SF-1420.pdf
Standard Form PDF 166 KB Posted
- Attached to
- SOUTHFORK CAMPGROUD RESTROOM REPLACEMENTS
- Solicitation number
- AG-9A14-S-09-0003
About this file
SF 1420
View the file
Other versions and copies of SF 1420
| File | Revision | Posted | Attached to |
|---|---|---|---|
| Attachment_3_-_SF_1420-17-2.doc | Revision not stated | USAID Economic Security Program in Georgia | |
| Attachment_4_-_SF_1420-17-2.doc | Revision not stated | USAIDs Agriculture Program in Georgia | |
| ATTACHMENT_J.6__EMPLOYEE_BIOGRAPHICAL_DATA_SHEET_(SF1420-17).pdf | Revision not stated | Integrated Malaria Program (IMaP) in Mozambique | |
| sf1420.pdf | Revision not stated | Provide Insectary Greenhouse | |
| SF 1420 Performance Evaluation.pdf | Revision not stated | RECOVERY Major renovations to the Western Regional Research Center (WRRC) in Albany, CA to address deferred maintenance of critical mechanical, electrical and plumbing systems and incidental repairs. |
Who attaches SF 1420
Other files
| File | Type | Posted |
|---|---|---|
| sf25_f.pdf | ||
| Sf25a.pdf | ||
| AG-9A14-S-09-0003.pdf | ||
| SF_DRAWING_SET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
(WHEN COMPLETED)
PERFORMANCE EVALUATION - CONSTRUCTION CONTRACTS
1. CONTRACT NUMBER
2. CONTRACTOR (Name, address and ZIP code) A. ADVERTISED
B. NEGOTIATED
FIRM
FIXED
PRICE
OTHER
(Specify)
4. COMPLEXITY OF WORK
CPFF
ROUTINE
5. DESCRIPTION AND LOCATION OF WORK
3. TYPE
OF
CONTRACT
(Check)
6. FISCAL
DATA
7. SIGNIFICANT
DATES
a.AMOUNT OF BASIC
CONTRACT
b.TOTAL AMOUNT OF
MODIFICATION
c.LIQUIDATED DAMAGES
ASSESSED
d.NET AMOUNT PAID
CONTRACTOR
a.DATE OF AWARD b.ORIGINAL CONTRACT
COMPLETION DATE
c.REVISED CONTRACT
COMPLETION DATE
d.DATE WORK ACCEPTED
8. TYPE AND EXTENT OF SUBCONTRACTING
PART II - PERFORMANCE EVALUATION OF CONTRACT (Check appropriate box)
9. PERFORMANCE ELEMENTS OUTSTANDING SATISFACTORY UNSATISFACTORY
a.QUALITY OF WORK b.TIMELY PERFORMANCE c.EFFECTIVENESS OF MANAGEMENT d.COMPLIANCE WITH LABOR STANDARDS e.COMPLIANCE WITH SAFETY STANDARDS
10. OVERALL EVALUATION
DIFFICULT
OUTSTANDING (Explain in Item 13, on reverse) SATISFACTORY
11. EVALUATED BY
a. ORGANIZATION (Type or print)
b. NAME AND TITLE (Type or print) c. SIGNATURE d. DATE
12. EVALUATION REVIEWED BY
a. ORGANIZATION (Type or print)
b. NAME AND TITLE (Type or print) c. SIGNATURE d. DATE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable FOR OFFICIAL USE ONLY
(When completed)
STANDARD FORM 1420 (10-83)
Prescribed by GSA FAR (48 CFR) 53.236-1(b)
UNSATISFACTORY (Explain in Item 14, on reverse)
FOR OFFICIAL USE ONLY
(When completed)
FOR OFFICIAL USE ONLY
(When completed)
13. REMARKS ON OUTSTANDING PERFORMANCE - AS INDICATED BY THE CONTRACTOR'S PERFORMANCE ON THIS CONTRACT. IF YOU CONSIDER THE
CONTRACTOR TO BE OUTSTANDING, SET FORTH FACTUAL DATA SUPPORTING THIS OBSERVATION. THESE DATA MUST BE IN SUFFICIENT DETAIL TO ASSIST
CONTRACTING OFFICERS IN SELECTING CONTRACTORS THAT HAVE DEMONSTRATED OUTSTANDING QUALITY OF WORK AND RELIABILITY. (Continue on separate sheet, if needed.)
14. EXPLANATION OF UNSATISFACTORY EVALUATION. FOR EACH UNSATISFACTORY ELEMENT, PROVIDE FACTS CONCERNING SPECIFIC EVENTS OR ACTIONS TO
JUSTIFY THE EVALUATION (e.g., extent of Government inspection required, rework required, subcontracting, cooperation of contractor, quality of workmen and adequacy of equipment). THESE DATA MUST BE IN SUFFICIENT DETAIL TO ASSIST CONTRACTING OFFICERS IN DETERMINING THE CONTRACTOR'S RESPONSIBILITY. (Continue on separate sheet, if needed.)
STANDARD FORM 1420 (10-83) BACK
| b: |
| CONTRACT_TYPE: Off |
| CONTRACT_NUMBER: |
| OTHER_NEGOTIATED: |
| BASIC_CONTRACT_AMT: |
| MODIFICATION_AMT: |
| LIQUID_DAMAGES_AMT: |
| CONTRACTOR_NET_AMT: 0 |
| AWARD_DATE: |
| ORIG_COMP_DATE: |
| REVISED_COMP_DATE: |
| WORK_DESC: |
| WORK_QUALITY: Off |
| b11: |
| b12: |
| b13: |
| TIMELY: Off |
| MANAGEMENT: Off |
| LABOR_STNDS: Off |
| SAFETY_STNDS: Off |
| OVERALL: Off |
| CONTRACTOR: |
| DATE_ACCEPTED: |
| EVALUATION_CIO: [ ] |
| EVALUATION_NAME_TITLE: |
| DATE_EVALUATED: |
| REVIEW_CIO: [ ] |
| REVIEW_NAME_TITLE: |
| DATE_REVIEWED: |
| OUTSTANDING_EXPLANATION: |
| UNSATISFACTORY_EXPLANATION: |
| Retrieve Data: |
| Reset Form: |
| Next Page: |
| Print: |
| Email Form: |
| Previous Page: |
| NEGOTIATED_CONTRACT: Off |
| COMPLEXITY: Off |
| Save Data: |
| SUBCONTRACTING: |
File details come from the government source that posted it. Updated .