Addendum Changes 5-4.docx
DOCX document 11 KB Posted
- Attached to
- Rainbow Pool Paving
- Solicitation number
- AG-97902-S-10-0343
About this file
AG-9702-S-10-0343 -- Addendum Changes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Est_Schedule 5-4 - Rainbow.xlsx | XLSX spreadsheet | |
| Specification 5-4.docx | DOCX document | |
| Rainbowpool_Plans 5-4.pdf | ||
| Amdt No. 02.pdf | ||
| Amdt No. 01 AG 9702-S-10-0343.docx | DOCX document | |
| AG 9702-S-10-0343 Rainbow Pool.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Changes
-Concrete Curb/Dike: “Asphalt Concrete Curb” changed to “7.5” Concrete Curb / Dike” in Schedule of Items. Pay Unit has been changed to Lump Sum.
-Curb Stop: 12” Curb Stop changed to 6” Curb Stop on Plans Sheet C1.1
-Landscape Area Spec 02542: Handicap Signs and Redwood Header Boards added to Landscape Area Specification
-Minor Hot Bitumious Concrete: “Minor Hot Bitumious Concrete” changed to “Minor Hot Asphalt Concrete” in Schedule of Items. Quantity changed from 80 Tons to 130 Tons.
-Feathered A.C.: Note changed from “2” A.C. Overlay” to “Feather to match existing pavement” in the Section A-A Detail of Sheet 4A of the Plans.
-Parallel Parking: A Parallel Parking Striping Detail has been added to sheet 3 of the Plans.
-Pavement Markings: Line Item No. 634(1) has had its Quantity changed from 500 LF to 550 LF.
-Culvert Cleaning: Added “Clean Culvert” Item 607(04) to Schedule of Items.