Maps Drawings.pdf
PDF 2 MB Posted
- Attached to
- Westfall Water System
- Solicitation number
- AG-9A40-S-10-0050
About this file
Attachment 2 Maps Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PAL Fire Plan.pdf | ||
| SF_24 Bid Bond.pdf | ||
| !Specifications.pdf | ||
| Davis Bacon Wage Determination.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
W W
W
W
W
W
W
W
W
W
W W
WW W W
W
W W W
W
W
W
W
W
W
W
W
GARAGE
SHED
SHOP
OFFICE
BARRACKS
LA
U
N D
R Y
R O
O M
RESIDENCE
WATER
TANKS
P-1
P-2
P-3
P-11
P-10
P-5
P-14
P-7
P-18
P-8
P-9
P-17
P-15 P-16
P-12
P-13
P-4
P-6
J-1J-9
J-10
J-2
J-3 J-4
J-11
J-8J-15
J-7J-6
J-13 J-14
J-12 J-5
LAB OFFICE
W
W
GV
BV
ARV
GV
BV
BV
GVBV
BV
BV
BV
ARV
GV
W W
W
W
W
W
W
W
W
W
W
W
WW W W
W
W W W
W
W
W
W
W
W
W
W
GARAGE
SHED
SHOP
OFFICE
BARRACKS
LA
U
N D
R Y
R O
O M
RESIDENCE
WATER
TANKS
LAB OFFICE
W
W
GV
BV
ARV
GV
BV
BV
GVBV
BV
BV
BV
ARV
GV
NOTE:
A. The contractor's attention is directed to the existence of pipe and other underground improvements which may or may not be shown on the drawings. All reasonable precautions shall be taken to preserve and protect any such improvements. The contractor shall be responsible for contacting U.S.A. 48 hours before excavating to locate utilities.
B. The contractor shall be aware of the possible existence of underground utilities and improvements which may be in place but not shown on the drawings. If such are encountered the contractor shall notify the Contracting Officer immediately and take precautions to preserve and protect any such improvements until further instructions can be issued by the Contracting Officer.
C. Where existing utilities or improvements interfere with the work, they shall not be removed, relocated or otherwise disturbed unless authorized by the Contracting Officer.
D. All native backfill shall have no debris of rocks larger than 4 inches.
E. Bedding around all water line shall be sand or approved equal.
F. All water trenches and raceway installations shall also be inspected and approved by the
Contractor Officer involved prior to backfilling.
G. All water pipe shall be placed in the center of the trench.
H. All site water and retardant lines shall be installed sloping back to drain areas as indicated in the drawings.
File details come from the government source that posted it. Updated .