SOW_rev060910.doc
DOC document 31 KB Posted
- Solicitation number
- AG-9702-S-10-0276
About this file
US FOREST SERVICE SOLICITATION NO. AG-9702-S-10-0276 STATEMENT OF WORK (SOW)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-9702-S-10-0276_Present_Past Perf Org Exp Questionnaire--10 Jun 10.doc | DOC document | |
| AG-9702-S-10-0276_Combined Synopsis Solicitation--27 May 10.doc | DOC document | |
| Revised Schedule of Items-DoorRepl.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Toilet Buildings Door and Jam Replacement
Prescott National Forest
February 2010
1.0 INTRODUCTION
The project consists of removing and replacing doors, door jams and hardware for several toilet buildings on the Prescott National Forest in both the Verde and Bradshaw Districts. There are six sites – Lynx Lake Southshore, Trailhead 307, Playa Day Use, Metate Day Use, Cayuse Equestrian Day Use and Mingus Summit. The Contractor shall provide all materials, equipment labor, transportation and incidentals. The work will include removal and proper disposal of doors, door jams and hardware and installing new doors, door jams and hardware.
2.0 DESCRIPTION OF WORK
The six sites will all include removal of existing doors, door jams and hardware and replace with new doors, door jams and hardware. The buildings are splitface CMU construction (8x4x16). There are a total of 21 doors to be replaced. The list below details the number of doors needed at each site. Each door will include removal and replacement of door, door jams and hardware:
· Lynx Lake Southshore – six doors (both bathrooms)
· Trailhead 307 – three doors
· Playa – three doors
· Metate – three doors
· Cayuse – three doors
· Mingus Summit – three doors
The existing doors and frames are all manufactured by Sutocon, Inc. The contractor shall match the dimensions, orientation, material type and quality of existing doors and frames and equal to Sutocon, Inc. products. The existing doors all have wire masonry anchors and are flush style.
· Doors are 3’- 0” x 6’- 8” x 1 ¾” Flush HM.
· Frames are 5 ¾”HM.
· Hinges shall be stainless steel with steel pin equal to Hager Hinge Model BB1279 4-1/2” x 4-1/2”
· Door lockset and handle shall be handicapped level style with deadlocking latchbolt (entrance or corridor lockset equal to Yale Security Model 5407L).
· Door deadbolt shall be equal to Yale Auxiliary Lock Model 314.
· Door closer shall be equal to Norton Series 7500.
Government Furnished Material
· The Government shall furnish the cylinder for the hardware. The hardware installed must be compatible with the Yale cylinder.
3.0
LOCATIONS
· Lynx Lake Southshore – From downtown Prescott, go east on Gurley Street. Gurley Street will become Highway 69. Go approximately 4.3 miles, turn right onto Walker Road. Lynx Lake Southshore entrance will be approximately 3 miles on your left side.
· Trailhead 307 – From downtown Prescott, go east on Gurley Street for approximately 0.3 miles. Turn right onto Mt. Vernon. Mt. Vernon will become Senator Highway. Travel approximately 6.3 miles. The trailhead parking lot will be on the left side of the road.
· Cayuse Equestrian Day use - From downtown Prescott, go north on Montezuma. Montezuma will become Whipple at the bend. Whipple will become Iron Springs road after the intersection with Willow Creek Road. Approximately three miles from the intersection, turn right onto Granite Basin Road. Cayuse Entrance will be approximately 2.4 miles on right side of the road.
· Playa Day Use – Follow directions from downtown Prescott for Cayuse site. Playa entrance will be approximately 1.3 miles on the right side of the road past Cayuse Day Use.
· Metate Day Use – Follow directions from downtown Prescott for Playa. Metate entrance will be approximately 1/4 mile on left side of the road past Playa Day Use.
· Mingus Summit – From downtown Prescott, go east on Gurley Street. Stay in far left lane and merge onto Highway 89 north. Approximately 3.6 miles, go right and merge onto Highway 89A towards Prescott Valley. Approximately 3.2 miles, at 2nd light intersection, turn left to continue on Highway 89A. Approximately 19 miles, turn right onto Forest Road 104. Take immediate left into parking area.
4.0
QUALITY REQUIREMENTS
· All work shall be performed in a workman like manner, to the quality and standard of the industry.
· Product submittals shall be approved by the Government prior to installation.
· Building installation shall follow manufacturer’s recommendations.
· All construction debris shall be removed from Forest lands.
· The contractor is required to pay wages according to Davis Bacon Act labor rates.
· Bonding will be required for any contracts over $25,000.
· No permits or inspections are required by local, county or state government agencies for any part of the work in this contract.
5.0
CONTRACT SCHEDULE
The contractor shall complete all work within 30 calendar days. The contractor shall notify the COR three (3) days prior to starting work at each location.
6.0
POINT OF CONTACT
Point of contact concerning technical issues shall be:
Ophelia Goatson-James
Prescott National Forest
344 S. Cortez Street
Prescott, AZ 86303
928.443.8172 office
928.925.7490 mobile