Section C - Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SECTION_G_-_Hilo_Exterior_Painting_of_Buildingdocx.docx | DOCX document | |
| Part_II_Section_I._Hilo_Exterior_Painting.docx | DOCX document | |
| Part_III_-_Hilo_Exterior_Painting_of_Building_-_INDEX.docx | DOCX document | |
| PART_IV._Section_K_-_Hilo_Exterior_Painting_for_Building.docx | DOCX document | |
| SECTION_E_-_Hilo_Exterior_Painting_of_Buildingdocx.docx | DOCX document | |
| Section_J-3_-_Hilo_Exterior_Painting_of_Building_-_Drawings.docx | DOCX document | |
| SECTION_L_-_Hilo_Exterior_Painting_for_Building.docx | DOCX document | |
| Hilo_SF1442-14a.pdf | ||
| SECTION_F_-__Hilo_Exterior_Painting_of_Building.docx | DOCX document | |
| SECTION_M_-__Hilo_Exterior_Painting_of_Building_.docx | DOCX document | |
| Section_J-2_-_Hilo_Exterior_Painting_Of_Building_-_Davis_Bacon_Wage_Rates.pdf | ||
| Section_J-1_-Definitions_of_Bid_Iterms_Hilo__Exterior_Painting_of_Building.docx | DOCX document | |
| SECTION_B_-_Schedule_of_Items._Hilo_Exterior_Painting_of_Building.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C – DESCRIPTION/SPECIFICATONS/STATEMENT OF WORK
For Prime Coat, and 2 Finish Coats of Exterior Paint on Concrete Masonry Units for Research Buildings Statement of work/Specifications (AGAR 452.211-72) (FEB 1988) The contractor shall furnish the necessary personnel, material, equipment, services facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
SUMMARY
Work for this project consists of surface preparation of existing paint, prime and paint on the exterior concrete masonry unit (smooth and split-faced) for the Research Building and Business Operations buildings. Finished painting shall match existing two-tone colors.
Work also includes four sets of exterior metal closet doors and one fixed metal attic louver located on the south side of the Research building. Paint color to match existing. See Research building photo - south elevation pg. 6.
This project requires the Contractor to supply all labor, materials, equipment, tools, transportation, freight and delivery required to complete the project in accordance with contract specifications and manufacturer’s specifications.
LOCATION
This project is located at 60 Nowelo Street, Hilo, Hawaii.
USE OF PREMISES
General: Contractor shall have limited use of premises for construction operations, including use of utilities and sanitary facilities at the Project site, during the construction period. Contractor shall leave the facilities as they are found.
Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Building closures will be permitted, when required, upon written approval of the Contracting Officer (CO).
Confine storage of materials to areas as approved by the CO.
Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
No dumping of waste products of any type will be permitted. All waste shall be transported to a sanitary landfill.
EXISTING UTILITIES
Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
CONSTRUCTION SEQUENCE
There is no specified construction sequence or season for this project.
VERIFICATION
Verify all new and existing dimensions affecting the work of this contract before ordering products.
PERMITS
Special permits for electrical work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.
Research Building
Research Building Photo – North Elevation
Research Building Photo-South Elevation
Research Building Photo – South Elevation
Research Building Photo – South Elevation Four Sets Closet Doors and Attic Louver Vent
Research Building Photo – East Elevation
Research Building Photo – West Elevation
Busness Operations/ Administration Building
Business Operations Building Photo – North Elevation
Business Operations Building Photo – South Elevation
Business Operations Building Photo – East Elevation
Business Operations Building Photo – West Elevation
SECTION C - SPECIFICATIONS
SECTIN J – LIST OF ATTACHMENTS
DEFINITION OF BID ITEMS AND MEASUREMENT AND PAYMENT
SECTION 01140
WORK RESTRICTIONS
Part 1-GENERAL
1.1 USE OF PREMISES
Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the work is indicated.
1. Limits: Confine constructions operations to the areas of the building where the painting is being done.
2. Government Occupancy: Allow for Government occupancy of site facilities.
3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Occupants, Government employees, and emergency vehicles at all times.
Use of Existing Building: Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
1.2 OCCUPANCY REQUIREMENTS
Full Government Occupancy: Government will occupy site and existing building during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government operations.
SUBMITTAL PROCEDURES
part 1- GENERAL
SUMMARY
This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.
DEFINITIONS
Action Submittals: Written and graphic information that requires Contracting Officer’s (CO's) responsive action.
Informational Submittals: Written information that does not require CO's approval. Submittals may be rejected for not complying with requirements.
SUBMITTAL PROCEDURES
Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. CO reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on CO's receipt of submittal.
2. Initial Review: Allow 2 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
3. If intermediate submittal is necessary, process it in same manner as initial submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
part 2 – PRODUCTS
ACTION SUBMITTALS
Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
Mark each copy of each submittal to show which products and options are applicable.
Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
Samples: Prepare physical units of materials or products, including the following:
Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
CLEAN UP AND DISPOSAL
PART 1 - GENERAL
CLEAN UP
A. The contractor shall keep the work site free from accumulation of waste materials and rubbish resulting from the work.
B. Before final acceptance of the project by the Government, the contractor shall remove from the site all waste materials and rubbish resulting from this work.
DISPOSAL
A. Haul to state-approved sanitary landfill.
B. Washing waste material down sewers or into waterways will not be permitted.
SECTION C - SPECIFICATION
painting part 1 - GENERAL
SUMMARY
This Section includes surface preparation and field painting of exposed exterior items and surfaces.
SUBMITTALS
Product Data: For each product indicated.
Samples: For each type of prime-coat and finish-coat material indicated.
QUALITY ASSURANCE
Single Source Responsibility: Provide primers and other undercoat paint produced by same manufacturer as finish coats. Use only thinners approved by paint manufacturers, use only within recommended limits.
PROJECT CONDITIONS
Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain storage containers in a clean condition, free of foreign materials and residue.
Apply waterborne paints only when temperatures of surfaces to be painted and surrounding air are between 50 and 90 deg F (10 and 32 deg C).
Apply solvent-thinned paints only when temperatures of surfaces to be painted and surrounding air are between 45 and 95 deg F (7 and 35 deg C).
Do not apply paint in snow, rain, fog, or mist; or when relative humidity exceeds 85 percent; or at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.
part 2 - PRODUCTS
MANUFACTURERS
Products: Subject to compliance with requirements, provide one of the products listed in other Part 2 articles.
1. Benjamin Moore & Co. (Benjamin Moore).
2. Coronado Paint Company (Coronado).
3. ICI Dulux Paint Centers (ICI Dulux Paints).
4. Kelly-Moore Paint Co. (Kelly-Moore).
5. M. A. Bruder & Sons, Inc. (M. A. B. Paint).
6. PPG Industries, Inc. (Pittsburgh Paints).
7. Sherwin-Williams Co. (Sherwin-Williams).
PAINT MATERIALS, GENERAL
Material Compatibility: Provide block fillers, primers, and finish-coat materials that are compatible with one another and with the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.
Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified that are factory formulated and recommended by manufacturer for application indicated. Paint-material containers not displaying manufacturer's product identification will not be acceptable.
Colors: As selected by Contracting Officer (CO) from manufacturer's full range. Colors to match existing building facility colors.
PREPARATORY COATS
Concrete Unit Masonry Block Filler: One Coat high-performance latex block filler of finish coat manufacturer and recommended in writing by manufacturer for use with finish coat and on substrate indicated.
EXTERIOR FINISH COATS
Exterior Low-Luster Acrylic Paint:
1. Benjamin Moore; Moorcraft Super Spec Low Lustre Latex House Paint No. 185.
2. Coronado; 408-Line Supreme Acrylic Satin Exterior.
3. ICI Dulux Paints; 2402-XXXX Dulux Professional Exterior 100 Percent Acrylic Satin Finishes.
4. Kelly-Moore; 1245 Acry-Velvet Exterior Low Sheen Acrylic Finish.
5. M. A. B. Paint; Fresh Kote Latex Eggshell 405 Line.
6. Pittsburgh Paints; 6-2000 Series SpeedHide Exterior House & Trim Satin--Acrylic Latex.
Exterior Semigloss Acrylic Enamel:
Benjamin Moore; Moorcraft Super Spec Latex House & Trim Paint No. 170.
Coronado; 12-Line Supreme Acrylic Semi-Gloss.
| ICI Dulux Paints; 2406-XXXX Dulux Professional Exterior 100 Percent Acrylic |
| Semi- Gloss Finish. |
Kelly-Moore; 1250 Acry-Lustre Exterior Semi-Gloss Acrylic Finish.
M. A. B. Paint; Sea Shore/Four Seasons Acrylic Latex Trim Enamel 024 Line.
Pittsburgh Paints; 6-900 Series SpeedHide Exterior House & Trim Semi-Gloss Acrylic Latex Paint.
Sherwin-Williams; A-100 Latex Gloss A8 Series.
part 3 - EXECUTION
APPLICATION
Surface Preparation: Powerwash, clean, and prepare surfaces to be painted according to manufacturers written instructions for each particular substrate condition and as specified.
Cementitious Materials: Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.
Material Preparation:
Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue.
Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using.
Exposed Surfaces: Include areas visible when permanent or built-in fixtures, grilles, convector covers, covers for finned-tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.
Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.
If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance.
Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions.
Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate. Provide total dry film thickness of the entire system as recommended by manufacturer.
Prime Coats: Before applying finish coats, apply a prime coat to material that is required to be painted or finished. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn-through or other defects due to insufficient sealing.
Finishes: Completely cover surfaces as necessary to provide a smooth, surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.
CLEANING AND PROTECTING
At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from Project site.
Provide "Wet Paint" signs to protect newly painted finishes.
EXTERIOR PAINT SCHEDULE
Concrete Unit Masonry:
Acrylic Finish: Two finish coats over block filler.
Block Filler: One coat concrete unit masonry block filler.
Finish Coats: Exterior low-luster acrylic paint or semi-gloss acrylic enamel for concrete.
image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image1.jpeg image2.jpeg