Maps Drawings.pdf

PDF 2 MB Posted

Attached to
Westfall Water System
Solicitation number
AG-9A40-S-10-0050
Issued by

About this file

Attachment 2 Maps Drawings

View the file

Other files

File Type Posted
PAL Fire Plan.pdf PDF
SF_24 Bid Bond.pdf PDF
!Specifications.pdf PDF
Davis Bacon Wage Determination.pdf PDF
Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

W W

W

W

W

W

W

W

W

W

W W

WW W W

W

W W W

W

W

W

W

W

W

W

W

GARAGE

SHED

SHOP

OFFICE

BARRACKS

LA

U

N D

R Y

R O

O M

RESIDENCE

WATER

TANKS

P-1

P-2

P-3

P-11

P-10

P-5

P-14

P-7

P-18

P-8

P-9

P-17

P-15 P-16

P-12

P-13

P-4

P-6

J-1J-9

J-10

J-2

J-3 J-4

J-11

J-8J-15

J-7J-6

J-13 J-14

J-12 J-5

LAB OFFICE

W

W

GV

BV

ARV

GV

BV

BV

GVBV

BV

BV

BV

ARV

GV

W W

W

W

W

W

W

W

W

W

W

W

WW W W

W

W W W

W

W

W

W

W

W

W

W

GARAGE

SHED

SHOP

OFFICE

BARRACKS

LA

U

N D

R Y

R O

O M

RESIDENCE

WATER

TANKS

LAB OFFICE

W

W

GV

BV

ARV

GV

BV

BV

GVBV

BV

BV

BV

ARV

GV

NOTE:

A. The contractor's attention is directed to the existence of pipe and other underground improvements which may or may not be shown on the drawings. All reasonable precautions shall be taken to preserve and protect any such improvements. The contractor shall be responsible for contacting U.S.A. 48 hours before excavating to locate utilities.

B. The contractor shall be aware of the possible existence of underground utilities and improvements which may be in place but not shown on the drawings. If such are encountered the contractor shall notify the Contracting Officer immediately and take precautions to preserve and protect any such improvements until further instructions can be issued by the Contracting Officer.

C. Where existing utilities or improvements interfere with the work, they shall not be removed, relocated or otherwise disturbed unless authorized by the Contracting Officer.

D. All native backfill shall have no debris of rocks larger than 4 inches.

E. Bedding around all water line shall be sand or approved equal.

F. All water trenches and raceway installations shall also be inspected and approved by the

Contractor Officer involved prior to backfilling.

G. All water pipe shall be placed in the center of the trench.

H. All site water and retardant lines shall be installed sloping back to drain areas as indicated in the drawings.

File details come from the government source that posted it. Updated .