MISFIRE SERVICE SCHEDULE OF ITEMS_REVISED.pdf
PDF 311 KB Posted
- Attached to
- Misfire Fuels Reduction Stewardship Project
- Solicitation number
- AG-9A63-S-11-0040
About this file
Amendment 1 - Attachment (24 pages) Road Maintenance Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 2.docx | DOCX document | |
| 77-0727_Forestry_06132011.mht | MHT file | |
| Amend 1.docx | DOCX document | |
| Restricted Roads Table.xlsx | XLSX spreadsheet | |
| Maintenance Specs.pdf | ||
| Misfire Drawings_REVISED.pdf | ||
| Stewardship_Table_20110408.pdf | ||
| Misfire_SA_Map_Large_20110419.pdf | ||
| Misfire_IRSC_20110419_SOLICITATION.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LENGTH (MILES)
RD # 1.24
DISTRICT Reconst
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
809(01) Drainage Excavation, Type Waterbar CQ Each 3. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 8. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile 1.24 -$ -$
TOTAL -$
NOTES:
NA
SUB TOTAL OPTIONAL
BASE WORK REQUIRED SUB TOTAL BASE
BEND
Road Work Type:PACIFIC
11N54
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
SUB TOTAL ALL WORK
PROJECT: MISFIRE FUELS REDUCTION
STEWARDSHIP PROJECT 3/25/2011
RD # 0.16
DISTRICT
OPTIONAL WORK METHOD OF S.R.C S.R.C
ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
837(02) Drainage Excavation, Type Rolling Dip CQ Each 3. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .16 -$ -$
TOTAL -$
NOTES:
NA
SUB TOTAL BASE
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N54A BEND SPUR
ELDORADO NATIONAL FOREST
SCHEDULE OF ITEMS
SERVICE CONTRACT
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.61
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
842(06) Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER. LSQ LS 1. -$ -$
837(01) Drainage Excavation, Type Swale CQ Each 1. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 5. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .61 -$ -$
TOTAL -$
NOTES:
NA
-$ SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N54B BEND OVER
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
PROJECT: MISFIRE FUELS REDUCTION
RD # 1.24
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(02) Blading, Grading & Watering Only,Compaction Method A CQ Mile 1.24 -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
11N55 PEAVINE RIDGE
PACIFIC
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
PROJECT: MISFIRE FUELS REDUCTION
RD # 1.53
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
842(05) Clearing & Grubbing, Disposal of Tops and Limbs-HAUL TO DESIGNATED LOCATIONS, and Stumps-SCATTER. LSQ LS 1. -$ -$
837(02) Drainage Excavation, Type Rolling Dip CQ Each 16. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile 1.53 -$ -$
OPTIONAL WORK DESCRIPTION -$ -$
842(05) Clearing & Grubbing, Disposal of Tops and Limbs-HAUL TO DESIGNATED LOCATIONS, and Stumps-SCATTER. LSQ LS 1. -$ -$
810(01) Excavation Curve Widening - Compaction B CQ LS 1. -$ -$ 813(03) Spot Surfacing, AB Grading B, Compaction Method B CQ Ton 400. -$ -$
TOTAL -$
NOTES:
BASE WORK REQUIRED SUB TOTAL BASE
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N55Z 55Z
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
SUB TOTAL $
SUB TOTAL $
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.14
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N55Z 55Z
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.12
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(02) Blading, Grading & Watering Only,Compaction Method A CQ Mile .12 -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N56 JAYBIRD CANYON
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 1.11
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(01) Blading, Roller Compaction - Method B CQ Mile 1.11 -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N56A SIDE CANYON
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.47
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
837(02) Drainage Excavation, Type Rolling Dip CQ Each 7. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .47 -$ -$
TOTAL -$
NOTES:
NA
PACIFIC
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N56AB SIDE CANYON AB
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 2.02
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(03) Reconditioning of Roadbed, Surface and Shoulder Maintenance,Pull Ditches, Clean CMP Inlets. CQ Mile 2.02 -$ -$
OPTIONAL WORK DESCRIPTION -$ -$
814(01) Spot Patching Hot Bituminous Plant Mix DG-2 - Caltrans Spec. CQ Ton 24. -$ -$
TOTAL -$
NOTES:
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
11N57 ROUND TENT CANYON
PACIFIC
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL ALL WORK
SUB TOTAL $
SUB TOTAL $
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.88
DISTRICT
OPTIONAL WORK METHOD OF S.R.C S.R.C
ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
837(01) Drainage Excavation, Type Swale CQ Each 3. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 7. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .88 -$ -$
TOTAL -$
NOTES:
NA
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
11N60B JAYBIRD NORTH
PACIFIC
SUB TOTAL BASE
SUB TOTAL ALL WORK
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.19
DISTRICT
OPTIONAL WORK METHOD OF S.R.C S.R.C
ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(01) Blading, Roller Compaction - Method B CQ Mile .19 -$ -$
TOTAL -$
NOTES:
NA
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
11N60H JAYBIRD H
PACIFIC
SUB TOTAL BASE
SUB TOTAL ALL WORK
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.08
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$ 813(03) Spot Surfacing, AB Grading B, Compaction Method B CQ Ton 24. -$ -$
TOTAL -$
NOTES:
NA
SCHEDULE OF ITEMS
PACIFIC
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
11N60T JAYBIRD T
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.18
DISTRICT Const
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
837(02) Drainage Excavation, Type Rolling Dip CQ Each 5. -$ -$ 249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$ 833(01) 24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. CQ LF 30. -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
11N60Z
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
JAYBIRD Z
Road Work Type:
PROJECT: MISFIRE FUELS REDUCTION
RD # 4.80
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(01) Blading, Roller Compaction - Method B CQ Mile 1.24 -$ -$ 811(03) Reconditioning of Roadbed, Surface and Shoulder
C C CQ Mile .24 -$ -$
OPTIONAL WORK DESCRIPTION -$ -$
811(01) Blading, Roller Compaction - Method B CQ Mile 3.32 -$ -$
TOTAL -$
NOTES:
BASE WORK REQUIRED SUB TOTAL BASE
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
11N64 SPRING VALLEY
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
SUB TOTAL $
SUB TOTAL $
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.57
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
809(01) Drainage Excavation, Type Waterbar CQ Each 1. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 6. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .57 -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N64C SILVER TIP
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.71
DISTRICT
OPTIONAL WORK METHOD OF S.R.C S.R.C
ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(01) Blading, Roller Compaction - Method B CQ Mile .71 -$ -$
TOTAL -$
NOTES:
NA
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N65D SHORTS NORTH
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
SUB TOTAL BASE
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.30
DISTRICT
OPTIONAL WORK METHOD OF S.R.C S.R.C
ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(01) Blading, Roller Compaction - Method B CQ Mile .3 -$ -$
TOTAL -$
NOTES:
NA
SUB TOTAL BASE
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N70 MCMANUS
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.32
DISTRICT
OPTIONAL WORK METHOD OF S.R.C S.R.C
ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
811(01) Blading, Roller Compaction - Method B CQ Mile .32 -$ -$
TOTAL -$
NOTES:
NA
SUB TOTAL BASE
OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N71 JAYBIRD CANYON SPRING
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 1.52
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
837(02) Drainage Excavation, Type Rolling Dip CQ Each 18. -$ -$
811(01) Blading, Roller Compaction - Method B CQ Mile 1.52 -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N71A SILVER CANYON VISTA
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.32
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
809(01) Drainage Excavation, Type Waterbar CQ Each 1. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .32 -$ -$
TOTAL -$
NOTES:
NA
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
SUB TOTAL ALL WORK
PACIFIC
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N71B SILVER CANYON EAST
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.10
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$ 813(03) Spot Surfacing, AB Grading B, Compaction Method B CQ Ton 25. -$ -$
TOTAL -$
NOTES:
NA
-$ SUB TOTAL ALL WORK
PACIFIC
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL OPTIONAL
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
11N71B1 71B1
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
PROJECT: MISFIRE FUELS REDUCTION
RD # 0.28
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
837(01) Drainage Excavation, Type Swale CQ Each 1. -$ -$
837(02) Drainage Excavation, Type Rolling Dip CQ Each 1. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .28 -$ -$
TOTAL -$
NOTES:
NA
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
SUB TOTAL OPTIONAL
11N72 JAYBIRD HOOK
PACIFIC
BASE WORK REQUIRED SUB TOTAL BASE
SUB TOTAL ALL WORK
PROJECT: MISFIRE FUELS REDUCTION
RD #
DISTRICT
METHOD OF S.R.C S.R.C
ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE
881(01) Mobilization - Applies to Project LSQ LS 1. -$ -$
TOTAL -$
NOTES:
SCHEDULE OF ITEMS
SERVICE CONTRACT
ELDORADO NATIONAL FOREST
MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME
ALL ROADS MOBILIZATION
PACIFIC
TOTAL BASENote:
All Base Work is included in Contract.
All or portions of Optional Work may be awarded.
TOTAL OPTIONAL
TOTAL ALL WORK
PROJECT: MISFIRE FUELS REDUCTION