AG-9702-S-10-0532_SOW 7-2-2010.doc
DOC document 26 KB Posted
- Solicitation number
- AG-9702-S-10-0532
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-9702-S-10-0532 Wage Determination.pdf | ||
| AG-9702-S-10-0532_Combined Synopsis Solicitation--30 Jun 10.doc | DOC document | |
| AG-9702-S-10-0532_Present_Past Perf Org Exp Questionnaire--30 Jun 10.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Forest Service
Solicitation No. AG-9702-S-10-0532
Statement of Work
July, 2010
A description of the supplies or services required to meet the agency’s needs (including the estimated 120 loads of packing support for packer mount per day, pack animal per day and your move in an out day.)
Pack support serviced are required to support a backcountry trail crews from the California Conservation Corps (CCC) performing trail work in a remote section of the San Rafael Wilderness on the Santa Lucia Ranger District. The base camp is 7.5 miles from the Sweetwater Trailhead.
Mules and packers are required to effectively support these large crews with heavy loads of food, trail tools, and camp materials. The packers and stock are planned for packing the camp in at the start of the trail work with 30 loads going in at the beginning of job. The Forest Service will have the items to be transported to the base camp at the trailhead. The contractor will be responsible to assemble items to be transported into “packs, manties or cargo loads.
Weekly re-supply of food 10 loads going in and back hauling the same day, weekly removal of trash and empty coolers(for use on the next re-supply), At the end of job 30 loads removing the base camp from South Fork camp.
The packer will be required to mobilize within 48 hours of notice.
There are no stock holding pens, water and grazing facilities at the trailhead.
The following trail work to be completed by using acquisition of services requisition for a two year period by the trail manager setting work order priorities base on currant road and weather conditions all dates are approximation.
With a starting date of April 1, 2011. Ending date of December 31, 2012 Please contact Wilderness & Trails Manager Joe Duran for any addition questions.
Santa Lucia Ranger District
1616 Carlotti Drive, Santa Maria
CA 93454
O 805-925-9539 ext. 220
File details come from the government source that posted it. Updated .