PROJECT TITLE:
CONTRACT No.:
PROJECT LOCATION:
CLIENT AGENCY:
PROJECT MANAGER:
DESIGN CONSULTANT:
UPPER TRUCKEE RIVER-
REACH 5 RESTORATION PROJECT
Note: Utility relocation to be done under
Upper Truckee River Reach 5 Utility Relocation Project
AG-9A63-C-09-0095
MEYERS, CA
EL DORADO COUNTY
USDA FOREST SERVICE-
LAKE TAHOE BASIN MANAGEMENT UNIT
THERESA CODY
STREAM SOLUTIONS, LLC
MIKE d’ABOR, P.E. -
FOREST ENGINEER
COSYST AFF
APPROVED FOR NFS LANDS BY:
USDA FOREST SERVICE
‘5
7. / / /
NANCY GlBONV FOREST SUFERVlSOR
DATE
iL_
DATE
AS RECOMMENDED FOR NFS (NATIONAL FOREST SYSTEM) LANDS BY:
USDA FOREST SER)4IC
‘2
C.Mlomla -
SI R.EA’\k SLLU I kYN, LI L 00 ,j 77, %CO’O Cl’, l’RM il,flCCki ‘iL .1 *15.)
DAT
SUBMITTED BY:
STREAM SOLUTIONS LLC
P.O. BOX 7041
CORTE MADERA, CA 94976
CAROL Y BEAHAN, P.E.
October 5, 2012 z
‘it)
LOCATION MAP (NTS):
PROJECT SITE
SUNSET STABLES — UPPER TRUCKEE RIVER
U S HWY 50 AND ELKS CLUB DRIVE
MEYERS, CA 96155
CARSON CITY
Issue
No Dote Description
STATELINE
NO SCALE
oP
/7
N ‘
/ , -U’
,. C
1/
/1
‘‘= 5’ Iv I/ ;/ /7, S (“
i) , /1 [I r
I UPPER TRUCKEE
RIVER CHANNEL
Project
UPPER TRUCKEE RIVER-
REACH 5 RESTORATION
PROJECT
MEYERS, ELDORADO CO., CA
‘A’ ‘A
K I
(5
‘A
PROJECT BOUNDARY
SITE MAP:
SCALE: 1 “=400’
Supervisor Deogeed Drown Checked
File Dote Veolt File Number
10/06/12
Sheet Title
TEILE SHEET
DOd Bu,lding Number Controot No.
AG-aA6s-C-09.009t
Reterer,oe North Sheet Sonic
AS SHOWN
W Sheet Number tream olutions, LLC 1541 Grizzly Mountain Drive, South Lake Tahoe, CA 96150
(530) 573-1378
S S
...10/05/12
AS SHOWN
PLAN SHEET:
EROSION CONTROL
AND DEWATERING PLAN
AMENDED FOR PHASE IV 2016
D-7
A'
A
B'
B
D-7
D-7
Legend:
Project Boundary
TRPA Land Capability Boundary
Existing Gravity Sewer Line
Existing Backup Force Main
Manhole
Parcel Boundary
Impermeable Barrier Fence; Detail A/C-5
TRPA Land Capability Designation
1A
Access Road
Double Coir Log Interim Winterization; Detail 6/D-7
Limits of Disturbance
Dewater Irrigation Cell
Upland Dewater Basin
Dewater Pipe
Optional Dewater Pipe
Orange Boundary Fence; Detail 5/D-7
Orange Boundary Fence with Coir Log; Detail 8/D-7
River Diversion - Phase IV - 2016; Detail 2/D-9
4/30/16
Upland Dewater Basin - Optional
Coir Log or Wattle (staked inside); Detail 9/D-7
GENERAL NOTES
1. ALL ITEMS SHOWN IN RED ARE DIVERSION CONTRACTOR'S RESPONSIBILITY.
2. DEWATER IRRIGATION CELLS REPRESENT AREAS IDENTIFIED FOR SPRAY IRRIGATION OF DECANT WATER ONLY. NO INSTALLATIONS OTHER THAN THE PIPING AND APPARATUS FOR SPRAY IRRIGATION ARE
PROPOSED IN THESE AREAS AND SURFACE RUNOFF WILL BE AVOIDED. THE EXCEPTION TO THIS IS DEWATER IRRIGATION CELL 6 THAT REQUIRES A WFB OR APPROVED EQUIVALENT BARRIER ON THE
DOWNSLOPE SIDE.
3. PHASE IV CONSTRUCTION (2016) RIVER DIVERSION WILL BE DONE IN TWO STEPS AS FOLLOWS:
(1) INSTALL THE FIRST TWO COFFER DAMS IN APPROX. LOCATIONS SHOWN FOR DIVERSION 1 (D-1) TO ALLOW FOR FISH RELOCATION OPERATIONS AND DRAINING OF THE NORTHERN SECTION OF THE
EXISTING RIVER. ONCE DRAINED LTBMU EQUIPMENT WILL ENTER THE EXISTING RIVER NEAR THE TEMPORARY HAUL ROAD TERMINUS IN ORDER TO ACCESS THE NORTHERNMOST WORK AREAS.
(2) WHEN DIRECTED, INSTALL DIVERSION 2 (D-2) AND, IF AUTHORIZED, DIVERT TO NEW CHANNEL DOWNSTREAM, OTHERWISE CONNECT VIA WYE FITTING TO DIVERSION PIPE AT D-1 IN ORDER TO DIVERT
AROUND ENTIRE WORK AREA UNTIL AUTHORIZED TO ACTIVATE NEW CHANNEL.
4. DIVERSION AND DEWATERING CONTRACTOR RESPONSIBLE FOR INSTALLING, OPERATING AND MAINTAINING DIVERSION SYSTEM ACCORDING TO PLANS, SPECIFICATIONS AND PERMITS.
5. DIVERSION AND DEWATERING CONTRACTOR RESPONSIBLE FOR INSTALLING AND MAINTAINING UPLAND DEWATER BASINS FOR LTBMU USE AND DEMOBILIZING ONCE DIRECTED. INSTALLATION AND
DEMOBILIZATION IS TO BE DONE ACCORDING TO PLANS, SPECIFICATIONS AND PERMITS.
6. LTBMU WILL BE RESPONSIBLE FOR INSTALLING ALL PIPING AND HOSE LINE USED TO PUMP FROM THE NEW CHANNEL TO THE DEWATER IRRIGATION CELLS AND UPLAND DEWATER BASINS.
18" MIN
COMP NATIIVE SOIL
IMPERMEABLE MATERIAL
SUPPORTIVE BACKING,
TENSAR GRID, OR WIRE MESH
FLO
W
KEY IN 6" MIN
KEY IN 6" MIN
STEEL POST
8' MAX
12" MAX, 8" MIN
IMPERMEABLE MATERIAL
IMPERMEABLE BARRIER FENCEA
PERSPECTIVE
SECTION
A
C-5
A
C-5
A
C-5
NOT TO SCALE
South Lake Tahoe, CA 96150
(530) 573-1378
S S
...10/05/12
AS SHOWN
PLAN SHEET:
D-7
D-7
Legend:
Project Boundary
TRPA Land Capability Boundary
Existing Gravity Sewer Line
Existing Backup Force Main
Manhole
Parcel Boundary
TRPA Land Capability Designation
1A
Access Road
Double Coir Log Interim Winterization; Detail 6/D-7
Limits of Disturbance
Orange Boundary Fence; Detail 5/D-7
Orange Boundary Fence with Coir Log; Detail 8/D-7
EROSION CONTROL
AND DEWATERING PLAN
AMENDED FOR PHASE IV 2016
4/15/16
Dewater Irrigation Cell
Upland Dewater Basin
Dewater Pipe
Optional Dewater Pipe
River Diversion - Phase IV - 2016; Detail 2/D-9
Upland Dewater Basin - Optional
GENERAL NOTES
1. ALL ITEMS SHOWN IN RED ARE DIVERSION CONTRACTOR'S RESPONSIBILITY.
2. DEWATER IRRIGATION CELLS REPRESENT AREAS IDENTIFIED FOR SPRAY IRRIGATION OF DECANT WATER ONLY. NO INSTALLATIONS OTHER THAN THE PIPING
AND APPARATUS FOR SPRAY IRRIGATION ARE PROPOSED IN THESE AREAS AND SURFACE RUNOFF WILL BE AVOIDED. THE EXCEPTION TO THIS IS DEWATER
IRRIGATION CELL 6 THAT REQUIRES A WFB OR APPROVED EQUIVALENT BARRIER ON THE DOWNSLOPE SIDE.
3. PHASE IV CONSTRUCTION (2016) RIVER DIVERSION WILL BE DONE IN TWO STEPS AS FOLLOWS:
(1) INSTALL THE FIRST TWO COFFER DAMS IN APPROX. LOCATIONS SHOWN FOR DIVERSION 1 (D-1) TO ALLOW FOR FISH RELOCATION OPERATIONS AND DRAINING
OF THE NORTHERN SECTION OF THE EXISTING RIVER. ONCE DRAINED LTBMU EQUIPMENT WILL ENTER THE EXISTING RIVER NEAR THE TEMPORARY HAUL ROAD
TERMINUS IN ORDER TO ACCESS THE NORTHERNMOST WORK AREAS.
(2) WHEN DIRECTED, INSTALL DIVERSION 2 (D-2) AND, IF AUTHORIZED, DIVERT TO NEW CHANNEL DOWNSTREAM, OTHERWISE CONNECT VIA WYE FITTING TO
DIVERSION PIPE AT D-1 IN ORDER TO DIVERT AROUND ENTIRE WORK AREA UNTIL AUTHORIZED TO ACTIVATE NEW CHANNEL.
4. DIVERSION AND DEWATERING CONTRACTOR RESPONSIBLE FOR INSTALLING, OPERATING AND MAINTAINING DIVERSION SYSTEM ACCORDING TO PLANS, SPECIFICATIONS AND PERMITS.
5. DIVERSION AND DEWATERING CONTRACTOR RESPONSIBLE FOR INSTALLING AND MAINTAINING UPLAND DEWATER BASINS FOR LTBMU USE
AND DEMOBILIZING ONCE DIRECTED. INSTALLATION AND DEMOBILIZATION IS TO BE DONE ACCORDING TO PLANS, SPECIFICATIONS
AND PERMITS.
6. LTBMU WILL BE RESPONSIBLE FOR INSTALLING ALL PIPING AND HOSE LINE USED TO PUMP FROM THE NEW
CHANNEL TO THE DEWATER IRRIGATION CELLS AND UPLAND DEWATER BASINS.
Impermeable Barrier Fence; Detail A/C-5
Coir Log or Wattle (staked inside); Detail 9/D-7
A
C-5
South Lake Tahoe, CA 96150
(530) 573-1378
S S
...10/05/12
AS SHOWN
DETAILS (CONT'D)
| --C4_staging.pdf |
| --C4_staging |
| C-4_access |