Amendment_Two.pdf
PDF 66 KB Posted
- Attached to
- DG Plantation Resale ARRA IRSC Stewardship Federal contract opportunity
- Solicitation number
- AG-9AC7-S-14-0077
About this file
Amendment Two
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_One.pdf | ||
| Wage_Determination_No._1977-0727_Revision_No._44.pdf | ||
| APPENDIX_A.pdf | ||
| Solicitation.pdf | ||
| APPENDIX_B.pdf | ||
| APPENDIX_C.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page of Pages
1 2
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No.
Two 06/03/2014
6. Issued By: Code 7. Administered By: Code USDA Forest Service Northern California Acquisition Service Area 2550 Riverside Dr.
Susanville, CA 96130
See Block 6
8. Name and Address of Contractor (X) 9A. Amendment of Solicitation No.
X AG-9AC7-S-14-0077
9B. Dated (See Item 11)
05/12/2014 10A. Modification of Contract No.
10B. Date Issued (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE
CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the Contract
Order No. in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return __1_ copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DG Plantation Resale ARRA IRSC Stewardship
This amendment hereby incorporates clause AGAR 452.236-78 Fire Suppression and Liability as part of this solicitation and any resulting contract(s) for DG Plantation Resale ARRA IRSC Stewardship.
This amendment hereby extends the due date June 10, 2014 @4:30 pm.
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer 16A. Name and Title of Contracting Officer
Katherine E. Pasini
15B. Contractor/Offeror Date Signed 16B. United States of America Date Signed
06/03/2014
(Authorized Signature) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV.10-83)
PRESCRIBED BY GSA
FAR (48CFR) 53.243
Solicitation No. AG-9AC7-S-14-0077 Amendment Two
AGAR 452.236-78 FIRE SUPPRESSION AND LIABILITY (MAY 2014)
(a) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees subject to the following fire classifications:
(b) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:
(1) Operations Fire. An “operations fire” is a fire caused by the Contractor's operations other than a negligent Fire.
The Contractor agrees to reimburse Forest Service for such cost for each operations fire, subject to a maximum of the dollar amount of $10,500.00. The cost of the Contractor's actions, supplies, and equipment on any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds contractor's obligation stated above, Forest Service shall reimburse the contractor for the excess.
(2) Negligent Fire. A “negligent fire” is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting, or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.
(3) Other Fires on Contract Area. Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of Forest Service, on any fire on contract area other than an operations fire or a negligent fire.
(c) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(d) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall temporarily redirect employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for any such redirection of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor's obligations shall be the same as if performance was by Contractor.
(f) State Law. The Contractor shall not be relieved by the terms of this contact of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires. Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.
| Solicitation No. AG-9AC7-S-14-0077 Amendment Two |
| Page 2 of 2 |
| AGAR 452.236-78 FIRE SUPPRESSION AND LIABILITY (MAY 2014) |
File details come from the government source that posted it. Updated .