DRY_CREEK_R5KProvisions2400-13_COMBINED.docx
DOCX document 262 KB Posted
- Attached to
- Dry Creek IRSC Stewardship
- Solicitation number
- AG-9JGP-S-15-9006
About this file
R5 provisions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX C_Dry Creek(roads).pdf | ||
| DryCreekContractAreaMap_With_Arch.pdf | ||
| IRSC_CommercialServices_DryCreek Final.docx | DOCX document | |
| APPENDIX A_Dry Creek_FINAL.pdf | ||
| Dry Creek Volume Summary Final 6 inch biomass.xlsx | XLSX spreadsheet | |
| DryCreekContractAreaMap_FINAL.pdf | ||
| Appendix B_Scaled_Dry_Creek.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dry Creek Stewardship Truckee Ranger District Tahoe National Forest
K-C.1.1# – TIMBER SUBJECT TO AGREEMENT. (9/04) In addition, there is within Contract Area an unestimated quantity of:
| Species |
| Product |
| All |
| Biomass |
that shall be Included Timber upon written agreement.
K-G.2.4# – SITE SPECIFIC SPECIAL PROTECTION MEASURES. (9/04) Special protection measures needed to protect known areas identified on Contract Area Map or on the ground include:
Cultural Resource Protection Measures: SITE LOCATIONS ARE NOT SHOWN ON THE CONTRACT AREA MAP - No operations, equipment, or disturbance permitted within the Cultural Resource Area site boundaries; directional fell away from site(s); no slash to be deposited within site boundaries. Boundaries of site(s) are designated with BLUE and BLACK stripped flagging and/or YELLOW Equipment Keep Out signs. A separate confidential map of the Cultural Resource site locations is available for review by the Contractor at the Truckee Ranger District Office.
Wildlife and Botanical Protection Measures: WILDLIFE - For Limited Operating Periods (LOP), see K-G.3.1.5#- Project Operations Schedule, for specific LOP dates and affected operations or subdivisions. Large stick nests (hawks, eagles, owls, or osprey) discovered during operations will be protected and reported to the Forest Service. If upon determination by the District Wildlife Biologist that the nest is active; a LOP may be instituted to protect nesting birds.
Cave Resource Protection Measures: NONE
K-C.3.5# - DESIGNATION OF TIMBER, CUTTING UNIT BOUNDARIES, AND SUBDIVISION/PAYMENT UNIT BOUNDARIES (6/2012) Trees are designated for cutting under B.3.5# only if designated as shown in the Timber Designation table below. The boundaries of Subdivisions/Payment Units and Cutting Units are designated as shown in the Boundary Designation table below. Trees used for boundary designation are not to be cut.
SPECIFICATIONS PURSUANT TO K-C.3.5# - DESIGNATION OF TIMBER, CUTTING UNIT BOUNDARIES, AND SUBDIVISION/PAYMENT UNIT BOUNDARIES
Timber Designation Table
Cutting Unit/ Subdivision/Area/Payment Unit Tree Paint Color
Designation or Specification
| All |
| Blue |
| Hazard Tree. Notwithstanding B.3.2 all dead and unstable live trees which are leaning towards a road or are otherwise hazardous to a road, and are sufficiently tall to reach Contractor's landings or the roadbed of National Forest System roads within Contract Area, shall be felled by Contractor when Marked in the specified paint color above and below stump height by Forest Service in advance of felling any other timber in the vicinity. Pieces meeting Utilization Standards from such dead and unstable live trees shall be removed unless Contractor is notified in writing that removal would cause unacceptable damage to areas requiring special protection such as residual timber, roads, administrative sites, streamside management zones, and areas identified on Contract Area Map or on the ground. |
| Thinning Units 26,27,28,38,39,46,53,72 and 74 |
| Blue |
| Individual Tree Mark. Individual trees are designated for cutting only if Marked above and below stump height with the specified paint color. |
| All Units |
| White/ |
Orange Leave Tree Mark. All live conifer trees 4.0 – 9.9 inches DBH are designated for cutting unless Marked as leave trees. Leave trees are Marked above and below stump height with the specified paint color. Contract Area Map indicates areas plainly identified on the ground where leave trees are Marked to be left uncut.
All Units
| White/ |
| Wildlife Trees.Notwithstanding the designation for cutting under B.3.l, B.3.3, B.3.4,or B.3.5, trees which are identified by standard Forest Service metal wildlife tree sign or painted with the specified paint color on the uphill and downhill side, shall be left uncut. In event such trees are destroyed in Contractor's Operations, Forest Service may designate alternate trees to be saved. |
| All Units |
| Black |
| Marked Out Trees. When it is necessary to delete previously marked trees, an unique tree marking paint color will be Marked over or adjacent to the original mark, but will not obscure the original marking. Trees Marked with the original marking paint color and the unique tree marking paint color are not Included Timber. |
Units 54,56,59 and 61
Designation by Spacing K-C.3.5.1#
N/A
Designation by Species and Diameter, K-C.3.5.2#
N/A
Designation by Damage Class, K-C.3.5.3#
N/A
Designation by Row Spacing, K-C.3.5.4#
Subdivision/Payment Unit and Cutting Unit Boundary Designation Table
| Subdivision/Payment Unit |
| Boundary Paint Color |
| Boundary Designation |
| All Units |
| Orange |
| Mechanical Thinning Subdivision Boundaries are marked with ORANGE paint and ORANGE Tags. Mastication Only unit boundarys, are marked with and ORANGE tags and/or ORANGE paint. All unit boundarys are marked with two painted dots, or plastic orange tags, facing into the unit, one dot facing, or orange plastic tag, each direction of the unit boundary and an Orange butt mark. |
| All Units |
| White Flagging |
| Wildlife Clumps to Protect. Notwithstanding the designation for cutting under B.3.l, B.3.3, B.3.4,or B.3.5, areas which are identified by WHITE FLAGGING, shall be left undisturbed. These ares range in size from ¼ acre to ¾ acre. In event such trees are destroyed in Contractor's Operations, Forest Service may designate alternate trees to be saved. |
K-C.3.5.1# – DESIGNATION BY SPACING. (9/04) Within Subdivision(s) or cutting unit(s) 54,56,59 and 61 as shown on Contract Area Map, all LIVE AND DEAD CONIFER TREES (PP/ JP, WF, RF, LP and IC) 4.0-19.9” BDH, except trees Marked with WHITE or ORANGE paint or described to be left uncut, that meet Utilization Standards and one or more of the following criteria are designated for cutting.
(a) The required spacing is a maximum average of 20 feet. The tree is within 10 feet of a LIVE CONIFER tree that has a larger stump diameter than it; and the larger tree is not designated for cutting.
(b) The tree is within N/A feet of a N/A tree greater than or equal to N/A inches stump diameter; and this tree is not designated for cutting.
(c) The tree is Marked with BLUE paint.
Distances are measured horizontal distance, outside bark stump height to outside bark stump height. Stump diameter is measured outside bark at stump height in a horizontal plane and is the average of a measurement across the short axis through the true center of the stump and a second measurement at right angles to the short axis.
All Sugar Pine, Incense Cedar, Red Fir, Juniper and all live and dead conifer trees greater than 20.0 inches DBH shall be left as leave trees, unless Marked with BLUE paint. No tree greater than or equal to 22.9 inches stump diameter shall be cut, unless Marked with BLUE paint. Cutting unit boundaries and other trees that shall be left uncut are Marked with ORANGE paint.
Contractor and Forest Service shall agree to skid trail location under G.4.2.2. Skid trails shall be no greater than 12 feet wide with a 75 foot spacing.
K-F.3.1# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contract Road Maintenance Requirements Summary
| Applicable pre- Haul Road Maintenance Requirements |
| Prehaul |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
Termini
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| Road Number |
| From |
| To |
| Miles |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 9 |
| 1 |
| 1 |
| 0 |
| 1 |
| 11-10 |
| Unit 46 |
| 89-36 Road |
| 0.84 |
| P |
| P |
P
| 89-36 |
| 89-36-12 Road |
| State Route 89 |
| 4.19 |
| P |
| P |
P
| 89-36-10 |
| Private Property |
| 89-36 Road |
| 1.14 |
| P |
| P |
P
| 89-36-12 |
| Unit 46 |
| 89-36 Road |
| 0.53 |
| P |
| P |
P
| 886-10 |
| 886-10-04 Road |
| NEV-886 |
| 0.67 |
| P |
| P |
P
| 886-10-04 |
| Unit 56 |
| 886-10 Road |
| 0.79 |
| P |
| P |
P
| 886-18 |
| Unit 54 |
| NEV-886 |
| 2.91 |
| P |
| P |
P
| 886-18-05 |
| Unit 53 |
| 886-18 Road |
| 0.60 |
| P |
| P |
P
| 889-14 |
| 889-14-02 Road |
| NEV-889 |
| 0.22 |
| P |
| P |
P
| 889-14-02 |
| 889-14-20 Road |
| NEV-886 |
| 0.67 |
| P |
| P |
P
| 890-06-10 |
| Unit 31 |
| NEV-889 |
| 0.15 |
| P |
| P |
P
P = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Applicable During Haul Road Maintenance Requirements
During Haul
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
Termini
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| Road Number |
| From |
| To |
| Miles |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 11-10 |
| Unit 46 |
| 89-36 Road |
| 0.84 |
| P |
| P |
| P |
| P |
| 89-36 |
| 89-36-12 Road |
| State Route 89 |
| 4.19 |
| P |
| P |
| P |
| P |
| 89-36-10 |
| Private Property |
| 89-36 Road |
| 1.14 |
| P |
| P |
| P |
| P |
| 89-36-12 |
| Unit 46 |
| 89-36 Road |
| 0.53 |
| P |
| P |
| P |
| P |
| 886-10 |
| 886-10-04 Road |
| NEV-886 |
| 0.67 |
| P |
| P |
| P |
| P |
| 886-10-04 |
| Unit 56 |
| 886-10 Road |
| 0.79 |
| P |
| P |
| P |
| P |
| 886-18 |
| Unit 54 |
| NEV-886 |
| 2.91 |
| P |
| P |
| P |
| P |
| 886-18-05 |
| Unit 53 |
| 886-18 Road |
| 0.60 |
| P |
| P |
| P |
| P |
| 889-14 |
| 889-14-02 Road |
| NEV-889 |
| 0.22 |
| P |
| P |
| P |
| P |
| 889-14-02 |
| 889-14-20 Road |
| NEV-886 |
| 0.67 |
| P |
| P |
| P |
| P |
| 890-06-10 |
| Unit 31 |
| NEV-889 |
| 0.15 |
| P |
| P |
| P |
| P |
P = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
| Applicable Post Haul Road Maintenance Specifications |
| Post Haul |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| T |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
| 8 |
Termini
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| Road Number |
| From |
| To |
| Miles |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 1 |
| 1 |
| 0 |
| 1 |
| 11-10 |
| Unit 46 |
| 89-36 Road |
| 0.84 |
| P |
| P |
P
| 89-36 |
| 89-36-12 Road |
| State Route 89 |
| 4.19 |
| P |
| P |
P
| 89-36-10 |
| Private Property |
| 89-36 Road |
| 1.14 |
| P |
| P |
P
| 89-36-12 |
| Unit 46 |
| 89-36 Road |
| 0.53 |
| P |
| P |
P
| 886-10 |
| 886-10-04 Road |
| NEV-886 |
| 0.67 |
| P |
| P |
P
| 886-10-04 |
| Unit 56 |
| 886-10 Road |
| 0.79 |
| P |
| P |
P
| 886-18 |
| Unit 54 |
| NEV-886 |
| 2.91 |
| P |
| P |
P
| 886-18-05 |
| Unit 53 |
| 886-18 Road |
| 0.60 |
| P |
| P |
P
| 889-14 |
| 889-14-02 Road |
| NEV-889 |
| 0.22 |
| P |
| P |
P
| 889-14-02 |
| 889-14-20 Road |
| NEV-886 |
| 0.67 |
| P |
| P |
P
| 890-06-10 |
| Unit 31 |
| NEV-889 |
| 0.15 |
| P |
| P |
P
P = Contractor Performance Item D = Deposit to Forest Service D3 = Deposit to Third Party
K-F.3.2# – ROAD MAINTENANCE DEPOSIT SCHEDULE. (9/04) Other provisions herein notwithstanding, when Forest Service requests payment in lieu of Contractor’s performance of road maintenance, Contractor shall make Required Deposits (16 USC 537) for current and/or deferred road maintenance. Such deposits are based on the estimated volume and distance hauled and Contractor’s commensurate use of each road listed in the Road Maintenance Plan in K-F.3.1#.
Contractor and Forest Service may agree in writing on adjustment of such rates. If Contractor uses roads under jurisdiction of Forest Service other than those listed in the Road Maintenance Plan, Forest Service shall establish rates commensurate with Contractor’s use of such roads.
The Required Deposits for Forest Service work in lieu of Contractor performance and for deferred maintenance is: $0.01 per Green Ton
The following table lists who Contractor will make deposits for road maintenance to, and the rate per unit of measure of the deposit. The Road Maintenance Agreement is available for inspection at the Forest Supervisor’s Office.
| Deposit Made To |
| Rate |
| Unit of Measure |
N/A
K-F.3.5# – ROAD AND WATER SUPPLY USE. (5/2008) National Forest water supply locations, access, method of filling trucks, period of water availability and procedures designed to maintain water quality at each location shall be agreed in advance of use. Such use shall at no time reduce water supplies to the level that further use may be detrimental to aquatic resources or other established use. Waterholes and other improvements relating to said water supplies shall be put into condition, prior to expected seasonal periods of precipitation or runoff, to avoid resource damage.
Damage to resources at such locations caused by Contractor's Operations, other than fire suppression activities, shall be repaired by Contractor in a timely and agreed manner to the extent practicable to restore and prevent further resource damage.
Unless otherwise agreed, Contractor’s use of roads and other water supply requirements shall conform to the following table.
SPECIFICATIONS PURSUANT TO K-F.3.5# - REQUIREMENTS OF ROAD AND WATER SUPPLY USE
| Load Limitations |
| Contractor shall notify Forest Service in writing of the planned size and load distribution for equipment which exceeds the State of California Vehicle Code legal size and weight, and the National Forest System roads to be used. Such notice may be part of plan of operation under G.3.1.1. Within l5 days after receipt of the written notice Forest Service shall notify Contractor in writing of any regulations or restrictions that may be needed to protect National Forest Transportation Facilities. |
A written permit shall be required for moving any vehicle which is in excess of the established legal size and weight which is not listed in the above plan, except as may be authorized in prior written agreements.
| Existing Non-National Forest System Roads |
| Roads not shown on Contract Area Map may be used as Temporary Roads if there is agreement before use is started. |
Snow Removal
If Contractor removes snow from roads, such work shall be done with Forest Service approval and in a manner that will protect roads and adjacent resources.
Snow berms shall be removed or placed to avoid accumulation of melt water on the road and prevent water concentration on erosive slopes or soils.
Snow must not be removed to the road surface. A minimum < > inch snow depth must be left to protect the roadway. If the road surface is damaged, Contractor shall replace lost surface material and repair structures damaged in blading operations prior to hauling, unless climatic conditions prevent necessary work from being accomplished or as otherwise agreed in writing.
Single lane roads shall be plowed full width including turnouts. In event double lane roads are not plowed to full width, warning signs shall be required and plowing shall be no less than single lane (12 feet) with intervisible turnouts.
| Water Supply Deposits |
| If Contractor utilizes the water site located < >, for any listed activity, Contractor shall make deposit with Forest Service for that activity at the time and in the amount shown in the Water Supply Deposit Schedule table below. |
WATER SUPPLY DEPOSIT SCHEDULE
| Activity |
| Unit of Payment |
| Unit Cost |
| Total Cost |
| Time of Payment |
N/A
| Surface Replacement Deposits |
| Contractor shall make Required Deposits for deferred surface replacement (16 U.S.C. 537) for use of existing surfaced roads. If applicable, such deposits shall be based upon the volume and distance hauled on the roads and at the applicable rates listed in the table below titled Surface Replacement Deposit Schedule. If Contractor uses surfaced roads under jurisdiction of Forest Service other than those listed, Forest Service may establish applicable rates for such surfaced roads. |
SURFACE REPLACEMENT DEPOSIT SCHEDULE
| Road No. |
| From |
| To |
| Miles |
| Rate |
| 11-10 |
| Unit 46 |
| 89-36 Road |
| 0.84 |
| $0.21/GT |
Depostied to Fund Code# FSSR01
| 89-36 |
| 89-36-12 Road |
| State Route 89 |
| 4.19 |
| 89-36-10 |
| Private Property |
| 89-36 Road |
| 1.14 |
| 89-36-12 |
| Unit 46 |
| 89-36 Road |
| 0.53 |
| 886-10 |
| 886-10-04 Road |
| NEV-886 |
| 0.67 |
| 886-10-04 |
| Unit 56 |
| 886-10 Road |
| 0.79 |
| 886-18 |
| Unit 54 |
| NEV-886 |
| 2.91 |
| 886-18-05 |
| Unit 53 |
| 886-18 Road |
| 0.60 |
| 889-14 |
| 889-14-02 Road |
| NEV-889 |
| 0.22 |
| 889-14-02 |
| 889-14-20 Road |
| NEV-886 |
| 0.67 |
| 890-06-10 |
| Unit 31 |
| NEV-889 |
| 0.15 |
Contract Area Average Rate: $0.21/ Green Ton
K-G.2.4# – SITE SPECIFIC SPECIAL PROTECTION MEASURES. (9/04) Special protection measures needed to protect known areas identified on Contract Area Map or on the ground include:
Cultural Resource Protection Measures: SITE LOCATIONS ARE NOT SHOWN ON THE CONTRACT AREA MAP - No operations, equipment, or disturbance permitted within the Cultural Resource Area site boundaries; directional fell away from site(s); no slash to be deposited within site boundaries. Boundaries of site(s) are designated with BLUE and BLACK stripped flagging and/or YELLOW Equipment Keep Out signs. A separate confidential map of the Cultural Resource site locations is available for review by the Contractor at the Truckee Ranger District Office.
Wildlife and Botanical Protection Measures: WILDLIFE - For Limited Operating Periods (LOP), see K-G.3.1.5#- Project Operations Schedule, for specific LOP dates and affected operations or subdivisions. Large stick nests (hawks, eagles, owls, or osprey) discovered during operations will be protected and reported to the Forest Service. If upon determination by the District Wildlife Biologist that the nest is active; a LOP may be instituted to protect nesting birds.
Cave Resource Protection Measures: NONE
K-G.3.1.5# - PROJECT OPERATIONS SCHEDULE. (12/2006) Unless otherwise agreed in writing, Contractor’s Operations shall be performed in accordance with the following schedule:
SCHEDULE PURSUANT TO K-G.3.1.5# - PROJECT OPERATIONS SCHEDULE (12/2006)
Subdivision/ Area/Unit
| Conditions of Operation |
| Purpose |
Units 27 and 28 Northern Goshawk Limited Operating Periods (LOP):
A LOP will be in effect from February 15 to September 15 for Units 27 and 28. This LOP may be modified by the wildlife biologist if surveys determine nesting will not be affected within ¼ mile of the proposed activities.
To protect the Northern Goshawk
All Subdivisions
A Limited Operating Period (LOP) may be in effect for these Subdivisions from November 30 through and including May 30, if a presence of a Sierra Nevada yellow-legged frog (SNYLF) is validated by the fisheries biologist. When sightings establish the presence of SNYLF, no ground disturbing activities will be permitted during the LOP. This LOP maybe modified by the Forest Service, if surveys or analysis determines that there will not be any negative affect to the species listed for that season of operation.
Frog protection
Units 26,27,28,52 and 53
| Powerline Hazard Tree Removal: The powerline company (NV Energy) shall be notified and coordinated with prior to implementation of product removal in these treatment units. |
| Powerline Safety |
All Units 25,28,53,57,58,60,61,74, 75, 76
COMMERATIVE EMIGRANT TRAIL SYSTEM (COET):
1. No Operations(product removal or Masticaion) of any kind allowed from 6:00pm on Friday thru 5:00am Monday as well as Holidays: Memorial Day, Fourth of July, Thanksgiving, and Labor Day within 300ft of the Commemorative Emigrant Trail System (COET).
2. If felling live or dead trees 10 feet in height or taller that could hit within 30 feet of the COET system, temporary trail closeures must be used with traffic control on both ends of the work on the trail system in order to assure user safety. Flagman controls shall be used as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highway (MUTCD)” which may inspected at the Truckee Ranger District Office. The USFS COR must be be notified in writing prior to any trail closure and must approve any request prior to any trail closure. Any trail closure must be reopend, safe and passible within 48 hours.
3. If MASTICATION is occuring within 300 feet of the COET system, temporary trail closeures must be used with traffic control on both ends of the work on the trail system in order to assure user safety. Flagman ad controls shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highway (MUTCD)” which may inspected at the Truckee Ranger District Office. The USFS COR must be be notified in writing prior to any trail closure and must approve any request prior to any trail closure. Any trail closure must be reopend, safe and passible within 48 hours.
4. Only a small skid steer or posi track loader will be allowed to travel and work on the established trail system. All other machinary must cross the trail system at designated crossing potins that are at a 90 degree angle to the trail.
5. The COET must have caution signs at approporiate ends of the active work being performed at all times during opertaions.
6. Trail must be restored to orignial condition after use or operational implementation.
Public Safety
Trail Protection
| Contract Area and Haul Route |
| If rare plants (TEP, sensitive, or watchlist) are discovered the location will be buffered from disturbance by a minimum of 50 feet or by the recommended distance as determined by the Forest Service after an on-the-ground site visit by the District Botanist. |
Protection of rare and endangered plant species.
| All Units |
| For operations approved outside of the Normal Operating Season (October 16 to June 1, inclusive), Contractor’s operations shall be conducted per the requirements of the Tahoe National Forest “Outside Normal Operating Season Standards”. |
Snow plowing or removal will not be permitted unless approved by the Forest Service. Snow plowing or removal shall be conducted per the requirements of the Tahoe National Forest “Outside Normal Operating Season Standards”.
Reduce soil compaction, disturbance and protect water quality.
ALL
For operations approved outside of the Normal Operating Season (October 16 to June 1, inclusive), Contractor’s operations shall be conducted per the requirements of the Tahoe National Forest “Outside Normal Operating Season Standards”.
Snow plowing or removal will not be permitted unless approved by the Forest Service. Snow plowing or removal shall be conducted per the requirements of the Tahoe National Forest “Outside Normal Operating Season Standards”.
Reduce soil compaction, disturbance and protect water quality.
| ALL |
| Utilize existing landings where possible. Locate all new landings off of main public travel corridors and outside of Riparian Habitat Conservation Areas (RHCAs). Landing locations shall be carefully planned to minimize the number needed, and will consider site-specific factors such as topography, watershed and other resource protection concerns, safety, and contract operational needs. |
Where site-specific resource protection concerns are not otherwise limiting, the number of landings should not exceed one (1) landing per 30 acres. To minimize the number of landings, utilize roads for skidding unless site conditions rule this out due to possible safety or resource protection concerns.
Reduce soil compaction, disturbance and protect water quality.
| ALL |
| Within a subdivision boundary, unless otherwise agreed in writing, Equipment Exclusion Zones are shown on Contract Area Map and/or identified on the ground by equipment and vehicle prohibited signs. All equipment shall operate perpendicular to the streamcourse channels. |
Skid trails shall be located no less than 60 feet from the high-water mark of stream courses identified on the Contract Area Map. Skidding equipment shall not operate within the 60 foot buffer strip. Skidding equipment will back up to bundles to minimize turning.
Feller-buncher equipment is permitted to operate within the RHCA and reach into buffer strip to cut and remove designated timber unless otherwise stated. The feller-buncher shall remove designated timber to approved skid trails. Feller-buncher operators are to minimize turning to prevent excessive soil disturbance. Equipment will back out of areas within the RHCA.
Reduce soil compaction, disturbance and protect water quality.
| ALL |
| Harvesting operations will be confined to designated main skid roads until soil conditions are dry. Dry soil is defined as soil when sampled from a specified depth below the surface and placed in the hand and squeezed, the hand shows no significant moisture stains. When soil is dry, Contractor may use additional skid trails agreed upon by Forest Service and Contractor. |
Specific harvesting equipment restrictions relating to dry soil are as follows:
1) Equipment rated as low-ground-pressure, which is defined as equipment applying an average ground pressure of 8.0 or less pounds per square inch design load, is restricted to main skid roads until the soil is dry to a depth of 4.0 inches.
2) Equipment rated as high-ground-pressure equipment which is defined as equipment applying an average ground pressure of 8.0 or greater pounds per square inch design load, is restricted to main skid roads until the soil is dry to a depth of 10.0 inches and while minimizing damage to residual trees.
Reduce soil compaction, disturbance and protect water quality.
| ALL |
| Ground skidding/forwarding equipment will be used on slopes no greater than 30% slope with short pitches up to 200 feet up to 35%. Short pitches over 35% may be agreed to on a site-specific basis as approved by the Forest Service. All skid trails over 30% will be mulched. |
Mulch will be spread to a maximum depth no greater than 4.0 inches on skid trails. Existing slash adjacent to skid trails will be used, if available, before slash from the landings.
This requirement may be modified by the Forest Service after an on-site inspection by the soil scientist or hydrologist in coordination with the COR and District Fuels Officer.
Reduce soil compaction, disturbance and protect water quality.
ALL
Within RHCAs, equipment should be limited to slopes ≤ 20% if the slope is directly above, and runs continuously down to a stream channel. If the slope is > 20%, but does not slope directly into the creek, the 30% rule with no short pitches to 35% will be permitted.
Do not track up and down drainage pathways and minimize all equipment movement through swales. When equipment is operating inside RHCAs, minimize ground disturbance with short perpendicular entries into the RHCA. Backblade any berms created by equipment that could concentrate water.
Reduce soil compaction, disturbance and protect water quality.
| ALL |
| Deep tilling (subsoil with a winged subsoiler) of landings and the first 100 feet from the landing’s primary skid trails. Subsoiling other skid trails in highly compacted areas will be evaluated on a site by site basis. |
The need for the tilling of skid trails would be reviewed by a Soil Scientist or Hydrologist, and the Timber Sale Administrator, and would be restricted to areas on slopes less than 25%, where residual trees would not be excessively damaged (root tearing leaving areas open to disease) and on those trails and landings that do not contain excessive rock unless otherwise agreed with the watershed specialist.
Reduce soil compaction, disturbance and protect water quality.
| ALL |
| Seasonal wet areas: Open, grassy areas in subdivisions will not be entered by harvester, feller-buncher, forwarder or skidding equipment. Included Timber to be removed will be endlined out of the seasonal wet areas. |
An on-site inspection by the soil scientist or hydrologist in coordination with the Contracting Officer Representative and Contractor will be required before skid trail layout is approved.
Reduce soil disturbance and protect meadow habitat.
| ALL |
| Road Dust Abatement |
· Water and road palliatives (including magnesium chloride) will be used on roads for dust abatement. Water will be preferred except on roads where distance limits practical application of water. When using road palliatives other than water, application will include a 25 foot buffer from flowing water.
System Roads
· Require a dust palliative on all primary system roads.
· Water may be used to reactivate dust palliatives on all roads.
· Where streams are the sole water source, drafting would be allowed until stream flows reach 2 cubic feet per second (CFS). Below 2 CFS, drafting would only be allowed in previously developed off-site water impoundments as approved by the Forest Service.
Temporary Roads
· Limit the amount of temporary road construction by maximizing the skidding distance.
· Minimize the length and width of the roads.
· Avoid unstable areas where there is potential for mass soil erosion.
· Decommission all temporary roads.
Reduce soil disturbance, protect water quality and maintain road surfaces.
| ALL |
| Contractor shall deck separately Sawtimber and Biomass products prior to the removal of products from the landing. Product decks shall be removed from the Contract Area in separate operations with all Sawtimber removed from each landing prior to the removal of Biomass. Forest Service shall inspect and approve utilization and removal of Sawtimber products prior to the initiation of Biomass product removal on a landing-by-landing basis. |
Accountability for contracts having two products with different pricing.
| ALL |
| All Included Products felled in the woods must be removed within 30 days of cutting from June 1 through and including September 30. Outside of this time period, felling shall be limited to the amount of Included Products that can be removed from the Contract Area within 4 weeks. |
Fuels reduction during period of high fire danger.
| Contract Area and Haul Route |
| Tightly woven fiber netting or plastic mono-filament netting or similar materials shall be not used for erosion control or other purposes to ensure that the Sierra Nevada yellow-legged frog do not get trapped, injured or killed. Any materials used for erosion control or other purposes will be approved by the Forest Service prior to use. |
Protection of endangered or threatened species.
| ALL |
| If a new Threatened, Endangered, or Sensitive (TES) species is listed or discovered, or a nesting TES species is found within 0.25 miles of project activities, a limited operating period appropriate for the TES species will be implemented for the effected subdivisions based on the recommendation by a qualified Wildlife or Fisheries Biologist. |
Protection of endangered, threatened, or sensitive species.
Drafting Sites
For the protection of the Sierra Nevada yellow-legged frog (SNYLF) the following drafting mitigation measures may be required under the direction of the Timber Sale Administrator and Fisheries Biologist:
· Drafting hose will have a suction strainer with holes 2 millimeters or less in size.
· The end of the drafting hose will be placed in a clean plastic 5 gallon bucket to avoid disturbing the sediment in the stream channel.
· Drafting will occur in the deepest portion of the stream channel.
· Drafting equipment shall be secured to prevent equipment from drifting down stream.
An on-site inspection by the Timber Sale Administrator and Contractor in coordination with the Fisheries Biologist will be required before any drafting site is approved for use by the Forest Service.
Protection of endangered or threatened species.
| ALL |
| All operations contract shall fully comply with the requirements of the Lahontan and/or Central Valley Regional Water Quality Board “Timber Waiver” covering activities conducted under this contract. |
| Protection of water quality. |
K-G.3.3.1 - LOG TRUCKING. (2/2005) To promote safe operations on National Forest roads and on Specified Roads, loads shall be safely secured before trucks move from the landing or loading location.
K-G.3.7 - SUBSTITUTE METHODS. (2/2005) Notwithstanding other provisions herein, for minor changes such as changes in logging systems for areas smaller than 5 acres, Contractor and Forest Service may agree in writing that use of substitute methods or equipment will achieve Forest Service objectives under this contract and may be used in lieu of those specified for Contractor's Operations.
K-G.4.1# - FELLING, BUCKING, AND LIMBING. (8/2007) Unless otherwise agreed in writing, Contractor’s felling, bucking, and limbing operations shall be conducted as specified in the table below.
SPECIFICATIONS AND TREATMENTS PURSUANT TO K-G.4.1# - FELLING, BUCKING AND LIMBING
| Treatment Method |
| Felling, Bucking and Limbing Specifications |
Limbing “Limb” Outside of construction clearings, Clearcutting Units and regeneration units, unless otherwise provided by G.4.1.4, Purchaser shall, prior to skidding/yarding operations, cut exposed limbs from products which are to be skidded/yarded. Such limbing of stems shall be done to a top diameter of approximately 6.0 inches, at which point the top shall be cut from the remainder of the stem.
No Lop “No Lop” Within units or subdivisions designated NO LOP on Contract Area Map, trees shall be skidded/yarded to agreed landing locations prior to lopping.
Optional
Whole Tree Yarding “Whole” N/A Optional
Directional Felling
“DF”1/
Within areas designated DF on Contract Area Map, Included Timber shall be directionally felled away from Utility Lines, gas lines, Survey Monuments, Cultural Resources and protected areas with the use of specialized equipment. Such directional felling shall not be required when in the faller’s judgment it is unsafe to do so, and shall be left standing.
Optional.
Treatment of Stumps
“TS”2/
Within areas shown on Contract Area Map, Contractor shall treat stumps of all live Conifer trees equal to or greater than 14.0 inches stump diameter, (measured inside bark) unless otherwise agreed in writing. Treatment shall be with a borate compound registered by EPA in the State of California for prevention of annosus root disease.
Treatment shall consist of removal of sawdust and other loose debris from the cut surface of the stump and application of a thin layer of the borate compound uniformly over the entire cut surface, including exposed wood surfaces on the stump sides, at the rate specified on the product label. Any surface irregularities on the stump preventing application of a uniform layer of borate compound shall be cut level prior to treatment. Unless waived in writing, Contractor shall also apply an approved colorant mixed with the borax to insure complete coverage. Treatment should be done as soon as possible but shall be completed no later than 4 hours after felling, otherwise stumps shall be re-cut and treated.
Contractor shall not apply borate compound during heavy rain fall or when such precipiation rate is predicted within 24 hours of application to cause borate compound to be flushed off the stump and become ineffective, in that case treatment shall be reapplied. Application shall be completed within 24 hours of the precipitation having ceased. Borate compound also shall not be applied to stumps located within 25 feet of live streamcourses and meadows/wetlands shown on Contract Area Map and/or 25 feet of sensitive plant location boundaries as flagged on the ground.
Contractor shall provide the borate compound and colorant and apply it in compliance with the State of California laws and regulations pertaining to pesticides and pest control operations. Borate compound storage shall be located such that any spillage will not contaminate water. All spills shall be promptly cleaned up and spilled material disposed of according to the product label. All spills occuring in water or over 1 pounds shall be reported to Forest Service within 4 hours.
Contractor shall submit at the end of each month a “Monthly Summary of Pesticide Use Reports” to the appropriate County Agricultural Commissioner with a copy to the District Ranger.
| Maximum Log Length 3/ |
| Cut trees shall be bucked prior to skidding so that resulting logs shall not exceed the maximum log length including trim allowance shown in following table: |
| Unit Number |
| Maximum Log Length |
| ALL UNITS |
| 41 Feet |
Optional
| Minimum Stump Height 5/ | |
| Unit/Subdivision | |
| Minimum Stump Height (inches) | |
| Purpose or Reason |
| All UNITS |
| 3 |
| Timber Designation/Fire Precautions/Stump Treatment |
K-G.4.2# - GROUND BASED SKIDDING. (12/2006) Unless otherwise agreed in writing, the method of skidding Included Timber shall be as shown on the Contract Area Map, by areas, with symbols defined in the following table:
Ground-Based Skidding Table - K-G.4.2#
| Map Symbol |
| Requirements |
| TRAC |
| Skid road pattern shall be agreed in advance of felling and main skid roads shall be flagged on the ground in advance of felling. Contractor shall stage-log by felling and skidding Included Timber in two or more separate operations when necessary to prevent undue damage to the resources or residual stand. Needed tractor trails shall be constructed in advance of skidding. |
Products shall be end-lined as needed to protect resources or residual timber from unnecessary damage. The number of chokers shall be limited as necessary to avoid unnecessary damage to resources or residual timber. By agreement, tractors may be used to separate products to prevent stain.
| SUSP |
| Products shall be skidded with leading end clear of ground. |
| SPACE |
| Skid roads will average 75 feet from center to center, except where converging. |
| ENDL |
| Endlining shall not be required for distances in excess of 75 feet uphill, and 75 feet downhill. |
| MAX |
| Tractors used for skidding outside Clearcutting Units, regeneration units or other authorized clearings, shall be of the type (rubber-tired or track-laying) shown on the Contract Area Map and shall not exceed the overall width designated on Contract Area Map. |
| MH |
| Contractor shall cut Included Timber and move it to designated skid trails using equipment with a boom having an operating radius of at least 20 feet for bunching trees, capable of severing, lowering and placing trees up to 20 inches diameter at stump height on the ground prior to skidding. Such equipment must be capable of operating on slopes up to 35 %. |
Notwithstanding above, hand felling using chainsaws may be required in or adjacent to sensitive areas to protect resources from unnecessary damage.
Trees which exceed capability of specified equipment may be felled, bucked and skidded in a manner consistent with the requirements of G.4.1 - Felling and Bucking, K-G.4.1# - Felling, Bucking, and Limbing Requirements and the above “TRAC”, “SUSP”, “SPACE”, “ENDL”, and “MAX” requirements.
| CTL |
| Included Timber shall be felled, limbed and bucked by a self-propelled mechanical harvester capable of producing finished sawlogs or chippable boles. Limbs of Included Timber shall be placed evenly in the machinery skid trail prior to product removal. The harvester shall be an all-wheel drive machine with at least 3 axles and a processing head mounted on a boom having a minimum-operating radius of 20 feet. |
Notwithstanding above, hand felling using chainsaws may be required in or adjacent to sensitive areas to protect resources or residual timber from unnecessary damage.
All Products shall be removed by an all-wheel drive forwarder with at least 3 axles capable of self-loading and unloading. The forwarder shall carry all products free of the ground during removal. The loading crane shall have a minimum-operating radius of 15 feet. Log landings and transfer points shall be agreed in advance of harvesting.
Included Timber exceeding the harvester's capability may be felled by conventional chainsaw methods, forwarded to nearest skid trail and processed into a finished Product with harvester or chainsaw, consistent with the requirements G.6.1 - Meadow Protection, G.4.1 - Felling and Bucking, K-G.4.1# - Felling, Bucking, and Limbing and the above “TRAC”, “SUSP”, “SPACE”, “ENDL”, and “MAX” requirements.
| PB |
| N/A |
| HCTL |
| N/A |
K-G.5 - Streamcourse Protection. (2/2005) Unless otherwise agreed in writing, wheel or track laying equipment shall not operate within "Buffer Strips" except as necessary for fire suppression activities. “Buffer Strips” are areas marked on the ground or are within the distances identified on the Contract Area Map measured from the apparent high water mark of streamcourses. Boundaries of Buffer Strips may be modified by agreement in writing to meet unforeseen operating conditions.
Culverts, bridges, or other suitable structures shall be required on skid roads and trails only at points where it is necessary to protect Stream courses. The type of crossing structures, method of installation and removal shall be determined by agreement. Contractor in accordance with K-G.6 - Erosion Prevention and Control, shall remove such structures and associated fills.
Damage to Stream course or Buffer Strips caused by unauthorized Contractor's Operations shall be repaired by Contractor in a timely and agreed manner to the extent practical as determined by Forest Service to restore and prevent further damage to Stream courses.
K-G.6 - EROSION PREVENTION AND CONTROL. (5/2008) Erosion prevention and control work, including Streamcourse protection, required by K-G.5 and G.6 shall be completed within l5 calendar days after skidding operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Contractor's Operations due to causes beyond Contractor's control. Such on the ground designation shall be done as promptly as feasible unless it is agreed that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Contractor's Operations due to failure to perform required work shall be repaired by Contractor.
Notwithstanding other provisions in this contract and unless otherwise agreed in writing, any hay, straw, or mulch used in this contract shall be State of California certified weed free.
Additional erosion control requirements of this contract are listed in the following table.
SPECIFICATIONS PURSUANT TO K-G.6# - EROSION PREVENTION AND CONTROL.
Vegetative Soil Stabilization Where soil has been disturbed by Contractor's Operations and the establishment of vegetation is needed to minimize erosion, Contractor shall take appropriate measures normally used to establish an adequate cover of grass or other vegetation acceptable to Forest Service or take other agreed stabilization measures. Forest Service shall designate on the ground such disturbed areas annually as logging and Temporary Road construction are completed.
Forest Service upon request shall provide advice as to soil preparation and the application of suitable seed mixtures, mulch and fertilizer and the timing of such work. In no event shall Contractor be required to treat more acres than that shown in the legend of Contract Area Map.
Contractor shall use the type of native seed mixtures, mulch, and fertilizer as listed below:
| Seed Mix |
| Pounds/Acre |
| Type of Mulch |
| Fertilizer |
N/A
OPTIONAL
Special Erosion Prevention Measures Contractor shall give adequate treatment by spreading slash or wood chips or by agreement giving other treatment to portion of tractor roads, skid trails, landings, cable yarding corridors, tractor-end lined corridors and Temporary Road fills where necessary to supplement other erosion prevention measures required elsewhere in this contract. In no event shall Contractor be required to treat more acres than that shown in the legend of Contract Area Map. The specific locations to be treated shall be designated on the ground by Forest Service. These special erosion prevention measures are to be done within the same date and time periods as stated above.
OPTIONAL
| Soil Scarification. In addition to meeting the requirements of G.6.3 and G.6.4, Contractor shall scarify the following areas; unless otherwise agreed: | |
| (a) | Traveled Way of National Forest System roads used by Contractor and listed in the legend of Contract Area Map. |
| (b) | Roadbeds of any Temporary Roads used for log hauling by Contractor. |
| (c) | Landings or portions thereof located outside Roadbed limits of National Forest System roads not designated for scarification. |
Scarification shall be to a depth of 6 inches, with intervals between striations not to exceed l2 inches, unless otherwise agreed.
OPTIONAL
Backblading Within recreation development sites and public use areas designated on Contract Area Map, Contractor shall, at Forest Service request, backblade skid trails in lieu of cross ditching.
OPTIONAL
Tillage In addition to meeting the requirements of G.6.4, unless otherwise agreed in writing, tillage shall be required on the areas listed in the following table.
Tillage shall be accomplished by equipment that will lift and fracture the soil by vertical and lateral shattering, leaving soil loosened through the full width and depth of the compacted layer with the topsoil remaining substantially in place rather than being inverted.
Tillage depth is shown in the following table. Agreement in writing may be made to a lesser depth if rocks or other limiting site conditions are encountered.
Tillage shall be limited to periods when soil dryness will result in crumbled soil, avoiding the formation of large clods. Contractor and Forest Service shall agree in writing on the timing of completion of such work to coordinate with desirable soil moisture conditions.
| Areas to Till |
| Tillage Depth (Inches) |
| Maximum Acres to Treat |
| Landings |
| 24 |
| 5 |
| Main Skid Roads and Tractor Roads designated by Forest Service |
| 24 |
| 2 |
| Temporary Roads |
| 24 |
| 2.0 |
OPTIONAL
K-G.7# - SLASH TREATMENT. (12/2006) Contractor shall pile, scatter, yard, construct firelines or otherwise treat slash defined in specifications below, within designated areas. Work required of Contractor shall be in accordance with the following slash plan and specifications, and the Contract Area Map.
All vegetative debris associated with construction of Specified Roads such as unutilized timber, brush and grubbed stumps is Construction Slash. Measures to be taken by Contractor for treatment of Construction Slash are set forth in the attached road construction specifications and in the attached slash treatment specifications.
Vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Contractor's Operations, other than Construction Slash, is Logging Slash. Measures to be taken by Contractor for treatment of Logging Slash are set forth below unless otherwise agreed in writing.
Forest Service and Contractor shall jointly develop a schedule for completion of slash treatment on the various portions of Project Area prior to Contractor's Operations.
Removing may be substituted for treatment of any other specified method.
By agreement in writing, certain slash may be left for fuelwood. When the specified treatment is by a combination of methods, Logging Slash not treated by one of the methods shall be treated by the other(s).
See the slash treatment specification table below.
SPECIFICATIONS PURSUANT TO K-G.7# - SLASH TREATMENT (12/2006)
Specified slash treatment methods shall be shown on Contract Area Map or listed in the following tables by the following symbols:
Slash Treatment Methods
| Symbol |
| Method |
| Definition |
| Buck-L |
| “Bucking Large Logging Slash” |
| Tops and limbs over 4 inches diameter outside bark (d.o.b.), not to be otherwise treated, shall be bucked into lengths not to exceed 6 feet, unless agreed otherwise. |
| Buck-P |
| "Bucking and Piling" |
| Logging Slash smaller than N/A inches and larger than 4 inches in large end d.o.b. shall be bucked into lengths not to exceed N/A feet and left in place. Logging Slash 4 inches and smaller in large end d.o.b. shall be hand Piled within Required Disposal Strip for Forest Service disposal. |
*Six feet is the minimum; longer lengths may be specified
| Bury |
| "Burying" |
| N/A Logging Slash shall be buried where agreed in borrow areas, pits, trenches, or other locations reasonably near the area of origin. Logging Slash shall be matted down in layers and shall be covered with at least 2 feet of rock and soil so that the final surface is sloped to drain and relatively smooth. |
| Chip |
| "Chipping" |
| Chippable Logging Slash up to 4 inches in d.o.b. shall be processed through a chipping machine. Chips shall be scattered to a loose depth not exceeding 6 inches. |
| Deck |
| "Decking" large material |
| Logging Slash N/A inches or larger in large end d.o.b. and N/A *feet or more in length shall be Decked for disposal by Forest Service by piling pieces parallel to each other. |
*Normally 10 inches and 10 feet. If other dimensions used make sure they are coordinated
| Mach |
| "Machine Piling" |
| N/A Concentrations of Logging Slash, excluding scattered individual pieces, shall be Machine Piled by tractor equipped with brush rake for disposal by Forest Service. |
| Pile |
| "Piling" small material |
| Logging Slash smaller than N/A inches in large end d.o.b. and N/A feet long shall be hand Piled for disposal by Forest Service. |
*Normally 10 inches and 10 feet. If other dimensions used make sure they are coordinated
| Remove |
| "Removing" |
| Logging Slash shall be moved or hauled to locations shown on Contract Area Map and designated on the ground where it shall be piled for disposal by Forest Service. |
Scat 18" Scat 30"
| "Scattering" |
| Logging Slash shall be scattered to reduce slash concentrations with slash being generally left within 18 or 30 inches of the ground as shown on Contract Area Map. Logging Slash shall be scattered into openings away from and without unnecessary damage to residual trees. All scattered logs shall be limbed, placed away from trees and positioned so they will not roll. When Scattering is specified, another method may be used by agreement. |
| Stack |
| “Stacking” small material |
| Logging Slash N/A inches or smaller in large end d.o.b. and N/A feet or more in length shall be stacked for disposal by Forest Service by piling pieces parallel to each other. |
*Normally 6 inches and 8 feet. If other dimensions used make sure they are coordinated
| View |
| “Visible Slash Treatment” |
| Designated on Contract Area Map with boundaries posted on the ground are N/A with distance limitations for visible slash treatment. Within such units and the area of visible Logging Slash adjacent thereto, Logging Slash shall be treated by Contractor. Primary treatment shall be by Removing, Burying, Chipping, Piling, Machine Piling, or a combination of these means unless a method is specified or prohibited on Contract Area Map. Logging Slash not readily treated by the selected or specified method shall be removed to designated areas or treated as agreed. |
| YUMD |
| “Yarding Unutilized Material-Decking” |
| All unutilized material developed by Contractor’s Operations shall be treated by the d.o.b. and length specifications as shown in the unit specification table. All unutilized material shall be Yarded to landings and Decked. Where this is impractical, or other reasons, other locations shall be agreed upon. |
Unit Large End d.o.b. (in)
Length (feet)
N/A
| YUME |
| “Yarding Unutilized Material-Exterior Boundary” |
| All unutilized material developed by Contractor’s Operations shall be treated by the d.o.b. and length specifications as shown in the unit specification table. All unutilized material shall be yarded to locations a minimum of 50 feet slope distance within the exterior boundaries of such units and positioned so the yarded material will not roll. |
Unit Large End d.o.b. (in)
N/A
| YUML |
| “Yarding Unutilized Material-Landing” |
| All unutilized material developed by Contractor’s Operations shall be treated by the d.o.b. and length specifications as shown in the unit specification table. All unutilized shall be yarded to locations within 100 feet slope distance of landing. Where this is impractical, or other reasons, other locations shall be agreed upon. |
Unit Large End d.o.b. (in)
N/A
| YUMR |
| “Yarding Unutilized Material-Removal” |
| All unutilized material developed by Contractor’s Operations shall be treated by the d.o.b. and length specifications as shown in the unit specification table. All unutilized shall be removed to locations shown on Contract Area Map and designated on the ground, or other agreed locations, and Decked. |
Unit Large End d.o.b. (in)
N/A
| Cover |
| “Covering Piles” |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .