| File | Type | Posted |
|---|---|---|
| Amendment 0002 page 1.pdf | ||
| Amendment 0002 pgs 2 3.doc | DOC document | |
| 38_Amend 0001 pgs 2 3.docx | DOCX document | |
| 38_Amend 0001 page 1.pdf | ||
| 35_Eastwood_Sheet3_KaiserPass EastwoodPaving.pdf | ||
| 35_Eastwood_Sheet5_RoadPaving TrailDetails.pdf | ||
| 35_Eastwood_Sheet6_Strip.pdf | ||
| 35_Eastwood_Sheet4_KaiserPass EastwoodStripeplan.pdf | ||
| 35_Eastwood_Sheet1_CoverSheet.pdf | ||
| 35_Eastwood_Sheet2_VicinityMap.pdf | ||
| 35_Eastwood_Sheet7_TrafficSignDetails.pdf | ||
| AG-9702-S-10-0106.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-9702-S-10-0106 Amendment 0001
Section B-Schedule of Items
| Item # |
| Description |
| MM |
| Unit |
| Quantity |
| Unit Price |
| Extended Price |
| 1 |
| MOBILIZATION |
| LSQ |
| LS |
| 1 |
| 2 |
| QUALITY CONTROL AND QUANTITY MEASUREMENT |
| LSQ |
| LS |
| 1 |
| 4 |
| ASPHALT ROADWAY AND PARKING SPURS SCARIFICATION AND PULVERIZING |
| LSQ |
| LS |
| 1 |
| 5 |
| HOT BITUMINOUS PLANT MIX GRADE 1/2" MAXIMUM TACK COAT (Liquid asphalt) shall be incidental to this item |
| AQ |
| TON |
| 300 |
| 6 |
| BITUMINOUS CONCRETE CURB |
| AQ |
| LF |
| 200 |
| 7 |
| PAINTED TRAFFIC MARKINGS (includes striping and symbols) |
| LSQ |
| LS |
| 1 |
| 8 |
| REGUALTORY & HANDICAP SIGNS AND POSTS INSTALLATION AND HARDWARE (Government will furnish the signs only) |
| AQ |
| EA |
| 2 |
Total Price
Note: Items 5 and 6: Payment is based on actual quantity used.
Standard Specifications for Construction of Bridges on Federal Highway Projects, FP-O3 and Supplemental Specifications, http://flh.fhwa.dot.gov/resources/pse/specs/fp-03/fp-03usc.pdf 52.211-18 -- Variation in Estimated Quantity.
As prescribed in 11.703(c), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated that authorizes a variation in the estimated quantity of unit-priced items:
Variation in Estimated Quantity (Apr 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.
(End of Clause)