Contract_Area_Map.pdf

PDF 410 KB Posted

Attached to
The Huntington Basin Stewardship Project, (IRSC) Federal contract opportunity
Solicitation number
AG-9A40-S-17-4002
Issued by
Department of Agriculture Forest Service

About this file

Contract Area Map

View the file

Other files for this federal contract opportunity

Other files attached to The Huntington Basin Stewardship Project, (IRSC), newest first.
File Type Posted
Appendix_B.pdf PDF
Fire_Plan.pdf PDF
Wage_Determination.pdf PDF
Appendix_A.pdf PDF
Vicinity_Map.pdf PDF
Appendix_C.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P P

P P

P

P P

P

P P

P P

P

P

P

P P P P P P P P P P

P P

P P

P P

P P

P P

P P

P P

P P

P P P P

P P

P P

P P

P P

P

P

15 14 13

4, 3, 1, 2,16

11109

HUNTINGTON LAKE

L%CA2

L%CA2

L%CA2

L%CA2

õW WATER DRAFT SITE AT

LAKESHORE BOAT RAMP

M2710

8S87

8S77

8S788S75Z

8S75Y

8S818S3 2C

8S75V

8S8 1A

8S75

YB

8S87B

8S75ZC

8S75

YC

8S87A

8S75ZB8S75ZD

8S87 C

8S81B

8S75ZA

HUNTINGTON BASIN STEWARDSHIP

CONTRACT AREA MAP

HIGH SIERRA RANGER DISTRICT

SIERRA NATIONAL FOREST

TRACTOR YARDING SPECIFIED, APPENDIX B GT.4.2, KT-GT.4.2#

INDIVIDUAL TREE MARKING UNIT, APPENDIX B CT.3.5, KT-CT.3.5#

DIRECTIONAL FELLING REQUIRED, APPENDIX B GT.4.1, KT-GT.4.1#

ITM

DF LAND LINES ARE APPROXIMATE

WEATHER STATION: DINKEY

TRAC

keb 5-17-2017

I

0 0.25 0.5 Miles

T8S, R25E

MDBM

CONTRACT AREA BOUNDARY, CLAUSE C.4

PAYMENT UNIT MARKED PRIOR TO ADVERTISEMENT, CLAUSE C.41,

OTHER OWNERSHIP, CLAUSE C.4

EXISTING ROAD SYSTEM, CLAUSE C.4

KEEP ROAD OPEN, ALL ROADS, CLAUSE C.4KO

ENDLINING, APPENDIX A F.14, APPENDIX B GT.4.2, KT-GT.4.2#ENDL

ONE END LOG SUSPENSION, KT-GT.4.2#SUSP

© DISPOSAL SITE, APPENDIX B GT.7, KT-GT.7#

REMOVE SLASH, APPENDIX B GT.7, KT-GT.7#REMOVE

MACHINE PILING LANDING SLASH, APPENDIX B GT.7, KT-GT.7#MACH

FELL DAMAGED SMALL TREES, APPENDIX B GT.7, KT-GT.7#FELL

DECK LARGE MATERIAL, APPENDIX B GT.7, KT-GT.7#DECK

TRAFFIC CONTROL, CLAUSE H.9T

WATER SOURCE, APPENDIX B KT-FT.3.5#W*

PROTECTION OF HERITAGE RESOURCES, CLAUSE H.12, APPENDIX A E.4

PROTECTION OF IMPROVEMENTS, POWERLINE, CLAUSE C.4

&,CA1

P P

PROTECT STREAM COURSE, 100 FOOT BUFFER STRIP, CLAUSE H.19

PROTECT STREAM COURSE, 75 FOOT BUFFER STRIP, CLAUSE H.19

PROTECT STREAM COURSE, 25 FOOT BUFFER STRIP, CLAUSE H.19

MEADOW PROTECTION, NO EQUIPMENT 100 FEET, CLAUSE H.20

YOSEMITE TOAD OCCUPIED HABITAT, APPENDIX A E.5, APPENDIX B KT-GT.3.1.5#

OSPREY LOP AREA, APPENDIX A E.5, APPENDIX B KT-GT.3.1.5#&,CA2

SCAT – 18” SCATTER SLASH, APPENDIX B GT.7, KT-GT.7#

BACKBLADING, CLAUSE H.18BKB

LOP LIMITED OPERATING PERIOD, APPENDIX A E.5, KT-GT.3.1.5#

CONTRACT REQUIREMENTS TABLE

PROVISION CONTRACT REQUIREMENT ROAD, PAYMENT UNIT, OR AREA

KT-GT.7# REMOV E ENTIRE CONTRACT AREA

KT-GT.7# MACH DISPOSAL SITE

KT-GT.7# SCAT-18” ENTIRE CONTRACT AREA

CLAUSE C.4 KO ALL ROADS

KT-GT.7# FELL ENTIRE CONTRACT AREA

KT-GT.7# DECK DISPOSAL SITE

KT-GT.4.1# DF ENTIRE CONTRACT AREA

CT.3.5, KT-CT.3.5# ITM PAYMENT UNITS 3 AND 4

GT.4.2, KT-GT.4.2# TRAC ENTIRE CONTRACT AREA

GT.4.2, KT-GT.4.2# SUSP ENTIRE CONTRACT AREA

GT.4.2, KT-GT.4.2# ENDL ENTIRE CONTRACT AREA

KT-GT.3.1.5# LOP ENTIRE CONTRACT AREA

CLAUSE H.8 T ENTIRE CONTRACT AREA

CLAUSE H.17 BKB ENTIRE CONTRACT AREA

File details come from the government source that posted it. Updated .