Specifications for
D5 Water Systems Upgrades
February 24, 2010 ii iii
TABLE OF CONTENTS
DIVISION 1 – GENERAL REQUIREMENTS
01010 – SCOPE OF WORK
01020 – MEASUREMENT & PAYMENT
01030 – CONSTRUCTION STAKING
01040 – SUBMITTALS
01050 – QUALITY CONTROL AND QUANTITY MEASUREMENTS
01060 – MOBILIZATION
01700 – PROJECT CLOSEOUT
DIVISION 2 – SITE WORK
02010 – DEMOLITION AND CLEARING
02050 – FINISH GRADING
02229 – UTILITY LINE MARKING
02510 – WATER DISTRIBUTION
2512 – WATER PEDESTAL & DRAIN SYSTEM
02526 – WATER COLLECTION BOX/TANK
DIVISION 3 – CONCRETE
03010 – CONCRETE FORMWORK
03020 – CONCRETE REINFORCEMENT
03090 – CAST!IN!PLACE CONCRETE
03040 – CONCRETE FINISHING
DIVISION 5 – METALS
05500 – METAL FABRICATIONS
DIVISION 9 – FINISHES
09910 – LEAD PAINT CONTAINMENT, REMOVAL & DISPOSAL
DIVISION 1 – GENERAL REQUIREMENTS
DIVISION 1
01010 – SCOPE OF WORK
PART 1 – GENERAL
1.1 – Definitions
Contractor – the successful bidder who is awarded the contract.
Government – the Contracting Officer (CO) or designated Contracting Officer’s
Representative (COR) of the Coronado National Forest.
1.2 – Description
Contractor shall furnish all materials, equipment, transportation, labor, supervision, and other associated work needed to complete work according to the drawings and specifications.
Contractor shall provide and install walterlines, ball valves, air release valves, drain valves, valve boxes, hydrants, yard hydrants, small potable water tanks, and hose racks on sites throughout the Santa Catalina Ranger District.
Utilize Government!furnished conceptual drawings for design and construction.
Each water system must comply with ADEQ standards as a public water system.
1.3 – Location and Conditions
Work will take place at various locations on the Santa Catalina Ranger District (Pima
County): Dead Fir Collection Box, Sabino Warehouse, Lemmon Rock Lookout, Palisades
Tank, Spencer Canyon Campground, Rose Canyon Campground, Showers Point
Campground, Sabino Recreation Area, and Peppersauce Campground.
PROJECTS IN THE SANTA CATALINA MOUNTAINS:
The Dead Fir collection box is located near Sabino Creek in the Santa Catalina
Mountains at Township 11 South, Range 15 East, Section 25. Access to the actual box site is along an unmaintained portion of National Forest System Road (NFSR) 19
(Turkey Run Road). This road can be accessed from Catalina Highway.
The water system that serves the Lemmon Rock Lookout is located east of
Summerhaven at Township 11 South, Range 15 East, Section 35. Access to the site is provided via Lemmon Rock Road, a 4!wheel!drive single!lane road that leads to the lookout. This road is can be access via Radar Base Road (the tail end of the Catalina
Highway, also known as Ski Valley Road).
The tank and water system that serves the Palisade Administrative Site (Palisade AS) and other downstream users is located due north of the Palisade AS at Township 12
South, Range 16 East, Section 9. The tank is located adjacent to the Catalina
Highway.
The Loma Linda water system serves multiple users throughout the Santa Catalina
Mountains. Access to the system is provided via several roads and trails that branch off of the Catalina Highway.
The Spencer Canyon Campground water system is a subsystem of the Loma Linda water system, which sits atop the Santa Catalina Mountains at Township 12 South, Range 16 East, Sections 5 and 6. Access to the campground itself is excellent, with an entry road directly off of the Catalina Highway. Access to the two tanks in the system varies – Ponderosa Tank is adjacent to readily accessible from the campground road system; Spencer Tank is not accessible by vehicle, and is located approximately ¼ mile away from the Ponderosa tank. The Spencer tank is positioned just south of the Catalina Highway, at the head of a draw.
The Rose Canyon Campground water system is also a subsystem of the Loma Linda water system, at Township 12 South, Range 16 East, Section 10. Access to the campground itself is excellent, with an entry road directly off of the Catalina
Highway. Access to the Rose Tank is poor, along a 4!wheel!drive dirt road that leads directly to the tank.
The Showers Point Campground water system is also a subsystem of the Loma Linda water system, at Township 12 South, Range 16 East, Section 8. Access to the campground itself is excellent, with an entry road directly off of the Catalina
Highway. Access to the Shower tank is moderate, along a wide footpath that leads to the tank.
The Peppersauce Campground water system is located approximately 10 miles south and east of the town of Oracle, Arizona, on the north side of the Santa Catalina
Mountains at Township 10 South, Range 16 East, Section 28. Access to the campground is via National Forest System Road (NFSR) 38.
PROJECTS IN THE SABINO CANYON RECREATION AREA:
The Sabino Canyon Recreation Area is located off of Sabino Canyon Road, just north of its intersection with Sunrise Drive in north Tucson.
The Cactus Environmental Education Center is located adjacent to the now!defunct
Cactus Picnic Area within the Sabino Canyon Recreation Area.
The water system that serves the Sabino Canyon Warehouse Yard is located within
Sabino Canyon, approximately one!quarter mile due north of the Visitor Center.
A detailed discussion of work to be completed is included in the contract STATEMENT OF
WORK.
Water and Electricity is not available at any of the sites. If needed, the Contractor must provide water and/or a generator or other power source for construction activities.
It will be the Contractor’s responsibility to familiarize themselves with the existing conditions and notify the Government of any discrepancies shown in these documents.
Contractor shall provide safety fencing around work to protect public.
1.4 – Schedule
A pre!work meeting will be held at each site for clarification of the projects.
A schedule for all work must be submitted to and approved by the Government prior to the commencement of construction.
The Contractor shall notify the Government three days in advance of any construction work.
Estimated start work date for projects not affected by owl restrictions is June 1, 2010.
No work is to occur on the Dead Fir, Spencer Canyon, and Showers Point sites from
March 1 – August 31. No work is to occur in the Sabino Canyon Recreation Area from
June 15 to September 30.
All work shall be completed within 180 days of award.
1.5 – Contract Administration
The Contractor shall be fully responsible for seeing that construction activities conform to the approved final drawings and specifications, and according to provisions of this contract. The Government will provide timely reviews as requested by the Contractor and may periodically review work at any time.
Construction quality control shall include supplying all the personnel, equipment, tests and reports necessary to ensure that construction is completed in compliance with the drawings, specifications and provisions of the contract.
The Contractor shall not disturb plants or soil except within the areas necessary to complete the work. The Contractor shall clearly stake limits of construction and maintain marks throughout construction. The Government will review all staking. Plants damaged or destroyed unnecessarily shall be replaced at Contractor’s expense with identical species and size of plants.
1.6 – Quality of Work
The products listed in the specifications are preferred products chosen for site compatibility and quality. However, equal or better alternatives submitted by the
Contractor will be considered and are encouraged.
Use recovered materials, recyclable materials, and environmentally preferable products and services where possible as per Executive Order 12873.
1.7 – Codes and Standards
Codes and standards of the following associations and listed publications will become part of this contract:
1. Arizona Department of Environmental Quality (ADEQ)
2. Arizona Department of Water Resources (ADWR)
3. American Water Works Association (AWWA)
4. Occupational Health and Safety Administration (OSHA) standards
5. American Society for Testing and Materials (ASTM)
6. American National Standards Institute (ANSI)
7. Steel Structures Painting Council (SSPC)
8. International Organization for Standardization (ISO)
9. National Sanitation Foundation (NSF)
All materials, workmanship, and designs shall meet specified requirements of the standards referenced in this section and other local or state codes, related to this type of work, whichever is more stringent.
1.8 – Special Construction Requirements
Upon completion of the project, all demolished improvements and other construction materials shall become the property of the Contractor and be removed from
Government land and/or disposed of in accordance with State and County standards.
Construction Access and Protection: The Contractor shall be responsible for securing the project area from the public. This includes providing the necessary security for protection of the Contractor's materials, equipment, tools and work until final acceptance by the Government.
The roadways to and within some of the project sites are narrow and windy, with abrupt curves and widths that vary. As such, mobilizing large equipment to the construction sites will likely require additional efforts to navigate these roads. Smaller dump trucks, concrete trucks, and standard width vehicles have accessed the site with no problems.
If campgrounds are open during construction, it is the Contractor’s responsibility to take appropriate care (such as the use of fencing) to protect the public from possibly injury from site activities.
Equipment and material storage: The Contractor shall obtain permission from the
Contracting Officer for equipment and material storage, and for other areas needed for construction. The safety and security of the Contractor’s equipment and materials is not guaranteed by the Government.
All site features to remain shall be protected from damage during the project.
No live trees are to be cut without permission from the COR. Tree limbs may be trimmed as necessary.
Sanitation/Garbage: No garbage service is available for Contractor use. The Contractor shall keep the construction site free of loose garbage at all times.
Campground or nearby restroom facilities will be made available for Contractor use.
The project will be implemented with the following Best Management Practices:
1. During servicing or refueling of equipment, vehicles, and machinery, there is a potential for pollutants to enter a watercourse. This threat will be minimized by locating service and refueling areas well away from Sabino Creek in an upland setting. The contractor will be required to have a Spill Prevention, Control and
Countermeasures Plan in place.
2. Loose, unconsolidated sidecast material will not be allowed to enter streamside management zones. The contractor will use wattles and or silt screens to prevent movement of disturbed soil into the stream. Wattles will be certified "weed
Free".
3. Sidecasting, the piling of excavated dirt on the edge of a ditch, or elsewhere in a wetland or other water of the U.S. will not be an acceptable construction alternative in areas where it will adversely affect water quality. Prior to commencing construction or maintenance activities, waste areas will be located where excess material can be deposited and stabilized.
1.9 – Contract Closeout
Remove temporary facilities and provide final cleaning and touch!up. Restore portions of buildings, site improvements, landscaping, and other items damaged by construction operations to the satisfaction of the Government at no additional expense to the
Government.
*** END OF SPECIFICATION 01010 ***
01020 – MEASUREMENT & PAYMENT
PART 1 – GENERAL
1.1 – Measurement & Payment
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to the completion of the items shown and no separate payment will be made.
1.2 – Determination of Quantities
The following measurements and calculations are used to determine contract quantities.
Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered in writing by the Government to fit field conditions.
For items that are measured by the linear foot, measurements will be made parallel to the base or foundation upon which the structures are placed.
For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of measurement. Measurements will be adjusted when material has been lost from the vehicle, has been wasted, or has otherwise not been incorporated into the work. Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day as directed by the
Government. Each vehicle shall bear a plainly legible identification mark.
For aggregates weighed for payment, the tonnage will not be adjusted for moisture content unless otherwise provided.
For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) which are specified by gauge, weight, section measurements, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.
1.3 – Units of Measurement
Payment will be by units defined and determined according to U.S. Standard measure.
*** END OF SPECIFICATION 01020 ***
01030 – CONSTRUCTION STAKING
PART 1 – GENERAL
1.1 – Scope
This section specifies construction staking required for all construction needs.
PART 2 – PRODUCTS
None
PART 3 – EXECUTION
3.1 – General
The Contractor shall set all flagging, stakes, nails and string lines etc. necessary to construct a complete project as SHOWN ON THE DRAWINGS. The Contractor is responsible for verifying any existing control points shown on the plans. The Contractor shall be responsible for maintaining all staking and for replacing any stakes lost or destroyed during their use period. Construction work shall not begin on an item until the staking for that item has been approved by the Government. This approval will not relieve the Contractor of the responsibility and the associated costs for correcting any errors, whether the errors are discovered during the performance of the survey or during subsequent phases of the project.
*** END OF SPECIFICATION 01030 ***
01040 – SUBMITTALS
PART 1 – REQUIREMENTS
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the submitted item. Contractor shall allow five (5) business days for processing of submittals by the Government. Submittals may also be referred to as shop drawings.
PART 2 – MANUFACTURER'S LITERATURE AND SHOP DRAWINGS
The Contractor shall submit three (3) copies of all submittals to the Government for approval on the items required herein. For each submittal, the Contractor must receive written approval from the Government to use the item before incorporating it into the project work. Literature must be marked or otherwise designated to show the exact model, size, etc. the Contractor proposes to use. Information must be adequate to determine compliance with the specifications. Approvals must be received for products differing from those described in the Government!supplied specifications.
Submittals will be waived if the Contractor furnishes the exact item used for design when the manufacturer's model, size, etc. are shown in the contract.
Manufacturer's literature, shop drawings, or samples are required for the following items:
1. Air release valves.
2. Valves and valve boxes.
3. Water meters.
4. Water pedestal/vault, yard hydrants, and hydrants.
5. Backflow prevention device.
6. HDPE pipe in each size required for completion of these projects.
7. Fencing layout and materials.
8. Potable water tank/collection boxes (NSF!61 compliant).
9. Hose Rack planking.
Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.
*** END OF SPECIFICATION 01040 ***
01050 – QUALITY CONTROL AND QUANTITY MEASUREMENTS
PART 1 – DESCRIPTION
This work shall consist of providing quality control in conformance with the inspection of construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specifications. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
PART 2 – CONSTRUCTION
The Contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all supplies, services, and construction conform to the contract requirements.
The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract.
Inspection and Tests. The Contractor shall maintain current records of all inspections and tests performed. The following format or one containing the following information will be acceptable to the Government:
Project Name Contract No.
Tested By
Item Test Date Location Standard Results (Initials)
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
As!Built Drawings. The Contractor shall maintain a set of the contract drawings depicting as!built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as!built drawings shall be submitted to the Government.
Quantity Measurements. The Contractor shall make all measurements for computation of quantities for all work items specified for payment by Actual Quantities (AQ). The
Contractor shall compute the quantities for periodic payments; the Government will compute the quantities for the final payment based on measurements taken by the
Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The accepted quantities will be paid for at the contract unit price for each pay item shown in the SCHEDULE OF ITEMS. Work items not included on the SCHEDULE OF
ITEMS are considered incidental to other pay items.
Frequencies for making approvals, inspecting, sampling and testing shall be as shown in
Table 1400!1. Responsibilities shall be as shown in Table 1400!1. The following key refers to the abbreviations shown in Table 1400!1:
1. CC: Certification and/or inspection, sampling, and testing by Contractor, or
Contractor's representative.
2. CL: Approvals, inspections, sampling, testing or measuring under the direction of and certification by a qualified employee of a certified lab or by a Registered
Professional Engineer in the state of Arizona. The Contractor shall be responsible for furnishing the Professional services as shown in Table 1400!1.
TABLE 1400!1
QUALITY CONTROL, INSPECTION, SAMPLING, TESTING, AND MEASUREMENTS
Item
Approvals, inspections, sampling, minimum or tests required Frequency Certification
Concrete Cylinder set 1 CL
Concrete Air entertainment test 1 CL
Concrete Slump 1 CL
Water Lines Pressure Test Per Complete Line CC
*** END OF SPECIFICATION 01050 ***
01060 – MOBILIZATION
PART 1 – GENERAL
1.1 – Description
This section specifies preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items at the project site.
1.2 – Basis of Payment
The Contractor can request payment for performance and payment bonds upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting
Officer. Under no circumstances will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
Progress payments will be made as follows:
1. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
2. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
3. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
The total of all payments shall not exceed the original contract amount for this item.
*** END OF SPECIFICATION 01060 ***
01700 – PROJECT CLOSEOUT
PART 1 ! GENERAL
1.1 ! Summary
The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
PART 2 ! PRODUCTS
Not used.
PART 3 ! EXECUTION
3.1 – Posted Operating Instructions
As specified in the individual sections. Furnish operating instructions attached to or posted adjacent to equipment. Include wiring diagrams, control diagrams, control sequence, start!up, adjustment, operation, lubrication, shut!down, safety precautions, procedures in the event of equipment failure, and other items of instruction recommended by the manufacturer.
3.2 ! Cleaning
Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, marks, stains, foreign materials, and labels from finished surfaces. Thoroughly clean building interiors. Pick up all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
3.3 – Project Record Drawings
A. Maintain one complete full!size set of contract drawings and one full!size set of vendor!supplied drawings. Clearly mark changes, deletions, and additions using
Forest Service drafting standards to show actual construction conditions. Show additions in red, deletions in green, and special instructions in blue. Show actual locations of all utility lines encountered during construction.
B. Keep record drawings current. Make record drawings available to the Contracting
Officer for inspection at the time of monthly progress payment requests. If project record drawings are not current, the Contracting Officer may retain an appropriate amount of the progress payment.
C. On completion of the total project, submit complete record drawings. Include all shop drawings, sketches, and additional drawings that are to be included in the final set, with clear instructions showing the location of these drawings.
3.4 – Closeout Submittals
Submit before final inspection request.
A. Project Record Drawings: As specified above.
B. Guarantees and Bonds: As specified in individual sections.
C. Spare Parts and Materials: As specified in individual sections.
D. Operation and Maintenance Data: As specified in individual sections.
E. Operating Tools: As specified in the individual sections.
F. Special Tools: One set of special tools required to operate, adjust, dismantle, or repair equipment. Special tools are those not normally found in possession of mechanics or maintenance personnel.
3.5 – Substantial Completion and Final Inspection
Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. Contracting Officer will make an inspection within 10 business days of receipt of request.
A. When work is determined to be substantially complete, Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a
Letter of Substantial Completion.
B. If work is not determined to be substantially complete, Contracting Officer will notify Contractor in writing. After completing work, Contractor shall resubmit certification and request a new final inspection.
3.6 – Acceptance of the Work
After all deficiencies have been corrected, a Letter of Acceptance will be issued.
PART 4 ! MEASUREMENT AND PAYMENT
Payment will be included in the bid item to which this work relates.
*** END OF SPECIFICATION 01700 ***
*** END DIVISION 1 ***
DIVISION 2 – SITE WORK
DIVISION 2
02010 – DEMOLITION AND CLEARING
PART 1 – GENERAL
1.1 – Section Includes
Removal of various facilities (including waterlines and springbox infrastructure) and other miscellaneous items as shown on drawings and/or as needed to complete construction.
Clearing of vegetation.
Application of silt fence or wattle as Best Management Practice for control of off!site sediment transport.
1.2 – References
A. Coordinate clearing work with the Government.
B. Comply with site!specific landscape and hardscape demolition requirements found in other sections and drawings.
PART 2 – PRODUCTS
A. Silt Fence – commercially available
B. Wattle – weed!free, commercially available
PART 3 – EXECUTION
3.1 – Preparation
Verify that existing plants designated to remain are identified and protected.
Install silt fence and/or wattle in locations down!gradient of to!be!disturbed areas.
3.2 – Protection
A. Protect plants and features not required to be removed by construction activities.
B. Protect benchmarks, survey control points and existing structures from damage or displacement. Also protect vegetation, soils, rock faces that are outside grading limits.
3.3 – Clearing
A. Clear areas required for access to site and execution of work.
B. Do not remove any trees unless approved by the COR.
C. If any archaeological artifacts or evidence is encountered, notify the Government and halt work in the area immediately.
3.4 – Removal
A. Remove and legally dispose of all construction debris.
B. Remove accumulated sediment and silt fence/wattle and dispose off USFS land.
C. The Contractor shall be responsible for removal, equipment, containment, cleanup, and associated costs necessary for removing and salvaging items shown on the plans.
D. All facilities and materials scheduled for demolition must be completely removed and disposed of legally off Government lands by the Contractor.
*** END OF SPECIFICATION 02010 ***
02050 – FINISH GRADING
PART 1 – GENERAL
1.1 – Work Included
Backfilling along concrete slabs, filling holes, restoring natural grades, rounding slopes, and tilling disturbed areas.
1.2 – Job Conditions
Comply with local regulations for dust control.
PART 2 – PRODUCTS
None
PART 3 – EXECUTION
3.1 – Preparation
The Contractor shall familiarize himself with all site conditions prior to the start of work, and shall notify the Government of any discrepancies found between site conditions and the contract documents.
Scheduling:
Schedule all work in a careful manner with all necessary consideration for the public.
Avoid interference with the use of, and access to adjacent facilities.
3.2 – Excess Water Control
A. Finish grading operations shall be performed during dry weather. Soil shall not be in a wet condition.
B. All standing water shall be promptly removed. Finish grading shall not resume until conditions are approved by the Government.
C. The Contractor shall be responsible for positive drainage of all areas of work.
3.3 – Finish Grading
A. Fine grade all areas, eliminating rough and low areas and holes. Maintain levels, profiles and contours to subgrades.
B. Remove all stones, roots, grass, weeds and other foreign material while finish grading. Remove and dispose legally of all debris.
C. Finish grading shall be approved by the COR.
D. Round edges on tops of slopes within project site to restore natural contours.
E. Backfill along all pavement edges so that none protrude over 1" above surrounding grade. Fill slopes shall be 3:1 or flatter with a 1’ flat compacted soil shoulder adjacent to the pavement.
F. Leave the topsoil undisturbed where grading is not required.
G. Till top 6" of all disturbed and compacted areas, and areas shown on drawings.
*** END OF SPECIFICATION 02050 ***
02229 – UTILITY LINE MARKING
PART 1 ! GENERAL
1.1 ! Summary
The work under this section shall consist of furnishing all labor, tools, and equipment necessary for providing and installing pipe detecting tape and tracer wire in accordance with the details shown on the plans and the requirements of these specifications. All costs associated with this specification shall be included in the unit price bid per linear foot of pipe furnished and installed.
1.2 ! Submittals
As specified in Section 01040.
A. Samples: 24!inch strips of tape.
B. Certification that the materials used in the tape fabrication meet the requirements of this section.
PART 2 ! PRODUCTS
2.1 ! Distributors
The following list includes the approved manufacturers/distributors for detecting tape.
Other manufacturers/distributors may be approved by the Forest Service prior to bid.
REEF INDUSTRIES
ALARMA TAPE
PROLINE
HYTECH
NORTH TOWN
LINETEC
LINEGUARD
TERRA TAPE
THOR INDUSTRIES
2.2 – Marking Tape
Capable of being inductively detected electronically.
A. Construction: Metallic foil laminated between two layers of impervious plastic film not less than 3 inches wide. Total thickness of tape shall not be less than
0.005 inch (5 mil) plus or minus 10 percent manufacturing tolerances.
1. Film: Inert plastic. Each film layer shall be not less than 0.0005 inch thick
(0.5 mil).
2. Foil: Not less than 0.00035 inch thick (0.035 mil).
3. Adhesive: Compatible with foil and film.
B. Imprint: 3/4!inch or larger bold black letters.
C. Legend: Identify buried utility line tape with imprint such as "Caution: Sewer Line
Below". Repeat identification at approximately 24!inch intervals.
D. Background Color: APWA color code and as specified below:
Color Utility
Safety Red Electric
High Visibility Safety Yellow Gas, Oil, Steam, Dangerous Materials
Safety Alert Orange Telephone, Communications, Cable
Television
Safety Precaution Blue Water System, Irrigation
Safety Green Sanitary Sewer, Storm Sewer
Safety Brown Force Mains, Reclaimed Water, and
Effluent Lines
E. Manufacturer: Lineguard, Inc., Wheaton, Illinois; Reef Industries, Inc., Houston, Texas; Thor Enterprises, Inc., Sun Prairie, Wisconsin; or similar.
PART 3 ! EXECUTION
3.1 – Marking Tape
After the trench is backfilled per applicable details and specifications to within 12 inches
(12”) of the finished grade the contractor shall install a detectable magnetic pipe locating tape over all installed pipe. The backfill shall be sufficiently leveled so that the tape will be installed on a flat surface. The tape shall be centered in the trench and laid flat with printed side up. Caution shall be exercised to avoid displacement of tape and to ensure its integrity. The remainder of the trench is then backfilled in accordance with applicable details and specifications.
Where utilities are buried in a common trench, identify each line by a separate warning tape. Bury tapes side by side directly over the applicable line.
*** END OF SPECIFICATION 02229 ***
02510 – WATER DISTRIBUTION
PART 1 ! GENERAL
1.1 ! Summary
The work under this section shall consist of furnishing all labor, tools, and equipment to install and replace waterlines including trench excavation, pipe bedding, valve boxes, valves, other appurtenances and backfill in accordance with the details shown on the plans and the requirements of these specifications. Contractor shall locate existing water lines and replace lines and install appurtenances as specified on drawings. Contractor shall provide water lines and connections to the new locations as required and as shown on the plans. This section also includes flushing, testing, and disinfecting waterlines.
Contractor shall complete DES required pressure testing per AWWA. All costs associated to this specification shall be included in the unit price bid per linear foot of water pipe furnished and installed.
1.2 – Submittals
A. Product Data for the following:
1. Pipe and fittings
2. Compression couplings for similar and dissimilar pipes
3. Ball Valve and Box
4. Method for disposing water used in testing and disinfection of waterlines.
5. Water meter and accessories
6. Backflow Prevention Device
7. Double check valve
8. Hydrants
B. Operation and Maintenance Data for the following:
1. Ball and Air Release Valves
2. Meters
3. Backflow Prevention Device
4. Double check valve
5. Hydrants
1.3 – Quality Assurance
A. Comply with standards of authorities having jurisdiction for potable!water!service piping, including materials, installation, testing, and disinfection.
B. Piping materials shall bear label, stamp, or other markings of specified testing agency.
C. NSF Compliance
1. Comply with NSF 14 for plastic potable!water!service piping. [Include marking
"NSF!pw" on piping.]
2. Comply with NSF 61 for materials for water!service piping and specialties for domestic water.
1.4 – System Performance Requirements
Minimum Working Pressures: The following are minimum pressure requirements potable water service for piping and specialties, unless otherwise indicated: 160 psig.
1.5 – Delivery, Storage and Handling
A. Deliver piping with factory!applied end!caps. Maintain end!caps through shipping, storage, and handling to prevent pipe!end damage and to prevent entrance of dirt, debris, and moisture.
B. Protect flanges, fittings, and specialties from moisture and dirt.
C. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.
PART 2 ! PRODUCTS
2.1 – General
All waterlines, pipes, and fittings shall be new and unused, of the type, pressure rating or class, and size specified and as shown on the drawings and detailed in these specifications. All plastic waterlines shall be installed with tracer wire.
2.2 – High Density Polyethylene (HDPE) Pipe
A. Pipe
1. HDPE plastic pipe shall be PE!3408 as defined in ASTM D1248, with a minimum cell classification of 345464C in accordance with ASTM D3350. The pipe shall be
SDR11, 160 psig minimum pressure rating and comply dimensionally with ASTM
D3035.
2. Pipe shall be manufactured in accordance with AWWA C901 for sizes ½” through
3”.
3. HDPE pipe 2” and smaller shall be provided in rolls.
4. The joining method shall be butt fusion method and shall be performed in strict accordance with the pipe manufacturer’s recommendations. Butt fusion equipment used in the joining procedures shall be capable of meeting all conditions recommended by the pipe manufacturer, including but not limited to, temperature requirements, alignment, and fusion pressures. Ribbed steel inserts with stainless steel clamps are not approved for HDPE pipe.
B. HDPE is locally available from Ferguson’s in Tucson AZ, or Mt. Graham Supply in
Safford AZ
C. Fittings
1. HDPE fittings shall be made from material meeting the same requirements as the pipe.
2. Molded fittings shall be manufactured in accordance with either ASTM D2683 for socket fused or ASTM D3261 for butt fused and shall be so marked.
3. All HDPE fittings shall have the same or higher pressure rating and compositions.
4. HDPE elbows, tees and reducers shall be as manufactured by Central Plastics Co., Shawnee, OK, (800) 654!3872 or approved equal.
2.3 – Galvanized Steel Pipe (GSP)
A. Pipe
1. ASTM A53 for pipe 4!inch diameter and smaller. Schedule 40.
2. Plain ends for joining with standard manufactured couplings.
3. Threaded ends shall meet requirements of ASME B1.20.1.
B. Fittings
1. ASTM A53. Schedule 40.
2. For threaded ends use Teflon thread sealing tape.
2.4 – PVC, Schedule Pipe
A. PVC, Schedule 40 Pipe
1. ASTM D 1785.
2. PVC, Schedule 40 Socket Fittings: ASTM D 2466.
B. PVC, Schedule 80 Pipe
1. ASTM D 1785.
2. PVC, Schedule 80 Socket Fittings: ASTM D 2467.
2.5 ! Couplings for Similar or Dissimilar Pipe
Compression type transition fittings for making connections between like and dissimilar pipe materials shall be designed to enable a variety of connections between polyethylene pipe to various pipes. Fittings shall be Cepex performance series compression fittings as manufactured by Cepex Holding, S.A. and distributed by The Lateral Connection Corp., Sparks, NV 89434 (775) 626!6777 or approved equal and supplied by Ferguson
Waterworks, Tucson, AZ, or approved equal.
2.6 – Riprap at Daylight Drain and Wash Crossing
Riprap shall consist of hard, dense, durable stone, angular in shape and resistant to weathering. Rounded stone or boulders will not be accepted as riprap material.
Individual stones shall have dimensions of 6” to 12”. Source of stone shall be from rocks uncovered on site during construction operations or from an approved off!site source.
2.7 – Ball Valves
Valves as indicated on the drawings shall be NSF!certified drinking water brass or stainless steel full!port ball valves sized to match the line.
2.8 ! Valve Boxes
Precast Concrete Valve or Valve!Meter Box: Valve box is to be concrete with steel lid that is lockable with a padlock; boxes in traffic areas must have a steel lid capable of
HS20 loading, 2’ x 3’ in size, or approved equal. Oldcastle Precast, Inc., Utility Vault
Division, (Valve or Meter Boxes) or approved equal.
The Contractor shall supply copies of keys, operating wrenches or tools as supplied by the valve or box manufacturer.
2.9 ! Underground Detection and Marking Tape
See Section 02229
2.10 – Water Meter
A. Available Manufacturers:
1. ABB Water Meters, Inc.
2. Badger Meter, Inc.
3. Carlon Meter Co.
4. Grinnell Corporation; Mueller Co.; Hersey Meters.
5. ROMAC Industries, Inc.; Hays Fluid Control Div.
6. Schlumberger Limited; Water Div.
7. Senses Technologies, Inc.
8. Water Specialties Corp.
B. Description: AWWA C700, displacement!type, bronze main case. Register flow in gallons (liters) unless cubic feet (cubic meters) are indicated.
C. Description: AWWA C702, compound!type, bronze case. Register flow in gallons
(liters) unless cubic feet (cubic meters) are indicated.
2.11 – Backflow!Prevention Devices
A. Available Manufacturers:
1. Ames Co., Inc.
2. Cla!Val Co.
3. CMB Industries, Inc.; Febco Div.
4. Conbraco Industries, Inc.
5. FLOMATIC Corp.
6. Grinnell Corporation; Mueller Co.; Hersey Meters.
7. Watts Industries, Inc.; Water Products Div.
8. Zurn Industries, Inc.; Wilkins Div.
B. General: ASSE standard, backflow preventers.
1. Working Pressure: 150 psig (1035 kPa) minimum, unless otherwise indicated.
2. NPS 2 (DN 50) and Smaller: Bronze body with threaded ends.
3. NPS 2!1/2 (DN 65) and Larger: Bronze, cast!iron, steel, or stainless steel body with flanged ends.
4. Interior Lining: AWWA C550 or FDA!approved, epoxy coating for backflow preventers having cast!iron or steel body.
5. Interior Components: Corrosion!resistant materials.
6. Exterior Finish: Polished chrome plate if used in chrome!plated piping system.
C. Pipe!Applied, Atmospheric!Type Vacuum Breakers: ASSE 1001, with floating disc and atmospheric vent.
D. Reduced!Pressure!Principle Backflow Preventers: AWWA C511, suitable for continuous pressure application. Include outside screw and yoke gate valves on inlet and outlet, and strainer on inlet; test cocks; and pressure!differential relief valve with ASME A112.1.2, air!gap fitting located between two positive!seating check valves; Maximum Pressure Loss: 12 psig through middle 1/3 of flow range.
E. Double!Check!Valve Backflow Prevention Assemblies: AWWA C510, suitable for continuous pressure application. Include outside screw and yoke gate valves on inlet and outlet, and strainer on inlet; test cocks; and two positive!seating check valves; Maximum Pressure Loss: 5 psig through middle 1/3 of flow range.
F. Double!Check!Valve Backflow Prevention Assemblies: UL 312, FM approved; with two UL 312, FM!approved, iron!body, 175!psig (1207!kPa) working!pressure, flanged!end check valves and two UL 262, FM!approved, iron!body, outside screw and yoke, flanged, 175!psig (1207!kPa) working!pressure gate valves; Maximum
Pressure Loss: 5 psig through middle 1/3 of flow range.
G. Antisiphon!Pressure!Type Vacuum Breakers: ASSE 1020, suitable for continuous pressure application. Include shutoff valves, spring!loaded check valve, spring!
loaded floating disc, test cocks, and atmospheric vent; Maximum Pressure Loss: 5 psig through middle 1/3 of flow range.
PART 3 ! EXECUTION
3.1 ! Pipe Alignment and Grade
A. Construct the water system to the lines and grades shown or established in the field.
B. Stake locations of new water lines as shown on the drawings. The Contracting
Officer (CO) shall approve the water line location prior to the start of excavation.
C. Sections of the water system that operate seasonally shall be constructed to drain by gravity to daylight drains for winter campground shutdown. Waterlines shall be constructed to drain at a minimum grade of 0.5% unless indicated on the drawings.
Waterlines not meeting this requirement shall be removed by the Contactor and replaced at no cost to the Government.
D. Pipelines may be relocated slightly, if necessary, to avoid existing obstacles.
However, seasonally operated lines shall be installed to slope towards drains as shown on the drawings.
E. Deflections from a straight line or grade, as required by vertical curves, horizontal curves, or offsets, shall not exceed the manufacturer's recommended maximum joint deflection or curvature for their pipe. If the alignment requires curvature or deflections in excess of these limitations, the Contractor shall provide special bends, standard fittings, or a sufficient number of shorter lengths of pipe to provide angular deflections at the joints within the limit set forth by the manufacturer.
F. Bends resulting in tension on joints will not be allowed.
3.2 ! General
A. All pipe, fittings, and appurtenances shall be handled and laid in strict conformance to the manufacturer’s recommendations.
B. Drains, valves, and other regulating and controlling devices shall be installed in the line where called for on the drawings.
C. The interior of all pipe, fittings, and other accessories shall be kept as free as possible from dirt and foreign matter at all times. Each piece of line as it is laid shall be cleaned of all debris. When the pipeline has become dirty on the inside during shipment or storage, it shall be swabbed out by drawing a damp swab through the line before lying. Care shall be exercised to keep all joining surfaces clean. Any pipe with contaminated or damaged joining surfaces, which cannot be satisfactorily cleaned or repaired, shall be discarded. Under no circumstances shall pipe be laid in water, and no pipe shall be laid when trench conditions or the weather is unsuitable for such work. At all times when work is not in progress, all open ends of the pipe and fittings shall be securely closed to the satisfaction of the CO so that no trench water, rodents, earth, or other substance will enter the pipe or fittings.
D. Any section of pipe already laid and found to be defective shall be taken up and replaced with new pipe at the Contractor’s expense.
E. Where water line crosses a road culvert, adjust grade of water line to provide a minimum of 12 inches of separation between the water line and culvert, maintaining slope of water line to daylight drain.
F. A minimum of one!foot separation shall be maintained between electric and water lines in the same trench. Unless the electric conductors are in conduit the water line shall be a minimum of one foot below the electric conductors.
G. Bury piping with depth of cover over top at least 24 inches (750 mm), with top at least 12 inches (300 mm) below level of maximum frost penetration.
H. Install underground piping with restrained joints at horizontal and vertical changes in direction. Use restrained!joint piping, thrust blocks, anchors, tie!rods and clamps, and other supports.
3.3 – Excavation, Trenching, and Bedding
A. Trenching Guidelines: Excavate the trench to the approximate level of the top of the utility line to be installed, using adequate trench width and side slopes to safely accommodate worker access. Continue excavating for the utility line, to a width not greater than is shown on the appropriate trench detail. Any shifting or change from the alignment and grade as staked or as shown on any included drawings must receive prior approval by the COR in writing.
1. Rocky Trench Bottom: Where ledge rock, hard pan, boulders, or sharp!edged materials are encountered, overexcavate a minimum depth of 6 inches below the bottom of the utility exterior wall to permit adequate bedding preparation.
The installed utility shall have at least 6 inches of clearance from any rock protrusion.
2. Unstable Trench Bottom: Secure approval of depth of over!excavation and stabilization method. For wet trench construction, use approved method of dewatering through diversion, damming and pumping, well points, or underdrain systems. Dispose of removed fluidized materials as approved. Use select material to build a suitable foundation to within 6 inches of finished utility grade, prior to bedding with the specified material. Compact layers to 95 percent of maximum density in not greater than 6!inch layers. Do not proceed with utility installation until wet trench and unstable conditions are under control.
B. Trim roots flush with trench wall.
C. During excavation, material satisfactory for backfilling shall be stockpiled in an orderly manner at a distance from the banks of the trench equal to ½ the depth of the excavation, but in no instance closer than 2 feet. Excavated material not required or not satisfactory for backfill shall be disposed of off!site by the
Contractor, or as directed by the COR.
D. Unauthorized over!excavation shall be backfilled in accordance with the parameters of these specs at no additional cost to the Government.
E. The trench width below the top of the pipe shall not exceed 24 inches plus pipe outside diameter.
F. Notify COR when excavation is completed. Do not place pipe, cable, or begin backfill until the excavation is approved by the COR.
3.4 – Cutting and Handling of Pipe
Cutting of pipe for closure pieces or for other reasons shall be done in a neat manner by methods, which will not damage the pipe. The pipe and fittings shall be handled in such a manner as to insure delivery and final placement in good, undamaged condition.
Particular care shall be exercised not to injure the pipe surfaces or coatings. Damaged pipe shall not be used in the work.
Handle and install pipe in accordance with ASTM F645 and manufacturer’s installation instructions
3.5 – Laying Pipe
A. No pipe shall be placed in the trench until the CO has approved the trench and bedding.
B. Each section of the pipe shall rest upon the pipe bed for the full length of its barrel.
C. Backfill the pipe within 24 hours after installing the pipe in the trench, leaving the joints and one foot of pipe on each side of each joint exposed until testing is complete.
D. When work is not in progress, securely close open ends of pipe and fittings. Keep interior of pipeline and joining surfaces clean.
E. When high density polyethylene pipe is used, it shall be weaved in the trench to provide horizontal slack in the line for expansion and contraction.
F. High density polyethylene pipe shall be allowed to cool to within 20° F of the shaded trench bottom temperature before backfilling.
G. Do not lay pipe in water.
H. Do not exceed the manufacturer’s recommended maximum deflection. Deflections in excess of these limitations require special bends or a sufficient number of shorter pipe lengths.
3.6 ! HDPE Pipe Installation
Install HDPE pipe according to ASTM D 2774 and ASTM F 645.
3.7 ! PVC Pipe Installation
Install PVC pipe according to AWWA M23 and ASTM F 645.
3.8 – Joint Construction – General
A. Joints shall be made using jointing materials and applied with the proper accessories, in accordance with the manufacturer’s instructions. The joints shall be adjusted and the work performed in a manner so as to obtain the degree of water tightness required. If pipe and fittings are assembled with lubricant, it must be nontoxic. Where connections are made between new work and existing lines, the connections shall be made by using special fittings to suit the actual conditions.
B. Threaded Joints:
1. Thread pipes with tapered pipe threads according to ASME B1.20.1, apply tape or joint compound, and apply wrench to fitting and valve ends into which pipes are being threaded.
2. Exposed threaded pipe joints on galvanized steel pipe shall be painted with mastic following the manufacturer’s application procedures.
3. Field cut ends shall be squared off by grinding or filing; ends shall be reamed with all chips and flakes removed.
4. Field cut threads or machined joints shall be made with sharp tools to sharp finished ends.
C. Thrust Blocks: Place thrust blocks on undisturbed soil and bearing on a a minimum
1/3 circumference of fitting.
D. HDPE Heat!Fusion Joints
1. According to ASTM D 2657 and piping manufacturer's written instructions.
2. The joining method shall be butt fusion method and shall be performed in accordance with the pipe manufacturer's recommendations. Butt fusion equipment used in the joining procedures shall be capable of meeting all conditions recommended by the pipe manufacturer, including but not limited to, temperature requirements, alignment, and fusion pressures.
3. Personnel trained in butt fusion techniques by…