MISFIRE SERVICE SCHEDULE OF ITEMS_REVISED.pdf

PDF 311 KB Posted

Attached to
Misfire Fuels Reduction Stewardship Project
Solicitation number
AG-9A63-S-11-0040
Issued by

About this file

Amendment 1 - Attachment (24 pages) Road Maintenance Schedule of Items

View the file

Other files

File Type Posted
Amend 2.docx DOCX document
77-0727_Forestry_06132011.mht MHT file
Amend 1.docx DOCX document
Restricted Roads Table.xlsx XLSX spreadsheet
Maintenance Specs.pdf PDF
Misfire Drawings_REVISED.pdf PDF
Stewardship_Table_20110408.pdf PDF
Misfire_SA_Map_Large_20110419.pdf PDF
Misfire_IRSC_20110419_SOLICITATION.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LENGTH (MILES)

RD # 1.24

DISTRICT Reconst

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

809(01) Drainage Excavation, Type Waterbar CQ Each 3. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 8. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile 1.24 -$ -$

TOTAL -$

NOTES:

NA

SUB TOTAL OPTIONAL

BASE WORK REQUIRED SUB TOTAL BASE

BEND

Road Work Type:PACIFIC

11N54

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

SUB TOTAL ALL WORK

PROJECT: MISFIRE FUELS REDUCTION

STEWARDSHIP PROJECT 3/25/2011

RD # 0.16

DISTRICT

OPTIONAL WORK METHOD OF S.R.C S.R.C

ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

837(02) Drainage Excavation, Type Rolling Dip CQ Each 3. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .16 -$ -$

TOTAL -$

NOTES:

NA

SUB TOTAL BASE

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N54A BEND SPUR

ELDORADO NATIONAL FOREST

SCHEDULE OF ITEMS

SERVICE CONTRACT

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.61

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

842(06) Clearing & Grubbing, Disposal of Tops and Limbs-SCATTER, Logs- DECK, and Stumps-SCATTER. LSQ LS 1. -$ -$

837(01) Drainage Excavation, Type Swale CQ Each 1. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 5. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .61 -$ -$

TOTAL -$

NOTES:

NA

-$ SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N54B BEND OVER

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

PROJECT: MISFIRE FUELS REDUCTION

RD # 1.24

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(02) Blading, Grading & Watering Only,Compaction Method A CQ Mile 1.24 -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

11N55 PEAVINE RIDGE

PACIFIC

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

PROJECT: MISFIRE FUELS REDUCTION

RD # 1.53

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

842(05) Clearing & Grubbing, Disposal of Tops and Limbs-HAUL TO DESIGNATED LOCATIONS, and Stumps-SCATTER. LSQ LS 1. -$ -$

837(02) Drainage Excavation, Type Rolling Dip CQ Each 16. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile 1.53 -$ -$

OPTIONAL WORK DESCRIPTION -$ -$

842(05) Clearing & Grubbing, Disposal of Tops and Limbs-HAUL TO DESIGNATED LOCATIONS, and Stumps-SCATTER. LSQ LS 1. -$ -$

810(01) Excavation Curve Widening - Compaction B CQ LS 1. -$ -$ 813(03) Spot Surfacing, AB Grading B, Compaction Method B CQ Ton 400. -$ -$

TOTAL -$

NOTES:

BASE WORK REQUIRED SUB TOTAL BASE

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N55Z 55Z

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

SUB TOTAL $

SUB TOTAL $

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.14

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N55Z 55Z

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.12

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(02) Blading, Grading & Watering Only,Compaction Method A CQ Mile .12 -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N56 JAYBIRD CANYON

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 1.11

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(01) Blading, Roller Compaction - Method B CQ Mile 1.11 -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N56A SIDE CANYON

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.47

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

837(02) Drainage Excavation, Type Rolling Dip CQ Each 7. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .47 -$ -$

TOTAL -$

NOTES:

NA

PACIFIC

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N56AB SIDE CANYON AB

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 2.02

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(03) Reconditioning of Roadbed, Surface and Shoulder Maintenance,Pull Ditches, Clean CMP Inlets. CQ Mile 2.02 -$ -$

OPTIONAL WORK DESCRIPTION -$ -$

814(01) Spot Patching Hot Bituminous Plant Mix DG-2 - Caltrans Spec. CQ Ton 24. -$ -$

TOTAL -$

NOTES:

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

11N57 ROUND TENT CANYON

PACIFIC

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL ALL WORK

SUB TOTAL $

SUB TOTAL $

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.88

DISTRICT

OPTIONAL WORK METHOD OF S.R.C S.R.C

ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

837(01) Drainage Excavation, Type Swale CQ Each 3. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 7. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .88 -$ -$

TOTAL -$

NOTES:

NA

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

11N60B JAYBIRD NORTH

PACIFIC

SUB TOTAL BASE

SUB TOTAL ALL WORK

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.19

DISTRICT

OPTIONAL WORK METHOD OF S.R.C S.R.C

ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(01) Blading, Roller Compaction - Method B CQ Mile .19 -$ -$

TOTAL -$

NOTES:

NA

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

11N60H JAYBIRD H

PACIFIC

SUB TOTAL BASE

SUB TOTAL ALL WORK

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.08

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$ 813(03) Spot Surfacing, AB Grading B, Compaction Method B CQ Ton 24. -$ -$

TOTAL -$

NOTES:

NA

SCHEDULE OF ITEMS

PACIFIC

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

11N60T JAYBIRD T

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.18

DISTRICT Const

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

837(02) Drainage Excavation, Type Rolling Dip CQ Each 5. -$ -$ 249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$ 833(01) 24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B. CQ LF 30. -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

11N60Z

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

JAYBIRD Z

Road Work Type:

PROJECT: MISFIRE FUELS REDUCTION

RD # 4.80

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(01) Blading, Roller Compaction - Method B CQ Mile 1.24 -$ -$ 811(03) Reconditioning of Roadbed, Surface and Shoulder

C C CQ Mile .24 -$ -$

OPTIONAL WORK DESCRIPTION -$ -$

811(01) Blading, Roller Compaction - Method B CQ Mile 3.32 -$ -$

TOTAL -$

NOTES:

BASE WORK REQUIRED SUB TOTAL BASE

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

11N64 SPRING VALLEY

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

SUB TOTAL $

SUB TOTAL $

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.57

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

809(01) Drainage Excavation, Type Waterbar CQ Each 1. -$ -$ 837(02) Drainage Excavation, Type Rolling Dip CQ Each 6. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .57 -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N64C SILVER TIP

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.71

DISTRICT

OPTIONAL WORK METHOD OF S.R.C S.R.C

ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(01) Blading, Roller Compaction - Method B CQ Mile .71 -$ -$

TOTAL -$

NOTES:

NA

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N65D SHORTS NORTH

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

SUB TOTAL BASE

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.30

DISTRICT

OPTIONAL WORK METHOD OF S.R.C S.R.C

ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(01) Blading, Roller Compaction - Method B CQ Mile .3 -$ -$

TOTAL -$

NOTES:

NA

SUB TOTAL BASE

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N70 MCMANUS

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.32

DISTRICT

OPTIONAL WORK METHOD OF S.R.C S.R.C

ITEM NO. DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

811(01) Blading, Roller Compaction - Method B CQ Mile .32 -$ -$

TOTAL -$

NOTES:

NA

SUB TOTAL BASE

OPTIONAL WORK MAY BE AWARDED SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N71 JAYBIRD CANYON SPRING

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 1.52

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

837(02) Drainage Excavation, Type Rolling Dip CQ Each 18. -$ -$

811(01) Blading, Roller Compaction - Method B CQ Mile 1.52 -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N71A SILVER CANYON VISTA

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.32

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

809(01) Drainage Excavation, Type Waterbar CQ Each 1. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .32 -$ -$

TOTAL -$

NOTES:

NA

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

SUB TOTAL ALL WORK

PACIFIC

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N71B SILVER CANYON EAST

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.10

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

249(01) Composite Road Construction-Includes All Work LSQ LS 1. -$ -$ 813(03) Spot Surfacing, AB Grading B, Compaction Method B CQ Ton 25. -$ -$

TOTAL -$

NOTES:

NA

-$ SUB TOTAL ALL WORK

PACIFIC

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL OPTIONAL

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

11N71B1 71B1

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

PROJECT: MISFIRE FUELS REDUCTION

RD # 0.28

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

837(01) Drainage Excavation, Type Swale CQ Each 1. -$ -$

837(02) Drainage Excavation, Type Rolling Dip CQ Each 1. -$ -$ 811(01) Blading, Roller Compaction - Method B CQ Mile .28 -$ -$

TOTAL -$

NOTES:

NA

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

SUB TOTAL OPTIONAL

11N72 JAYBIRD HOOK

PACIFIC

BASE WORK REQUIRED SUB TOTAL BASE

SUB TOTAL ALL WORK

PROJECT: MISFIRE FUELS REDUCTION

RD #

DISTRICT

METHOD OF S.R.C S.R.C

ITEM NO. BASE WORK DESCRIPTION MEASURE UNIT QUANTITYUNIT PRICE TOTAL PRICE

881(01) Mobilization - Applies to Project LSQ LS 1. -$ -$

TOTAL -$

NOTES:

SCHEDULE OF ITEMS

SERVICE CONTRACT

ELDORADO NATIONAL FOREST

MISFIRE FUELS REDUCTION STEWARDSHIP PROJECT ROAD NAME

ALL ROADS MOBILIZATION

PACIFIC

TOTAL BASENote:

All Base Work is included in Contract.

All or portions of Optional Work may be awarded.

TOTAL OPTIONAL

TOTAL ALL WORK

PROJECT: MISFIRE FUELS REDUCTION

File details come from the government source that posted it. Updated .