Attachment 1 Waterline specifications.docx
DOCX document 209 KB Posted
- Solicitation number
- AG-9702-S-10-0547
About this file
Attachment 1 Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0002.pdf | ||
| Amendment0001.pdf | ||
| AG-9702-S-10-0547 Pages 1-3.pdf | ||
| AG-9702-S-10-0547 Pages 4-38.pdf | ||
| Attachment 4 Offeror Certifications.doc | DOC document | |
| Attachment 2 DRAWINGS.pdf | ||
| Attachment 3 Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS TABLE OF CONTENTS
DIVISION 1—GENERAL
| 01010—SUMMARY OF WORK |
| 01100—ARRA SIGNAGE |
| 01340—SUBMITTALS |
| 01700—CLEANING OF EQUIPMENT |
| 01710—CLEANUP |
| 01900—MOBILIZATION |
DIVISION 2—SITE WORK
| 02110—CLEARING AND GRUBBING |
| 02111—DEMOLITION |
| 02114—UNDERGROUND BORING FOR UTILITY LINES |
| 02200—TEMPORARY ROAD CONSTRUCTION |
| 02220—EXCAVATION, TRENCHING, & BACKFILLING |
| 02230—COMPACTION CONTROL |
| 02505—AGGREGATE BASEROCK |
| 02510—ASPHALT CONCRETE PAVING |
DIVISION 9—FINISHES
09900--PAINTING
DIVISION 15—MECHANICAL
| 15220—WELL CONSTRUCTION |
| 15232—SUBMERSIBLE WATER WELL PUMP |
| 15250—WATER DISTRIBUTION SYSTEM |
| 15251—VALVES AND ENCLOSURES |
| 15252—WATER STORAGE TANKS |
| 15253—WATER STORAGE TANK CLEANING |
| 15254—DISINFECTION OF WATER DISTRIBUTION SYSTEM |
| 15255—HDPE POTABLE WATER PIPE |
| 15256—WELL HEAD ENCLOSURE |
DIVISION 16—ELECTRICAL
| 16010—GENERAL PROVISIONS ELECTRICAL |
| 16050—BASIC MATERIALS AND METHODS |
SECTION 01010 SUMMARY OF WORK
PART 1. GENERAL
1.01 SCOPE: This project includes but is not limited to the materials and labor associated with drilling 4 wells, constructing 3 pump houses and 1 wellhead box, installing 4 – 4” submersible well pumps, plumbing and electrical work to connect the wells to existing water systems, and the replacement of water distribution lines. The contract also includes the decommissioning of two existing wells at Lumberyard and the installation of generators.
1.02 STORAGE AREAS: Some of the project work will be performed within a high use recreation area. The Contractor shall confine his operations within the limits of the work. The Contractor will be required to restore these areas to their original conditions as outlined in Section 01710. Material storage and maintenance of equipment will be confined to the road, parking areas, clearing limits of the waterline or in areas agreed to in writing by the Contracting Officer.
1.03 TRAFFIC REQUIREMENTS:
A. Traffic Control:
Installation of the waterline across North South Road shall not delay traffic more than 15 minutes at a time. Traffic control shall be provided by the contractor and signs shall be MUTCD compliant.
1.04 CAMPGROUND CLOSURES: The campground areas and administrative site will NOT be closed to public use during construction. Construction work will need to be closely coordinated between the Contracting Officer, the Concessionaire and the Contractor. Trenches within the campgrounds will not be left open overnight. Work areas inside the campgrounds will be taped off with caution tape.
1.05 WATER SOURCE: Water may be drafted from approved locations.
1.06 MEASUREMENT AND PAYMENT: No separate payment will be made for work specified in this Section. Payment for such work shall be included in the contract unit price for other items of work.
PART 2. PRODUCTS
Not applicable.
PART 3. EXECUTION
3.01 TIMING OF CONSTRUCTION: Construction work shall commence as approved by the Contracting Officer.
END OF SECTION 01010
SECTION 01100 ARRA SIGNAGE
PART 1. GENERAL
1.01 SCOPE: To post American Recovery and Reinvestment Act signs while work is in progress at PiPi Campground, Capps Crossing Campground, and Hell Hole Station.
1.02 MEASUREMENT AND PAYMENT: Measurement is Lump Sum Quantity. Payment of the amount bid under Pay Item 01100 in the Schedule of Items will be made for satisfactory completion of work under this section. Such amount will be considered full compensation for all work and incidentals.
PART 2. PRODUCTS
2.01 MATERIAL USED: Signs may be made of wood or metal. Wood shall be 5/8” Plywood manufactured will all special waterproof glue. Metal signs must be 16 gauge sheet stock with embossed or vitrified finish. When embossed the details of the sign are raised from the background of the sign not less than .100” nor more than .125”.
2.02 Refer to drawings for sign sizing and content requirements.
| PART 3. | EXECUTION |
| 3.01 | SIGN PLACEMENT: With respect to placement of traffic control signs, regulatory, warning, and guide signs have a higher priority than the economic recovery signs. The Contracting Officer will approve sign locations. |
In no case shall these signs be placed such that it obscures road users' view of other traffic control devices.
Economic recovery signs should be placed where they can be easily identified with the corresponding projects.
If the placement of economic recovery signs conflicts with newly installed higher priority signs, or traffic signals, or temporary traffic control devices, or other priority devices, the economic recovery sign should be relocated.
Due to public safety concerns, economic recovery signs should not be allowed at the following locations:
· On the front, back, adjacent to or around any traffic control device, including traffic signs, signals, changeable message signs, traffic control device posts or structures, or bridge piers.
· At key decision points where a driver's attention is more appropriately focused on traffic control devices, roadway geometry, or traffic conditions. These locations include, but are not limited to exit and entrance ramps, intersections controlled by traffic signals or by stop or yield signs, highway-rail grade crossings, and areas of limited sight distance.
END OF SECTION 01100
SECTION 01340 SUBMITTALS
PART 1 GENERAL
1.01 SCOPE: This work consists of furnishing pertinent data and the submittal of technical information, including requests for substitutions. It describes the review time for submittals and substitutions.
1.02 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
3.01 SUBMITTALS: Provide Contracting Officer with three copies of each submittal. Provide catalog cuts, data or other pertinent information on all valving, piping, generators, pumps, solar panels, water storage tanks and all items specified which the Contractor is going to use.
3.02 APPROVALS: Approval of satisfactory submittals and substitutions will be made within 7 calendar days of receipt of the submittal.
3.03 RESUBMITTALS: When a resubmittal is required, one copy so indicating will be returned to the Contractor.
3.04 TIMING: The Contractor shall make submittals far enough in advance of the schedule dates of installation to provide time for reviews, securing necessary approvals, for possible revisions and resubmittals and for placing orders and securing delivery.
No portion of the work requiring an approved submittal shall be started nor shall any material be fabricated or installed prior to the approval of such item.
END OF SECTION 01340
SECTION 01700 – CLEANING OF EQUIPMENT
PART 1. GENERAL
1.01 SCOPE: Contractor shall prevent the spread of noxious weeds by cleaning all equipment.
1.02 MEASUREMENT AND PAYMENT: No separate payment will be made for work specified in this section. Compensation for this work will be considered included in the bid items.
PART 2. – PRODUCTS
N/A
PART 3. – EXECUTION
All off-road equipment will be cleaned to insure it is free of soil, seeds, vegetative matter or other debris before entering National Forest System lands to prevent the introduction or spread of noxious weeds. Equipment also shall be cleaned prior to moving from an infested project area to a weed-free area. Prior to the start of operations, the Forest Service will be given the opportunity to do a visual inspection for such debris.
Noxious weed species will be flagged with noxious weed flagging prior to project implementation and shall be avoided by contractor’s vehicles and equipment. Areas flagged for sensitive species habitat shall also be avoided.
END OF SECTION 01700
SECTION 01710 CLEANUP
PART 1. GENERAL
1.01 SCOPE: This section covers the disposal of material from clearing and grubbing, excavation, building construction, cleaning of any other operation in which waste is generated.
1.02 MEASUREMENT AND PAYMENT: No separate payment will be made for work specified in this section. Compensation for this work will be considered included in the bid items.
PART 2. PRODUCTS
Not applicable.
PART 3. EXECUTION
3.01 WORKMANSHIP
A. All debris and unusable material shall be removed from the site. All construction debris shall be disposed of off National Forest land in accordance with local regulations. The site shall be restored to as near its original condition as possible.
B. Burning of material will not be allowed.
C. Clearing and grubbing debris shall be disposed of in accordance with SECTION 02110 CLEARING AND GRUBBING.
D. Excess excavated material which cannot be used for construction of the project shall be loaded, transported to and disposed of as directed by the Contracting Officer.
E. All waste deposits from asphalt and aggregate truck washing shall be cleaned up and removed by the Contractor.
F. All stakes, lath and flagging used under the contract shall be removed and disposed of off National Forest Lands.
END OF SECTION 01710
SECTION 01900 MOBILIZATION
PART 1. GENERAL
1.01 SCOPE: The work consists of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site. This shall include cost of obtaining County Health Department well permits.
1.02 MEASUREMENT AND PAYMENT:
| A. | The accepted quantities will be paid for at the contract unit price for item 01900 |
| Mobilization. |
B. Progress payments will be made as follows:
1. The Government will pay to the Contractor in the first progress payment the total premium paid by the Contractor to obtain bonds. This payment shall not be in addition to the contract price and will be included in Item 01900 Mobilizaton.
2. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
3. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
4. Upon completion of all work on the project, any upaid amount for item 01505, Mobilization, will be paid.
| C. | The total of all payments will not exceed the original contract amount for item 01900 |
| Mobilization. |
PART 2 - PRODUCTS
Not Applicable
PART 3 - EXECUTION
Not Applicable
END SECTION 1900
SECTION 02110 CLEARING AND GRUBBING
PART 1. GENERAL
1.01 SCOPE: This section covers all clearing and grubbing necessary for the contract work in accordance with the plans and these specifications. Such work includes, but is not limited to the following:
A. Removal of duff, stumps, rocks, boulders, and debris. All trees, brush, and vegetation within the specified work area shall be removed. Locations of all disposal sites shall be agreed upon prior to their use.
B. Protection and trimming of existing adjacent trees.
C. All logs remain the property of the Forest Service.
1.02 RELATED SECTIONS: The following items of associated work are included in other sections of these specifications.
A. 01700 - CLEANUP
C. 02220 – EXCAVATION, TRENCHING & BACKFILLING
1.03 MEASUREMENT AND PAYMENT: No separate payment will be made for work specified in this Section. Payment for such work shall be included in the contract unit price for other items of work.
PART 2. PRODUCTS
2.01 Not applicable
PART 3. EXECUTION
3.01 WORKMANSHIP
A. Clearing:
1. Contractor shall remove all vegetation, debris, stumps, previously fallen trees, deadfall, rocks, boulders, organic matter, specified existing improvements, and otherwise objectionable material which is not suitable for use as fill.
B. Tree Felling:
1. Trees shall be felled into areas being cleared whenever possible. Tree felling shall be controlled to minimize damage to merchantable timber and remaining trees and vegetation. Felling shall be done with saws or shears.
2. Maximum stump height is 1/3 stump diameter, maximum 12.0 inches, except for occasional stumps of greater heights shall be acceptable when necessary for safe and efficient conduct of logging. Contractor shall re-cut high stumps so they will not exceed heights specified herein.
C. Grubbing: Grubbing shall consist of the removal of roots and stumps. The removal of roots larger than two inches in diameter, and not lower than 18 inches below original ground level, shall extend, except as otherwise noted, at least two feet beyond the proposed construction. Unless further excavation is required, depressions made by grubbing shall be filled and compacted to the density of the surrounding soil, such that the surface conforms to the contour of adjacent ground. Roots protruding from excavated slopes shall be cut flush with the slope surface.
D. Protection and Trimming of Trees to Remain:
1. All trees on the site and adjacent thereto shall be protected from injury. The natural top soil around the root systems shall also be protected and preserved.
2. Limbs or branches which are broken or damaged during the work shall be trimmed. Remaining trees with limbs or branches which reach into the grading limits shall be trimmed as specified herein. Limbs shall be trimmed as near flush with the trunk as practicable.
3. Where any trees are damaged, or where limbs are required to be trimmed or removed because of operations under this contract, the cutting or removal of limbs or branches shall be performed in accordance with good tree surgery practices. No additional compensation will be paid for the tree trimming. No trees shall be removed or pruned unless designated by the Contracting Officer.
4. Temporary buildings, structures, automobiles, and mechanical equipment shall not be parked or located within the drip line of any tree.
5. Solvents, oils and other materials which may be harmful to plant life shall be disposed of in containers and removed from the site. At the completion of the work, any contaminated soil shall be removed and replaced with topsoil at no additional expense to the Forest Service.
3.02 DISPOSAL OF CLEARING AND GRUBBING DEBRIS
A. Logging slash is vegetative debris larger than 1 inch in diameter outside bark and 3 feet long resulting from Contractor’s Operations. Logging slash includes conifer limbs, tops, grubbed stumps and brush. Contractor shall dispose of slash as follows:
Option 1: chipped and spread to a maximum depth of 4 inches adjacent to constructed areas or as directed by the Contracting Officer.
OR
Option 2: haul to disposal site within 1 mile from project site where it will be piled by the contractor for disposal by Forest Service. Slash piles shall not contain soil.
B. Duff and overburden removed during the clearing and grubbing operations shall be spread to a maximum depth of 4 inches adjacent to constructed areas or as directed by the Contracting Officer.
C. All non-natural debris such as pavement, trash, scrap lumber, metal containers, glass, scrap metal, etc., shall be removed by the Contractor to an approved disposal site off of Government land. This shall include non-natural debris placed at the campgrounds by others either prior to or after the start of construction.
END OF SECTION 02110
SECTION 02111 DEMOLITION
PART 1. GENERAL
1.01 SCOPE: The work includes demolition and removal of 3 plastic water storage tanks at Capps Crossing, PiPi and Kirkwood. Contractor is also responsible for disposing of waterline encountered during excavation.
1.02 RELATED SECTIONS:
01700 - CLEANUP
02210 - EARTHWORK
02230 - COMPACTION CONTROL
1.03 MEASUREMENT AND PAYMENT: No separate payment will be made for work specified in this section. Compensation for this work will be considered included in bid items 15250 Water distribution system and 15252 Water storage tanks.
PART 2. EXECUTION
2.01 Demolition and Disposal:
A. Remove and dispose of three plastic below ground water storage tanks, 1200 gallons or less in size, off Forest Service land. One tank will be removed from each of the following locations: PiPi, Kirkwood, and Capps Crossing
B. Remove and dispose of old waterline encountered during excavation, off Forest Service Land.
2.02 Site Restoration: Resulting excavation (trenches, pits or disturbed areas) shall be backfilled and compacted to surrounding soil density. Areas shall be graded to blend with existing surrounding topography.
END OF SECTION 02111
SECTION 02114 - UNDERGROUND BORING FOR UTILITY LINES
GENERAL
SUMMARY
This Section includes installation of pipe or casing underground by tunneling, jacking or boring methods.
Related Sections include the following:
Section 15250—WATERLINES & APPURTENANCES Section 02220—EXCAVATION, TRENCHING & BACKFILLING
COORDINATION
Selection of the exact procedure to be used and equipment to be used is subject to the approval of the Contracting Officer and the State Highway Department or other owner of the road.
The Contractor is responsible for obtaining all necessary permits from entities having jurisdiction.
QUALITY
It is not the intent of this specification to limit or restrict initiative in developing tunneling and jacking procedures, but it is intended to describe generally acceptable procedures.
SUBMITTALS
If an alternative method is proposed by the Contractor, submit detailed description of the procedure to the Contracting Officer as described in Part 2 “Products.”
MEASUREMENT AND PAYMENT: Payment will be lump sum for this section and includes the utility pipes and pipe sleeve. The pipe sleeve shall extend a minimum of 10 feet beyond the edge of pavement. Bore and receiving pits shall be no larger than required by drilling equipment and shall not be closer than 10 feet from the edge of the pavement. Backfill of the pits shall conform to the requirements of section 02220 and 02230.
The horizontal bore hole will span the width of Highway 88 as shown on drawings.
PRODUCTS
PIPE, SLEEVE OR CASING
12” galvanized steel pipe. Pipe material must be approved by CALTRANS.
END SEALS
Design: With ASTM C443 compliant gaskets.
Model: Link-Seal, as manufactured by Pipeline Seal & Insulator, Inc. or an approved equal.
EXECUTION
GENERAL
The pipe to be placed by tunneling and jacking or boring procedures may be used as a casing or transmission pipe, as shown on the Drawings. Gravity flow pipelines shall be installed to the proper grade. Pressure pipelines may vary slightly from line and grade, as approved in writing by the Contracting Officer. When casing pipe is used, it will be advanced from a prepared jacking pit at one end of the penetration, by tunneling and jacking methods.
ACCEPTABLE METHODS
Four methods are recognized as acceptable, but others will be considered upon written submission to the Contracting Officer.
Method 1: A tunnel shall be excavated or bored in advance of the pipe or casing, and the pipe or casing shall be forced into the excavated tunnel by means of jacks or other devices from a pit.
Method 2: A tunnel shall be excavated by use of an auger or other drilling equipment. The auger or drilling equipment shall then be withdrawn and the pipe or casing of the proper strength and size jacked into the augered hole.
Method 3: The casing pipe may be jacked forward into undisturbed soil, if possible, with soil inside the pipe, then the soil removed by augering.
Method 4: A sectional steel rod may be jacked from the jacking pit through undisturbed soil. The pointed driving head on the steel rod shall then be replaced by an expanded coupling. The pipe or casing is then attached to the expanded coupling and the steel rod is retracted through the penetrated material, pulling the pipe or casing into place.
Should the Contractor decide to use some procedure which is entirely different from the described procedures, he shall submit a detailed description of procedures, equipment, and materials to be used. Any alternative procedure must be approved by the Contracting Officer before start of jacking, tunneling or boring operations.
PIT
A pit large enough to accommodate at least one length of pipe, all necessary equipment, and adequate space for workers shall be provided. The butt mat, framing, and bracing shall be strong enough to resist all anticipated loads and maintain walls of the pit. Said timbers or other guides capable of supporting pipe loads while maintaining grade and alignment shall be provided.
The pit shall be kept dewatered at all times.
PROCEDURES AND PRECAUTIONS
Once jacking of pipe has begun, a continuous operation may be necessary in order to prevent pipe from freezing in place. Preparations for continuous operation must be made. Adequate lighting shall be provided for a 24-hour-a-day operation.
The tunnel shall be excavated to a section not more than one inch (1") larger than the outside surface of the pipe on the sides and top and to grade, or a little above grade at the bottom surface of the pipe. Excavation shall proceed no further ahead of pipe than is consistent with safety and maintenance of stable tunnel section.
If the tunneling and jacking operations disturb or damage the street or highway surface above the pipeline, the damage shall be immediately repaired to the satisfaction of the Contracting Officer and the State Highway Department or other owner.
Line and grade shall be accurately maintained by the Contractor and will be checked periodically by the Contracting Officer.
Total variation from established grade shall not exceed .05 feet per ten (10) feet of length, and total variation from established alignment shall not exceed .10 feet per ten (10) feet of length. Grade and alignment shall be checked frequently during operations, and attempts to correct accumulating errors during construction shall be made, even though total variation may be within allowable tolerances.
SAFETY, SHORING, AND PROTECTION
Follow OSHA Standards.
All supports shall be removed after construction is completed and shall be withdrawn in a manner that will prevent the caving of the sides of the excavation. All openings in the ground, caused by the removal of supports, shall be filled with suitable material and properly compacted.
END SEALS
If electrical conduit and/or pipe to convey a liquid is installed inside a sleeve or casing, the annular space between the sleeve or casing and the installed conduit or pipe shall be plugged with an end seal to provide a positive seal against a hydrostatic head and prevent soil from entering the space.
CLEANUP AND BACKFILL
When tunneling and jacking have been completed, all bracing, shoring, and other timber shall be removed from the pit. The pit shall be filled in and graded to near original grade. Final grading will be approved by the Contracting Officer. Debris and excess material shall be removed from the site.
REVISION HISTORY:
PRIMARY AUTHOR: D. Wewer Created primarily from old FS CSI Section 02202 “Tunneling and Jacking Methods.”
6/2/2005: D. Wewer – Fixed “Wills” and “Shalls” per Jo Lippire’s suggestions. Still need to more thoroughly review.
10/26/05: D. Wewer – Updated End Seal product info and installation.
3/21/2006: D. Wewer - Updated Section to new numbering system.
7/19/2006: D. Wewer – Cleaned things up a bit and moved to R4 Standards. Could be researched better, but should work as is for now.
END OF SECTION 02114
SECTION 02200 TEMPORARY ROAD CONSTRUCTION
PART 1 - GENERAL
1.01 SCOPE: To construct a temporary road for equipment to access the Capps Crossing Well site.
| 1.02 | RELATED SECTIONS: |
| 15220—WELL CONSTRUCTION |
1.03 MEASUREMENT AND PAYMENT: Payment will be lump sum for this section.
PART 2 - PRODUCTS
Not Applicable
PART 3 – EXECUTION
3.01 Road construction: Construct road to allow equipment to access the well site next to the existing spring. Road width may not exceed 14 feet. Road shall have a three percent grade and be outsloped. During construction set cleared vegetation to the side to be reused during restoration
3.02 Site restoration: After the project has been completed at the well site install three non-driveable waterbars along temporary road bed, one fifty feet from building, one in the middle and one at the beginning of the road. Refer to drawings for non-driveable waterbar specifications. Scatter the previously removed vegetation across the road.
END SECTION 02200
SECTION 02220 EXCAVATION, TRENCHING, AND BACKFILLING
PART 1. GENERAL
1.01 SCOPE: This section covers the excavation, trenching, fill, and backfilling required for the completion of this contract.
1.02 RELATED SECTIONS: The following items of associated work are included in other sections of these specifications.
A. 01700 - CLEANUP
B. 02110 - CLEARING AND GRUBBING
C. 02111 - DEMOLITION
E. 02230 - COMPACTION CONTROL
K. 15251 – WATERLINES & APPURTENANCES
1.03 MEASUREMENT AND PAYMENT: No separate payment will be made for work specified in this section. Compensation for this work will be considered included in the bid items.
PART 2. MATERIALS
2.01 BACKFILL MATERIALS are classified as follows:
A. Native Backfill Material: Excavated native material with all organic and four inch and larger material removed.
B. Select Backfill Material: Excavated native material with all organic and larger than 1 inch material removed.
C. Sand
2.02 SUBGRADE: Suitable material for trench excavations and water tank excavations shall consist of material less than four inches in greatest dimension which is free of cinders, debris, roots, wood and other organic material.
2.03 GROUND PREPARATION: Ground on which the material is to be placed shall be firm, dry, unfrozen and cleared of all debris, organic and deleterious matter.
PART 3. EXECUTION
| 3.01 | SITE PREPARATION: | |
| A. | Strip top six inches of soil and remove grass, roots and debris. |
B. Examine the areas and conditions under which work will be performed. Correct conditions detrimental to timely and proper completion of the work. Do not proceed until unsatisfactory conditions are corrected.
3.02 UTILITIES
A. Verify location and depth of all existing utilities. Unless shown to be removed, protect active utility lines AS SHOWN ON THE DRAWINGS or otherwise made known to the Contractor prior to excavating. If damaged, repair or replace at no additional cost to the Government.
B. If active utility lines are encountered, and are not shown on the drawings or otherwise made known to the Contractor, promptly take necessary steps to assure that service is not interrupted.
C. If service is interrupted as a result of work under this section, immediately restore service by repairing the damaged utility at no additional cost to the Government.
D. If existing utilities are found to interfere with the permanent facilities being constructed under this section, immediately notify the Contracting Officer and secure further Instructions. Do not proceed with permanent relocation of utilities until written instructions are received from the Contracting Officer.
3.03 PROCEDURES:
| A. | Protection of persons and property: |
| 1. | Barricade open holes and depressions occurring as part of the Work, and post warning lights on property adjacent to or with public access. |
2. Protect structures, utilities, sidewalks, pavements and other facilities from damage caused by settlement, lateral movement, washout, and other hazards created by operations under this Section.
3. Safety shall be the responsibility of the Contractor at all times.
3.01 EXCAVATION
A. General: Excavations shall be to the depth SHOWN ON THE DRAWINGS or staked in the field. Material shall be placed a sufficient distance from the excavation to avoid overloading and to prevent slides or cave-ins. Excess excavated material may be utilized in other work areas, provided it is suitable material. Sheeting and shoring shall be used as necessary for the protection of the work and for the safety of personnel.
B. Drainage Excavation: Drainage ditches shall follow existing slopes. Drainage ditches leading away from structures and pavement edges shall be graded, extended and sloped as necessary to provide positive drainage (i.e. to "daylight").
C. Blasting: All rock excavations that require blasting shall be performed using controlled blasting techniques. Controlled blasting is defined as the controlled use of explosives and blasting accessories in appropriately aligned and spaced drill holes for the purpose of producing a free surface or shear plane in the rock excavation slopes and of minimizing landscape damage, over excavation and disturbance to adjacent ground.
3.02 BACKFILL
A. Backfill for Trenches: Select bedding material shall be placed around pipes in the lower portion of trenches as SHOWN ON THE DRAWINGS. In trenches with multiple pipes there should be minimum spacing between pipes of 2 inches. Native backfill bedding material shall be placed in six inch lifts and uniformly compacted to 95% of maximum density. Do not use power driven compactors directly above the pipe until a minimum of 6 inches of the bedding material covers the pipe. Any damage to pipes shall be repaired by the Contractor at no additional cost to the Government. Backfill in the upper portion of trenches above the select bedding material shall consist of native backfill material free from stones and clods larger than four inches with all organic material removed and shall be placed in six inch lifts with each lift uniformly compacted to 95% of maximum density as determined in accordance with SECTION 02230 COMPACTION CONTROL. Compaction of trench backfill material shall be accomplished using power driven hand-held compactors. Hand compaction tools shall be used in areas not accessible to power driven compactors.
B. Backfill for Water Storage Tanks: Follow Tank Manufacturer’s recommendations for bedding and backfill and compaction requirements. Water storage tanks shall be completely buried. If solid rock is encountered mounding of soil over the tank will be allowed as long as half of the tank is buried below existing grade.
3.03 EXCESS MATERIAL AND DEBRIS: Excess material from excavation that is suitable for use shall be disposed in accordance with SECTION 01710 CLEANUP.
3.04 DEWATERING: When water is encountered, the Contractor shall furnish, install, maintain, and operate all necessary machinery, appliances and equipment to keep excavations free from water until the placing of the bedding material, laying and jointing of the pipe, and pouring of concrete has been completed, inspected and approved, and all danger of flotation and other damages are removed.
3.05 TESTING: The Contracting Officer may, during the progress of the work, make density tests of compacted material in accordance with ASSHTO T-238, T-239, or other approved field density tests. If, by such tests, the Contracting Officer determines that the specified density and moisture conditions have not been attained, the Contractor shall perform additional work as may be necessary to attain the specified conditions.
END OF SECTION 02220
SECTION 02230 COMPACTION CONTROL
PART 1. GENERAL
1.01 SCOPE: The work to be performed under this section shall include the furnishing of all labor, equipment, materials and other items necessary to fulfill the compaction requirements as specified herein.
1.02 RELATED SECTIONS: The following items of associated work are included in other sections of these specifications.
A. 02220 - EXCAVATION, TRENCHING, AND BACKFILLING.
B. 02510 – ASPHALT CONCRETE PAVING
1.03 MEASUREMENT AND PAYMENT: No separate payment shall be made for work specified in this section. Compensation for this work will be considered incidental to other Bid Items.
PART 2. PRODUCTS
2.01 Fill and backfill material shall be approved material as specified, free of debris, roots, organic or frozen matter and shall be suitable for compaction to the specified density.
2.02 Ground on which the material is to be placed shall be firm, dry, unfrozen and cleared of all debris, organic and deleterious matter.
2.03 Water shall be applied in a uniform and controlled manner to facilitate compaction.
PART 3. EXECUTION
3.01 The Contractor shall provide compaction equipment capable of attaining the specified material compaction density requirements.
3.02 Fill and backfill material layers shall not exceed the specified thickness prior to compaction. Each fill and backfill layer shall be uniformly and completely compacted until a uniform density of not less than 95% of maximum is attained prior to placement of the next successive layer.
PART 4. TESTING
The Contracting Officer may during the progress of the work make density tests of compacted material in accordance with AASHTO T-238, T-239, or other approved field density tests. If, by such tests, the Contracting Officer determines that the specified density and moisture conditions have not been attained, the Contractor shall perform additional work as necessary to attain the specified conditions.
END OF SECTION 02230
SECTION 02505 AGGREGATE BASE ROCK
PART 1. GENERAL
1.01 SCOPE
A. This work shall consist of loading, hauling, and placing aggregate base as SHOWN ON THE DRAWINGS and in accordance with these specifications.
B. Aggregate base shall be placed to a compacted thickness of three (3) inches minimum, or as SHOWN ON THE DRAWINGS, on all areas requiring aggregate base.
1.02 RELATED SECTIONS: The following items of associated work are included in other sections of these specifications.
A. 02230 - Compaction Control
B. 02510 - Asphalt Concrete Paving
1.03 MEASUREMENT AND PAYMENT
A. Measurement: The quantity for payment for Aggregate Base will be by the C.Y.
B. Payment of the unit amount bid under Pay Item 02505 in the Schedule of Items will be made for satisfactory placement of aggregate base rock used to patch pavement disturbed from excavating across North South Road and the paved road within PiPi Campground. Such amounts will constitute full compensation for all work and incidentals.
PART 2. PRODUCTS
2.01 SOURCE: Aggregate base material will be supplied by a commercial source. The Contractor shall furnish all aggregate base material and load, transport, and place the material in accordance with these specifications.
2.02 GRADATION: The aggregate base shall conform to the requirements of class 2, 3/4 inch maximum gradation as specified in the State of California, Caltrans, Standard Specification, Section 26.
PART 3. EXECUTION
3.01 PREPARATION OF SUBGRADE: Prior to placing aggregate base, the sub-grade shall be shaped to the original grades and cross-sections prior to ground disturbance and shall meet compaction requirements of SECTION 02230 COMPACTION CONTROL. The sub-grade shall be approved in writing by the Contracting Officer before placing aggregate base.
3.02 PLACEMENT
A. The aggregate shall be spread in a uniform layer, with no segregation of size, and to a loose depth that shall have the required thickness when compacted.
B. If the required compacted depth of any aggregate base course exceeds six inches, it shall be placed and compacted in two or more layers of approximately equal thickness.
C. Hauling equipment shall be operated over the surface of the previously constructed layer in a dispersed manner to minimize rutting or uneven compaction. The finished surface shall be protected from unnecessary traffic and watered to prevent degradation until the asphalt concrete or the other specified paving course is placed. In the case of aggregate base surface courses not to receive paving, the aggregate base shall be protected until all work under the contract is complete and accepted, a final re-grading and re-compaction using water may be required.
D. All areas shall be graded and compacted to drain freely. No flat area or depressions will be allowed. Water shall be applied to facilitate compaction, to control dust and to maintain the integrity and prevent deterioration of the compacted aggregate base surface.
3.03 Compaction shall meet the requirements of SECTION 02230 COMPACTION CONTROL.
3.04 Compaction Equipment shall meet the requirements of SECTION 02230 COMPACTION CONTROL.
END OF SECTION 02505
SECTION 02510 ASPHALT CONCRETE PAVING
PART 1. GENERAL
1.01 SCOPE: Provide all labor, materials, equipment, and services necessary for and incidental to constructing one or more courses of dense graded cold bituminous plant mix on a prepared base as specified herein. Surfaces to be constructed upon shall be approved, in writing, by the Contracting Officer prior to placing plant mix.
1.02 RELATED SECTIONS: The following items of associated work are included in other sections of these specifications.
A. 02230 - COMPACTION CONTROL
B. 02505 - AGGREGATE BASE ROCK
1.03 SUBMITTALS
A. Submit product data under provisions of Section 01340 Submittals.
B. Certification: The Contractor shall provide a certificate showing place of purchase.
1.04 ENVIRONMENTAL REQUIREMENTS
A. The bituminous mixture shall not be placed when weather conditions prevent the proper handling or finishing of the mixture, when the base course is frozen, or when the average temperatures of the underlying surface upon which the bituminous mixture is to be placed is less than that specified in the following paragraph.
B. Do not place asphalt concrete when base surface temperature is less than 50 degrees F.
C. Placing during rain, snow, or other adverse weather conditions or when foundation contains standing water or flowing water, will not be permitted.
1.05 MEASUREMENT AND PAYMENT: Measurement for payment for asphalt concrete paving will be by the Ton of installed material. Certified weight tickets shall be provided to the Contracting Officer upon delivery of each load of material. Payment of the unit amount bid under Pay Item 02510 of the Schedule of Items will be made for satisfactory completion of work under this section. Such amounts will constitute full compensation for all work, materials, and incidentals.
PART 2. PRODUCTS
2.01 MATERIALS
A. Asphalt Paving Material Type 1: Material shall be a “cold mix” that conforms to current products being furnished to Caltrans, a county Public Works Agency or a City Public Works Department.
B. Tack Coat: Material shall be SS-1 or equal.
PART 3. EXECUTION
3.01 PREPARATION
A. Immediately before placing the bituminous mixture, the existing surface shall be cleaned of loose or deleterious material. Tack coat shall be applied to all contact surfaces and edges.
3.02 PLACING EQUIPMENT REQUIREMENTS
A. Trucks used for hauling bituminous mixtures shall have tight, clean, smooth metal beds that have been thinly coated with a material to prevent the mixture from adhering to the beds. Truck beds shall be drained prior to loading.
B. Compaction equipment shall meet the requirements of SECTION 02230 COMPACTION CONTROL.
3.03 PLACING ASPHALT PAVEMENT
A. Place and spread the bituminous mixture using motor grader or by hand.
B. Compact pavement by rolling. Do not displace or extrude pavement from position. Hand compact in areas inaccessible to rolling equipment.
C. Develop rolling with consecutive passes to achieve even and smooth finish, without roller marks.
D. Haul, spread, compact and finish the bituminous paving mixture in accordance with the following requirements:
1. The mixture shall be transported from the mixing plant to the point of use in vehicles meeting the requirements of Subsection 3.02.
2. The mixture shall be spread and struck off to the grade and elevation established. The asphalt concrete shall have the original compacted thickness.
3. On areas where irregularities or unavoidable obstacles make the use of mechanical spreading and finishing equipment impracticable, the mixture may be placed and finished by hand tools.
4. All surfaces shall drain freely. No flat areas or depressions will be allowed.
5. Compaction shall be performed with vibratory or non-vibratory steel-wheel rollers.
6. Rolling shall begin at the sides and proceed longitudinally parallel to the road centerline, each trip overlapping six inches or two times the pavement depth, whichever is greater, gradually progressing to the center. On super elevated curves, the rolling shall begin at the low side and progress to the high side.
7. Along forms, curbs, headers, walls and other places not accessible to the rollers, the mixture shall be thoroughly compacted with mechanical tampers.
8. Material trimmed from the edges and any other discarded bituminous mixture shall be removed as stated in Section 01700 CLEANUP.
3.04 PROTECTION: Immediately after placement, protect pavement from mechanical injury until final completion of all work under the Contract and Final Acceptance.
3.05 QUALITY ASSURANCE AND TESTING
A. Acceptance testing of the compacted bituminous mixture for surface and thickness tolerance will be as follows:
1. Surface - Acceptance testing will be performed on the top surface. The surface will be tested by the Contracting Officer with a 10 foot straightedge. The variation of the surface from the testing edge of the straightedge shall not deviate at any point more than 1/8 inch.
2. Thickness - The total compacted thickness of the mixture shall not vary more than 1/4 inch less than or 1/2 inch greater than the specified thickness. The compacted thickness shall not be consistently below nor consistently above the specified thickness.
B. The Contracting Officer reserves the right to test areas that appear defective and require immediate correction.
C. Acceptance of bituminous material will be based upon certificates and samples provided in accordance with Paragraph 1.03 above, the job mix-formula, and Section 01340 Submittals.
END OF SECTION 02510
09900 - PAINTING
PAINTING
PART 1. GENERAL
1.01 SCOPE: This work consists of furnishing and applying paints, stains and protective finishings in accordance with the plans and these specifications.
1.02 RELATED SECTIONS: The following items of associated work are included in other sections of these specifications:
Refer to Pumphouse Drawings
1.03 DEFINITIONS
A. "Paint" and "Protective Coating" shall include primers, enamels, paints, stains, sealers, catalysts, thinners, and other organic or inorganic paint products.
1.04 MEASUREMENT AND PAYMENT: No separate payment will be made for work specified in this section. Payment for such work will be included in the contract unit price for the pumphouses.
PART 2. MATERIALS
2.01 PAINTS AND STAINS: Unless shown otherwise on the plans, paints and stains shall be as follows:
A. Pumphouse siding: Benjamin Moore Butternut Exterior Stain or equal.
B. Pumphouse trim: Benjamin Moore Chocolate Exterior Stain or equal.
C. Metal roof: Weathered copper or equal.
2.02 SAMPLES: Contractor shall submit product samples as requested. Colored finishes shall not be applied until colors are approved by the Contracting Officer.
PART 3. EXECUTION
Paints and stains shall be applied in accordance with the manufacturer's instructions. The Contractor shall provide a copy of the manufacturer's application instructions to the Contracting Officer.
3.01 PREPARATION OF SURFACES: Surfaces to be painted shall be clean and free of dirt, dust, rust, scale, or any other substance which may interfere with the adhesion of the specified coating. Metal surfaces shall be stripped clean of oil and grease.
3.02 APPLICATION: Finished surfaces shall be free from runs, drops, ridges, waves, laps, brush marks and other blemishes. Welds shall receive special attention to assure their receiving a coating of the required thickness. Cloth, cotton wastes, or other materials which constitute a fire hazard shall be placed in closed metal containers or be destroyed at the end of each days work.
Special care shall be taken not to damage or spatter adjacent work. Should adjacent work be damaged spattered, it shall be cleaned and the original finish restored.
3.03 ENVIRONMENTAL CONDITIONS: Surfaces shall be painted only when they are free from moisture. No painting on exterior surfaces shall be done with less than 72 hours of actual drying weather after a rain, nor during periods of dew or fog. Receiving surfaces shall be properly dried out before proceeding with the work. No painting shall be done when temerature is below 45 degrees F., except when specifically directed otherwise in writing by the Contracting Officer.
END OF SECTION 09900
SECTION 15220 - WELL CONSTRUCTION
PART 1. GENERAL
1.01 SCOPE - The work consists of all labor, equipment, and materials necessary for the drilling, casing, gravel packing, grouting, and developing of four water wells and the decommissioning of three.
1.02 RELATED SECTIONS:
02200—TEMPORARY ROAD CONSTRUCTION
1.03 LICENSES AND PERMITS – The Contractor must hold a valid California C57 license. All work must be performed under the direct supervision of an experienced well driller. The contractor is responsible for following all Federal, State, and County laws, rules, and regulations pertaining to the performance of the work. The Contractor is responsible for obtaining permits from the county. Contractor must give the County Environmental Health Department 48 hours advance notice before installing the well seal.
1.04 LOCATION OF WORK - The exact locations of the wells will be staked by the Forest Service. The well driller is expected to drill in areas of uneven terrain a maximum of 150 feet off the road with a maximum slope of 30%. Access to the site is the responsibility of the contractor.
1.05 CODES AND STANDARDS – Contractor shall comply with:
California Department of Water Resources Bulletin 74-81 Water Well Standards: State of California and supplemental Bulletin 74-90 California Well Standards.
California Title 22 Code of Regulations Chapters 15 & 16
1.06 MEASUREMENT AND PAYMENT –
1. Pay Item 15220-1 Water Well Drilling (linear feet). The quantity of well drilling to be measured will be the number of linear feet of drilling. Installation of temporary conductor casing is included in this item.
2. Pay Item No. 15220-2 Casing (linear feet). The quantity of casing to be measured will be the number of linear feet of well casing and perforated well casing installed.
3. Pay Item No. 15220-3 Stainless steel screen (linear feet). The quantity of casing will be measured by the number of linear feet of slotted casing installed.
4. Pay Item No. 15220-4 Sanitary Seal (each). The sanitary seal will be measured as one for each well.
5. Pay Item No. 15220-5 Develop and Disinfect (each). The developing and disinfection of the well will be measured as one for each well for a complete job in accordance with these specifications.
6. Pay Item No. 15220-6 Test for Yield and Drawdown (each). The testing for yield and drawdown of the well will be measured as one for each well for a complete job in accordance with these specifications and standard methods.
7. Pay Item No. 15220-7 Well Abandonment (lump sum). The decommissioning of the two wells will be paid in lump sum upon satisfactory completion according to county and state guidelines. This line item includes the cost of obtaining well abandonment permits from the County.
8. Pay Item No. 15220-8 Gravel Pack (linear feet). (Optional bid item) The quantity of gravel pack to be measured shall be the number of linear feet of gravel pack placed in the well.
9. Pay Item No. 15220-9 Conductor Casing (linear feet). (Optional bid item) If conductor casing is needed during drilling and it becomes necessary for it to remain permanently in place the contractor will be paid for each foot of casing.
PART 2. PRODUCTS
2.01 CASING
A. WELL CASING – Casing material shall be new 6” Low-Carbon Steel. The casing shall conform to ASTM Designation A53/A53B, or API Standard Specification 5CT or 5L. All casing shall be subjected to the approval of the Contracting Officer Representative. The well shall be entirely cased and the casing shall extend to the bottom of the hole with a cap on the bottom end.
B. WELL SCREEN –
1. Construction.
a. Continuous slot type with closed, bail bottom.
2. Material.
a. Screen shall be constructed of one of the following.
1) Stainless Steel – ASTM A240 Type 304.
2) Stainless Steel – ASTM A240 Type 304 L.
3) Stainless Steel – ASTM A240 Type 316.
3. Diameter.
a. Equal to casing diameter.
4. Slot Size and Length.
a. Manufacturer’s standard; slot size to be recommended by driller and approved by COR
C. STEEL CONDUCTOR CASING - The conductor casing shall be a new, single wall, steel water well casing with a minimum thickness of a quarter (1/4) inch and fabricated from high-tensile strength, corrosion-resistant steel with the minimum material properties set forth in ASTM A53. If the casing is to remain in place the casing and sanitary seal will start at a point at least 50 feet below the original ground surface and will extend to a minimum of 24 inches above the ground surface.
2.02 WATER - Contractor shall be responsible for providing an adequate supply of potable water for all drilling activities.
2.04 GROUT – The grout shall be Class A concrete or neat cement. Class A concrete includes Portland Cement (ASTM designation C-150 Type I or II) mixed with not more than five (5) gallons of potable water per bag (94 lbs) of cement. Each cubic yard of concrete shall contain at least six (6) sacks of Portland Cement. The mixing water shall be potable. Aggregates shall be suitable for use in concrete with 100% passing a ¾ -inch screen. Neat cement shall include one sack of Portland cement (94lbs) to between 4-½ to 6-½ (depending on cement type and additives used) gallons of potable water per sack of cement.
2.05 GRAVEL PACK – The gravel pack shall consist of clean, durable, well-rounded grains that are smooth and uniform. The gravel pack shall have a thickness of two inches. The Contractor shall recommend the grading on the basis of formation samples, for the COR’s approval.
PART 3. EXECUTION
3.01 WELL DRILLING – The Contractor shall drill the wells at the locations designated by the Contracting Officer Representative. The Contractor shall drill the well and install the materials previously described so that the finished well conforms to the general design as outlined by these specifications.
The Contractor shall contain all drilling fluids and cuttings in portable sumps supplied by the Contractor, when drilling muds or other drilling additives are used. Contractor shall be responsible for cleaning up drilling fluids, which are not contained in the sump.
The Contracting Officer Representative shall review and approve the method of disposal of water discharged during well drilling and completion.