A_1 SF-30.pdf
PDF 33 KB Posted
- Solicitation number
- AG-9702-S-10-0226
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 2_ PAL Fire Plan_jun2006.doc | DOC document | |
| Att 3_Wage Determination.pdf | ||
| S-10-0226_Repave_VisitorCntr_Mono.doc | DOC document | |
| Att 1_DRAWINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-9702-S-10-0226
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
VALLEJO CA 94592
1323 CLUB DRIVE
EROC SW
US FOREST SERVICE
VALLEJO CA 94592
1323 CLUB DRIVE
EROC - SW
US FOREST SERVICE
CIM-05-05R03/15/2010000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/23/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TAS::12 1102::TAS Capitol Improvement and Maintenance RECOVERY (ARRA) Scenic area visitor center Lee Vining. Re-pave existing 32,000 square foot parking lot by use of cold asphalt recycling method. Bid options are for road slurry seal coat, striping and signing.
The purpose of this Amendment is is answer Questions regarding this requirement.
The answer to your questions are as follows:
1. The Restrictions on Work are mentioned in Section C. Add to Section C - Restrictions on Work the following:
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JILL S. CLAYTON
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-9702-S-10-0226/000001
The Mono Basin SAVC is a popular destination for visitors to the area. This Visitor Center is open seven (7) days a week in the summer months.
Contractor shall insure that the operation of the
Visitor Center remains uninterrupted by the
Contractor¿s construction activities, equipment, material suppliers, and employees during the time the Visitor Center is in open.
Due to higher visitation during the weekends, the
Contractor must perform work Monday through
Thursday during daylight hours. Permission to work on weekends will be considered by the CO on a case by case basis.
2. The Contracting Officer does not feel like this requirement needs liquidated damages. We normally do not do liquidated damages except in rare instances.
3. The Contractor should carry insurance in accordance with California State Law for
Contractors. Awardee will be required to carry their own Liability Insurance and show proof thereof, at time of award.
Submit a Signed and Dated copy of this amendment with your BID Submittal Package. Bid Submittal
Due Date Remains as: March 24, 2010, 2:00 PM
Pacific Time. All information in Section L -
Instructions for Submittal Remain Unchanged.
Period of Performance: 05/03/2010 to 06/03/2010