C
L O
S
IT
H H
O L
D O
P E
N F
E A
T U
R E
M E
C H
A N
IC
A
L D
O O
R C
L O
S
IT
H O
U T
H O
L D
O P
E N
F E
A T
U R
E
N O
N -R
E M
O V
A B
L E
H
IN
G E
P
IN
S
S O
U N
D G
A S
K E
T S
E T x
V
IS
IO
N P
A N
E L
C O
A T
H O
O K
W A
L L
M O
U N
T E
D D
O O
R S
T O
P
IL
E N
C E
R S
L A
T C
H G
U A
R D
C A
R D
R E
A D
E R
ROOM FUNCTION
WAITING ROOM (From
Public Corridor) X X X X X X X X
WAITING ROOM
(Entry into Office Suite) X X X X X X X
REAR ENTRY DOOR X X X X X X X
CONFERENCE ROOM
(From Waiting Room) X X X X X
CONFERENCE ROOM
(To/From Trustee Suite) X X X X X
AUDITOR OFFICE X X X X
COPY/MAIL ROOM X X X
BREAK ROOM X X X
ATTORNEY OFFICE X X X X
COMMUNICATION CLOSET X X X X
AUST OFFICE X X X X
WORK ROOM X X X X X
VISITING ATTORNEY OFFICE X X X X
STORAGE ROOM X X X
CASE FILE ROOM X X X X
CRIMINAL CASE FILE X X X X X X
6. Floor Covering:
A. Carpet for the Office shall be constructed of cut pile, have static controlled and soil resistant fiber, and meet GSA standards.
B. Carpet tile should be used throughout as indicated on the schedule. The carpet tiles shall have integral padding.
C. Vinyl Composition Tiles shall be installed in the case file, copy/mail, storage and break rooms.
Static Resistant Vinyl Composition tile shall be installed in the Communication Closet
7. Window Treatment:
A. Mini blinds shall be provided for all exterior windows and be thin (1 inch wide) metal slat or building standard.
8. Signage:
A. Building standard signs shall be provided for the primary office entrances to meet building standard signage.
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
Final Version (06/15/2020)
B. Individual room signs shall be furnished and installed by the General Contractor for all rooms within the Office suite. Signs shall identify the room number, the individual’s name and title or the room’s functional use. Signs shall be ADA compliant and have removable inserts that can be easily changed by the local office. The GC shall provide extra blank inserts to the local office.
US trustees will provide specific sign information and a quote from UNICOR System 2/90 for the general contractor to procure and install. Procuring and installing the signage shall be included in the contractor’s bid proposal.
C. The building directory shall identify the organization, the Office suite and the corresponding room/suite number.
9. Break Room
A. Standard office build-out with vinyl floor covering.
B. Furnish and install an 18" x 24" stainless steel sink with garbage disposal and hot and cold water supply in a finished 6’-0” (minimum length) base and overhead cabinets. Overhead cabinets shall be 42” tall, unless noted otherwise on the DID’s. Base cabinets shall have a laminate countertop with integral back/side splash.
C. Furnish and install a minimum of four (4) Ground Fault Interrupter (GFI) electrical outlets as shown on DID plans.
D. Furnish and install one (1) frost-free refrigerator (Whirlpool, 33”, 21.6 cu. ft., model number WRS322FNAB) and one microwave oven with carousel turn-table (Panasonic, 1.2 cu. ft., 1200 watts, countertop microwave, black, model number NN-SN651B). Provide initial and replacement supply of paper towels.
SECTION IX. STRUCTURAL
1. Ceiling Height Requirements
A. Office: 8’-0” to 10’-0”. Any height above 10’-0” will require EOUST approval.
B. File Room (a.k.a. case file room): 8’-0” minimum.
2. The case file room will have either open file system shelving or 5-drawer lateral file cabinets. The A/E shall verify filing system type that is/will be used. High density file system will NOT be used.
3. Column spacing shall be a minimum of twenty (20) feet. Spacing of twenty-five (25) feet is preferred.
SECTION X. MECHANICAL AND ELECTRICAL
1. HVAC:
A. The building HVAC system shall provide American Society of Heating, Refrigerating and Air- Conditioning Engineers (ASHRAE) and code compliant heating, cooling, and ventilation (outside air) for the office, including all conference and meeting rooms.
B. Break room shall have an exhaust system, Penn-Zephyr, model Z-10, 200 CFM or equivalent. It shall exhaust to the outside of the building or be tied to the buildings’ general exhaust.
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
Final Version (06/15/2020)
C. Communication Closet shall have a dedicated exhaust of 200 CFM and 150 CFM supply air. The door shall have a secure louver for make-up air. When the room temperature reaches 74 degrees, the exhaust fan shall be activated and exhaust the air into the plenum, outside the perimeter of room or to a dedicated building exhaust duct. Design and installation shall ensure no noise or vibration is generated by the exhaust fan.
2. Electrical
A. All electrical outlets shall be duplex, NEMA 5-20R, 110-125V/20A, three-wire, single phase, unless noted otherwise.
B. A NEMA 5-20R, 20A, three-wire, single phase, dedicated circuit, shall be installed for each copier and shredder and one (1) in the Communication Closet.
C. Furnish and install a minimum of three (3) duplex outlets per office, support space, work area/workstation.
SECTION XI. COMMUNICATION CLOSET TELEPHONE AND DATA
1. General
A. The General Contractor (GC) shall furnish and install ALL horizontal phone and data wiring, jacks, boxes, wall plates, patch panels, racks, cabinets, modular patch cables, identification labeling, etc.
B. All wiring shall be plenum rated Category 6A.
C. All jacks shall be Cat 6A, RJ45. Wall jacks (phone and data) shall be angled type.
D. All wiring shall be homerun from a jack to the punch-down block and/or patch panel.
E. Label all cables, jacks, patch panels, and other related components of the system and submit a wiring schematic upon completion.
F. Terminate, test, and certify all installed wiring in accordance with industry standards. Submit test results 3 working days prior to final inspection.
G. Performance Test: Test each cable run for polarity, attenuation and impedance. The placement and installation of cables and associated materials shall meet local codes and established standards for quality workmanship. Any deficiencies in transmission or work standards must be corrected prior to acceptance and occupancy of the space. The contractor must provide an acceptable warranty of work and materials for a period of one year. The cable installation shall be tested and certified to meet category 6 standards using TIA/EIA-568B wiring scheme.
H. The computer cabling and connector specifications are based on current day IT system requirements. Prior to the construction of this project, new technology may be available and different requirements may be required for the computer cabling. Therefore, prior to initiating any contract bids, GSA should confirm the cable related specifications.
2. Communication Closet:
A. The GC shall furnish and install a 4’-0” x 8’-0” (minimum) sheet of ¾” fire-rated plywood with a
“class A” surface, fastened securely to wall(s) as shown on DID plans. Location of the punch-down blocks shall be coordinated with EOUST prior to installation. Paint plywood to match adjacent wall. Do not paint over the fire rating label(s).
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
B. Furnish and install Mighty Mo 6 cable management rack, model number OR-MM6710, as manufactured by Ortronics. Included shall be the following accessories:
a) Vertical Management Cage with Latches, model number OR-MM6VML706, quantity: 2 each
b) Ceiling Extension Kit model number OR-MM6CEK10, quantity: 1 each
c) Power strip, model number OR-60400681: 2 each
d) Equipment Shelf model number OR-60400538, quantity: 2 each
e) Four-point equipment shelf model number OR-604045681, quantity: 2 each
f) Panduit horizontal cable manager NCMHF1, quantity: 5 each.
C. The phone and data patch panels shall be Category 6A, 8-wire - 8 position, T568B wiring, and shall have a port count sufficient to terminate all phone and data jacks (separately). In calculating the size of the patch panels, add 25% spare capacity. Two “sets” of patch panels for each utility (phone and data) shall be provided (minimum 4 each).
D. Furnish and install the following:
a) Emergency lighting.
b) Grounding cable the length of the plywood, #6, copper, with termination blocks in the middle of the wall and at each end (total of 3). Cable and termination block shall be mounted near the bottom portion of the plywood.
c) Cable tray, ladder type, installed above the racks, but below SAT ceiling, 16 inches wide by the length & with of the room (as shown on DID plans).
E. Substitution of any equipment shall not be permitted.
3. Communication Backbone:
A. Less than 100 Meters (328 feet): If the physical path from DMARC to point of service in the new constructed space is less than 100 Meters (328 Feet), terminate 21 pairs of the 25P Cat5e tie cable with 110 block and terminate the 4 pair necessary to provide a standard Cat 5e RJ45 termination surface mount box at both ends. Label all UST at both ends. This is the simplest configuration that satisfies all data and voice circuit extension needs. AT&T will coordinate completion of extension of the data circuit and one dial tone for their out of band management use.
B. Greater than 100 Meters (328 Feet): If the physical path from DMARC to point of service in the new constructed space is more than 100 Meters (328 Feet), install 1.5 inch innerduct with pull string to accommodate fiber extension of the circuit. A Cat5e tie cable terminated 110 block at both ends will satisfy voice dial tone extensions. Label all UST at both ends. The LEC or AT&T will physically extend the fiber circuit. AT&T will coordinate completion of extension of the data circuit and one dial tone for their out of band management use.
C. Furnish and install 1.5” diameter innerduct with 500 pull force pull string from the building D-mark to the communication rack. Innerduct color shall be blue. Leave a minimum of 10 feet slack on either end. Properly tag both ends of the innerduct.
4. Telephone Cabling:
A. Cabling and jacks shall be color white.
B. Label both ends of the new cables and terminations, identifying the room and jack number.
Identification labels or tags must be legible, neat and durable. Provide a cabling plan/ diagram to show jack designations by office, and by patch panel port number.
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
Final Version (06/15/2020)
C. Labeling shall be as follows:
a) The wall plates: V - ## (## = numbering sequence)
b) Communication Closet patch panel: V - ## (corresponding number sequence)
D. All telephone wires shall be homerun from a jack to the patch panel in the Communication Closet.
A service loop of at least ten (10) feet shall be provided at the punch down end in the Communication Closet. The service loop shall be secured to the cable support system/tray below the suspended ceiling.
E. Furnish a second patch panel and install in the communication rack and a second 110 block and install on plywood. Cross connect the patch panel and the 66 block via category 6A tie cable.
F. Furnish Category 6A, RJ-45, 4-pair, 8-wire, straight-pinning modular patch cables, color white, as follows:
a) Two (2) feet in length. Quantity: one (1) for each cable pull.
b) Three (3) feet in length. Quantity: one (1) for each cable pull.
c) Eight (8) feet in length. Quantity: six (6).
d) Twelve (12) feet in length. Quantity: six (6).
G. Data Cabling:
a) Cabling and jacks shall be color blue.
b) Label both ends of the new cables and terminations, identifying the room and jack number.
Identification labels or tags must be legible, neat and durable. Also, provide a cable diagram to show jack designations by office, and by patch panel port number.
c) Labeling shall be as follows:
a. The wall plates: D - ## (## = numbering sequence)
b. Communication Closet patch panel: D - ## (corresponding number sequence)
H. All data cables shall be homerun from a jack to the patch panel in the Communication Closet. A service loop of at least ten (10) feet shall be provided at the punch down end in the Communication Closet. The service loop shall be secured to the cable support system/tray below the suspended ceiling.
a) Furnish a second patch panel, same size/capacity, and install below the above noted data patch panel. Both patch panels shall be labeled alike.
b) Furnish Category 6A, RJ-45, 4-pair, 8-wire, straight-pinning modular patch cables, length and color as follows: (Exact quantities shall be determined during CD development)
a. Two (2) feet in length, color blue. Quantity: one (1) for each cable pull.
b. Three (3) feet in length, color blue. Quantity: one (1) for each cable pull.
c. Five (5) feet in length, color black. Quantity: equal to 25% of the number of cable drops.
d. Eight (8) feet in length, color black. Quantity: equal to 25% of the number of cable drops.
e. Twelve (12) feet in length, color black. Quantity: 10 each.
f. Twelve (12) feet in length, color blue. Quantity: 10 each
g. Fifteen (15) feet in length, color black. Quantity: 10 each.
h. Twenty (20) feet in length, color black. Quantity: 5 each.
I. Furnish Category 6A, RJ-45, 4-pair, 8-wire, straight-pinning modular patch cables, length and color as follows for use with IT equipment:
a. Three (3) feet in length, color red. Quantity: 5 each.
b. Two (2) feet in length, color blue. Quantity: 5 each
c. Five (5) feet in length, color green. Quantity: 5 each.
d. Five (5) feet in length, color orange. Quantity: 5 each.
e. Three (3) feet in length, color purple. Quantity: 5 each
f. Two (2) feet in length, color yellow. Quantity: 5 each.
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
SECTION XII. USEFUL WEBSITES AND TYPICAL SET-UPS
Useful Websites
US Trustee Program http://www.usdoj.gov/ust/
Insulgard https://www.insulgard.com/product/svpt-transaction-window/
Bosch Duress System http://www.boschsecurity.us/
Dormakaba/Cipher lock Hardware https://www.dormakaba.com/us-en
Black Box Corp. http://www.blackbox.com/
Legrand/Ortronics http://www.legrand.us/ortronics.aspx
TYPICAL COMMUNICATION RACK SET-UP:
http://www.usdoj.gov/ust/ http://www.boschsecurity.us/ http://www.blackbox.com/ http://www.legrand.us/ortronics.aspx
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
LEGEND:
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
TYPICAL WAITING ROOM, RECEPTION AREA AND CONFERENCE ROOM:
TYPICAL COPY/MAIL ROOM AND BREAK ROOM:
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
TYPICAL OFFICE CONFIGURATION:
441 G St. NW, Suite 6150 Washington, DC 20530
DESIGN GUIDE
U.S. Trustee Region 4; Greenbelt, MD
06/24/2020
TYPICAL COMMUNICATION CLOSET:
File details come from the government source that posted it. Updated .