SF_30_Mod 1.doc
DOC document 67 KB Posted
- Attached to
- RECOVERY - Fairview Boat Ramp Overlay
- Solicitation number
- AG-9702-S-10-0156
About this file
Questions and answers from Pre-Proposal Conference. Please review thoroughly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-9702-S-10-0156 Solicitation.docx | DOCX document | |
| AG-9702-S-10-0156 Maps and Drawings.pdf | ||
| AG-9702-S-10-0156 Special Reqs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 1 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 00001 |
| 3/9/2010 |
| 6. ISSUED BY |
| CODE |
| 9702 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
| 9702 |
USDA Forest Service Pacific Southwest Region, EROC 1323 Club Drive
Vallejo, CA 94592
USDA Forest Service
Pacific Southwest Region, EROC
1323 Club Drive
Vallejo, CA 94592
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-9702-S-10-0156
9B. DATED (SEE ITEM 11)
2/9/2010
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not FORMCHECKBOX is required to sign this document and return 1 copies submitted w/Bid to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Questions and answers from the pre-bid conference are hereby incorporated into the solicitation. See next page
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
JILL S. CLAYTON
Contracting Officer
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
FAIRVIEW BOAT RAMP OVERLAY
PREBID MEETING Q & A
Q: What will the lake level be at time of award and what happens if lake level does not allow construction?
A: At present, the lake is 34’ below the bottom of the ramp. Bottom of ramp is at 2,309’ elevation. The Bureau of Reclamation has predicted that the lake elevation will likely not reach the bottom of the ramp this year. However if this occurs, negotiation with the Contracting Officer will be required.
Q: Is camping on site permitted?
A: Yes, with camp permit.
Q: What is the compressive strength required of concrete?
A: From plans, “Concrete shall be a minimum 6 sack mix with a minimum 28-day compressive strength of 4,000 psi, maximum slump of 3-4 inches and 5% (+/-1%) entrained air.”
Q: Where is the dump place for removed concrete from curb and transition ramp and slough material?
A: IMPORTANT: At the meeting, we stated that it would be approved to remove the slough material to beyond the bottom of the ramp. However, after reviewing our permit for construction, all material will be removed to disposal area located on Pettijohn Mountain that is 2.5 miles away.
Q: What is the overlap for rebar splices?
A: Specifications call for abiding by Building Code Requirements for Reinforced Concrete, American Concrete Institute. Our Engineer calculated a 20-inch overlap.
Q: Will curing retardant be allowed in the concrete?
A: Specification 552 states that “Set retarding and/or water reducing admixtures may be used provided they conform to the requirements of Type B or Type D of AASHTO M-194 or ASTM C 494. The type and quantity of the admixture to be used must be included in the mix design submitted to the Engineer. The use of the admixture shall conform to the manufacturer’s recommendations.
File details come from the government source that posted it. Updated .