AG-9AC7-S-11-0026.pdf
PDF 2 MB Posted
- Attached to
- Soldier Creek Road Paving
- Solicitation number
- AG-9AC7-S-11-0026
About this file
Solicitation for Soldier Creek Road Paving
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Soldier Creek Drawings.pdf | ||
| CA9_dvb.pdf | ||
| SF24BidBond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Soldier Creek Road Paving, Shasta-Trinity National Forest Weaverville Ranger District Page 3 of 58
TABLE OF CONTENTS
PART I
SECTION A - SOLICITATION, OFFER, AND AWARD
TABLE OF CONTENTS
SECTION B – SCHEDULE OF ITEMS
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK……………………. 5
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H – SPECIAL CONTRACT REQUIREMENTS……………………………………………39
PART II
SECTION I – CONTRACT CLAUSES
PART III
SECTION J – LIST OF ATTACHMENTS
PART IV
SECTION K – REPRESENTATIONS AND INSTRUCTIONS
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES
INSTRUCTIONS FOR SUBMISSION OF OFFERS
SECTION M – EVALUATION FACTORS FOR AWARD
RESPONSE TO EVAULATION FACTORS
SEPARATE:
DRAWINGS (SEE LIST OF ATTACHMENTS, Section J)
DAVIS BACON WAGE DETERMINATION
Weaverville Ranger District Page 4 of 58
SOLDIER CREEK ROAD PAVING
Shasta Lake Ranger District, Shasta-Trinity National Forest
Shasta County
B- 1 - SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
Method
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
LSQ
Job
301(01) Untreated aggregate, Course Gradation D, Table 703-2 Shoulder backing, Compaction A
AQ
TN
303(01) Road Reconditioning Grading and Compacting only
MI
403(01) Hot Asphalt Concrete Pavement Type PG 64-16, grading B
TN 1625
634(01) Permanent Pavement Markings 4 inch, white, Type H Fog Line
FT
10560
635(01) Temporary Traffic Control LSQ EA 1
TOTAL BASE COST
Optional Work, will be awarded in 0.1 increments up to ½ mile total
301(01)
Untreated aggregate Course Gradation D, Table 703-2 Shoulder Backing Compaction A
6.5
32.5
303(01) Road Reconditioning Grading and Compacting only AQ MI 0.1
0.5
403(01) Hot Asphalt Pavement Type PG 64-16, grading B
634(01) Permanent Pavement Markings 4 inch, white, Type H Fog Line
TOTAL OPTIONAL WORK TOTAL
TOTAL PROJECT COST
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Weaverville Ranger District Page 5 of 58
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1. DESCRIPTION OF WORK
Furnish all labor, equipment and materials to regrade, compact, pave, stripe and shoulder back 1.0 miles of road 33N47 Soldier Creek Road, from Soldier Creek (approximately mp 0.9) to approximately mile post 1.9.
The schedule of items includes optional items to complete regrading, compacting paving, striping and shoulder backing. If funds are available, the work will be awarded in 120 ton increments of asphalt with the corresponding amount of striping and shoulder backing, which equates to approximately 0.1 mile. We have the option of awarding up to 600 extra tons of asphalt which is approximately 0.5 mile.
C.2. SAMPLING AND TESTING
The contractor will be required to complete all sampling and testing in accordance with the specifications.
Sampling and testing does not have a separate pay item. Any cost associated with sampling and testing should be included in the associated bid item.
C.3. PROJECT LOCATION
The project is located in the Weaverville Ranger District, Trinity County. Travel west out of Weaverville, CA on Hwy 299 approximately 6.5 miles. Turn West (left) on Dutch Creek Road. Travel approximately 3 miles to the intersection of Soldier Creek Road. Travel approximately 0.9 miles to Soldier Creek at the end of the pavement. Begin project.
C.4. PRE-BID CONFERENCE
A Pre-Bid meeting has not been scheduled. Contact Gene Rand, project COR, (530) 226-2330 for further information.
C.5. CONTRACT TIME AND ESTIMATED STARTING DATE
Estimated starting date is August 1st, 2010. The contract time will be 30 days.
C.6. PROJECT ACCESS AND ROAD CLOSURE
This project road may be closed to traffic during construction for no more than 4 hours before allowing traffic to pass. The Contractor will give the Government 14 days notice before closing the road. Preparatory work or after paving work will require the road to be closed for no more than one hour at a time before allowing traffic to pass. A traffic control plan must be submitted and approved before any work is started.
C.7 TECHNICAL INFORMATION
The Contractor shall furnish a Traffic control plan, Safety Plan and a Spill Plan, along with a detailed plan of operation for review by the Government prior to starting work. Technical information concerning this project can be obtained from Gene Rand, Shasta-Trinity National Forest Supervisor’s Office, Redding, CA, telephone
(530) 226-2330.
Weaverville Ranger District Page 6 of 58
C.8 FIRE PLAN
FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS
6-14-2006
(Ref: FSH 6309.32 and 6309.11)
1. SCOPE:
The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.
2. RESPONSIBILITIES:
A. Contractor
(1) Shall abide by the requirements of this Fire Plan.
(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.
(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.
(4) Shall designate in the fire plan and furnish on Contract Area during operating hours a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.
Shall complete the Contractor's Plan Regarding Personnel and shall furnish the Contracting Officer (CO) with a copy prior to commencing work at the site. Shall currently advise the CO of any changes in personnel as the changes occur. Shall revise Section 6.B to reflect current activities upon request of the CO.
B. Forest Service
The Forest Service may conduct one or more inspections for compliance with the fire plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.
3. TOOLS AND EQUIPMENT:
Weaverville Ranger District Page 7 of 58
A. The Contractor shall comply with the following requirements during the fire precautionary period as defined by unit administering contracts unless waived in writing:
The Fire Precautionary Period is May 15to October 15.
Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C.
Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the. National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition.
Contractor shall meet minimum requirements of Sections 4427 and 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source.
Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 10 feet of each tail and corner block.
Trucks, tractors, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.
Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).
Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent. In addition, concentrations of wood dust and debris shall be removed from such equipment daily.
Additional extinguishers and sizes may be required at landings in accordance with Section 5.
Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. One fire extinguisher meeting specifications of C.P.R.C. Section 4431 shall be kept with each operating power saw. A size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.
Contractor shall meet minimum requirements of Section 4430 of the California Public Resources Code (C.P.R.C.). Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor 's Operations hereunder during Fire Precautionary Period unless otherwise agreed. When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or
Weaverville Ranger District Page 8 of 58 immediately adjacent to each active landing unless otherwise excepted when hot saw technology is being used. See Section 5 for specific contract requirements.
The tank shall contain at least 300 gallons of water available for fire suppression. A water sprinkling tank truck will meet this requirement if provision is made to insure that the minimum of 300 gallons is available for fire suppression at all times. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area. Tank truck or trailer shall be equipped with following:
(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contract Area using a 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:
The pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread. A bypass or pressure relief valve shall be provided for other than centrifugal pumps.
(2) 300 feet of 3/4-inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1-inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.
(3) A shut-off combination nozzle that meets the following minimum performance standards when measured at 100 P.S.I. at the nozzle:
G.P.M. Horizontal Range Straight Stream 10 38 feet Fog Spray 6 - 20 N/A
T e m p
Sea Lev el
Feet
Feet 55 17
23 17
23 16
23 16
22 16
22 15
22 15
22 15
21 14
21 14
21 13
70 17
23 17
23 16
22 16
22 15
22 15
22 15
21 14
21 14
21 13
21 13
85 17
23 16
23 16
22 15
22 15
22 15
21 14
21 14
21 14
21 13
20 13
23 16
23 15
22 15
22 15
22 14
21 14
21 14
21 13
20 13
20 13
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
Weaverville Ranger District Page 9 of 58
(4) Sufficient fuel to run pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.
When Contractor is using Hot Saw Technology, an additional 500 feet of not less than one (1) inch outside diameter serviceable hard rubber poly or rubber lined or fiber jacket rubber lined (FJRL) hose shall be immediately available for use and be capable of connecting to the 300 feet of hose and appurturances in (2) and (3) above. Synthetic hose may be used by agreement.
B Any additional fire plan requirements:
4. GENERAL
A. State Law. The Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.
B. Permits Required. The Contractor must secure a special written permit from the District Ranger or designated representative before engaging in any of the activities listed below. The terms and conditions of any of the permits required for this contract are as shown on copies attached to the Fire Plan.
(1) Blasting and Storage of Explosives and Detonators. (Explosives Permit required by California
Health & Safety Code, Section 12101.)
(2) Burning.
(3) Air Pollution. (Issued by local State or County Air Pollution Control Districts, as applicable.)
(4) Camp, Lunch and Warming Fires.
(5) Welding and Cutting.
C. Regulations for Burning. Before setting any fires whatsoever, the Contractor shall notify the CO of his/her intentions. Special care shall be taken to prevent scorching or causing any damage to adjacent structures, trees, and shrubbery. Piles of material to be burned shall be of such size and so placed that during burning no damage shall result to adjacent objects.
D. Smoking and Fire Rules. Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter (CPRC 4423.4). In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see. Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.
E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by
Weaverville Ranger District Page 10 of 58 local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.
F. Welding. Contractor shall confine welding activity to cleared areas having a minimum radius of ten feet measured from place of welding.
G. Blasting. Contractor shall use electric caps only unless otherwise agreed in writing. When blasting is necessary in slash areas, a watchperson equipped with a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump shall remain in the immediate area for an hour after blasting has been completed.
H. Oil Filter and Glass Jugs. Contractor shall remove from National Forest lands oily rags and used oil filters and shall prohibit use of glass bottles and jugs in Contractor's Operations.
I. Reporting Fires. As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor.
J. Communications. Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone. The communications system shall be operable during Contractor's Operations in Fire Precautionary Period described in Section 3 and during the time fire patrolperson service is required. A radio-equipped fire patrolperson vehicle will satisfy this requirement if in operation during the time required except during PAL levels “D” and “Ev”. See Section 5 for other communication requirements when operating on “D” and “Ev” days with hot saw technology. A CB is not acceptable communication because FCC Regulations prohibit commercial use.
K. Fire Patrol Person. Contractor shall furnish a qualified fire patrolperson each operating day when Project Activity Level B or higher is in effect. When on duty, sole responsibility of patrolperson shall be to patrol the operation for prevention and detection of fires, take suppression action where necessary and notify the Forest Service as required by Section 5.
By agreement, one patrolperson may provide patrol on this and adjacent projects or sales. No patrolperson shall be required on Specified Road construction jobs except during clearing operations unless otherwise specified.
L. Time of Snag Felling. Unless the felling of dead trees would interfere with the felling, skidding or yarding of green timber or be a safety hazard, or be prevented under Section 5, required felling of dead trees shall be concurrent with the felling of live timber. There shall be reasonably timely felling of dead trees to facilitate utilization and protection from fire.
M. Clearing of Fuels. Contractor shall clear away, and keep clear, fuels and logging debris as follows:
Weaverville Ranger District Page 11 of 58
5. EMERGENCY MEASURES
The table set forth below establishes work restrictions and fire precautions that the Contractor must observe at each activity level. The restrictions are cumulative at each level.
The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant additional restriction of activities.
Contractor shall obtain the predicted Project Activity Level by calling the following phone number before starting work each day. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM local time. If predictions made after 6:00 PM are significantly different than originally estimated, Forest Service will inform Contractor when changes in restrictions or industrial precautions are indicated.
The following definitions shall apply to these Project Activity Levels:
Cable Yarding Systems: A yarding system that takes logs from the stump area to a landing using an overhead system of winch-driven cables to which logs are attached with chokers or grapples.
Hot Saw Technology: A harvesting system that employs a high-speed (>1100 rpm) rotation felling heads (i.e., full rotation lateral tilt head).
Sunset: The time that sunset is reported in the local newspaper for that day.
Except for Project Activity Level days “Ev after 1:00 PM local time” and “E”, Forest Service may issue substitute precautions(s) of the requirements below. Such agreements shall prescribe measures to be taken by Contractor to reduce risk of ignition and/or spread of fire.
Forest Service may change the Project Activity Levels to other values upon revision of the National Fire Danger Rating System and may change the specific Project Activity Levels and/or requirements when such changes are necessary for the protection of the National Forest. When sent to Contractor, the revised Project Activity Levels will supersede the levels below.
Welding equipment and stationary log loaders, yarders and other equipment listed in California State Law:
10 feet slope radius
Tail or corner haulback blocks:
5 feet slope radius
Lines near, between or above blocks:
Sufficient clearing to prevent line from rubbing on snags, down logs and other dead woody material
Weaverville Ranger District Page 12 of 58
PROJECT ACTIVITY LEVEL –EMERGENCY PRECAUTIONS
Table version 6/13/2006
PROJECT ACTIVITY LEVEL
Level Project Activity Requirements
A Minimum required by Section 3
1. PAL levels are cumulative, Ev level would include all preceding
PAL requirements.
B 1. A fire patrolperson is required for mechanical operations from cessation of operations until 2 hours after operations cease or sunset, which ever occurs first.
2. Tank truck or trailer shall be on or adjacent to each active landing.
3. When hot saw technology is being used, the tank truck or trailer (B2 above) may serve dual purpose as active landing tank truck provided it shall be kept readily available for use as follows:
a.Within one quarter mile of the operating hot saw technology; and b.Within 10 minutes of the active landing; and
c. Effective communications exist between hot saw technology and active landing.
Otherwise, there shall be a tank truck or trailer at both the active landing and within one quarter mile of the operating hot saw technology.
4. (Additional restrictions specified by the forest.)
C 1. The following operations are prohibited from 1:00 PM until 8:00 PM local time:
a. Blasting
2. Operations using hot saw technology are prohibited between 1:00 PM and sunset local time.
Hot saw technology operations may continue if Contractor provides a portable fire suppression system capable of extinguishing a 20-foot by 20-foot wild land fire within five (5) minutes of discovery. The following equipment will meet the requirements above:
a. Compressed Air Foam System with minimum requirements of 20 gallons stored energy, 100 feet of 1 inch hose and adjustable 1 inch nozzle, minimum discharge range of 60 feet and 1 spare air cylinder; or
b. All terrain tank truck or equivalent capable of traveling throughout the cutting unit, containing not less than 300 gallons of water and complies with all tank truck requirements of Section 3. All terrain tank truck or equivalent may serve dual purpose as active landing tank truck provided:
1) Tank truck or equivalent shall be kept readily available to extinguish a fire within 5 minutes of discovery of the operating hot saw technology,
2) Tank truck or equivalent shall be no further than 10 minutes
Weaverville Ranger District Page 13 of 58 travel time to the active landing,
3) A 4-A:80-B:C extinguisher is maintained at the landing fire tool box and,
4) Effective communications exist between the hot saw technology, active landing and all terrain tank truck or equivalent.
Otherwise there shall be a tank truck at the active landing and an all terrain tank truck or equivalent with the hot saw technology.
3. (Additional restrictions specified by the forest.)
D 1. The following restrictions apply:
a. No blasting after 10:00 AM
b. Welding or cutting of metal only by special permit
c. No Burning without a permit
2. The following activities may not operate after 1:00 PM local time unless fire patrolperson(s) walks all areas operated that day once per hour until sunset local time and has the capability of notifying the designated Forest Service Dispatch Center within fifteen (15) minutes of discovery of a fire:
a. Track-laying equipment
b. Chipping outside of landings and roadbeds
c. Equipment using Hot Saw Technology
d. Chainsaw operations outside of landings and roadbeds
e. Tree felling operations
f. Ripping roads and landings
g. Mastication
h. Cable-yarding employing motorized carriages.
3. (Additional restrictions specified by the forest.)
Ev 1. The following operations are prohibited:
a. Blasting
b. Welding or cutting metal
c. Burning
2. Following activities may operate when fire patrolperson walks from 9:00 AM until local sunset all areas once per hour that were mechanically operated that day.
A. Activities that may operate all day:
1. Hauling and loading of logs decked at approved landings.
2. Hauling and loading of chips piled at approved landings.
3. Equipment servicing at approved sites.
4. Roads: Dust abatement or rock aggregate installation (does not include pit or quarry development)
5. Chainsaw or stroke delimber operation associated with loading at
Weaverville Ranger District Page 14 of 58 approved landing sites.
B. All other Operations are permitted until 1:00 PM local time subject to the following:
1. When hot saw technology is being used a tractor or other equipment with blade capable of constructing fire line, shall be on standby and immediately available. Tractor will have effective communications with hot saw technology and be within one quarter mile of hot saw technology to quickly reach and effectively attack a fire start.
C. (Additional restrictions specified by the forest.)
E The following activities may operate subject to B1. and B2.
1. Hauling and loading of logs decked at approved landings.
2. Hauling and loading of chips piled at approved landings.
3. Equipment at approved sites may be serviced.
4 Roads: Dust abatement or rock aggregate installation (does not include pit development).
5. Chainsaw operation associated with loading at approved landings.
6. REPORTING ALL WILD FIRES
A. Contractor's employees shall report all fires as soon as possible but no later than 15 minutes after initial discovery to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:
Name Office Address and/or telephone Home address and/or telephone Dispatch Center Nearest FS Station Weaverville (530) 623-2121 (Day) (530) 226-2499 (Night) Inspector Justin Nettleton (530) 226-2333 COR Gene Rand (530) 226-2330 District Ranger Tina Lynsky (530) 623-1700 D.R. Designated Rep Alex McBath (530) 623-1740
When reporting a fire, provide the following information;
Your Name;
Call back telephone number;
Project name;
Location;
Legal description (Township, Range, Section); and Descriptive location (Reference point);
Fire Information;
Acres;
Rate of Spread; and Wind Conditions.
Weaverville Ranger District Page 15 of 58
B. Contractor's Plan Regarding Personnel. The Contractor shall, prior to commencing work, furnish the following information relating to key personnel Title Name Address and/or telephone Fire Supervisor
Fire Patrolperson
Weaverville Ranger District Page 16 of 58
C.9 TECHNICAL SPECIFICATIONS
ALL of the specifications from the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 are part of this solicitation and any resultant contract. The website for the specifications is http:/www.wfl.fha.dot.gov/design/specs/fp03.htm. The following specifications are specifically associated with this contract. The omission of a Forest Service Specification shall not be cause for a contract modification.
Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
107.02 Protection and Restoration of Property and Landscape
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
151 - Mobilization 155 - Schedules for Construction Contracts
155 Delete 156 - Public Traffic
156.04 Maintaining Roadways During Work
156.08 Traffic and Safety Supervisor
301 - Untreated Aggregate Courses 301 Title Change
301.05 Compacting
303 - Road Reconditioning
303.05 Compacting
702 Asphalt Material
Weaverville Ranger District Page 18 of 58
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
Weaverville Ranger District Page 19 of 58
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
http://www.nist.gov/�
Weaverville Ranger District Page 20 of 58
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Weaverville Ranger District Page 21 of 58
Figure 101-1—Illustration of road structure terms.
Weaverville Ranger District Page 22 of 58
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
Weaverville Ranger District Page 23 of 58
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005 Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Weaverville Ranger District Page 24 of 58
105 - Control of Material 105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
Weaverville Ranger District Page 25 of 58
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill.
Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract.
Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
107.10_05_us_05_04_2007
107.02 Protection and Restoration of Property and Landscape
Add the following:
Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September 2000
Weaverville Ranger District Page 26 of 58
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
Weaverville Ranger District Page 27 of 58
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Weaverville Ranger District Page 28 of 58
151 - Mobilization 151.00_01_us_10_11_2006
Delete Section 151 in its entirety and replace with the following.
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.
Construction Requirements
Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.
Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.
Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest.
Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
Use methods of cleaning and locations for cleaning approved by the CO.
For work at a commercial washing facility, use an approved facility.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.
Measurement
151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.
Weaverville Ranger District Page 29 of 58
Measure mobilization according to Subsection 109.02.
Payment
151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for mobilization lump sum will be paid as follows:
(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization.
Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.
Weaverville Ranger District Page 30 of 58
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
Weaverville Ranger District Page 31 of 58
156 - Public Traffic 156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633 Retro-reflective sheeting 718.01 Temporary concrete barrier 618 Temporary plastic fence 710.11 Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the
National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
Weaverville Ranger District Page 32 of 58
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 14 days in advance and place signs indication the day of closure. Submit a traffic safety plan for approval before any work can start.
Table 156-1 Temporary Road Closures
Road
Number From
Terminus To
Terminus Maximum
Consecutive Days of Closure
Minimum Consecutive Days Open
33N47 See note below N/A
NOTE: This road can only be closed for no more than 4 hours.
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Payment will be made as specified in the Schedule of Items.
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the
CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
Weaverville Ranger District Page 33 of 58
301 - Untreated Aggregate Courses
301.00_nat_us_03_03_2005
301 Title Change.
Change the title to: Section 301 Aggregate Courses
301.05_nat_us_05_17_2005
301.05 Compacting
Delete and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.10_nat_us_03_03_2005
301.10 Payment
Delete the following:
adjusted according to Subsection 106.05
Weaverville Ranger District Page 34 of 58
303 - Road Reconditioning
303.05 Compacting
Delete the line
Compact according to Subsection 204.11.
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
Weaverville Ranger District Page 35 of 58
Asphalt Material
702.01 Delete the first sentence add the following
Performance graded (PG) asphalt binder shall conform to the following Standard Specifications, State of California:
Performance Graded Asphalt Binder Specification Grade
Property AASHTO Test
Method
PG
58-22a
64-10
64-16
64-28
70-10 Original Binder
Flash Point, Min. °C T48 230 230 230 230 230 Solubility, Min. % b T44 99 99 99 99 99 Viscosity at 135°C, c Max., Pa·s
T316 3.0
Dynamic Shear, Test Temp. at 10 rad/s, °C Min. G*/sin(delta), kPa
T315
1.00
RTFO Test e, Mass Loss, Max., %
T240
RTFO Test Aged Binder Dynamic Shear, Test Temp. at 10 rad/s, °C Min. G*/sin(delta), kPa
T315
2.20
Ductility at 25°C Min., cm
T51
PAV f Aging, Temperature, °C
R28
RTFO Test and PAV Aged Binder Dynamic Shear, Test Temp.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .