Text version

3. EFFECTIVE DATE

22 Jun 2010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

PAGE

TION NO 5. PROJECT NO. (ff applicable)

6. ISSUED BY

USDA Forest Service

EROC-SW

1323 Club Dr.

7. ADM| NISTERED BY (ff othet than ltem 6) cA 94592

8. NAME AND ADDRESS OF CONTMCTOR (No., strcet, county, AMENDMENT OF SOLICITATION NO.

AG-9702-S-10-0358

(sEE |TEM 11)

27 May 2010

CODE

11, THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITA

X fn" above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers I is extended, [l is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing ltems I and 15, and retuming ! copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE

SPECIFIED MAY RESULT lN REJECTION OF YOUR OFFER. lf by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIiATION DATA (ff requircd)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACTIORDER NO. AS DESCRIBED IN ITEM 14.

lS ISSUED PURSUANT TQ'. (Specify authontfl THE TH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 1OA.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (SUCh AS ChANgES iN paying offie, appropiation date, etc.) SET FORTH lN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

ALAGREEMENT IS ENTERED INTO

D. OTHER type and authority)

E. IMPORTANT: Contractor is not, I is required to sign this document and return -copies to the issuing office.

The purpose of this amendment is to provide responses to questions and change the number of calendar days in Section F.

A. Section F, FAR 52.21 1.1 0 is hereby cianged to read 360 caledar days.

B. euestion - Can water be obtained at Squirrel Springs or anywhere else locally. Arcwer: No, Water is not available at Squinel Springs. Will need to procure $rater from a commercial source.

C. Question - tree removal, Answer: Yes tree removal is considered incidental to the project and will be required to construct the faciliUes and roadways. Disposal of brush, stumps and logs will be at the Benny Creek Pit located approximately 5 miles from the project site.

4. Question - Are liquidated damages part of the contract Answer: No liquidated damages - actual damages will apply, if necessary

5. Question: Water supply line size and material Answer 2" - galvanized

6. Question: Quality Control Answer: Contractors responsibility per contract specifications, Contract requires a quality control plan to be submitted.

7. Question: R.O.W. on highway for effluent line. Answer: plan on staying out of the highway R.O.W. or else contacting ADOT for permtts.

8. ,qll other terms and conditions remain unchanged.

the document referenccd in ltem 9A or 104. as and in fuil force (Type or print) 16A. OFFICER (Type or pnnq