ATTACHMENT 2 PLANS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_4_Wage_Determination.pdf | ||
| AG-9AB5-S-15-0050_BDF_Reroof.pdf | ||
| Attachment_1_Specs.pdf | ||
| Attachment_5_Bid_Bond_SF-24.pdf | ||
| Attachment_3_Fire_Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
B D
F H
E A
D Q
U A
R
TE
R S
R O
O F
R E
H A
B
IL
IT
A
TI
O
N
TI
TL
E S
H E
E T
T-1
AS NOTED
05/29/2015
SA
N
B
ER
N A
R D
IN
O
N A
TI
O
N A
L
FO
R
ES
T
1 2
PROJECT SITE: BDF HEADQUARTERS OFFICE
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
B D
F H
E A
D Q
U A
R
TE
R S
R O
O F
R E
H A
B
IL
IT
A
TI
O
N
R O
O F
P
LA
N
A-1
SEE BAR SCALE
05/29/2015
SA
N
B
ER
N A
R D
IN
O
N A
TI
O
N A
L
FO
R
ES
T
2 2
ROOF PLAN
ROOFING NOTES:
THESE REQUIREMENTS SHALL BE USED IN CONJUNCTION WITH THE PROVIDED
CSI SPECIFICATIONS. WHERE THERE IS A CONFLICT BETWEEN THESE
REQUIREMENTS AND THE CSI SPECIFICATIONS, THE MORE STRINGENT SHALL
GOVERN.
1. CONTRACTOR SHALL LEAVE EXISTING ROOFING MEMBRANE IN PLACE.
2. CONTRACTOR SHALL INSTALL NEW FLUID APPLIED 2-PLY REINFORCED
ROOFING SYSTEM (WESTERN COLLOID "2 PLY POLYESTER REINFORCED -
EMBEDDED ACRYLIC SURFACE, SPECIFICATION SM-2P-XE," OR APPROVED
EQUAL).
3. REMOVE ALL LOOSE GRAVEL, DIRT, DUST AND FOREIGN DEBRIS BY
VACUUM, WASHING, SWEEPING OR POWER BLOWER. ENTIRE ROOF
SURFACE SHALL BE PROPERLY CLEANED PRIOR TO APPLICATION.
4. PREPARE ALL VALLEYS AND REPAIR ALL ROOF BLISTERS AND SPLITS AS
DESCRIBED IN THE SPECIFICATIONS.
5. CONTRACTOR SHALL APPLY NEW ROOFING SYSTEM AS PER THE CSI
SPECIFICATIONS AND ALL MANUFACTURER INSTALLATION SPECIFICATIONS
AND GUIDELINES.
6. CONTRACTOR SHALL ENSURE THAT NEW ROOFING SYSTEM FOLLOWS THE
EXISTING DRAIN CONTOURS AS SHOWN ON THE DRAWINGS AND SHALL
ENSURE THAT POSITIVE DRAINAGE IS ACHIEVED THROUGHOUT THE ROOF
SUCH THAT NO PONDING OCCURS.
7. CONTRACTOR SHALL PROVIDE A WARRANTY ON MATERIALS AND LABOR AS
DESCRIBED IN THE SPECIFICATIONS.
8. CONTRACTOR SHALL NOT, TO THE MAXIMUM EXTENT FEASIBLE, INTERFERE
WITH THE STANDARD OPERATION OF ALL EQUIPMENT CURRENTLY IN USE
ON THE ROOF.
9. WHERE TEMPORARY RELOCATION OR SHUTDOWN OF ROOF EQUIPMENT IS
UNAVOIDABLE, THE CONTRACTOR SHALL COORDINATE WITH THE
GOVERNMENT AND GIVE AT LEAST 1 WEEK ADVANCE NOTICE PRIOR TO ANY
DISTURBANCE. ALL EQUIPMENT CURRENTLY IN USE ON THE ROOF SHALL BE
RETURNED TO FULLY FUNCTIONAL STATUS AS EARLY AS FEASIBLE.
AC3 EF 3-3
AH 3-3
AH 3-1
AH
3-4
AH
3-2
EF 3-1EF 3-5
AC1 AC2
EF 3-4
EF 3-2
CA
EQUIP ROOM ROOF PLAN
NOTE: DRAWING OPTIMIZED
FOR ANSI D (22X34) PRINT
BS
TV
LADDER
LEGEND
AC
AH
CENTRAL AIR CONDITIONER
BS
CA
AIR HANDLER
BOILER STACK
COMMUNICATION ANTENNA
ROOF DRAIN
EF EXHAUST FAN
TV TURBINE VENT
DRAWING NOTES:
1. CONTRACTOR SHALL INSTALL NEW ROOFING SYSTEM ON ALL ROOF
AREAS AS SHOWN ON THE DRAWINGS.
2. ALL ROOF EQUIPMENT AND FEATURE LOCATIONS AND DIMENSIONS
ARE APPROXIMATE AND SHALL BE FIELD VERIFIED BY THE
CONTRACTOR PRIOR TO BID SUBMITTAL.
3. ARROWS INDICATE DESIGN ROOF SLOPE FOR DRAINAGE TO EXISTING
ROOF DRAINS.
| SO Roof_TITLE-SO ROOF TITLE |
| SO Roof LAYOUT-Arch 22x34 |
File details come from the government source that posted it. Updated .