Attachment 1 - Demolition Specifications
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE PROJECT SPECIFICATIONS
Rev. Date 03/16 29 Mile Guard Station and Garage Demolition Project 02050 - 1/5 Demolition
SECTION 02050
DEMOLITION
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section includes requirements for the selective removal and demolition of building components at a project site, as well as the entire demolition of small buildings.
B. This work may also include the removal of foundations, capped and abandoned utilities, and other site improvement as described in the Contract.
1.02 RECYCLING OF DEMOLITION MATERIALS
A. Demolition materials recycling requirements: The work of this contract shall provide for a minimum of 50% by weight of the solid waste generated in the work to be diverted from landfill disposal through a combination of re-use and recycling activities.
1.03 SUBMITTALS
A. Health and Safety Plan must be submitted and approved prior to the commencement of the work.
B. Project Work Plan must be submitted and approved prior to the commencement of the work.
C. Erosion Control Plan must be submitted and approved prior to the commencement of the work.
D. Contractor’s Demolition Report which includes quantitative reports for demolition waste materials generated by the Contractor, as a condition of approval of progress payments and final payment.
1.04 DEFINITIONS
A. Remove: Remove from National Forest Lands and legally dispose of items, except those identified for use in recycling, re-use, and salvage programs.
B. Inert Fill: Non-liquid solid waste including, but not limited to, soil and concrete that does not contain hazardous substances or soluble pollutants at concentrations in excess of water-quality standards.
C. Approved Landfill: An approved landfill that accepts non-hazardous materials resulting from construction, remodeling, repair, and demolition operations.
D. Demolition Waste: Building materials and solid waste resulting from construction, remodeling, repair, cleanup, or demolition operations that are not hazardous. This term includes, but is not limited to, asphalt concrete, Portland cement concrete, brick, lumber, gypsum wallboard, cardboard and other associated packaging, roofing material, ceramic tile, carpeting, plastic pipe, and steel. The materials may include rock, soil, tree stumps, and other vegetative matter resulting from land clearing and landscaping for construction or land development projects.
Rev. Date 03/16 29 Mile Guard Station and Garage Demolition Project 02050 - 2/5 Demolition
E. Chemical Waste: Includes petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals and inorganic wastes.
F. Recycling: The process of sorting, cleansing, treating and reconstituting materials for the purpose of using the altered form in the manufacture of a new product. Recycling does not include burning, incinerating or thermally destroy-ing solid waste.
G. Reuse: The use, in the same or similar form as it was produced, of a material which might otherwise be discarded.
H. Solid Waste: All solid, semisolid, and liquid wastes, including garbage, trash, refuse, paper, rubbish, ashes, industrial wastes, demolition and construction wastes, dewatered, treated, or chemically fixed sewage sludge which is not hazardous waste, manure, vegetable or animal solid and semisolid wastes, and other discarded solid and semisolid wastes. "Solid waste" does not include hazardous waste, radioactive waste, or medical waste as defined or regulated by State law.
1.05 HAZARDOUS MATERIALS
A. Hazardous building materials include, but are not limited to, asbestos and lead based paint.
B. This facility has been surveyed and tested by an independent laboratory for the presence of asbestos and lead based paint. Both asbestos and lead based paint were found to be present in this facility. See attachment 6, Asbestos and Lead Reports for location and concentration of asbestos and lead based paint.
Abatement has been included as individual line items in the Section B. The contractor must follow all local, state, and federal regulations for removal and transportation of the hazardous material.
C. Asbestos – See attached Asbestos Report dated June 8, 2016.
1. Friable ACM will easily release fibers when crushed. Only California licensed asbestos abatement contractors and certified asbestos workers can remove and dispose of Friable ACM. Examples of friable ACM can include, but are not limited to the following: sheet vinyl flooring, insulation on piping, duct and boilers, fireproofing, ceiling texture and panel products, and soundproofing.
2. Nonfriable ACM has a binder that holds the asbestos fibers within a solid matrix and will not allow asbestos fibers to release easily, unless mishandled, damaged, or in badly worn or weathered condition. A California licensed asbestos abatement contractor or a certified asbestos worker is not required to perform nonfriable asbestos abatement or removal. However, the nonfriable materials must remain in nonfriable condition (predominantly whole pieces) during the removal and disposal process. Examples of nonfriable ACM can include, but are not limited to the following: vinyl floor tile, AC water pipe, and cement (transite) siding or roofing.
a. If you remove nonfriable ACM, follow the California guidance documents.
Rev. Date 03/16 29 Mile Guard Station and Garage Demolition Project 02050 - 3/5 Demolition
1.06 MATERIALS OWNERSHIP
A. Except for items or materials indicated in the Contract to be reused, salvaged, reinstalled, or otherwise indicated to remain property of the Government, demolished materials shall become the Contractor's property and shall be removed, recycled, or disposed from National Forest Lands in an appropriate and legal manner.
1.07 QUALITY ASSURANCE
A. See Additional Technical Specifications for Applicable Codes and Regulations.
1.08 PROJECT CONDITIONS
A. Existing waterline under Guard Station must be protected in-place and remain intact to serve downstream cabins at the conclusion of this contract.
B. Contractor must protect Historic components of the Lincoln Highway as shown on the drawings.
C. Buildings to be demolished will be vacated and their use discontinued before start of work.
2. PART 2 - PRODUCTS (NOT USED)
3. PART 3 - EXECUTION
3.01 CONTRACTOR’S WORK PLAN
A. See Additional Technical Specifications for Project Work Plan requirements.
3.02 CONTRACTOR’S DEMOLITION REPORT
A. See Additional Technical Specification for Demolition Report requirements.
3.03 PREPARATION
A. Conduct demolition operations and remove materials to ensure minimum interference with roads, streets, walks, and other adjacent occupied and utilized facilities.
B. Do not close or obstruct streets, walks, or other adjacent occupied or utilized facilities without permission from COR. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
C. Conduct demolition operations to prevent injury to people and damage to adjacent buildings and facilities to remain. Ensure safe passage of people around demolition area.
D. Protect existing site improvements, appurtenances, and landscaping that are not scheduled for removal.
E. Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of buildings to be demolished and adjacent buildings to remain.
1. Strengthen or add new supports when required during progress of demolition.
Rev. Date 03/16 29 Mile Guard Station and Garage Demolition Project 02050 - 4/5 Demolition
3.04 EXPLOSIVES
A. Explosives: Use of explosives is not permitted.
3.05 ENVIRONMENTAL CONTROLS
A. Protection of Natural Resources: Preserve the natural resources within the project boundaries or restore to an equivalent condition.
B. Take reasonable precautions to protect surrounding vegetation.
C. Water Resources: Comply with applicable regulations concerning the direct or indirect discharge of pollutants to underground and natural surface waters.
D. Dust Control, Air Pollution, and Odor Control: Prevent creation of dust, air pollution and odors.
1. Use temporary enclosures and other appropriate methods to limit dust and dirt rising and scattering in air to lowest practical level.
2. Store volatile liquids, including fuels and solvents, in closed containers.
3. Properly maintain equipment to reduce gaseous pollutant emissions.
3.06 DEMOLITION
A. Building Demolition: Demolish buildings completely and remove from the site. Use methods required to complete Work within limitations of governing regulations and as follows:
1. Locate demolition equipment throughout the building and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
2. Demolish concrete and masonry in sizes that will be suitable for acceptance at recycling or disposal facilities.
3. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
4. Break up and remove concrete slabs on grade in small sizes, suitable for acceptance at recycling or disposal facilities, unless otherwise shown to remain.
5. Remove all disconnected, abandoned utilities on site
B. Below-Grade Construction: demolish foundation walls and other below-grade construction, as follows:
1. Completely remove below-grade construction, including foundation walls and footings.
2. Break up and completely remove below-grade concrete slabs, in small sizes, suitable for acceptance at recycling or disposal facilities.
3. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demolition operations to street level with satisfactory weed free soil materials.
C. Damages: Promptly repair damages to adjacent facilities caused by demolition operations.
D. Burning: Do not burn demolished materials.
Rev. Date 03/16 29 Mile Guard Station and Garage Demolition Project 02050 - 5/5 Demolition
3.07 DISPOSAL PRACTICES AND WASTE HAULING
A. Legally transport and dispose of materials that cannot be delivered to a source-separated or mixed recycling facility to an approved landfill or disposal facility that can legally accept building materials for the purpose of disposal.
B. Use a permitted waste hauler or Contractor’s trucks and personnel.
C. Become familiar with the conditions for acceptance of excavation and demolition materials at recycling facilities and landfills, prior to delivering materials.
D. Deliver to facilities that can legally accept excavation and demolition materials for purpose of re-use, recycling, composting, or disposal.
E. Do not burn, bury or otherwise dispose of rubbish and waste materials on project site.
4. PART 4 - MEASUREMENT AND PAYMENT
4.01 PROGRESS PAYMENTS WILL BE MADE AS FOLLOWS:
A. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
B. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
D. The total of all payments shall not exceed the original contract amount for this item.
4.02 BASIS OF PAYMENT
A. Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
1100 Mobilization Lump Sum
1200 Erosion Control BMP’s Lump Sum
1300 Guard Station Demolition Lump Sum
1400 Garage Demolition Lump Sum
1500 Asbestos removal and disposal Lump Sum
1600 Lead based paint removal and disposal Lump Sum
END OF SECTION