Attachment_1_Specifications.pdf
PDF 3 MB Posted
- Attached to
- Angeles Crest Scenic Byway Project Federal contract opportunity
- Solicitation number
- AG-9AB5-S-15-0053
About this file
Attachment 1 Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2015_Scenic_Byway_Projects_R01.pdf | ||
| Amend_1_Angeles_Crest_Byway.pdf | ||
| Attachment_5_Bid_Bond_SF-24.pdf | ||
| AG-9AB5-S-15-0053_ANF_Angeles_Crest_Byway.pdf | ||
| Attachment_4_Wage_Determination_LA.pdf | ||
| Attachment_2_Drawings.pdf | ||
| Attachment_3_Fire_Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications for ANGELES CREST SCENIC BYWAY PROJECTS
Part 1 – General Section
Division 1 - General Specifications Pages
SECTION 01010 – Summary of Work 2
SECTION 01025 – Measurement and Payment 3
SECTION 01060 – Regulatory Requirements 2
SECTION 01200 – Schedules and Reports 1
SECTION 01300 – Shop Drawings and Submittals 3
SECTION 01401 – Quality Control and Quantity Measurement 2
SECTION 01505 – Mobilization 1
SECTION 01600 – Use of Government Facilities 1
SECTION 01800 – Project Cleanup 1
Division 2 – Site Work
SECTION 02052 – Demolition 3
SECTION 02101 – Site Preparation 2
SECTION 02142 – Dewatering and Site Drainage 1
SECTION 02200 – Earthwork 4
SECTION 02220 – Trench Excavating, Backfilling, and Compacting 3
SECTION 02223 – Structural Excavation & Backfill 3
SECTION 02224 – Site Development & Grading 1
SECTION 02235 – Compacted Aggregate Base & Surface Course 4
SECTION 02505 – Emulsified Slurry Seal 7
SECTION 02510 – Hot Bituminous Paving 2
SECTION 02520 – Asphalt Pavement Rebab 3
SECTION 02521 – Patching & Crack Sealing 4
SECTION 02530 – Concrete Walkways & Pads 1
SECTION 02531 – Concrete Swale & Retaining Wall Footing 1
SECTION 02582 – Painted Traffic Markings 2
SECTION 02845 – Boulder Barriers 1
SECTION 02847 – Traffic Signs 2
SECTION 02875 – Information Board 1
SECTION 02891 – Wheel Stops 1
Division 3 – Concrete
SECTION 03100 – Concrete Formwork 2
SECTION 03200 – Concrete Reinforcement 3
SECTION 03300 – Cast-In-Place Concrete 5
Division 4 – Masonry Pages
SECTION 04100 – Masonry Mortar & Grout 3
SECTION 04222 – Veneered Reinforced Concrete Unit Masonry 6
SECTION 04400 – Mortared Rock Walls 1
Division 5 – Metals
SECTION 05720 – Tube Handrails 1
Division 6 – Wood & Plastics
SECTION 06100 – Rough Carpentry 7
Division 7 – Not Used
Division 8 – Not Used
Division 9 – Not Used
Division 10 – Not Used
Division 11 – Not Used
Division 12 – Furnishings
SECTION 12600 – Site Furnishings 2
Division 13 – Special Construction
SECTION 13121 – Toilet Buildings 2
Division 14 – Not Used
Division 15 – Not Used
Division 16 – Not Used
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01010-1
ANGELES NATIONAL FOREST
SECTION 01010
SUMMARY OF WORK
PART 1 GENERAL
1.01 Scope: The Angeles National Forest proposes to perform site renovations and improvements at Big Pines Visitor Center, Inspiration Point and Jarvis Vista – all of which are projects in support of the San Gabriel Mountains National Monument
(SGMNM). The proposed work includes, but is not limited to the following:
A. BIG PINES VISITOR CENTER IMPROVEMENTS – Performing removal and relocation of existing utilities; site development and grading of parking lot, retaining wall, accessible DG walkway and importing suitable fill; backfilling and compacting;
placement of compacted aggregate base and hot bituminous pavement; placing painted traffic markings; placing cast-in-place concrete for v-ditch drain and footings;
furnishing and installing new wheel stops; constructing new masonry retaining wall with rock-veneer matching existing rock features; and furnishing and installing site appurtenances such as new interpretive information boards, new railroad ties for stair treads, signage and solar power lighting fixtures and poles.
B. INSPIRATION POINT IMPROVEMENTS – Performing removal and relocation of existing bulletin board; site development and grading of new accessible concrete pad and shade structures; infill of rock stairs with mortar; placing painted traffic markings; furnishing and installing wheel stops; placing cast-in-place concrete pads and footings for shade structures; and furnishing and installing site appurtenances such as new interpretive information board, benches, shade structures and signage.
C. JARVIS VISTA IMPROVEMENTS – Performing demolition of an existing vaulted wood toilet building; removing existing wood fencing; demolition and removing existing rock stairs; infilling existing viewing platform with mortar; site development and grading of new accessible walkway, pad and ramp; importing suitable fill, installing new split-rail fencing; placing large boulders along perimeter of parking areas; placing painted traffic markings; installing new wheel stops; placing cast-in-place concrete for new accessible walkway, pads, and footing for new railing;
installing new tube railing at walkway; and furnishing and installing new interpretive information board, new picnic tables, trash receptacles, new single-unit SST toilet building, and signage.
1.02 Measurement and Payment: No separate measurement and payment will be made for work specified in this section. See Section 01025 Measurement and Payment.
PART 2 PRODUCTS
Not Applicable.
PART 3 EXECUTION
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01010-2
3.01 Work requirements: All work in the contract shall meet the codes and standards referenced in this Section and elsewhere herein, unless otherwise SHOWN ON THE
DRAWINGS or in the specifications. When more stringent requirements are called out in these specifications or shown on the drawings, the more stringent requirements shall take precedence over the codes and standards. All work shall be performed in a workman-like manner according to the best practices of the trade and the best standards of the industry.
3.02 Requirements of Regulatory Agencies: All work performed shall comply with health, safety and fire protection codes, OSHA regulations, and/or applicable regulations established by Local, County and State Codes. The 2012 International
Building Code (IBC) and Architectural Barriers Act (ABA) of 1968 shall be applicable throughout the project unless otherwise noted.
END OF SECTION
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01025-1
SECTION 01025
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 Scope: This specifications section defines the methods of measurement, units of measurement, and determination of quantities, and payment for work. Measurement and Payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS of this contract. All work, equipment, material, and incidentals shall be included in the bid price and payment for the appropriate related pay item.
FOR BID PURPOSES CONTRACTORS SHALL submit one lump sum as described in Section 01010, Part 1. The Contactor to whom the contact is AWARDED shall submit a project cost breakdown per schedule of items.
1.02 Method of Measurement: Following are the methods of measurement for determining final payment as designated on the Schedule of Items:
A. Designed Quantities (DQ)
1. These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data includes the preliminary survey information, design assumptions, calculations, drawings and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:
a. As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, and the like, will not be considered changes in quantities.
b. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by 10 percent or more.
c. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 10 percent or more.
2. Final Payment for Designed Quantities: Final payment will be made for the designed quantities at the unit price shown in the Schedule of Items, subject to the provisions above.
B. Staked Quantities (SQ)
These quantities are determined from stake measurements prior to construction.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01025-2
C. Actual Quantities (AQ)
These quantities are determined from the measurements of the completed work.
D. Vehicle Quantities (VQ)
These quantities are measured in the hauling vehicles.
E. Lump Sum Quantities (LSQ)
These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
They will not be measured.
1.03 Determination of Quantities: Only actually completed and accepted work of the contract will be measured and determined as follows:
A. Area computations will be horizontal or corrected to horizontal plane.
B. Volumes of excavation or embankment will be by average end area or approved three-dimensional calculations. General grading will be by horizontal area and mean depth(s). With prior written approval, or when specified, measured haul vehicle volumes or certified scale weigh bills may be substituted.
C. Structural volumes will be to the neat lines SHOWN ON THE DRAWINGS, or to the dimensions of limits indicated in the specifications.
1.04 Units of Measurement: Units of measurement will be those shown in the
SCHEDULE OF ITEMS, and as defined in the specification sections. Accurate and approved measuring devices, appropriate to the unit, will be used for measuring.
A. Quantities other than job, each set, and the like will be measured to the whole amount.
B. Quantities such as job, each, set and the like, and subject to need for incrementing for partial payment, will be measured as a mutually acceptable percentage.
1.05 Payment: Payment will be made only for actual quantities completed and accepted, and measured as indicated above, or the items AS SHOWN ON THE SCHEDULE
OF ITEMS. Such payment will be at the Contract Unit Price for each Item as
SHOWN ON THE SCHEDULE OF ITEMS, and shall constitute complete and final payment for such work. Payment will be made for whole amounts or increments as indicated in Method of Measurement above.
1.06 Variations to Above: Variations may be permissible as agreed by Contracting
Officer.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01025-3
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
Not Applicable
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01060-1
SECTION 01060
REGULATORY REQUIREMENTS
PART 1 GENERAL
1.01 Scope: This section describes the Regulatory Requirements and the Codes and
Standards that apply to the work in this contract.
1.02 Regulatory Requirements:
A. All laws, ordinances, codes, and regulations of the United States Government shall apply and be implemented into this contract.
B. The following codes and standards shall apply to the work in this contract (Where no date is specified, the applicable edition shall be the one in effect on the date of solicitation.):
1. International Building Code, (IBC), 2012 edition
2. Uniform Building Code, Standards
3. Uniform Plumbing Code (UPC), latest edition
4. American Society for Testing Materials (ASTM)
5. Underwriters’ Laboratories (UL)
6. Uniform Federal Accessibility Standards (UFAS)
7. Forest Service Handbook 6709.11 Health and Safety Code Handbook
8. International Conference of Building Officials (ICBO)
9. Architectural Barriers Act (ABA) of 1968
1.03 Codes and Standards: Standards and practices set forth by the references mentioned elsewhere in these specifications shall be adhered to unless otherwise noted.
1.04 Duties of the Contractor:
A. Responsibilities: It is the duty of the Contractor to complete the work covered by this contract in accordance with approved plans and specifications.
B. Performance of the work: The Contractor shall study carefully the approved plans and specifications and shall plan his schedule of operations well ahead of time. If at any time it is discovered the work is being done which is not in accordance with the approved plans and specifications, the Contractor shall correct the work immediately.
All inconsistencies or items which appear to be in error in the contract documents shall be promptly called to the attention of the Contracting Officer’s Representative
(COR). Local conditions which may affect the work shall likewise be brought to the attention of the COR at once. In no case, however, shall the instruction of the COR be construed to cause work to be done which is not in conformity with approved plans, specifications and change orders.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01060-2
The Contractor shall not carry on work except with the knowledge of the COR.
1.05 Contract Change Order: Where so indicated or in lieu of drawing or specification requirements, materials shall be used and installed in the best quality manner and method recommended by the manufacturer. Such recommendation shall be in written form. Substitution of materials shall be considered a Contract Change
Order and as such shall be approved by signature of the Contracting Officer prior to use or fabrication.
1.06 Subcontractors: Subcontractors engaged to do work on the project must be approved by the CO.
PART 2 PRODUCTS
2.01 Products and Materials: All products and materials in the work shall meet the standards and requirements of the codes and standards referenced in Part 1 – General of this Section, and elsewhere herein unless otherwise SHOWN ON THE
DRAWINGS, the more stringent requirements shall take precedence over the codes and standards.
2.02 Handling, Storage, Installation, and Maintenance: All materials, unless specified otherwise, shall be handled, stored, installed, and maintained in accordance with the manufacturer’s instructions and recommendations.
PART 3 EXECUTION
3.01 Work requirements: All work in the contract shall meet the standards and requirements of the codes and standards referenced in Part 1 – General of this Section and elsewhere herein, unless otherwise SHOWN ON THE DRAWINGS or in the specifications. When more stringent requirements are called out in these specifications or shown on the drawings, the more stringent requirements shall take precedence over the codes and standards. All work shall be performed in a workman-like manner according to the best practices of the trade and the best standards of the industry.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01200-1
SECTION 01200
SCHEDULES AND REPORTS
PART 1 GENERAL
1.01 Scope: This section includes the requirements for the submittal of the Contractor’s proposed work schedule for the project and a breakdown of the Contractor’s bid amount for purposes of making progress payments.
PART 2 PRODUCTS
2.01 Submittals: The submittal of the work schedule and cost breakdown shall be on paper and shall include three copies.
PART 3 EXECUTION
3.01 Work Schedule: Within 5 days of the issuance of the Notice to Proceed, the
Contractor shall submit to the Contracting Officer for approval a proposed work schedule for the project. Such schedule shall be in the form of a critical path network or other approved format and shall include the timing for each major phase of the work. The Contractor shall update such approved schedule as necessary when significant changes occur during the progress of the work.
3.02 Cost Breakdown: Within 15 days of the issuance of the Notice to Proceed, the
Contractor shall submit to the Contracting Officer for approval a breakdown of ALL lump sum price items for the purpose of making progress payments. Such breakdown shall include each separate phase of the work but need not separate labor from material costs. The approved cost breakdown will constitute the basis under which monthly progress payments will be made.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01300-1
SECTION 01300
SHOP DRAWINGS AND SUBMITTALS
PART 1 GENERAL
1.01 Scope: Perform all work necessary and required for the construction of the project as indicated. Such work includes but is not limited to the following:
1. Shop Drawings
2. Samples
3. Catalog Data
1.02 Related Work In Other Sections: The following items of associated work are included in other sections of these specifications:
1. Operating Instructions
2. Maintenance Manuals
3. Certificates and Warranties
1.03 Submittals: Submittals shall include all pertinent data required to understand the quality of components, dimensional relationships, integrations with other materials, assembly techniques, structural aspects, color, finish, texture, and other such characteristics as may be necessary to fully describe the item and its intended use.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
3.01 Submittals:
A. Submittals shall be made for approval no more than 60 days after award of the contract, or as approved by the Contracting Officer.
B. Submittals and shop drawings shall be submitted in a timely fashion to allow 21 days for review by the government. No work shall begin until shop drawings and submittals are approved.
3.02 Shop Drawings:
A. Original Submittal: A reproducible and four copies of all shop drawings shall be submitted for approval as required under 3.01 above prior to fabrication, installation, or order placement to allow for checking and coordination. The reproducible will be retained by the Contracting Officer.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01300-2
B. Resubmittal: When a resubmittal is required, one print so indicating will be returned to the Contractor. After revision of the original, a new reproducible and four copies shall be submitted for approval.
C. Approval: Once approved, stamped documents shall be returned to the Contractor and shall be complied with as noted. Variation from the approved documents shall be likewise submitted and approved before being carried out.
3.03 Samples:
A. Original Submittal: Two samples of each item for which samples are required, unless otherwise specified, shall be furnished for approval. Approval shall be obtained prior to delivery of the material to the project site. These samples shall be representative of the actual material proposed for use in the project and of sufficient size to demonstrate design, color, texture, and finish, as they will appear in the completed installation.
B. Resubmittals: All rejected samples will be returned upon request and any or all resubmitttals required shall consist of two new samples.
C. Approval: Upon approval, one sample so noted will be returned and the remainder will be retained by the Contracting Officer until completion of the work. When requested, all approved samples will be returned for installation, providing that identity is maintained in an approved manner until final acceptance of the project.
3.04 Catalog Data:
A. Submittals: Four copies of catalog data are required for the original submittal and each resubmittal. Catalog data shall be submitted along with shop drawings. One copy will normally be returned unless additional copies are requested.
B. Data: Each submittal shall have all pertinent data contained therein that is applicable to the item submitted for approval.
3.05 Identification:
A. Catalog Data: Each separate catalog brochure for page submitted shall have the identification shown. Catalog of brochures submitted containing multiple items for approval need have only cover identification. In such cases the identification shall include page and catalog item numbers.
B. In the event that one or more of the multiple items is not approved in any submittal, the additional copies required will not be requested until all items are approved.
3.06 Contractor’s Responsibility:
A. Representation: By his submittal of any shop drawing or catalog data, the contractor thereby represents that he has determined and verified all field measurements, field construction criteria, materials, dimensions, catalog numbers and other essential data
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01300-3 as well as, has verified the same construction criteria with the contract documents and other approved submittals.
B. Deviations: Approval of shop drawings, samples, or catalog data shall not relieve the contractor from responsibility of errors or omissions therein.
C. Prohibitions: No Portion of the work requiring a shop drawing, sample, or catalog data shall commence, nor fabrication begin, prior to approval of such items.
D. Coordination: Contractor shall be responsible for coordination between trades to insure total compatibility with or between substituted items and those existing, specified, or otherwise provided. Alterations required to achieve compatibility with or between substituted items, shall be accomplished without sacrifice of performance and at no additional cost to the Government.
E. Verification: Any change from elements as originally designed shall be substantiated by calculations and/or data certified by a registered engineer or architect licensed in the state in which the project is constructed.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01401-1
SECTION 01401
QUALITY CONTROL AND QUANTITY MEASUREMENT
PART 1 GENERAL
1.01 Scope: This work shall consist of providing certification that the quality and quantity of construction conforms to the drawings, specifications, and requirements of the contract. Provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.02 Measurement and Payment: No separate measurement and payment will be made for the work specified in this section.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
3.01 General: The contractor shall provide and maintain a quality control system that will ensure conformance to specifications and requirements for all services, supplies, and construction work required or otherwise provided under this contract.
3.02 Certifications and Measurements:
A. Offsite Produced Materials: The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work, meet the applicable requirements SHOWN ON THE
DRAWINGS or stated in the specifications. All incidental purchases needed to remedy minor shortages of material must also be certified.
B. Quantity Measurements: The Contractor shall make all measurements for computation of quantities for all work items, except those specified for payment by designed quantity or lump sum. The Contractor shall compute the quantities for periodic progress payments; the Contracting Officer will compute the quantities for the final payment based on measurements taken. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities and certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
Road No./Project Contract No. .
Quantity or Measured By
Bid Item No. Date Station Measurement (Initials)
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01401-2
3.03 Sampling, Inspection, and Testing: Provide and maintain appropriate testing devices, equipment, and supplies to accomplish the required testing and inspection in a timely manner. Test samples as often as is necessary to achieve the quality of construction required of this contract, and make measurements of work performed onsite under this contract. Sampling and testing frequency for specific items will be SHOWN ON THE
DRAWINGS, or in the specification(s).
3.04 As- Built Contract Drawings: The contractor shall maintain a set of contract drawings depicting as-built conditions. The drawings shall be maintained in a current condition, and made available for review. Changes from the original contract drawings shall be indicated in red on the as-built drawings. Upon completion of the contract work, submit as-built drawings to the Engineer.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01505-1
SECTION 01505
MOBILIZATION
PART 1 GENERAL
1.01 Scope: This work consists of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, as well as all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
1.02 Measurement and Payment:
A. The accepted quantities will be paid for at the contract unit price for item 01505
Mobilization.
B. Progress payments will be made as follows
1. The Government will pay to the Contractor in the first progress payment, the total premium paid by the Contractor to obtain bonds. This payment shall not be in addition to the contract price and will be included in Item 01505, Mobilization.
2. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
3. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilizations, or 10 percent of the original contract amount, whichever is less, will paid.
4. Upon completion of all work on the project, any unpaid amount for item 01505, Mobilization, will be paid.
C. The total of all payments will not exceed the original contract amount for items
01505, Mobilization.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
SECTION 01600
USE OF GOVERNMENT FACILITIES
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01600-1
PART 1 GENERAL
1.01 Scope: This work consists of the use, by the Contractor, of areas and facilities owned by the Government during the construction of this project.
1.02 Measurement and Payment: No separate measurement or payment will be made for the work of this section.
PART 2 PRODUCTS
3.01 Security: The Contractor shall be responsible for providing for the security of his equipment and materials delivered to the jobsite.
3.02 Sanitary Facilities: Santitary facilities located and are open to the public at the site will be made available to the Contractor.
3.03 Storage: The Contractor will be provided a work and storage area within the designated project area, as arranged and approved by the Contracting Officer. The
Contractor's operations and storage of materials and equipment shall be confined to this area.
3.04 Services: Water will be made available to the Contractor at the project site. Water must be for construction purposes only and shall be requested by the Contractor. The request shall be made to the Contracting Officer. The Contractor shall provide his own means of delivering the Government provided utilities from point source to points of use. Once requested, the source of the water will be determined by the Contracting
Officer’s Representative.
3.05 Construction Camp: The Contractor may be allowed to establish a construction camp at/on site in Self-contained units. Such use shall be in full accordance with all
Forest Service Regulations and are dependent on concurence by the District Ranger.
3.06 Project Safety: The Contractor shall be responsible for providing a safe work place.
Signs identifying the work site as a hard hat area shall be posted by the Contractor around the perimeter of the affected work areas. The Contractor shall also be responsible for a safe construction camp.
Angeles Crest Scenic Byway Projects DIVISION 1 Section 01800-1
SECTION 01800
PROJECT CLEANUP
PART 1 GENERAL
1.01 Scope: This section covers intermediate and final cleanup of the project. The
Contractor also shall, at all times during the progress of the work, keep the worksite clean of all rubbish, material scraps, and construction debris.
PART 2 PRODUCTS
2.01 All cleaning materials and equipment used shall be selected and employed with care to avoid scratching, marring, defacing, staining, or discoloring the surfaces cleaned.
PART 3 EXECUTION
3.01 Cleanup During Construction: Cleanup shall be performed by the Contractor as required to prevent accidents to personnel and protect all work in-place. Construction cleanup shall consist of the removal of all dirt, trash, scrap, debris, and excess materials from any surface that may lead to personal injury, or damage to equipment or facilities.
3.02 Final Cleanup: Final cleanup shall be performed, prior to the Contractor’s request for final inspection for the Project.
3.03 Quality of Cleanup: In addition to the normal “broom clean” requirements, the following requirements shall be completed:
A. Remove all trash, debris and surplus excavated material.
B. No items shall be left or discarded elsewhere on the site.
C. Items that will be discarded shall be removed to a proper disposal location off
National Forest lands.
SECTION 02052
DEMOLITION
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02052-1
1.01 Scope: Perform demolition work AS SHOWN ON THE DRAWINGS and as specified herein. Work may be indicated by note or by non-inclusion in work shown to remain. The work consists of:
A. Removing/replacement of existing utility boxes and electrical wiring.
B. Demolition of existing vault toilet building, wood fencing and rock stairs; disposing of demolished and removed materials.
C. Disposing of demolished and removed materials that are not suitable for re-use.
D. Salvaging indicated materials, items, and equipment, as well as the Contractor's right
(subject to codes or regulations) to salvage any other items and materials designated for disposal.
1.02 Project Conditions:
A. Perform all demolition work after enacting site protection measures of items to remain.
B. Dust Abatement: Sprinkle demolished materials/mulch to control dirt and dust.
Prevent flooding and contaminated runoff.
C. Existing Utilities: The Contractor shall verify the location of utility lines. It may be necessary to relocate or stub-off or plug domestic water lines to complete the work.
D. Demolition Schedule: Provide a schedule indicating proposed demolition methods, operations, and sequence for review and acceptance before start of the work. Include termination or continuation of utility services required by project conditions.
E. Safety: Demolition work shall be performed in a manner ensuring the safety of persons, and existing facilities designated to remain against damage by settlement, falling debris, or other causes in connection with this work.
F. Explosives: Use of explosives is not permitted.
G. All of such work shall be in accordance with codes, regulations, and safety orders, and subject to approval of the Contracting Officer.
1.03 Salvage: Where these specifications or the drawings indicate items or material to be salvaged for reuse, those items shall be protected from damage. All other items and
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02052-2 materials become the property of the Contractor for disposal as indicated, or for salvage at the Contractor's option.
1.04 Measurement and Payment: Measurement and payment shall be as specified and
AS SHOWN IN THE SCHEDULE OF ITEMS.
2.01 Equipment: The Contractor shall select equipment of a size and type suitable for the space and other constraints of this contract as subject to approval by the Contracting
Officer.
3.01 Inspection: Prior to starting demolition work, the Contractor shall make an inspection with the Contracting Officer to determine the physical condition of adjacent improvements scheduled to remain.
3.02 Demolition:
A. Existing Utilities:
1. Information on the drawings relating to existing utility lines and services is from the best sources presently available. All such information is furnished only for information and is not guaranteed. The Contractor shall verify actual locations.
2. Perform work and provide necessary materials to disconnect or relocate existing utilities as necessary. Replace existing utility box with new concrete box and place flush with new asphalt.
3. Above Ground Utilities: Remove above ground sprinklers, risers, and faucets, and close off AS SPECIFIED FOR UNDERGROUND UTILITIES.
4. Underground utilities do not need to be removed except where such are encountered in other construction, such as trenching, excavation, and the like.
Pipelines shall be cut back or removed 1 foot outside of trench and shall be capped or plugged mechanically. If remaining line is to be alive, cap or plug shall provide a liquid seal against pressure(s) of system. Removed material shall be disposed of off Government land.
B. Existing Vault Restroom Building: Demolish existing wood restroom building and concrete vault. Backfill with suitable fill material as needed.
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02052-3
C Existing Fencing and Rock Stairs: Remove existing wood split-rail fencing and rock stairs and if necessary, re-use existing rock materials for infill for viewing platform
AS SHOWN ON THE DRAWINGS.
3.03 Disposal: Remove all waste materials, rubbish, and debris. Accumulation is not permitted. Clean-up, transport and dispose of such in accordance with applicable codes and regulations.
3.04 Salvage Items and Materials:
A. Where items are indicated for salvage and reuse, or to be turned over to the government, such shall be removed with care and stored until reused or accepted by the Government. Such shall include protection from physical or weather damage.
B. Any item or material not so indicated shall be removed from the project site as if for disposal. Disposal or salvage is the Contractor's option, subject to codes or regulations.
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02101-1
SECTION 02101
SITE PREPARATION
PART 1 GENERAL
1.01 Scope: Perform site preparation work AS SHOWN ON THE DRAWINGS and specified herein. The work includes:
1. Protecting existing trees and vegetation
2. Clearing and Grubbing
1.02 Project Conditions:
A. Perform all vegetation protection work before commencing with demolition and site construction.
B. Locate, protect, and maintain active utilities and site improvement scheduled to remain.
C. Restore to original grades and conditions, areas adjacent to site disturbed or damaged as a result of site preparation work.
1.03 Measurement and Payment: No separate measurement and payment will be made for work specified in this section.
PART 2 PRODUCTS
2.01 Equipment: The Contractor shall select equipment of a size and type suitable for the space and other constraints of this contract as subject to approval by the Contracting
Officer.
PART 3 EXECUTION
3.01 Tree and Vegetation Protection: Protect all existing trees and vegetation not scheduled to be removed against injury or damage, including cutting, breaking, skinning or bruising of roots, trunks or branches; smothering by stockpiled construction materials, excavated materials or vehicular traffic with in branch spread.
3.02 Disposal of Waste Materials:
A. Stockpile, haul from site, and legally dispose of waste materials and debris.
Accumulation is not permitted.
B. Maintain disposal routes clear, clean, and free of debris.
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02101-2
3.03 Clearing and Grubbing:
A. Written approval of clearing and grubbing is required prior to beginning excavation, to verify actual condition on site
B. All debris, trees, stumps, downed timber and roots within the clearing limits not designated to remain, shall be cleared, grubbed, removed and disposed of as specified herein.
C. All roots protruding into trenches shall be cut flush with trench sidewalls.
D. All roots protruding from the backslopes of excavation shall be cut flush with the backslope surface.
E. Clearing limits for trenches shall extend one foot on either side of the trench centerline.
F. All damaged limbs on trees designated to remain or on trees outside the clearing limits shall be cut off and an approved tree sealant applied.
G. Approved tree sealant shall be applied to the trunks of all damaged trees not designated to be removed.
H. Slash and debris resulting from clearing operations shall be hauled off of National
Forest Land.
I. Down trees shall be cut into lengths not to exceed 6 feet and remove all limbs.
3.04 Cleaning: Upon completion of site preparation work, clean areas within contract limits, in accordance with Section 01800.
SECTION 02142
DEWATERING AND SITE DRAINAGE
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02142-1
1.01 Scope: This work consists of control and diversion of surface or sub-surface water away from any and all project work, whenever such a requirement occurs as a part of the work, or interferes with such work. Diversion, drainage, and other handling of such water shall cause no damage, unwarranted erosion, siltation, or other harmful effect, and shall meet all code requirements for such cases.
3.01 General: In the case of uncontrolled water or dewatering activities, work shall be as follows:
A. All diversion ditches, dikes, or cofferdams necessary shall be constructed to achieve and maintain a well drained site. Drainage shall be to an approved disposal location as for storm water.
B. Care shall be taken so that no diversion at one site damages or adversely impacts any location, creates a hazard to workers or public health or safety. All erosion or siltation is prohibited. All such work shall be in accordance with all regulations applicable.
Mechanical removal and conductance devices may be used, again if such are not prohibited by regulation.
C. All dewatering work, any equipment and conduits, and all physical or other appurtenances and methods, shall be subject to approval by the Contracting Officer prior to doing such work.
D. Upon completion of dewatering, all work shall be cleaned up and restored to the original or planned condition.
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02200-1
SECTION 02200
EARTHWORK
PART 1 GENERAL
1.01 Scope: This work consists of providing and installing all earthwork and related work.
Earthwork shall include but not be limited to the following:
A. Excavation to levels and lines required for subgrade work.
B. Fill and backfill to grades indicated.
C. Removal of unsuitable subgrade material and replacement with acceptable material.
D. Compaction
E. Rough and finish grading to levels and lines indicated
F. Finish grading
G. Imported fill material
1.02 Protection: Furnish, install and maintain all supports, shoring and sheet piling required to support the sides of excavation and to protect adjacent work or existing improvements.
1.03 Verification of Conditions: The Contractor prior to beginning work by careful examination of existing conditions and information shall inform himself as to the nature and location of the work, the conformation of the ground, the nature of subsoil conditions, groundwater conditions, nature and extent of materials or existing improvements to be encountered and any and all determinable matters that can affect the work.
1.04 Measurement and Payment: Measurement and payment shall be as specified and
AS SHOWN IN THE SCHEDULE OF ITEMS.
PART 2 PRODUCTS
2.01 Backfill: General: All fill material shall be approved by the Contracting Officer.
Excavated materials from the site may be used if approved. Imported fill shall be non-expansive and predominantly granular soil or soil rock mixture which is free from organic matter and deleterious substances and which does not contain materials over two inches in the greatest dimension. Material having a dimension greater then
1-½ inches shall not be used in the upper six inches of fill.
2.02 Bedding Material—Sand and Gravel:
A. Bedding material for all utilities and all other sub-grade piping shall conform to the following table:
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02200-2
PEA GRAVEL TYPE I SAND TYPE II
U.S. SIEVE SIZE PERCENT PASSING PERCENT PASSING
3/8inch 90-100% -
No. 4 10-30% 100%
No. 8 2-9% 90-100%
No. 30 - 10-30%
No. 200 - 2-9%
B. Pea Gravel shall conform to ASTM C33, except Type I size classification above.
C. Sand shall conform to ASTM C33, except Type II size classification above.
D. Unless otherwise indicated, all piping excepting steel pipe shall be bedded and covered with sand, Type II, only.
E. Steel pipe shall be bedded sand and covered with select backfill or excavated material from trench. Sand may be used.
2.03 Select and Non-Select Backfill:
A. Select Backfill: Select backfill shall consist of hard, durable granular soil or a soil-rock mixture. It shall be non-expansive, free of organic matter and deleterious substances. It shall contain no lumps or particles larger than ½ inch and only 30 percent of the material shall exceed ¼ inch. Material shall be obtained by screening of excavated or borrow material, or from an approved source.
B. Non-select material shall be of the same quality as above, except it shall contain no particles or lumps in excess of 6 inches in greatest dimension and only 15 percent greater than 2 inches.
C. Native backfill, where designated, shall be excavated native material replaced as is.
2.04 Imported Fill Material: Imported fill materials shall consist of hard, durable granular soil or soil-rock mixture. It shall be non-expansive, free of organic matter and deleterious substances. It shall contain no particles or lumps in excess of 4 inches in greatest dimension and only 15 percent greater than 2 inches.
PART 3 EXECUTION
3.01 Site Conditions: Topographic drawings of the project are intended for reference only. Contractor shall verify all actual site conditions, levels and grades prior to beginning work and inform the Contracting Officer as to any discrepancies that exist.
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02200-3
3.02 Excavation and Disposal:
A. General excavation shall be made to dimensions and elevations indicated or implied on the drawings. Excavation for concrete sections to be formed shall be sufficient in width to allow for convenient construction and removal of forms.
B. Excavated material not suitable for backfill shall be removed and disposed of off
National Forest Land. Rock and boulders may be scattered on site with prior approval from the Contracting Officer.
C. All material to be excavated shall be unclassified and shall include earth fill, gravels, boulders, debris and any other materials encountered in excavation and grading operations. The contractor shall remove all materials to the depth and extent indicated on the drawings or specified herein.
D. Unsuitable material not having the required bearing capacity as shown on drawings or that has been disturbed or weakened by construction activity shall be completely removed and replaced with compacted backfill material or concrete to the required levels. The unsuitable material removed shall be disposed of as directed by the
Contracting Officer.
3.03 Backfill and Compaction:
A. Prior to placement of backfill, all forms shall be removed and the excavation be cleaned of all trash, debris and unsuitable material.
B. Where self-propelled or power mechanical compaction is used, the uncompacted thickness of each lift of structural backfill or imported fill be not more than 12 inches.
Where hand-operated mechanical compaction is used, the structural backfill shall be placed in thinner layers of not more than six inches such that the specified degree of compaction is attained.
C. Rollers shall not be operated within two feet of structural walls unless otherwise approved by the Contracting Officer. Care shall be exercised in placing backfill to avoid damage to conduit and piping systems.
D. Fill material shall be compacted to 95% relative compaction and shall be placed and compacted at a moisture content suitable for compaction. No fill material shall be placed when free water is standing on the surface of the area where the fill is to be any point of the surface of the fill to be compacted. Any fill containing organic materials or other unacceptable material previously described shall be removed and replaced with approved fill material prior to compaction.
E. Unless otherwise specified, all backfill not accessible to roller compactions shall be compacted by power tampers or vibratory compactors or other approved means to the same degree of compactions specified for roller compaction.
F. In areas where field density test results indicate less than the required degree of compaction, or in areas where previously accepted compaction has been disturbed, Angeles Crest Scenic Byway Projects DIVISION 2 Section 02200-4 the backfill shall be replaced and/or compacted to obtain the required results at no additional cost to the Government.
G. If in the process of fulfilling the backfill requirements of this specification, a deficit of material results, the Contractor shall import and place suitable materials as specified elsewhere herein.
3.04 Dewatering: See Section 02142.
A. The contractor shall maintain all excavated and general site areas free of water at all times. Grading, drainage ditches, dikes and any other necessary work shall be undertaken to divert rainfall or other surface water from the excavation. Concrete curing water or water from other construction operations shall not be allowed to accumulate in the excavation during foundation construction.
B. Water pumped from the excavation shall be disposed of in such a manner as will not cause nuisance, health or safety problems.
3.05 Temporary Bracing: Temporary bracing shall be employed by the contractor to protect all excavations against movement and caving of soil. Proper sloping of the sides of excavations may be used if adequate for this purpose.
3.06 Grading: All areas covered by the project, including excavated and filled areas and adjacent transition areas, shall be uniformly graded so that finished surfaces are at the elevations SHOWN ON THE DRAWINGS. Areas to receive future topsoil shall be graded to allow for such material in the finished elevations. Finished surfaces and surfaces to receive paving and aggregate base shall be reasonably smooth, compacted and free from surface irregularities that would affect drainage. Grades shall not vary more than 0.10 foot from the established grades. Ditches, gutters and swales shall be furnished to permit proper surface drainage.
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02220-1
SECTION 02220
TRENCH EXCAVATING, BACKFILLING, AND COMPACTING
PART 1 GENERAL
1.01 Scope:
A. This work consists of all trench excavation, backfilling, and compaction for utilities, and all utilities within the 5-foot building perimeters.
B. All work under this section shall be incidental to other sections of work.
1.02 References: State of California Construction Safety Orders Title 8, Subchapter 4, and Sections for Sheeting, Shoring, and Bracing, and for Dewatering.
PART 2 PRODUCTS
2.01 Beddings, Select and Non-Select Backfill, and Native Fill: All fill material shall be
AS SHOWN ON THE DRAWINGS, or as specified herein or in the Section for
Earthwork.
2.02 Marking Tape:
A. Marking tape shall be metallized detectable tape as manufactured by Calpico Inc., 185 Harbor Way, South San Francisco, CA 94580.
B. Marking Tape shall be imprinted and of the proper width and color as specified in other sections.
2.03 Water: Water for compactions shall be clean and free of all organic deleterious substances and contaminants.
2.04 Filter Fabric: Filter fabric, if needed, shall be non-woven, barbed needle punched, 4 ounce per square yard.
PART 3 EXECUTION
3.01 Excavation:
A. General: All required excavation of every description and of whatever substances encountered shall be performed:
1. All trench excavation shall be considered unclassified.
2. Trenching shall be kept within the environmental constraints of this project.
Where the work limits and where clearing and grubbing are for trenching only, the work shall be confined to the absolute necessary for the approved trenching equipment, the trench width and the required piling width starting 1 foot away form trench edge.
Angeles Crest Scenic Byway Projects DIVISION 2 Section 02220-2
3. Excavation shall be performed as SHOWN ON THE DRAWINGS. Material suitable for backfilling shall be piled in an orderly manner along the trench line or stockpiled in designated locations approved by the Contracting Officer. All excavated materials not required or unsuitable for backfill or embankment shall be removed.
4. The Contractor shall erect barriers all around trench excavations to prevent accidents. Lights shall also be placed, from sunset to sunrise of the next day, until excavation is entirely back filled.
B. Trenching:
1. Trenches shall be constructed to the depths and dimensions as staked in the field.
The banks shall be as nearly vertical as practicable. Equipment used for trenching may include trenching machines. However all equipment shall be approved by the Contracting Officer for use within the environmental constraints.
2. All roots shall be cut off at trench walls. Any roots, 3 inches in diameter or greater, which interfere with the laying of pipe and which cannot be bypassed, shall only be removed with the Contracting Officer’s approval. Where cutting is approved and necessary, the tree side of the cut root shall be treated with an approved commercial product specifically manufactured for that purpose.
3. The bottoms of trenches shall be uniformly graded. Whenever unsuitable material is encountered in the bottom of the trench, such material shall be over-excavated to a depth of 6 inches minimum below trench bottom, and filled back to bottom grade with compacted select material. The bottom of trenches shall be scarified and compacted to a depth of 4 inches below bedding.
3.02 Control of Ground Water:
A. Should water be encountered during excavation, the Contractor shall conduct dewatering in accordance with that conduct dewatering in accordance with that section until after the placing of the bedding material, laying and jointing of he pipe, and placing of concrete, if required. The water-free condition shall be maintained until all work had been completed, inspected, and approved.
B. Trenches excavated below the water table or in wet areas shall be over-excavated 8 inches below the select backfill elevation, and backfilled with drain rock. Prior to placing select backfill, filter fabric shall be placed on top of the drain rock; the top surface of the rock shall be free of water.
3.03 Existing Utility Lines: The Contractor’s attention is directed to the possible existence of pipe and other underground…