Detailed_Unit_Info_Butler_Mechanical 1 .pdf

PDF 136 KB Posted

Attached to
2014 Butler Mechanical Site Prep
Solicitation number
AG-9AC7-S-14-0126
Issued by

About this file

Detailed Unit Information Table

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUTLER MECHANICAL SITE PREP

Detailed Unit Information

ITEM

#(s)

UNIT # ACRES STAND

TREATMENT

LEAVE TREES

AND BRUSH

STAND AGE SLASH TREATMENT

Noxious Weed:

Avoid parking vehicles in areas flagged for noxious weeds

NEPA:

BUTLER

Reforestation Project

30 est.

Felling Trees

CONIFERS

> 22” DBH/

marked with orange paint/

< 2” DBH/

≥ 30% LCR

HARDWOODS

From the previous natural stand/

< 2” DBH/

≥ 30% LCR

ALL BRUSH

Plantations planted 1983 to

1984, burned 2013 wildfire

Whole tree pile.

Maximum Height ≤ 20 feet.

When available, post-treatment soil cover will range from 50-80 percent. If not available, soil cover shall not be reduced below pre-treatment levels. Fine organic matter (<3” diameter material), if available, shall be left in place to increase soil cover.

File details come from the government source that posted it. Updated .