1._Special_Project_Specs.pdf

PDF 595 KB Posted

Attached to
Six Rivers Road Maintenace IDIQ Federal contract opportunity
Solicitation number
AG-9AC7-S-17-0019
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Project Specs

View the file

Other files for this federal contract opportunity

Other files attached to Six Rivers Road Maintenace IDIQ, newest first.
File Type Posted
Amendment_001_final.pdf PDF
4._77-0727_sca.pdf PDF
3._PAL_Fire_Plan_complete.pdf PDF
2._Map_&_Drawings_Pkg.pdf PDF
AG-9AC7-S-17-0019_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Contents

SECTON 806 REGULATORY REQUIREMENTS (2015)

SECTION 807 EQUIPMENT RENTAL (2/99)

SECTION 808 WORK AREA MANAGEMENT (1/92)

SECTION 811 BLADING (2/99)

SECTION 813 SPOT SURFACING (3/96)

SECTION 814 ASPHALT PAVEMENT PATCHING (2/99)

SECTION 831 DITCH MAINTENANCE (2015)

SECTION 832 REMOVAL, DISPOSAL AND HAUL OF MATERIALS (2015)

SECTION 834 DRAINAGE STRUCTURE MAINTENANCE (8/96)

SECTION 835 ROADWAY DRAINAGE MAINTENANCE (3/96)

SECTION 838 MAINTENANCE FOR LIMITED USE (3/96)

SECTION 851 LOGGING OUT (3/96)

SECTION 854 HAZARD REMOVAL AND CLEANUP (3/96)

SECTION 861 MAINTENANCE of CATTLEGUARDS, TRAFFIC GATES and BARRIERS, GUARDRAILS, and RETAINING WALLS (11/07)

SECTION 872 SIGN MAINTENANCE (4/02)

SECTION 881 MOBILIZATION (2/94)

SECTION 883 CLEANING OF EQUIPMENT (6/07)

SECTION 884 EROSION CONTROL (2015)

SECTION 891 WATER SUPPLY AND WATERING (3/96)

SECTION 892 BITUMINOUS PRODUCTS (7/91)

SECTION 893 AGGREGATE (2015)

SECTION 895 EROSION CONTROL MATERIALS (2015)

2 | P a g e

SECTON 806 REGULATORY REQUIREMENTS (2015)

1. DESCRIPTION

This Section identifies the codes and standards which apply to the work in this contract.

2 REQUIREMENTS

The Contractor shall comply with any Federal, State, and municipal laws, codes, regulations, and standards that apply to the work to include but not limited to the following:

29 CFR Part 1926 – Safety and Health Regulations for Construction 49 CFR – Transportation Manual of Uniform Traffic Control Devices (MUTCD) NFPA 30 – Flammable and Combustible Liquids Code NFPA 30A – Motor Fuel Dispensing Facilities and Repair Garages American Society for Testing and Materials (ASTM) Standards National Historic Preservation Act

3. MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for meeting requirements of this Section. All work and materials shall be incidental to paid work in this contract.

3 | P a g e

SECTION 807 EQUIPMENT RENTAL (2/99)

This Section establishes the basis for the Government to order road maintenance work not otherwise under the contract.

2. PREWORK REQUIREMENTS

Prior to the issuance the Work Order, the Contractor shall provide the Government with a listing of proposed rental rates for specified equipment.

3. EQUIPMENT

a. Equipment under this Section, shall be provided fully operated by the Contractor and includes subcontractor equipment performing work under the contract. A competent qualified operator shall be provided by the Contractor.

b. The Government will review the proposed rates and those common to the area for this type of use.

Mutually agreed rates will be established. Work Orders may be issued as needed to obtain work under this Section.

4. DELIVERY OF EQUIPMENT TO SITE

The Government, in conjunction with the Contractor, will determine if equipment is to be moved onto and off the site by roading under its own power or by use of Contractor's truck transport. The Work Order will include the method of moving as roading or transport. Subsequent moving of equipment from one portion of the job to another shall be by roading unless otherwise documented in the Work Order.

5. HOURS OF OPERATION

Hours of operation shall be the same as for the Contractor's regular work shift, unless otherwise directed in writing by the Government.

6. TIMEKEEPING AND COMPENSATION

a. The Government will maintain a daily record showing the actual hours, to the nearest half (1/2) hour, that the equipment is in operation performing work under this item.

b. Time for equipment roading will commence with the beginning of the move. Time will be counted for the operator during roading.

c. Time for equipment transported will be in accordance with the appropriate of the following:

1. When equipment is not being actively used on the contract at the time moving is ordered under this Section, time will be counted for the transporting vehicle, but not the equipment being transported.

2. Where work under this contract is interrupted for ordered performance under this Section, time will be counted for the transporting vehicle and the equipment that would otherwise have been operating.

d. The equipment hours recorded will be paid for at the agreed rate. Labor costs paid for under this

Section will be those paid by the Contractor under this contract.

7. PAYMENT

4 | P a g e

a. Equipment rental rates will include operator.

b. Payment will be made under:

Pay Item Pay Unit

807(1) Rental Equipment, Type , Hour Horsepower, Minimum 807(2) Equipment Moving, Truck Transport Hour 807(3) Laborer Hour

5 | P a g e

SECTION 808 WORK AREA MANAGEMENT (1/92)

This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.

2. REQUIREMENTS

a. Traffic Conditions - Roads other than those listed for work under Section 835 shall be open to traffic with not more than fifteen (15) minutes maximum delay time unless otherwise provided in Special Project Specifications.

b. Work which interferes with use of traveled roadways shall not be initiated or performed until a plan for satisfactory handling of traffic has been approved by the Government.

c. Traffic Control Devices

1. The Contractor shall provide signs and other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD). Traffic control for occupied work areas shall be in accordance with MUTCD specifications. All signs and devices remain the property of the Contractor.

2. Traffic devices shall be kept current with maintenance operation and removed upon its completion.

3. Traffic approaching the work zone from either direction and side accesses open to travel within the work zone shall be warned by signing.

4. Required signs may be mounted on portable or temporary mountings. Standard MUTCD shapes, colors, sizes, and legends shall be used.

5. Hazards incidental to the work within or on the traveled way, shoulders, or turnouts shall be marked with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Work segments not completed on a daily basis shall be marked appropriately for night travel. Contractor shall obtain authorization before commencing work at night.

6. Advisory speed plates may be used to control traffic through the work area.

d. Flaggers - Properly equipped flag person(s) shall be provided where the traffic is required to stop before proceeding. Traffic shall be stopped in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.

e. Contractor's Equipment

1. All vehicles and machinery operating on or from the traveled way or road shoulder shall have flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Truck headlights shall be on while operating. Back-up horns shall be required on all self-propelled equipment.

2. Vehicles and machinery not currently used in the maintenance operation shall be parked off the traveled way at approved locations to minimize interference with normal use.

3. Refuel and service vehicles and machinery well away from water or riparian resources. Clean up spills immediately. Remove service residues, waste oils, and other materials from National Forest land and dispose of them according to Federal, State, and Local laws.

6 | P a g e

4. Areas marked as being contaminated by invasive plants shall not be used to park, stage, or service vehicles and machinery.

3. MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for meeting requirements of this Section. All work and materials shall be incidental to paid work in this contract.

7 | P a g e

SECTION 811 BLADING (2/99)

This work consists of surface blading native or aggregate roads to a condition to facilitate traffic and provide proper drainage. Blading includes shaping the crown or slope of traveled way, maintaining berms and drainage dips, and compacting the surface in accordance with this specification.

2. MAINTENANCE REQUIREMENTS

a. Timing

Surface blading shall be performed during the contract period as ordered by the Government.

b. General

1. The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise Marked on the Ground, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. Surfacing materials shall be thoroughly loosened to a depth of no less than 2 inches or the depth of potholes or corrugations. Corrugations are washboarding and similar defects. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.

2. When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.

3. Existing native, rock or aggregate surfaced drainage dips shall be cleaned and shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.

4. The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract. Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainageways or structures. This material may be scattered off the roadbed if there is free drainage.

c. Routine Blading

1. Excess roadbed width shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.

d. Compaction

All roads bladed under this section shall be compacted using Method A. Compaction Method A is considered incidental to blading.

Compaction shall commence immediately following blading. Compaction methods are:

8 | P a g e

Compaction Method A: By breaking track while operating equipment on the bladed surface.

Compaction shall cover the full width bladed surface.

Compaction Method B: 8-10 ton pneumatic, steel or equivalent vibrating roller, operated to cover the full width of the bladed surface two (2) times.

e. Intrusions

Where the minimum width of 12 feet is not available, the Contractor shall construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated by the Government.

f. Undercutting

Roadway backslope shall not be undercut.

g. Intersections

1. Intersections with side roads which are not closed or restricted to vehicular use shall be bladed to assure smooth transitions.

2. Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars. Also, roads listed for work under Sections 835 or 838 shall be considered restricted.

3. Side roads listed for work under this Section shall be considered as not restricted.

h. Cleaning of Structures

Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, drainage dips, aprons, or flumes.

i. Berms

Existing berms shall be maintained to the condition of adjacent segments when ordered by the

j. Scarification

1. This work shall consist of distroying or breaking up old or damaged chip seal and dust oil surfaces and the loosening of native and pit run surfaces for blading and reshaping the road surface.

2. Scarification shall be accomplished by rippers spaced not more than 12 inches apart.

3. Scarification shall not penetrate the aggregate base to the subgrade. Where aggregate base is 3 inches or greater in depth, the minimum scaification depth shall be 3 inches.

3. MEASUREMENT

Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

a. Measurement for blading will be single-lane mile measured along the centerline of the roadway (see quantity measurement terms). Two-lane roads will be measured as two (2) single-lane miles.

Measurement will be to the nearest one-tenth (0.1) mile.

9 | P a g e

b. Each intersection bladed under 2.g. will be equivalent to one-tenth (0.1) single-lane mile; however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.

c. Berm maintained or established will be measured by linear foot.

d. No measurement will be made under this Section for Compaction Method A. Measurement for

Compaction Method B will be the same as stated in 3.a for blading.

4. PAYMENT

a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.

b. Payment will be made under:

Pay Item Pay Unit

811(1) Blading Surfaced Roads Mile 811(2) Blading Native and Pit Run Roads Mile 811(3) Berm Maintained Linear Foot 811(4) Establishing Berms Linear Foot 811(5) Compaction - Method B Mile 811(6) Scarification Pass Mile

10 | P a g e

SECTION 813 SPOT SURFACING (3/96)

This work consists of placing surface aggregate as staked on the ground. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.

2. MATERIALS

a. Materials will be Government furnished when stated in Schedule of Items.

b. Materials furnished by the Contractor shall conform to the gradation requirements and the quality requirements of Section 893.

3. MAINTENANCE REQUIREMENTS

a. The area to be spot surfaced shall be thoroughly loosened to a minimum depth of one (1) inch prior to placement of aggregate.

b. Mixing and Placing

1. When scheduled coincident with work under Section 811, spot surfacing and existing aggregate, when ordered, shall be mixed with water until a uniform mixture is obtained prior to final shaping and compaction.

2. The material shall otherwise be spread on the prepared area in layers no more than four (4) inches in depth. When more than one (1) layer is required, each layer shall be shaped and compacted before the succeeding layer is placed. Upon completion, the spot surfacing shall reasonably conform to the adjacent cross section and provide smooth transition in the road profile.

3. Compaction shall be accomplished by using Method A. Compaction Method A is considered incidental. Compaction Method B shall be used when ordered.

Compaction methods are:

Compaction shall cover the full width bladed surface.

Compaction Method B: 8-10 ton pneumatic, steel or equivalent vibrating roller, operated to cover the full width of each layer two (2) times.

4. MEASUREMENT

a. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed, or tonnage verified by weight slips whichever is shown in the Schedule of Items.

b. Hauling is considered incidental when materials are furnished by the Contractor and when the haul distance is less than one (1) mile for Government furnished materials. When the haul distance exceeds one (1) mile for Government furnished materials haul will be ordered and paid under 832(3).

11 | P a g e

5. PAYMENT

a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items.

813(1) Spot Surfacing, Grading ____ Cubic Yard 813(2) Spot Surfacing, Grading ____ Square Yard 813(3) Spot Surfacing, Grading ____ Ton 813(4) Spot Surfacing, Government Furnished Materials Cubic Yard 813(5) Compaction Method B Square Yard

12 | P a g e

SECTION 814 ASPHALT PAVEMENT PATCHING (2/99)

This work consists of patching potholes, deep patching of asphalt surfaces, skin patching of asphalt surfaces, and patching asphalt berms. The work includes preparing the area to be patched, furnishing and placing all necessary materials and work. All areas to be patched will be marked by the Government.

2. MATERIALS

Materials used for asphalt patching shall conform to the requirements in Sections 892 and 893.

a. Deep Patching

1. Existing materials shall be removed to a minimum of two (2) inches below the bottom of the asphalt surfacing or as necessary to reach firm support, but limited to a maximum depth of eighteen (18) inches. If firm support for a patch is not available, the hole shall be barricaded and the Government shall be notified. Prior to the Contractor placing any materials, the Government will decide on any corrections to be made.

2. The edges of the prepared hole shall be extended to form a vertical face of unfractured asphalt surfacing. The prepared hole shall be rectangular in shape and cleaned of all loose material. The prepared area shall be backfilled with crushed aggregate base material in layers not to exceed six (6) inches in depth, compacting each layer with mechanical equipment designed for this purpose.

Compaction shall continue until visual displacement ceases. Backfilling shall continue to a depth of four (4) inches from the top of the existing asphalt surface. The bottom and faces shall be sprayed with an emulsified asphalt.

3. Prepared holes shall be patched or barricaded immediately.

4. The hot bituminous mixture shall be placed in layers not exceeding four (4) inches. Each layer shall be compacted thoroughly with hand tampers, mechanical tampers, or rollers.

5. Finished surface shall be compacted with an eight (8) to ten (10) ton steel roller or comparable vibratory roller. Upon completion, the compacted patch shall be flush with or not more than one quarter (1/4) inch above the level of the adjacent pavement.

b. Skin Patches

1. Prior to skin patching, potholes shall be patched.

2. Minor depressions, light ravelling, or surface checking at scattered locations marked on the ground shall be treated by applying a skin patch.

3. Prior to skin patching, the surface shall be cleaned of loose and deleterious material, then sprayed with emulsified asphalt at the rate of 0.1 gallons per square yard. The emusified asphalt tack coat will be considered incidental to the patching materials. No bituminous mixture shall be placed until the prepared surface is approved by the Government.

4. Hot bituminous mixture shall be distributed uniformly in layers not to exceed two (2) inches compacted depth. When multiple layers are ordered, joints shall be offset at least six (6) inches between layers.

13 | P a g e

5. Each layer shall be compacted with an eight (8) to ten (10) ton steel roller or comparable vibratory roller.

6. The completed patch shall not have abrupt transitions which adversely affect the steering of a passenger car. The surface must be at least as smooth as the adjacent pavement after twenty-four

(24) hours of exposure to traffic.

c. Potholes

1. Surfacing material, loose aggregate, and other debris shall be removed from potholes prior to patching.

2. The cleaned pothole shall be sprayed with emulsified asphalt.

3. The prepared pothole shall be filled with a hard setting cold bituminous mixture and compacted with hand tampers, mechanical tampers, or wheel rolled by deliver vehicles. The finished patch shall not protrude more than one half (1/2) inch above the adjacent surface.

d. Asphalt Berm

Damaged segments of berm shall be removed and exposed ends beveled at approximately forty-five (45) degrees from vertical. The berm foundation shall be cleaned and patched as necessary. The foundation and joining surfaces shall be coated with emulsified asphalt. Asphalt mix shall be placed and compacted to conform with the shape of the undamaged berm segment.

e. Disposal

All materials removed from potholes, patches, and berms shall be disposed of in areas designated by the

Government.

a. Bituminous Mixture

1. Hot and cold bituminous mixture acceptably placed will be measured by the ton for Pay Items 814(2) and 814(4) and by the square yard for Pay Items 814(1) and 814(3). Bituminous materials incorporated into the mixture will be incidental to the item.

2. Ton Measure - The quantity of mixture will be the number of tons in the accepted work. Any material rejected in the field as not meeting specifications shall be deducted based on estimated quantities. Rejected quantities shall be reconciled between the Government and the Contractor each day. If not reconciled each day, the Government's figures will apply.

b. The following work and materials are incidental:

1. Cleaning of surfaces.

2. Haul and compaction of bituminous mixture.

3. Material removal and disposal.

4. Emulsified asphalt for tack coat.

5. Crushed aggregate backfill material.

14 | P a g e

a. The accepted quantities will be paid for at the contract unit price shown in the Schedule of Items.

b. Payment will be made under:

Pay Item Pay Unit

814(1) Deep Patching Square Yard 814(2) Skin Patching Ton 814(3) Pothole Patching Square Yard 814(4) Asphalt Berm Maintenance Ton

15 | P a g e

SECTION 831 DITCH MAINTENANCE (2015)

This Section provides for routine maintenance of various types of ditches to provide a waterway which is unobstructed, at locations marked on the ground. Drainage ditch maintenance is limited to materials contained within the ditch below the elevation of the adjacent edge of the traveled way or shoulder.

2. MAINTENANCE REQUIREMENTS

a. Ditches shall be maintained by removing rock, soil, wood, and other materials. Low growing vegetation and grasses that do not disrupt or impede water flow can be left in place when possible. Upon completion the maintained ditch shall be of the same character as abutting segments that were not required to be maintained.

b. Backslopes shall not be undercut by removal operations.

c. Suitable material up to four (4) inches in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.

d. Material from ditch cleaning operations shall not be blended into or bladed across aggregate surfaced roads nor bladed onto or across bituminous surfaced roads.

e. Material in excess of 2(d) or subject to 2(e) shall be disposed of at a designated waste area under Section 832. Excess materials temporarily stored on the ditch slope or edge of the shoulder shall be removed daily.

f. Limbs and wood chunks in excess of one (1) foot in length or three (3) inches in diameter shall be removed from ditches and placed outside the roadway.

g. Paved surfaces shall be cleaned of all materials resulting from Contractor's ditch maintenance work.

Paved surface cleaning shall be in accordance with Section 815.

h. Lead-off ditches shall be shaped to drain away from the traveled way.

3. VEGETATION

a. Brush and trees one (1) inch in diameter or smaller shall be removed as incidental to Item 831(1).

Brush and trees larger than one (1) inch and less than six (6) inches in diamenter shall be removed and paid for under Item 831(3). Trees six (6) inches and larger in diameter shall be removed and paid for under Item 831(4).

b. Removed brush and trees shall be cut into lengths of four (4) feet or less and scattered on the fill slopes or outside the roadway limits. Concentrations of material will not be allowed. If ordered, materials shall be hauled and disposed of in accordance with Section 832.

a. Pay Items 831(1) and 831(3) will be measured to the nearest one-tenth (0.1) mile. Segments of less than one-tenth (0.1) mile will be counted as a full one-tenth (0.1) mile. Pay Item 831(2) will be measured by the number of ditches completed. Pay Item 831(4) will be measured by the number of units removed.

b. Ordered haul of excess material will be measured and paid under Section 832.

16 | P a g e

a. The accepted quantity will be paid for at the contract unit price shown in the Schedule of Items.

831(1) Clean and Reshape Drainage Ditch Ditch Mile 831(2) Clean and Reshape Lead off Ditch Each 831(3) Remove Vegetation Larger Than 1" Ditch Mile and Less Than 6" in Diameter 831(4) Remove Vegetation 6" and Larger Each in Diamenter

17 | P a g e

SECTION 832 REMOVAL, DISPOSAL AND HAUL OF MATERIALS (2015)

Work consists of ordered removal, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.

a. Excess materials generated by work under other Sections of this contract may be ordered for removal, haul, and disposal under this Section. Removal and disposal under all Sections will be ordered without haul when a distance of less than one (1) mile is involved.

Excess material from work sites contaminated with invasive plants shall be disposed of on site or hauled to a site that is already contaminated. Contaminated matrials shall be covered while being hauled.

Contaminated work sites and disposal sites will be MARKED ON THE GROUND.

b. Slide and slough materials to be removed shall include those in the area extending approximately six

(6) feet vertically above the road surface and that area extending not more than four (4) feet downslope from the roadbed. Material shall be disposed of at designated sites as Marked on the Ground.

The slope which generated the slide material shall be reshaped as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section 831.

c. When ordered by the Government, slumps shall be filled by compacting selected materials into roadway depressions. Compaction shall be by Method 2.

d. All materials removed and placed in disposal sites shall be placed by one or more of the following methods as shown in Road Listing.

1. Method 1 - Side Casting and End Dumping. Material may be placed by side casting and end dumping. Where materials include large rocks, a solid fill shall be provided by working smaller pieces and fines into voids. The finished surfaces shall be shaped to drain.

2. Method 2 - Layer Placement. Surfaces on which materials are to be placed shall be stepped or roughened prior to placing any material. Materials shall be placed in approximately horizontal layers no more than twelve (12) inches thick. Each layer shall be compacted by using one of the following methods:

Compaction shall cover the full width bladed surface. Compaction method A is incidental Placement method 2 and shall be used unless compaction method B is specified.

Compaction Method B: 8-10 ton steel or equivalent vibrating roller, operated to cover the full width of each layer two (2) times.

3. MEASUREMENT

a. Removal and disposal will be measured by the cubic yard, determined by equipment measure, for materials acceptably removed and placed.

18 | P a g e

b. Except as provided in 2(a) of this Section, haul of materials will be measured by the cubic yard mile, determined by the number of miles hauled times the cubic yards. Mileage will be measured one way rounded to the nearest 1/10 mile.

4. PAYMENT

832(1) Removal and Disposal, Placement Method 1 Cubic Yard 832(2) Removal and Disposal, Placement Method 2 Cubic Yard 832(3) Haul Yard Mile 832(4) Hauling Contaminated Materials Yard Mile 832(5) Compaction Method B Cubic Yard

19 | P a g e

SECTION 834 DRAINAGE STRUCTURE MAINTENANCE (8/96)

This work consists of cleaning and reconditioning culverts and other drainage structures.

a. Drainage structures, inlet structures, culverts, catch basins, and inlet and outlet channels shall be cleaned when required by the Government. Catch basins shall be cleaned by removing the material within the area shown on Drawing 834-1.

b. The transition from the ditchline to the catch basin shall be cleaned a distance of ten (10) feet. Inlet channels shall be cleaned for a distance of ten (10) feet of debris that obstructs water flow or could move down and plug the culvert inlet. Outlet channels and lead-off ditches shall be cleaned a distance of six (6) feet. Debris and vegetation shall be removed and placed so as to not enter the channel or ditch or obstruct traffic. Debris and vegetation in quantities of ten (10) cubic yards or less is incidental. Quantities over ten

(10) cubic yards will be paid for under Section 832. Debris and vegetation ordered to be hauled shall be hauled to a designated disposal area in accordance with Section 832.

c. Hydraulic flushing of drainage structures is not allowed unless approved by the Government.

d. Cleaning and reconditioning is limited to the first four (4) feet of inlet and outlet determined along the top of the structure. Ordered reconditioning of culvert inlet or outlet shall be by field methods such as jacking out or cutting away damaged metal which obstructs flow. All cut edges and damage to galvanized coating shall be cleaned and treated with zinc rich coating. Damage or obstructions which are not field corrected under the requirements of this Section shall be reported to the Government.

e. Removal of brush and trees less than six (6) inches in diameter is incidental. The removal of brush and trees six (6) inches in diameter and larger shall be paid under Section 831. Brush and trees shall be disposed of by cutting into lengths of four (4) feet or less and scattered on fill slopes or outside the roadway limits.

a. Measurement will be the number of units of each culvert type including cleaning of inlet and outlet ditches or channels and catch basins completed and accepted.

b. Reconditioning and cleaning of drainage structures will be incidental to cleaning.

c. Ordered haul of materials will be measured under Section 832.

a. Quantities as determined above will be paid at the contract unit price.

834(1) Clean Culverts 24" Diameter and under Each 834(2) Clean Culverts Over 24" through 48" diameter Each 834(3) Clean Culverts Over 48" diameter Each

20 | P a g e

SECTION 835 ROADWAY DRAINAGE MAINTENANCE (3/96)

This work consists of providing drainage on roads that have been physically closed to traffic.

a. Access

1. The Government will provide for access through locked gates and also provide any special devices other than standard wrenches or tools, required for removal or replacement of fabricated barricades.

2. Other work associated with Contractor's access shall be the responsibility of the Contractor. The entrance shall not be left available for access to persons not associated with this contract; temporary barricades shall be used during the active performance of work.

b. Drainage

1. Upon completion of work, the roadway shall be shaped to provide for the removal of surface water, but need not be passable to vehicles. Waterbars, barriers or berms existing prior to the Contractor's operation shall be repaired or reinstalled. Areas where water is ponded by existing centerline profile sags in through cuts may be left untreated.

2. Continuous blade shaping of the roadbed is not required under this specification.

3. Work to be done at staked locations shall be as indicated on the stake.

4. Any of the following methods are acceptable for use at eroded or rutted locations.

a. Method A: Outsloping the roadbed at not less than one-half (1/2) inch per foot.

b. Method B: Insloping the roadbed at not less than one-half (1/2) inch per foot of width.

c. Method C: Water bar roadbed at locations staked on the ground. Construct in accordance with Drawings.

5. Drainage structures located in through fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within twenty (20) feet of the structure.

6. Culverts and other fabricated structures providing drainage from road ditches shall either be cleaned and the ditch made functional or waterbar(s) shall be provided across the roadbed. Fabricated drainage structures discharging on natural ground within three (3) feet of roadbed elevation may be removed at Government's option to provide the waterbar. Removed structures shall become Contractor's property to be removed from National Forest. Contractor-installed temporary drainage structures, if any, shall be removed and replaced with a water bar.

c. Slides, Slumps and Slough

1. Slides and slough may be left in place provided they do not potentially impound water or divert water from watercourses. Reshaping of the various surfaces shall be done as necessary to provide drainage.

21 | P a g e

2. Drainage shall be provided to effectively decrease or eliminate the entry of surface water into slides, slumps, and roadbed surface cracks. The Contractor shall place berms, waterbars, or ditches as needed to intercept and remove runoff water from the roadbed. Cracks shall be surface sealed by covering with native soil materials to prevent additional water entry and compacting with equipment tires.

d. Entrance Devices

Upon completion of work, entrance devices shall be replaced to effectively eliminate access by motorized vehicles having four (4) wheels and a width in excess of fifty (50) inches.

e. Seeding

All disturbed areas shall be seeded and fertilized in accordance with requirements set forth in Section 836 and are incidental.

3. MEASUREMENT

Measurement for the ordered and accepted work will be the length of the road in miles as shown on the

Road Listing.

835(1) Roadway Drainage Maintenance Miles

22 | P a g e

SECTION 838 MAINTENANCE FOR LIMITED USE (3/96)

This work consists of making the roadway passable for use by high clearance vehicles and providing drainage from the traveled way and roadbed.

a. Timing

Maintenance shall be performed during the contract period as often as indicated by the accepted schedule or subsequently ordered by the Government.

b. Drainage

1. Drainage shall be provided at all existing drainage structures (including culverts, drainage dips, and lead-off ditches). Culverts providing drainage from road ditches shall have at least two thirds of the end area usable. Culverts in live streams or natural watercourses requiring cleaning shall have the end area fully usable.

2. Cross ditches conforming to Drawing 838-1 shall be placed at locations staked by the Government to provide drainage across the full width of the roadbed. Except as provided in 2.c herein, materials removed from cross ditches and cleaning of existing drainage dips shall be bermed downgrade on the roadbed. Cross ditches shall be angled and shall discharge at points of least fill height or on natural ground. Cross ditches are considered incidental under Pay Item 838(1).

When ordered by the Government, Driveable Drain Dips (conforming to Drawing 838-6) shall be placed at staked locations to provide free flowing drainage of surface water across the full width of the roadbed. Suitable road surfacing materials removed from lead off ditches and drain dips shall be placed downgrade on the roadbed, as shown in Drawing 838-6.

3. When ordered by the Government, the existing traveled way and shoulders, including any turnouts, shall be bladed and shaped to produce a surface which is consistent to grade, and crowned or cross-sloped as indicated by the character of the existing roadbed.

Roadbed width in excess of twelve (12) feet shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage.

c. Intersections (See Drawing 838-2)

Intersections shall be cross ditched to drain over the full width of the listed road and define the traveled way of the adjacent road. Material removed from this cross ditch shall be placed as a berm on the roadbed and traveled way away from the intersection. A second cross ditch conforming to Drawing 838-1 shall be placed within sight of the intersection when possible, but in no case more than one hundred feet (100') from the intersection.

23 | P a g e

d. Objects on Roadbed (See Drawing 838-3)

1. Upon completion, no object extending over four (4) inches above the road surface shall remain within a ten (10) foot usable traveled way width. Larger objects shall be selectively removed or repositioned to provide the usable width and lateral clearance required (See Drawing 838-3). The usable width shall be centered on the roadbed or positioned away from the fill slope.

2. Logs and down trees shall be cut to provide not less than twelve (12) feet of opening for vehicle passage provided the remaining ends are in ground contact and do not interfere with drainage. The portion to be removed may be cut into chunks or left as one piece and placed in a stable position where it will not restrict drainage or vehicle passage. Limbs shall be selectively removed to provide stability or ground contact and shall be scattered downslope outside of the roadbed and drainage ways.

3. Rocks and other objects outside the ten (10) foot usable width may remain if drainage is provided from the road surfaces.

e. Slough and Slides (See Drawing 838-4)

1. Slough and slides may be left in place when surface drainage is provided for and at least ten (10) feet of width is available for vehicle passage. The roadbed immediately upgrade shall be cross ditched.

Any roadside ditch between the cross ditch and the remaining materials shall be filled and shaped to drain.

2. The Contractor may reposition or ramp over slides and slough when the traveled way is less than ten (10) feet (See Drawing 838-4), providing the material is capable of supporting vehicles. Ramp profile gradient shall not exceed twelve (12) percent nor have an out slope exceeding six (6) percent.

Ramped crossings shall be drained and bermed to a height of at least six (6) inches on the out side of the ramped area.

3. Slough or slide materials which are not capable of supporting a vehicle shall be repositioned on the roadbed to provide the ten (10) foot width unless the Government orders it removed under Section 832.

f. Slumps (See Drawing 838-5)

1. The roadbed immediately upgrade of slumps shall be cross-ditched (See Section A-A of Drawing 838-1).

2. Slumps at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to eight (8) feet provided a berm of at least six (6) inches in height is placed on the undisturbed roadbed to divert surface water and provide a curb on the downhill side.

3. Roadbed slumps shall be ramped on both ends onto undisturbed roadbed to provide at least eight

(8) foot usable width. No material shall be placed on the slumped area. Removed materials shall be bermed on the roadbed to guide vehicles to the ramp location, used to block any abutting ditches, and to divert water from entering the slump area. Ramp profile gradient shall not exceed twelve (12) percent. Areas within the slumps that could pond water shall be drained.

4. Roadbed cracks shall be sealed with native soil and wheel or tamper compacted to reduce the introduction of surface water.

g. Cutting Vegetation

1. Trees, brush and limbs shall be cut and removed to provide at least twelve (12) feet of usable width centered on the existing usable road surface.

24 | P a g e

2. Encroaching limbs shall be removed to a height of ten (10) feet above the traveled way surface extending into the passageway from the side. Limbs extending laterally into the twelve (12) foot width shall be cut within six (6) inches of the trunk. Limbs extending down into the ten (10) foot height limitation may be cut or lopped as needed to meet the height requirement.

3. Brush and trees within the twelve (12) foot usable width corridor shall be cut parallel to and within two (2) inches of the traveled way surface.

4. Materials shall be scattered downslope outside the roadway.

h. Earth Barricade (See Drawing 836-6)

1. Earth barricades shall be constructed in locations specified in accordance with the attached drawings.

2. Multiple barricades at one site may be specified.

a. Measurement for all work under this section will be by the mile of existing centerline length expressed to the nearest one-tenth (1/10) mile.

b. When ordered by the Government under Pay Item 838(2), the measurement will be by the mile for removing down trees and logs, in accordance with 2.d.2., Maintenance Requirements, Objects on Roadbed.

c. When ordered by the Government under Pay Item 838(3), the measurement will be for the number miles bladed in accordance with 2.b.3., Maintenance Requirements, Drainage.

d. When ordered by the Government under Pay Items 838(4) and 838(5), the measurement will be the number of units of each completed in accordance with 2.b.2., Maintenance Requirements, Drainage.

a. The accepted quantities will be paid for at the contract unit price shown in the Schedule of Items.

838(1) Maintenance for Limited Use Mile 838(2) Log and Down Tree Removal Mile 838(3) Limited Use Blading Mile 838(4) Driveable Drain Dip Each 838(5) Cross Ditch Each

25 | P a g e

SECTION 851 LOGGING OUT (3/96)

This work consists of ordered removal of fallen trees and snags which encroach into the roadway.

a. Fallen trees, marked for removal, shall be cut into lengths for handling and disposed of outside ditches and drainages, off of the traveled way and turnouts or at designated locations.

b. Fallen trees and any remaining trunks shall be cut a minimum of four (4) feet beyond the roadbed limits.

c. All materials remain the property of the Government, unless otherwise stated in the contract.

d. Woody debris and slash in excess of one (1) foot in length or three (3) inches in diameter shall not remain in ditches, drainage channels, or on backslopes, traveled way, shoulders or turnouts.

Accumulations of debris may be ordered hauled and paid under Section 832. Materials not ordered hauled shall be scattered downslope from the roadbed, avoiding any drainage ways or concentrations.

Measurement will be the number of trees ordered and acceptably logged out under this Section. Diameter size will be measured at the largest cut. Miles will be measured to the nearest tenth of a mile.

a. The quantity accepted will be paid at the contract unit price shownin the Schedule of Items.

851(1) Logging Out Marked Trees, Each Less Than 24 Inches Diameter 851(2) Logging Out Marked Trees, Each 24 Inches Diameter and Over 851(3) Logging Out Unmarked Trees, Each Less Than 24 Inches Diameter 851(4) Logging Out Unmarked Trees, Each 24 Inches Diameter and Over 851(5) Logging Out Unmarked Trees, Mile All trees

26 | P a g e

SECTION 854 HAZARD REMOVAL AND CLEANUP (3/96)

This work consists of removing and disposing of marked hazards such as trees, rocks, and stumps.

a. Removal of trees shall include the felling and subsequent treatment of hazard trees designated by the

1. Trees and snags felled away from and at right angles to the road centerline and resting entirely beyond the roadside limits of five (5) feet beyond roadway slopes shall be limbed to provide ground contact over two-thirds (2/3) or more of its length. When the ground contact condition cannot be met, additional bucking will be done to achieve the two-thirds (2/3) contact control. Trees and snags falling cross slope shall be limbed and bucked into manageable lengths, and reoriented at right angles to the road centerline.

2. Trees or snags falling into the roadway shall be limbed, bucked into manageable lengths, and decked off of the roadbed.

3. All materials remain the property of the Government unless otherwise provided in the contract.

4. Woody debris and slash in excess of one (1) foot in length or three (3) inches in diameter shall not remain in ditches, drainage channels, or on backslopes, traveled way, shoulders or turnouts. Large accumulations of materials may be ordered hauled under 832. Materials not ordered hauled shall be scattered downslope from the roadbed, avoiding any concentrations or drainages.

b. Marked rocks and stumps 36 inches or less in diameter shall be removed.

1. Resulting holes outside the roadbed shall be backfilled with native materials and mounded to drain after settlement.

2. Removed rocks and stumps shall be hauled to a designated disposal site.

Measurement will be the number of marked hazards removed. Ordered haul of materials shall be under Section 832.

a. The quantity accepted will be paid at the unit price shown in the Schedule of Items.

854(1) Removal of Hazard Trees Each (24 " Diameter and Under) 854(2) Removal of Hazard Trees Each (Over 24" diameter) 854(3) Removal of Rocks & Stumps Each

27 | P a g e

SECTION 861 MAINTENANCE of CATTLEGUARDS, TRAFFIC GATES and BARRIERS, GUARDRAILS, and RETAINING WALLS (11/07)

Maintain cattleguards, traffic gates and barriers, guardrails, retaining walls and appurtenances, and culverts inlet and outlet structures. Remove traffic gates and barriers.

2. MATERIALS

a. The Government will furnish replacements for damaged or defective components which can be replaced incidental to reassembly.

b. Barbed or smooth wire, welding materials, tools, fasteners, and other materials shall be incidentally furnished by Contractor.

Cattleguard maintenance is complete when: it is free of structural defects, the deck provides a smooth, stable, compact transition to the adjacent road surface, and presents no traffic or livestock hazards; the wings are functional and secured to the deck and post; loose fasteners are tightened; and debris and other materials have been removed from the vault area to the full depth of the foundation over the entire width.

Traffic gate maintenance is complete when it is free of structural defects, the gate and all associated posts are stable, loose fasteners are tightened, and the locking mechanism is in working order.

Rock and earth barrier maintenance is complete when it is stable, aligned and at the dimensions SHOWN ON

THE PLANS.

4. Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

5. Payment

The accepted quantities will be paid at the contract price per unit of measurement for the Section 861 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item Pay Unit

861(1) Maintain one-lane cattleguard Each

861(2) Maintain two-lane cattleguard Each 861(3) Maintain traffic gate Each 861(4) Welding Cattleguard or Gate Hour 861(5) Maintain rock/earth barrier Each

28 | P a g e

SECTION 872 SIGN MAINTENANCE (4/02)

This work consists of cleaning, replacing, and reconditioning signs, posts, and markers.

2. MATERIALS

a. Posts, hardware, replacement signs, metal foil backing, reflective sheeting, and direct applied characters will be furnished by the Government.

b. Cleaning solutions shall be biodegradeable, having no adverse effect on existing sheeting.

3. EQUIPMENT

Use of steam cleaners and high-pressure washers are prohibited.

4. MAINTENANCE REQUIREMENTS

a. Cleaning Sign Faces

Sign faces ordered for cleaning shall be thoroughly cleaned with a solution of water, including cleaning compound, and rinsed to remove dirt and grime.

b. Reconditioning Sign Faces

1. Reconditioning of existing designs and markers includes cleaning, the treatment of holes, and patching of reflective sheeting and legend contained thereon. Not more than eight patches per sign face shall be made.

2. Holes and dents in metal signs shall be pounded out to provide a smooth face when the area involved is thirty six (36) square inches or less. Signs with areas exceeding this shall be left untreated and the Government notified within twenty-four (24) hours. Bent metal signs shall be straightened and patched.

3. Holes in metal or wood signs shall be initially patched with an adhesive backed metal foil over a dry face to provide backing for reflectorized sheeting.

4. All metal foil backing shall be covered with a patch of reflective sheeting sized at least one (1) inch larger, but not more than two (2) inches larger than the backing material. The patched area shall be free of air bubbles and be oriented to the pattern, if any, of the reflective sign face.

5. Where patching overlaps the existing legend or there is other damage to the legend, the affected characters shall be restored to full legibility with direct applied characters of the color, size, type, and series used on the sign. The applied characters shall be free of air bubbles.

6. Contractor shall check for missing items on signs such as bolts, washers, nuts and lag screws. If such items are missing contractor shall replace them with hardware provided by the Government.

c. Broken or vandalized posts shall be replaced. The usable sign/marker, if recovered, or a Government-furnished replacement shall be mounted in conformance with MUTCD Standards. Where the post is usable but the sign is gone or requires replacement, the Contractor shall install a Government-furnished sign and hardware on the existing post. Existing posts shall be plumbed. Removed signs and posts remain the property of the Government. Sign posts shall be installed plumb with the sign plate firmly fastened to the post. Holes for wood posts shall be excavated to minimum depth of 24 inches and backfilled by tamping of

29 | P a g e suitable material in lifts not exceeding 6 inches in depth. Metal posts shall be driven to a minimum depth of 24 inches.

d. Signs and markers which cannot be maintained in accordance with this Section shall be identified as to their location and legend and such information provided to the Government weekly.

5. MEASUREMENT

The quantity to be measured will be the completed number of units of the various items listed in the Schedule of Items and accepted under this Section.

6. PAYMENT

a. The accepted quantities will be paid at the contract unit price shown in the Schedule of Items.

872(1) Clean Sign Face Each 872(2) Recondition Sign Face Each 872(3) Replace Metal Sign Post Each 872(4) Replace Wood Sign Post Each 872(5) Remount Sign (1 or 2…