Attachment 2 DRAWINGS_Buckhorn.pdf
PDF 4 MB Posted
- Solicitation number
- AG-9702-S-10-0325
About this file
Attachment 2 DRAWINGS Buckhorn
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINE STARTING ENDING DISTANCE AVG. WIDTH AREA
SEGMENT INTERSECTION INTERSECTION (FT) (FT) (SQFT)
1 1 2 2,231 12 26,772
2 2 3 374 12 4,488
3 3 4 332 12 3,984
4 4 5 193 12 2,316
5 5 6 1,756 12 21,072
6 2 3 477 12 5,724
7 4 8 246 12 2,952
8 5 8 149 12 1,788
9 8 9 187 12 2,244
10 9 10 248 18 4,464
11 9 11 407 12 4,884
12 8 12 281 12 3,372
13 12 13 554 12 6,648
14 14 15 851 14 11,914
15 12 16 294 12 3,528
TOTALS: 8,580 ‐ 106,150
BUCKHORN CAMPGROUND ROAD RENOVATION SCHEDULE (EXCLUDING SPURS)
OLD NEW EXISTING EXISTING EXISTING WIDTH LENGTH EXTENDED REVISED REVISED REVISED
SPUR SPUR WIDTH LENGTH AREA EXTENSION EXTENSION AREA WIDTH LENGTH AREA
IDs IDs (FT) (FT) (SQFT) (FT) (FT) (SQFT) (FT) (FT) (SQFT)
1 1 8 37.5 300 2 75 10 37.5 375
2 2 10 21 210 10 210 20 21 420
‐ 3 0 14 23 322 14 23 322
3 4 11 25 275 11 121 11 36 396
4 5 11 19 209 17 187 11 36 396
5 6 10 38 380 0 10 38 380
6 7 10 21.5 215 13.5 135 10 35 350
7 8 10 37 370 0 10 37 370
8 9 10 31 310 5 50 10 36 360
9 10 10 41.5 415 0 10 41.5 415
10 11 10 33 330 3 30 10 36 360
11 12 10 28 280 8 80 10 36 360
12 13 10 24 240 0 10 24 240
13 14 11 31 341 3 5 55 14 36 504
14 15 11 31 341 9 279 20 31 620
15 16 11 41 451 0 11 41 451
16 17 12 38 456 0 12 38 456
17 18 11 39 429 0 11 39 429
18 19 10.5 38 399 0 10.5 38 399
19 20 10.5 41 431 0 10.5 41 431
20 21 13 38 494 0 13 38 494
21 22 11 34 374 0 11 34 374
22 23 11.5 38 437 0 11.5 38 437
23 24 12 26 312 0 12 26 312
24 25 10.5 32 336 0 10.5 32 336
25 26 10 25.5 255 12 120 10 37.5 375
26 27 12 30 360 11.5 138 12 41.5 498
27 28 10 20 200 13 260 23 20 460
28 29 12 24 288 0 12 24 288
29 30 11 40 440 0 11 40 440
30 33 13 21 273 5 105 18 21 378
31 32 12 26 312 6 156 18 26 468
32 31 10 23.5 235 0 10 23.5 235
33 34 11 26 286 0 11 26 286
34 35 11.5 32 368 0 11.5 32 368
35 ‐ 10 22 220 ‐10 ‐22 ‐220 0 0 0
36 36 10 36 360 0 10 36 360
37 37 10 36 360 0 10 36 360
38 38 10 36 360 0 10 36 360
TOTALS: TOTALS: ‐ ‐ 12,652 ‐ ‐ 2,103 ‐ ‐ 14,863
BUCKHORN CAMPGROUND SPUR RENOVATION SCHEDULE
NEW
SPUR TABLE NEEDED
IDs TYPE REPAIR(S)
1 WOOD ‐
2 METAL/WOOD
3 ‐ REPLACE W/ NEW ACCESSIBLE 8' TABLE
4 WOOD ‐
5 WOOD REPLACE ONE BENCH
6 WOOD ‐
7 WOOD ‐
8 WOOD REPLACE ONE BENCH
9 WOOD EXCAVATE AROUND TABLE
10 WOOD ‐
11 WOOD ‐
12 WOOD EXCAVATE AROUND TABLE
13 WOOD ‐
14 WOOD REPLACE W/ NEW ACCESSIBLE 8' TABLE
15 WOOD ‐
16 WOOD ‐
17 WOOD ‐
18 WOOD ‐
19 WOOD REPLACE ONE BENCH
20 WOOD REPLACE DAMAGED BOARDS
21 WOOD ‐
22 WOOD ‐
23 WOOD ‐
24 WOOD REPLACE DAMAGED LEGS
25 WOOD REPLACE DAMAGED BOARDS
26 WOOD ‐
27 WOOD REPLACE DAMAGED LEGS
28 WOOD REPLACE W/ NEW ACCESSIBLE 8' TABLE
29 WOOD ‐
30 WOOD ‐
33 WOOD ‐
32 WOOD ‐
31 WOOD ‐
34 WOOD ‐
35 WOOD REPLACE DAMAGED LEGS
36 WOOD ‐
37 WOOD ‐
38 WOOD ‐
BUCKHORN CAMPGROUND TABLE RENOVATION SCHEDULE
EXISTING TABLES ‐ TO BE REPAINTED
| 01 |
| 02 |
| 03 |
| 04 |
| 05 |
| 06 |
| 07 |
| 08 |
| 09 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
File details come from the government source that posted it. Updated .