Appendix C

View the file

Other files for this federal contract opportunity

Other files attached to Yeti Stewardship, newest first.
File Type Posted
1_Yeti_APPENDIX_A.docx DOCX document
8_Yeti_South_Shore.pdf PDF
4_Yeti_Apendix_C_T-Specs.doc DOC document
2_Yeti_APPENDIX_B.doc DOC document
9_Wage_Determination.docx DOCX document
Yeti_IRSC_CommercialServices.doc DOC document
6_Yeti_Apendix_C_T-Specs_810_BarrierTyp.pdf PDF
7_Yeti_North_Shore.pdf PDF
5_Yeti_Apendix_C_T-Specs_803_SvcEntTyp.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Yeti Fuels Reduction and Forest Health Stewardship Page 1 of 7

APPENDIX C

Road Maintenance and Erosion Control: The following is intended as a set of operating conditions for the use of roads, landings, and forwarding trails within summer or winter operating seasons. Included in this Item is equipment mobilization, the costs associated with seasonal move-in and move-out requirements.

Contractor shall perform specified road maintenance and erosion control activities, which includes road blading, drainage maintenance, preventative maintenance, and dust abatement on designated Forest Roads, and any unnumbered newly constructed roads, existing non-system roads and existing and new temporary roads.

Water for performing road maintenance may be obtaining from hydrants in the project vicinity. The contractor is responsible for obtaining a water use permit and encroachment permit for use of county/city roads. Specific road maintenance and erosion control requirements for each unit are listed below. Ripping of landings and temporary roads is not permitted in known noxious weed sites and in rocky soils. A slash mat will be required when crossing areas of wet soils in Stream Environment Zones. Equipment will not be required to operate over a slash mat outside of wet Stream Environment Zones, but where a slash mat is not present on equipment trails, water bars shall be installed upon completion of use of each equipment trail.

· Unit 19: Construct landing along road 12N28. During landing closeout spread chipped material over the landing not to exceed 6 inches in depth. Rip the landing to a depth of 12 inches.

· Unit 117: Reopen existing landing along road 12N31. During landing closeout spread chipped material over the landing not to exceed 6 inches in depth. Rip the landing to a depth of 12 inches.

· On road 12N28 at the intersection with Lake Tahoe Blvd, and road 12N31 at intersection with Tahoe Mtn. Road-Install/maintain rock or chip apron at intersection of paved road. If rock is used, rock shall be 3+ inches in size and placed to a 4 inch depth for 25 feet from the paved road. If chip is used, place to a 4 inch depth for 25 feet.

· Unit 1: Construct landings along road 16N86 and 16N57. During landing closeout spread chipped material over the landing not to exceed 6 inches in depth. Rip the landing to a depth of 12 inches.

· Unit 3: Construct landings along road 16N87. Re-open existing temp road and two landings off road 16N87. Re-open existing temp road and landing at the end of Cambridge Drive. During landing closeout spread chipped material over the landing not to exceed 6 inches in depth. Rip the landing to a depth of 12 inches.

· Unit 4: Construct new temp road and new landing. During landing closeout spread chipped material over the landing not to exceed 6 inches in depth. Rip the landing to a depth of 12 inches.

· At the intersection of roads where native surface material and pavement meet - Install rock or chip apron at intersection of paved road. If rock is used, rock shall be 3+ inches in size and placed to a 4 inch depth for 25 feet from the paved road. If chip is used, place to a 4 inch depth for 25 feet.

· Install barriers as shown on the Project Area maps to effectively block vehicular access.

· Water bar spacing shall be in accordance with the California Department of Forestry and Fire Protection’s California Forest Practice Rules, 2009.

· All temp roads shall me mulched then ripped to incorporate material into soil. Rip to a depth of 18 inches.

The following Best Management Practices (BMP) are applied to this contract for erosion control purposes. BMPs are specified in: Water Quality Management for National Forest System Lands in California – Best Management Practices, USDA Forest Service, 2000 may be found at:

http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5362512.pdf

BMP 1-5, Limiting Operating Period of Timber Sale Activities BMP 1-6, Protection of Unstable Lands BMP 1-8, Streamside Management Zone Designation BMP 1-9, Determining Tractor Loggable Ground BMP 1-10, Tractor (Forwarder) Skidding Design BMP 1-12, Log Landing Location BMP 1-13, Erosion Prevention and Control Measures During Timber Sale Operations BMP 1-14, Special Erosion Prevention Measures on Disturbed Land BMP 1-15, Revegetation of Areas Disturbed by Harvest Activities BMP 1-16, Log Landing Erosion Prevention and Control BMP 1-17, Erosion Control on Skid (Forwarder) Trails BMP 1-18, Meadow Protection BMP 1-19, Streamcourse Protection (Implementation and Enforcement) BMP 1-20, Erosion Control Structure Maintenance BMP 1-21, Acceptance of Contract Erosion Control Measures Before Contract Closure BMP 1-22, Slash Treatment in Sensitive Areas BMP 1-25, Modification of the Contract for Environmental Protection BMP 2-2, Erosion Control Plan BMP 2-3, Timing of Construction Activities BMP 2-4, Stabilization of Road Slope Surfaces and Spoil Disposal Areas BMP 2-5, Road Slope Stabilization Construction Practices BMP 2-6, Dispersion of Subsurface Drainage from Cut and Fill Slopes BMP 2-7, Control of Road Drainage BMP 2-9, Timely Erosion Control Measures on Incomplete Roads and Stream Crossings BMP 2-10, Construction of Stable Embankments BMP 2-11, Control of Sidecast Material During Construction and Maintenance BMP 2-12, Servicing and Refueling of Equipment BMP 2-13, Control of Construction and Maintenance Activities Adjacent to SMZs BMP 2-16, Stream Crossings on Temporary Roads BMP 2-21, Water Source Development Consistent with Water Quality Protection BMP 2-22, Maintenance of Roads BMP 2-23, Road Surface Treatment to Prevent Loss of Materials BMP 2-24, Traffic Control during Wet Periods BMP 2-25, Snow Removal Controls to Avoid Resource Damage BMP 2-26, Obliteration or Decommissioning of Roads BMP 5-2, Slope Limitations for Mechanical Equipment Operation BMP 5-3, Tractor Operation Limitation in Wetlands and Meadows BMP 5-4, Revegetation of Surface Disturbed Areas BMP 5-5, Disposal of Organic Debris BMP 5-6, Soil Moisture Limitations for Mechanical Equipment Operations BMP 7-4, Forest and Hazardous Substance Spill Prevention Control and Countermeasure (SPPC) Plan BMP 7-7, Management by Closure to Use

1. Road Maintenance T-Specifications: The following specifications shall govern road maintenance made necessary by Contractor's road use and responsibilities for protecting roads from seasonal weather damage and for safeguarding soil and water. T-Specifications are included in Section J.

T-802 Ditch Cleaning T-803 Surface Blading T-805 Drainage Structures T-806 Dust Abatement T-807 Roadway Vegetation T-808 Miscellaneous Structures T-809 Waterbars T-810 Barriers

Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary, attached specifications, and drawings:

Contract Road Maintenance Requirements Summary

Road
Termini
Miles
Applicable Pre-haul Road Maintenance Specifications
From
To
T-802
T-803
T-805
T-806
T-807
T-808
T-809
T-810
12N28
Lake Tahoe Blvd
Landing
0.2
P
P

P

12N31
Tahoe Mtn Rd
Landing
1.5
P
P

P

16N57
Intersection of 16N86
Landing
0.5
P
P

P

16N57A
Intersection of 16N57
Landing
.05
P
P

P

16N86
End of Beaver St
Furthest Landing
1
P
P

P

16N87
Intersection of 16N86
Existing temp rd
1
P
P

P

Road
Termini
Miles
Applicable During Haul Road Maintenance Specifications
From
To
T-802
T-803
T-805
T-806
T-807
T-808
T-809
T-810
12N28
Lake Tahoe Blvd
Landing
0.2

P

P

12N31
Tahoe Mtn Rd
Landing
1.5

P

P

16N57
Intersection of 16N86
Landing
0.5

P

P

16N57A
Intersection of 16N57
Landing
.05

P

P

16N86
End of Beaver St
Furthest Landing
1

P

P

16N87
Intersection of 16N86
Existing temp rd
1

P

P

Road
Termini
Miles
Applicable Post Haul Road Maintenance Specifications
From
To
T-802
T-803
T-805
T-806
T-807
T-808
T-809
T-810
12N28
Lake Tahoe Blvd
Landing
0.2
P
P
P
P
P
P
12N31
Tahoe Mtn Rd
Landing
1.5
P
P
P
P
P
P
16N57
Intersection of 16N86
Landing
0.5
P
P
P
P
P
P
16N57A
Intersection of 16N57
Landing
.05
P
P
P
P
P
P
16N86
End of Beaver St
Furthest Landing
1
P
P
P
P
P
P
16N87
Intersection of 16N86
Existing temp rd
1
P
P
P
P
P
P

P = Contractor Performance Item D = Deposit to Forest Service D3 = Deposit to Third Party

2. Cooperative Road Use: When two or more commercial users are simultaneously using the same road, they shall agree on a maintenance plan and arrangements for accomplishing the work. The Forest Service shall approve this plan.

3. Temporary Roads: As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Contractor shall employ such measures as out-sloping, drainage dips, and water-spreading ditches. After a Temporary Road has served Contractor’s purpose, Contractor shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, out-slope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are removed, associated fills shall also be removed to the extent necessary to permit normal maximum flow of water.

4. Landings: After landings have served Contractor’s purpose, Contractor shall ditch and slope them to permit water to drain or spread. Unless agreed otherwise, cut and fill banks around landings shall be sloped to remove overhangs and otherwise minimize erosion.

5. Forwarder Trails: When log forwarding is completed and portions of forwarder trails are not covered by slash, Contractor shall construct cross ditches on forwarder trails where staked or otherwise marked on the ground by Forest Service. By agreement, Contractor may use other comparable erosion control measures, such as backblading forwarder trails, in lieu of cross ditching.

6. Erosion Prevention and Control: The following specifications shall govern erosion control work made necessary by Contractor's operations to minimize soil erosion. The Agreement for Wet Weather Operations and Operations Outside Normal Operating Season are included in Section J.

a. Grading: To minimize the potential of offsite sediment transport from grading activities (T-803), drainage structures must be concurrently maintained (T-805).

b. Erosion Prevention and Control: Erosion prevention and control work, including Streamcourse protection, shall be completed within 15 calendar days after forwarding or mastication operations related to each landing are substantially completed or after Forest Service designation on the ground of work where such designation is required hereunder. Said time limit shall be exclusive of full days lost in Contractor’s Operations due to causes beyond Contractor’s control. Such on the ground designation shall be done as promptly as feasible unless it is agree that the location of such work can be established without marking on the ground. After September 15 and as long thereafter as operations continue the work shall be done as promptly as practicable. Damage resulting from Contractor’s Operations due to failure to perform required work shall be repaired by Contractor.

7. Use of roads, landings, or forwarder trails shall be halted during wet weather. Contractor shall install temporary waterbars to maintain drainage on travel way if rutting results in unacceptable road damage.

a. Work may be allowed when:

1. Earth surfaced landings must be dry enough to be bladed and shaped to maintain proper drainage. This may be necessary quite frequently, depending on road conditions and pending storms.

2. Appropriate drainage structures are in place and the soil is frozen.

b. Work shall not be allowed when:

1. The landing is stabilized with aggregate, but the subgrade becomes saturated and the stability of the landing cannot support log loading or haul.

2. When native surface landings turn to mud and cannot be immediately shaped for drainage.

3. If sections of landings lose structural strength and will not support log loading or haul.

4. When sediment is draining from the landing and entering a streamcourse or paved roadway.

c. Other than haul traffic:

1. In some instances, work may alter the designed landing drainage through rutting. When this occurs, the contractor will be required to install temporary waterbars to maintain drainage on the landing. This will be done on a daily basis if melting and run-off is occurring. If this traffic is causing soil resource damage or sediment to enter a streamcourse, work on landings shall not be allowed.

d. General

1. If Contractor removes snow from landings, such work shall be done in a manner that will protect roads and adjacent resources.

2. Snow berms shall be removed or placed to avoid accumulation of melt water on the road and prevent water concentration on erosive slopes or soils. If the landing is damaged, Contractor shall replace lost surface material and repair structures damaged in blading operations prior to log loading, unless climatic conditions prevent necessary work from being accomplished or as otherwise agreed in writing.

3. Snow removal to 2 inches above paved landing surfaces, 6 inches above compacted soils shall be permitted. Soil surface shall not be removed by plowing. Any damage or loss of landing surface shall be replaced or repaired. Drain outs shall be provided at 100 to 200 foot intervals or as designated on the ground.

4. Temporary cross drains may be required in advance of predicted storms or warm fronts.

5. Large puddles shall be drained.

6. Ditches and culverts shall be maintained so they will be functional at all times.

8. Landings shall not be constructed in wet or difficult to drain areas, in depressions, or within designated SEZ’s.

9. Contractor shall install temporary sediment barriers (e.g., filter fabric fences or anchored straw waddles) adjacent to landings as directed by the Forest Service. If soil has been piled in a landing it shall be protected by sediment barriers and covered with plastic. After landings, log decking and sorting areas have served Contractor's purpose or prior to seasonal precipitation, Contractor shall ditch, waterbar, or slope landings to permit water to drain or spread as determined by the Forest Service. If landings are used for log decking, Contractor shall close all landings following completion of log hauling and fuels treatment. Closure shall consist of subsoiling, spreading slash or mulch over the landing surface, and blocking all access to the landing from the road.

10. The Government shall approve the location, size and allowable uses of equipment service and refueling areas. If the Contractor maintains storage facilities for oil or oil products at the contract location, they shall take appropriate preventative measures to insure that any spill of such oil or oil products does not enter any stream, ground water, or other waters of the United States or any of the individual States. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

Summer Operating Standards:

1. Ground based log removal equipment shall be limited to operating on slope gradients less than 30 percent.

2. Forest Service will establish stream environment zones (SEZ), along all project streams, meadows and riparian areas in which equipment shall not operate unless specifically designated for mechanical operations. Minimum width of SEZ's shall be 25 feet each side from apparent high water mark for perennial or intermittent streams, and 10 feet each side from apparent high water mark for ephemeral streams and meadows. SEZ type will be determined in advance of operations and designated on the ground by the C.O.R.

3. The Contractor’s operations shall be conducted to minimize disturbance to the duff layer. Slash or litter may be substituted for duff as a soil cover where the resource objective conflicts with the duff retention standard.

Winter Operating Standards:

A minimum of 12 inches of compacted snow/ice with slash where available, shall be maintained on all skid trails and forwarder trails. A minimum of 6 inches of compacted snow/ice shall be maintained on all landings where compacted soils already exist. The snow/slash must be able to support the weight of the equipment without causing disturbance or detrimental compaction to the soil. Transfer Point Landings on pavement must have a minimum 2 inches packed snow and ice. Paved surface shall not be removed by plowing. Any damage or loss of road surface shall be replaced or repaired. Any debris on pavement shall be removed immediately after snow melts. Operations shall be suspended when suitable snow conditions do not exist. After March 1 or when extended warming periods occur, a minimum of 12 inches of compacted snow/ice/slash shall be maintained on all skid trails and forwarder trails. An agreement may be made between the C.O. and the Contractor to allow lesser snow depths when the soil is adequately frozen or soils have a low susceptibility to compaction.