Attachment_2_PLANS.pdf

PDF 830 KB Posted

Attached to
SAN BERNARDINO NF HEADQUARTERS OFFICE RE-ROOF
Solicitation number
AG-9AB5-S-15-0090
Issued by

About this file

ATTACHMENT 2 PLANS

View the file

Other files

File Type Posted
Attachment_4_Wage_Determination.pdf PDF
AG-9AB5-S-15-0050_BDF_Reroof.pdf PDF
Attachment_1_Specs.pdf PDF
Attachment_5_Bid_Bond_SF-24.pdf PDF
Attachment_3_Fire_Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

B D

F H

E A

D Q

U A

R

TE

R S

R O

O F

R E

H A

B

IL

IT

A

TI

O

N

TI

TL

E S

H E

E T

T-1

AS NOTED

05/29/2015

SA

N

B

ER

N A

R D

IN

O

N A

TI

O

N A

L

FO

R

ES

T

1 2

PROJECT SITE: BDF HEADQUARTERS OFFICE

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

B D

F H

E A

D Q

U A

R

TE

R S

R O

O F

R E

H A

B

IL

IT

A

TI

O

N

R O

O F

P

LA

N

A-1

SEE BAR SCALE

05/29/2015

SA

N

B

ER

N A

R D

IN

O

N A

TI

O

N A

L

FO

R

ES

T

2 2

ROOF PLAN

ROOFING NOTES:

THESE REQUIREMENTS SHALL BE USED IN CONJUNCTION WITH THE PROVIDED

CSI SPECIFICATIONS. WHERE THERE IS A CONFLICT BETWEEN THESE

REQUIREMENTS AND THE CSI SPECIFICATIONS, THE MORE STRINGENT SHALL

GOVERN.

1. CONTRACTOR SHALL LEAVE EXISTING ROOFING MEMBRANE IN PLACE.

2. CONTRACTOR SHALL INSTALL NEW FLUID APPLIED 2-PLY REINFORCED

ROOFING SYSTEM (WESTERN COLLOID "2 PLY POLYESTER REINFORCED -

EMBEDDED ACRYLIC SURFACE, SPECIFICATION SM-2P-XE," OR APPROVED

EQUAL).

3. REMOVE ALL LOOSE GRAVEL, DIRT, DUST AND FOREIGN DEBRIS BY

VACUUM, WASHING, SWEEPING OR POWER BLOWER. ENTIRE ROOF

SURFACE SHALL BE PROPERLY CLEANED PRIOR TO APPLICATION.

4. PREPARE ALL VALLEYS AND REPAIR ALL ROOF BLISTERS AND SPLITS AS

DESCRIBED IN THE SPECIFICATIONS.

5. CONTRACTOR SHALL APPLY NEW ROOFING SYSTEM AS PER THE CSI

SPECIFICATIONS AND ALL MANUFACTURER INSTALLATION SPECIFICATIONS

AND GUIDELINES.

6. CONTRACTOR SHALL ENSURE THAT NEW ROOFING SYSTEM FOLLOWS THE

EXISTING DRAIN CONTOURS AS SHOWN ON THE DRAWINGS AND SHALL

ENSURE THAT POSITIVE DRAINAGE IS ACHIEVED THROUGHOUT THE ROOF

SUCH THAT NO PONDING OCCURS.

7. CONTRACTOR SHALL PROVIDE A WARRANTY ON MATERIALS AND LABOR AS

DESCRIBED IN THE SPECIFICATIONS.

8. CONTRACTOR SHALL NOT, TO THE MAXIMUM EXTENT FEASIBLE, INTERFERE

WITH THE STANDARD OPERATION OF ALL EQUIPMENT CURRENTLY IN USE

ON THE ROOF.

9. WHERE TEMPORARY RELOCATION OR SHUTDOWN OF ROOF EQUIPMENT IS

UNAVOIDABLE, THE CONTRACTOR SHALL COORDINATE WITH THE

GOVERNMENT AND GIVE AT LEAST 1 WEEK ADVANCE NOTICE PRIOR TO ANY

DISTURBANCE. ALL EQUIPMENT CURRENTLY IN USE ON THE ROOF SHALL BE

RETURNED TO FULLY FUNCTIONAL STATUS AS EARLY AS FEASIBLE.

AC3 EF 3-3

AH 3-3

AH 3-1

AH

3-4

AH

3-2

EF 3-1EF 3-5

AC1 AC2

EF 3-4

EF 3-2

CA

EQUIP ROOM ROOF PLAN

NOTE: DRAWING OPTIMIZED

FOR ANSI D (22X34) PRINT

BS

TV

LADDER

LEGEND

AC

AH

CENTRAL AIR CONDITIONER

BS

CA

AIR HANDLER

BOILER STACK

COMMUNICATION ANTENNA

ROOF DRAIN

EF EXHAUST FAN

TV TURBINE VENT

DRAWING NOTES:

1. CONTRACTOR SHALL INSTALL NEW ROOFING SYSTEM ON ALL ROOF

AREAS AS SHOWN ON THE DRAWINGS.

2. ALL ROOF EQUIPMENT AND FEATURE LOCATIONS AND DIMENSIONS

ARE APPROXIMATE AND SHALL BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO BID SUBMITTAL.

3. ARROWS INDICATE DESIGN ROOF SLOPE FOR DRAINAGE TO EXISTING

ROOF DRAINS.

SO Roof_TITLE-SO ROOF TITLE
SO Roof LAYOUT-Arch 22x34

File details come from the government source that posted it. Updated .