RFP No. AG-9702-S-09-0035.doc
DOC document 3 MB Posted
- Attached to
- RECOVERY - Chip Seal Maintenance of the 73 Road (Mt Watson Boulevard) on the LTBMU in Placer County
- Solicitation number
- AG-9702-S-09-0035
About this file
RFP No. AG-9702-S-09-0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-9702-S-09-0035 Amendment 000002.pdf | ||
| RFP No. AG-9702-S-09-0035 Amendment 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-9702-S-09-0035
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
X FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
10/07/2009
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
304348
6. PROJECT NO.
CIM-05-05R
7. ISSUED BY
CODE
| 9702 |
| 8. ADDRESS OFFER TO |
USDA Forest Service, EROC SW
1323 Club Drive
Vallejo, CA 94592 USDA Forest Service, EROC SW
ATTN: Fred Weatherill
1323 Club Drive
Vallejo, CA 94592
9. FOR INFORMATION
CALL:
A. NAME
Fred Weatherill B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(530) 226-2508
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
RECOVERY - Chip Seal Maintenance of the 73 Road (Mt Watson Boulevard) on the Lake Tahoe Basin Management Unit (LTBMU) in Placer County.
11. The Contractor shall begin performance within 10 calendar days and complete it within 30 calendar days after receiving
FORMCHECKBOX
award, X FORMCHECKBOX notice to proceed. This performance period is X FORMCHECKBOX mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
X FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
X FORMCHECKBOX
is, FORMCHECKBOX is not required.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
FRED WEATHERILL
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-8
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASUREMENT |
| UNIT |
ESTIMATED QUANTITY
UNIT PRICE
TOTAL
| 0001 |
| Chip Seal Maintenance of the 73 Road (Mt Watson Boulevard) on the LTBMU in Placer County |
| Job |
| 0001 |
PROJECT
UNIT
SOL. #
METHOD OF
| ITEM NO. |
| DESCRIPTION |
| MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
| 15101 |
| Mobilization |
| CQ |
| LSum |
| 1 |
| 23050 |
| Brushing |
| CQ |
| Mile |
| 10.75 |
| 40901 |
| Surface treatment aggregates designation D |
| AQ |
| Ton |
| 1400 |
| 40904 |
| Emulsified asphalt grade CMS-2H |
| AQ |
| Gallon |
| 32900 |
| 40950 |
| Chip Seal designation 1C |
| CQ |
| SYD |
| 113530 |
| 43001 |
| Hot asphalt concrete mixture hand patching |
| AQ |
| Ton |
| 70 |
| 63501 |
| Temporary traffic control |
| CQ |
| LSum |
| 1 |
| 63507 |
| Construction sign |
| CQ |
| Syd |
| 4.5 |
| 63509 |
| Flagger |
| AQ |
| Hour |
| 128 |
| 63510 |
| Pilot car |
| AQ |
| Hour |
| 40 |
TOTAL
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SCOPE OF WORK
Per the Plans and specifications, the Contractor shall provide all professional services, labor, etc. necessary for the complete Chip Seal Maintenance of the 73 Road (Mt Watson Boulevard) on the LTBMU in Placer County. Work includes a single layer chip seal with associated hand patching and brushing to prepare the road surface. Also included are traffic control items needed to maintain public traffic while work progresses.*
LOCATION
From the intersection of Hwy 28 and Hwy 267, travel 3.2 miles north on Hwy 267 to Mt Watson Blvd (Left Side). At the gate is the beginning of the project. Continue on Mt Watson for 10.75 miles to the end of existing chip seal. This is the end of the project.
GOALS AND OBJECTIVES
The Contractor shall provide all management services, quality control, logistical support, vehicles, equipment and materials. Contractor shall comply with contract requirements with regard to work and materials. The period of performance is 30 calendar days after issuance of notice to proceed. Warranty period shall begin upon written government acceptance of the completed work.
GENERAL REQUIREMENTS
Along with the Requirements and Responsibilities identified in this document, the Contractor shall provide project administration services to include the following:
· Consultation with the Government regarding all aspects of the project.
· Attendance at (Pre bid walk through, pre construction conference, bi-weekly construction meetings, and close out.).
· Travel.
· Direction and quality control of in-house personnel and consultants.
· Coordination and response to Submittals and Requests for Information.
· Coordination with the local utility companies.
· Coordination with the local government.
· Contractor must be registered in Central Contractor Registration prior to the request for proposal date for their proposal to be considered valid. (See - http://www.ccr.gov/)
GOVERNMENT REVIEWS
Following each submittal, the Government’s project team will review and comment on the work. This review period shall be a minimum of 10 and a maximum of 15 working days without impact to the Contractor. The Contractor may continue to work during this review period following all submittals at its own risk.
REQUESTS FOR INFORMATION
The Contractor shall prepare written comments and/or drawings to enable the government representative to understand the request and allow the government representative to respond in a timely manner and at no additional expense to the Government.
CHANGES
The Contractor shall provide all documents for change orders, including drawings and/or specifications required because of errors and/or omissions, or unforeseen changes in scope.
SUBMITTALS & DELIVERY POINTS
Project Manager:
Paul Potts Phone:
(530) 543-2746 Correspondence shall be directed to:
Paul Potts, USDA Forest Service Lake Tahoe Basin Management Unit
53 College Drive
South Lake Tahoe, CA 96150 Changes to the contract such as changes in the statement of work, quantity of work, the performance period, or funds, stop work, termination actions, or final acceptance are reserved for the Contracting Officer.
Prior to the final payment under this contract, the Contractor shall furnish the Government a release of all claims against the Government other than such claims as the Contractor may specifically state. The Contractor shall describe and state the amount of each stated claim.
Selection Procedure: During the review of offers the Forest Service may ask for additional information. The Forest Service may initiate action to award a contract at any point after review of the offers. Therefore, offers should reflect the contractors best terms both from a technical and cost standpoint.
NOTE: Contractor must be fully registered at www.ccr.gov for the proposal to be accepted
1.
2.
Contractor must begin work within 10 days of the effective date of the Notice to Proceed. See Section F for additional information.
Restrictions on Work
NONE
Worker's Compensation Insurance
The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
Camping and Housing (see also Section H, Camping Permit Compliance)
Camping is not permitted in US Forest Service campgrounds. Contractor [ ] will [ X ] will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.
Maps
INCLUDED WITH DRAWINGS
Drawings and Specifications
Project Drawings: The following drawings are part of this solicitation:
Specifications:
[ X ] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 (US Customary Units) This document is incorporated by reference and is available on the web in either MS Word
(http://www.wfl.fha.dot.gov/design/specs/English/FP03_USCust_final_111403.doc) or Acrobat (http://www.wfl.fha.dot.gov/design/specs/English/FP03_USCust_final_111403.pdf)
It is also available as a wire-bound book that can be purchased from the US Government Printing
Office:
Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001
Stock Number: 050-001-00341-4 (U.S. Customary)
The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.
Table of Contents 7Table of Contents
Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract 103 - Scope of Work Deletions 104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
107.02 Protection and Restoration of Property and Landscape 108 - Prosecution and Progress 108 Delete.
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions.
155 - Schedules for Construction Contracts 155 Delete.
409 - Asphalt Surface Treatment
409.02 Material.
409.06 Weather.
409.06 Date & Time.
409.08 Asphalt Application.
409.10 Fog Seal.
409.11 Single Course Surface Treatments.
Table 409-1 Approximate Quantities of Material-Single Course Surface Treatment Table 409-2 Approximate Quantities of Material – Double Course Surface Treatments Table 409-3 Approximate Quantities of Material – Triple Course Surface Treatments
409.13 Acceptance.
Table 409-4 Sampling and Testing Requirements.
430 - Asphalt Pavement Patching 635 - Temporary Traffic Control
635.03 General.
703 - Aggregate 703.10(e) Flakiness Index.
703.10(i) Adherent Coating.
703.06 Crushed Aggregate
718 - Traffic Signing and Marking Material
Preface
Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work 106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
107.10_05_us_05_04_2007
107.02 Protection and Restoration of Property and Landscape
Add the following:
Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September 2000
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
409 - Asphalt Surface Treatment 409.02_nat_us_05_12_2004
409.02 Material.
Add the following:
When designated, conform to applicable State department of transportation asphalt cement or emulsified asphalt requirements.
409.06_nat_us_05_12_2004
409.06 Weather.
Delete the first paragraph and replace with the following:
Apply surface treatments with aggregate only when ambient air and surface temperatures are above 60 °F and rising in the shade, when the weather is not foggy or rainy, and when rain is not forecast for at least 24 hours after application.
409.06 Date & Time.
Add the following.
Construct fog seal and single-course surface treatments between _____ June 1, 2010 and October 31, 2010______ and multiple-course surface treatments between June 1, 2010 ______ and _October 31, 2010_____.
409.08_nat_us_06_21_2005
409.08 Asphalt Application.
Add the following to the 3rd paragraph:
Ensure the length of spread is no more than what can be covered with aggregate within 1 minute of the asphalt application.
409.10 Fog Seal.
Add the following to the first paragraph:
Dilute by adding an equal amount of water to the emulsified asphalt. Do not cut the emulsified asphalt more than once.
409.11 Single Course Surface Treatments.
Add the following:
Do not permit traffic to travel over any Asphalt Surface Treatment until completion of rolling.
409.10_nat_us_08_12_2004
Delete Table 409-1 and substitute the following:
Table 409-1 Approximate Quantities of Material-Single Course Surface Treatment Table 409-1
Approximate Quantities of Material for
Single-Course Surface Treatment
| Designation |
| ADVANCE \d 3Nominal Maximum Size of Aggregate |
| Aggregate Gradation (1) |
| Estimated Quantity of Aggregate (2) pounds/yd2 |
| Estimated Quantity of Emulsified Asphalt (3) gallons/yd2 |
| Estimated Quantity of Asphalt Binder (3) gallons/yd2 |
| 1A |
| 3/4 inch |
| B |
| 40 – 49 |
| 0.40 – 0.55 |
| 0.27 – 0.38 |
| 1B |
| 1/2 inch |
| C |
| 26 – 29 |
| 0.31 – 0.44 |
| 0.20 – 0.31 |
| 1C |
| 3/8 inch |
| D |
| 20 – 26 |
| 0.20 – 0.35 |
| 0.13 – 0.24 |
| 1D |
| No. 4 |
| E |
| 15 – 20 |
| 0.15 – 0.22 |
| 0.11 – 0.18 |
| 1E |
| Sand |
| F |
| 9 – 15 |
| 0.11 – 0.18 |
| 0.09 – 0.15 |
(1) See Table 703-7 for aggregate gradations.
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and
T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.
(3) Adjust the asphalt content for the condition of the road.
409.11_nat_us_12_18_2004
Table 409-2 Approximate Quantities of Material – Double Course Surface Treatments
Delete Tables 409-2 and substitute the following:
Table 409-2
Approximate Quantities of Material for
Double Course Surface Treatments
| Designation (Thickness) |
| Nominal Maximum Size of Aggregate |
| Aggregate Gradation(1) |
| Estimated Quantity of Aggregate(2) |
pounds/yd2
| Estimated Quantity of Emulsified Asphalt (3) gallons/yd2 |
| Estimated Quantity of Asphalt |
Binder (3) gallons/yd2
2A (1/2 inch)
| 1st Application |
| 3/8 inch |
| D |
| 26 – 35 |
| 0.20 – 0.31 |
| 0.11 – 0.22 |
| 2nd Application |
| No. 4 |
| E |
| 9 – 15 |
| 0.31 – 0.40 |
| 0.18 – 0.29 |
2B (5/8 inch)
| 1st Application |
| 1/2 inch |
| C |
| 29 – 40 |
| 0.31 – 0.40 |
| 0.18 – 0.29 |
| 2nd Application |
| No. 4 |
| E |
| 14 – 20 |
| 0.40 – 0.51 |
| 0.24 – 0.33 |
2C (3/4 inch)
| 1st Application |
| 3/4 inch |
| B |
| 40 – 49 |
| 0.35 – 0.51 |
| 0.22 – 0.33 |
| 2nd Application |
| 3/8 inch |
| D |
| 20 – 26 |
| 0.51 – 0.60 |
| 0.33 – 0.42 |
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and
T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.
(3) Adjust the asphalt content of the first application for the condition of the road.
409.12_nat_us_08_12_2004
Delete Tables 409-2 and substitute the following:
Table 409-3 Approximate Quantities of Material – Triple Course Surface Treatments Table 409-3
Approximate Quantities of Material for
Triple Course Surface Treatments
| Designation (Thickness) |
| Nominal Maximum Size of Aggregate |
| Aggregate Gradation(1) |
| Estimated Quantity of Aggregate(2) |
pounds/yd2 Estimated Quantity of Emulsified Asphalt (3) gallons/yd2 Estimated Quantity of Asphalt Binder(3) gallons/yd2
3A (1/2 inch)
| 1st Application |
| 3/8 inch |
| D |
| 26 – 35 |
| 0.20 – 0.31 |
| 0.11 – 0.22 |
| 2nd Application |
| No. 4 |
| E |
| 9 – 15 |
| 0.24 – 0.35 |
| 0.15 – 0.27 |
| 3rd Application |
| Sand |
| F |
| 9 – 15 |
| 0.20 – 0.31 |
| 0.11 – 0.22 |
3B (5/8 inch)
| 1st Application |
| 1/2 inch |
| C |
| 29 – 40 |
| 0.20 – 0.31 |
| 0.11 – 0.22 |
| 2nd Application |
| 3/8 inch |
| D |
| 15 – 20 |
| 0.31 – 0.40 |
| 0.18 – 0.29 |
| 3rd Application |
| No. 4 |
| E |
| 9 – 15 |
| 0.20 – 0.31 |
| 0.11 – 0.22 |
3C (3/4 inch)
| 1st Application |
| 3/4 inch |
| B |
| 35 – 46 |
| 0.24 – 0.35 |
| 0.15 – 0.27 |
| 2nd Application |
| 3/8 inch |
| D |
| 20 – 26 |
| 0.31 – 0.40 |
| 0.18 – 0.29 |
| 3rd Application |
| No. 4 |
| E |
| 9 – 15 |
| 0.24 – 0.35 |
| 0.15 – 0.27 |
(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65 as determined by AASHTO T 84 and
T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.
(3) Adjust the asphalt content of the first application for the condition of the road.
409.13_nat_us_05_13_2004
409.13 Acceptance.
Delete the 2nd paragraph and replace with the following:
Aggregate gradation for asphalt surface treatment will be evaluated under Subsection 106.04.
Table 409-4 Sampling and Testing Requirements.
Delete the last cell (4th) under Sampling Frequency and replace with the following:
1 per tanker truck and 1 per trailer
Delete the 2nd and 3rd cell under Type of Acceptance and replace with the following:
Measured and tested for conformance (106.04)
430 - Asphalt Pavement Patching 430.00_nat_us_07_27_2007
Description
430.01 This work consists of performing full depth patching, patching with geotextiles, skin patching, spray-injection patching, and removal and replacement of asphalt berms.
Material
430.02 Conform to the following Subsections:
| Minor Hot Asphalt Pavement |
| 404.02 |
| Asphalt Binder |
| 702.01 |
| Cutback Asphalt |
| 702.02 |
| Emulsified Asphalt |
| 703.03 |
| Application Temperatures |
| 702.04 |
| Cold Asphalt Mix |
| 702.10 |
| Aggregate |
| 703.07 (a) and (b) |
| Choker Aggregate |
| 703.12 |
| Geotextile Type VI |
| 714.01 |
| Sand |
| 703.15 |
Construction
430.03 Composition of Mix (Job-Mix Formula). Furnish either Minor Hot Asphalt Pavement or Minor Cold Asphalt Mix as approved by the CO.
430.04 Full Depth Patch.
Remove material to a minimum depth of 4 inches, or as necessary to reach firm support. If firm support for a patch is unavailable, notify the CO prior to placing any material.
Trim or mill the edges of the prepared hole to form a vertical face in un-fractured asphalt surfacing. Make the prepared hole rectangular, and clean it of all loose material. When the hole is dry, apply emulsified asphalt to the bottom and faces of the hole. Barricade prepared sites. Patch the sites immediately after the emulsified asphalt breaks. Place the asphalt concrete mixture in layers not exceeding 4 inches. Thoroughly compact each layer with hand or mechanical tampers or rollers. For hot asphalt concrete mixtures, compact the mix while it is above 230 °F.
Compact the finished surface with a steel-wheel roller or vibratory plate compactor. Ensure that the compacted patch is approximately 1/8 to 1/4 inches above the level of the adjacent pavement. Seal the edges of the completed patch with emulsified asphalt, and blot with fine sand.
430.05 Patching with Geotextile. Prepare the surface by digging out and patching according to Subsection 430.04 or by cleaning the surface, removing vegetation, and filling all cracks more than 1/4 inch wide with an approved crack-filling material. Remove excess crack-filling material. Spray the prepared surface with asphalt cement or emulsified asphalt according to the geotextile manufacturer’s direction. Immediately place the geotextile over the repaired area. Allow emulsified asphalt to break before placing geotextile. Extend the fabric a minimum of 6 inches beyond the repaired or patched area onto sound adjoining pavement. Use a minimum of 2 inches overlap where adjacent fabric panels are needed to cover the repaired area.
Do not place the asphalt concrete mixture until authorized by the CO. Uniformly distribute asphalt concrete mixture in layers not to exceed 2 inches compacted depth. Feather the edges of skin patches. When placing more than one layers, offset all joints at least 6 inches between layers. Compact each layer with an 8 to 10 ton steel roller. For hot asphalt concrete mixtures, compact the mix while it is above 230°F. Ensure that the completed patch does not have abrupt transitions that could adversely affect the steering of a passenger car traveling across the area. Provide transition tapers for skin patches that are 12 inches long per 1/8 inch thickness of patch in the direction on travel.
430.06 Skin Patches. Prepare the surface on which the skin patch is placed by cleaning the surface, removing vegetation, and filling all cracks more than 1/4 inch wide with an approved crack-filling material. Remove excess crack-filling material. Spray the surface with emulsified asphalt at the rate approved by the CO.
Apply the asphalt concrete mixture according to Subsection 430.05.
430.07 Spray-Injection Patching. Use an approved continuous process that cleans and dries the area to be patched, sprays a tack coat of binder on the sides and bottom of the pothole, place aggregate coated with emulsified asphalt, and covers the area with a choker aggregate.
430.08 Asphalt Berm. Remove damaged segments of berm and bevel exposed ends at approximately 45 degrees from vertical. Clean and patch the berm foundation as necessary. Coat the foundation and joining surfaces with emulsified asphalt. Place and compact asphalt mix to conform to the shape of the undamaged segment.
430.09 Waste Material. Dispose of all materials removed from potholes, patches, and berms in accordance with Subsection 203.05(a).
430.10 Acceptance. Asphalt concrete mixtures will be evaluated under Subsections 106.02 and 106.03. Geotextiles will be evaluated under Subsection 106.03. Spray-injection patching will be evaluated under Subsections 106.02 and 106.03.
Measurement
430.11 Measure the Section 430 items listed in the bid schedule according to Subsection 109.02.
Payment
430.12 The accepted quantities will be paid at the contract unit price per unit of measurement for Section 430 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 (US Customary Units) 35 - Temporary Traffic Control 635.03_nat_us_05_13_2004
635.03 General.
Add the following:
Install temporary traffic control signs to temporary posts or approved temporary sign mounts.
703 - Aggregate 703.06_nat_us_03_02_2005
703.10(e) Flakiness Index.
Delete and replace with the following:
Flakiness Index, FLH T 508
30% max.
703.10(i) Adherent Coating.
Add the following:
Adherent coating on the aggregate, FLH T 512
0.5% max.
703.06_01_us_10_12_2006
703.06 Crushed Aggregate
Add the following
Hard, durable, and well draining pit run material, suitable for reestablishing roadbed grade at the locations specified is acceptable for this project. Furnish material with a maximum size of 2 inches, free of organic material, clay, and other deleterious material. Replace unsuitable imported material, removed from the roadbed, with an equal quantity of suitable pit run material and spread the unsuitable material along the adjacent roadside.
718 - Traffic Signing and Marking Material 718.05_nat_us_02_25_2008
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.
FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS
6-14-2006
(Ref: FSH 6309.32 and 6309.11)
1. SCOPE:
The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.
2. RESPONSIBILITIES:
A. Contractor
(1) Shall abide by the requirements of this Fire Plan.
(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.
(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.
(4) Shall designate in the fire plan and furnish on Contract Area during operating hours a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.
Shall complete the Contractor's Plan Regarding Personnel and shall furnish the Contracting Officer (CO) with a copy prior to commencing work at the site. Shall currently advise the CO of any changes in personnel as the changes occur. Shall revise Section 6.B to reflect current activities upon request of the CO.
B. Forest Service
The Forest Service may conduct one or more inspections for compliance with the fire plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.
3. TOOLS AND EQUIPMENT:
A. The Contractor shall comply with the following requirements during the fire precautionary period as defined by unit administering contracts unless waived in writing:
The Fire Precautionary Period is May 1 to Dec 1.
Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the. National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition.
Contractor shall meet minimum requirements of Sections 4427 and 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source.
Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 10 feet of each tail and corner block.
Trucks, tractors, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.
Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).
Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent. In addition, concentrations of wood dust and debris shall be removed from such equipment daily. Additional extinguishers and sizes may be required at landings in accordance with Section 5.
Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. One fire extinguisher meeting specifications of C.P.R.C. Section 4431 shall be kept with each operating power saw. A size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.
Contractor shall meet minimum requirements of Section 4430 of the California Public Resources Code (C.P.R.C.). Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor 's Operations hereunder during Fire Precautionary Period unless otherwise agreed. When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or immediately adjacent to each active landing unless otherwise excepted when hot saw technology is being used. See Section 5 for specific contract requirements.
The tank shall contain at least 300 gallons of water available for fire suppression. A water sprinkling tank truck will meet this requirement if provision is made to insure that the minimum of 300 gallons is available for fire suppression at all times. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area. Tank truck or trailer shall be equipped with following:
(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contract Area using a 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:
| Temp |
| Sea |
Level
| 1000 Feet |
| 2000 Feet |
| 3000 Feet |
| 4000 Feet |
| 5000 Feet |
| 6000 Feet |
| 7000 Feet |
| 8000 Feet |
| 9000 Feet |
| 10000 Feet |
| 55 |
| 179 |
| 23 |
| 174 |
| 23 |
| 169 |
| 23 |
| 165 |
| 22 |
| 161 |
| 22 |
| 157 |
| 22 |
| 153 |
| 22 |
| 150 |
| 21 |
| 146 |
| 21 |
| 142 |
| 21 |
| 139 |
| 21 |
| 70 |
| 175 |
| 23 |
| 171 |
| 23 |
| 166 |
| 22 |
| 162 |
| 22 |
| 158 |
| 22 |
| 154 |
| 22 |
| 150 |
| 21 |
| 147 |
| 21 |
| 143 |
| 21 |
| 139 |
| 21 |
| 136 |
| 20 |
| 85 |
| 171 |
| 23 |
| 168 |
| 23 |
| 163 |
| 22 |
| 159 |
| 22 |
| 155 |
| 22 |
| 151 |
| 21 |
| 147 |
| 21 |
| 144 |
| 21 |
| 140 |
| 21 |
| 136 |
| 20 |
| 133 |
| 20 |
| 100 |
| 168 |
| 23 |
| 164 |
| 23 |
| 159 |
| 22 |
| 155 |
| 22 |
| 152 |
| 22 |
| 148 |
| 21 |
| 144 |
| 21 |
| 141 |
| 21 |
| 137 |
| 20 |
| 133 |
| 20 |
| 131 |
| 20 |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
| PSI |
| GPM |
The pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread. A bypass or pressure relief valve shall be provided for other than centrifugal pumps.
(2) 300 feet of 3/4-inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1-inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.
(3) A shut-off combination nozzle that meets the following minimum performance standards when measured at 100 P.S.I. at the nozzle:
| G.P.M. |
| Horizontal Range |
| Straight Stream |
| 10 |
| 38 feet |
| Fog Spray |
| 6 - 20 |
| N/A |
(4) Sufficient fuel to run pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.
When Contractor is using Hot Saw Technology, an additional 500 feet of not less than one (1) inch outside diameter serviceable hard rubber poly or rubber lined or fiber jacket rubber lined (FJRL) hose shall be immediately available for use and be capable of connecting to the 300 feet of hose and appurturances in (2) and (3) above. Synthetic hose may be used by agreement.
B Any additional fire plan requirements:
4.
GENERAL
A. State Law. The Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.
B. Permits Required. The Contractor must secure a special written permit from the District Ranger or designated representative before engaging in any of the activities listed below. The terms and conditions of any of the permits required for this contract are as shown on copies attached to the Fire Plan.
(1) Blasting and Storage of Explosives and Detonators. (Explosives Permit required by California Health & Safety Code, Section 12101.)
(2) Burning.
(3) Air Pollution. (Issued by local State or County Air Pollution Control Districts, as applicable.)
(4) Camp, Lunch and Warming Fires.
(5) Welding and Cutting.
C. Regulations for Burning. Before setting any fires whatsoever, the Contractor shall notify the CO of his/her intentions. Special care shall be taken to prevent scorching or causing any damage to adjacent structures, trees, and shrubbery. Piles of material to be burned shall be of such size and so placed that during burning no damage shall result to adjacent objects.
D. Smoking and Fire Rules. Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter (CPRC 4423.4). In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see. Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.
E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.
F. Welding. Contractor shall confine welding activity to cleared areas having a minimum radius of ten feet measured from place of welding.
G. Blasting. Contractor shall use electric caps only unless otherwise agreed in writing. When blasting is necessary in slash areas, a watchperson equipped with a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump shall remain in the immediate area for an hour after blasting has been completed.
H. Oil Filter and Glass Jugs. Contractor shall remove from National Forest lands oily rags and used oil filters and shall prohibit use of glass bottles and jugs in Contractor's Operations.
I. Reporting Fires. As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor.
J. Communications. Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone. The communications system shall be operable during Contractor's Operations in Fire Precautionary Period described in Section 3 and during the time fire patrolperson service is required. A radio-equipped fire patrolperson vehicle will satisfy this requirement if in operation during the time required except during PAL levels “D” and “Ev”. See Section 5 for other communication requirements when operating on “D” and “Ev” days with hot saw technology. A CB is not acceptable communication because FCC Regulations prohibit commercial use.
K. Fire Patrol Person. Contractor shall furnish a qualified fire patrolperson each operating day when Project Activity Level B or higher is in effect. When on duty, sole responsibility of patrolperson shall be to patrol the operation for prevention and detection of fires, take suppression action where necessary and notify the Forest Service as required by Section 5.
By agreement, one patrolperson may provide patrol on this and adjacent projects or sales. No patrolperson shall be required on Specified Road construction jobs except during clearing operations unless otherwise specified.
L.
Time of Snag Felling. Unless the felling of dead trees would interfere with the felling, skidding or yarding of green timber or be a safety hazard, or be prevented under Section 5, required felling of dead trees shall be concurrent with the felling of live timber. There shall be reasonably timely felling of dead trees to facilitate utilization and protection from fire.
M.
Clearing of Fuels. Contractor shall clear away, and keep clear, fuels and logging debris as follows:
| Welding equipment and stationary log loaders, yarders and other equipment listed in California State Law: |
| 10 feet slope radius |
| Tail or corner haulback blocks: |
| 5 feet slope radius |
| Lines near, between or above blocks: |
| Sufficient clearing to prevent line from rubbing on snags, down logs and other dead woody material |
5. EMERGENCY MEASURES
The table set forth below establishes work restrictions and fire precautions that the Contractor must observe at each activity level. The restrictions are cumulative at each level.
The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant additional restriction of activities. Contractor shall obtain the predicted Project Activity Level by calling the following phone number 530-644-6048 before starting work each day. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM local time. If predictions made after 6:00 PM are significantly different than originally estimated, Forest Service will inform Contractor when changes in restrictions or industrial precautions are indicated.
The following definitions shall apply to these Project Activity Levels:
Cable Yarding Systems: A yarding system that takes logs from the stump area to a landing using an overhead system of winch-driven cables to which logs are attached with chokers or grapples.
Hot Saw Technology: A harvesting system that employs a high-speed (>1100 rpm) rotation felling heads (i.e., full rotation lateral tilt head).
Sunset: The time that sunset is reported in the local newspaper for that day.
Except for Project Activity Level days “Ev after 1:00 PM local time” and “E”, Forest Service may issue substitute precautions(s) of the requirements below. Such agreements shall prescribe measures to be taken by Contractor to reduce risk of ignition and/or spread of fire.
Forest Service may change the Project Activity Levels to other values upon revision of the National Fire Danger Rating System and may change the specific Project Activity Levels and/or requirements when such changes are necessary for the protection of the National Forest. When sent to Contractor, the revised Project Activity Levels will supersede the levels below.
PROJECT ACTIVITY LEVEL –EMERGENCY PRECAUTIONS
Table version 6/13/2006
PROJECT ACTIVITY LEVEL
| Level |
| Project Activity Requirements |
| A |
| Minimum required by Section 3 |
1. PAL levels are cumulative, Ev level would include all preceding
PAL requirements.
| B |
| 1. A fire patrolperson is required for mechanical operations from cessation of operations until 2 hours after operations cease or sunset, which ever occurs first. |
2. Tank truck or trailer shall be on or adjacent to each active landing.
3. When hot saw technology is being used, the tank truck or trailer (B2 above) may serve dual purpose as active landing tank truck provided it shall be kept readily available for use as follows:
a.Within one quarter mile of the operating hot saw technology; and b.Within 10 minutes of the active landing; and
c. Effective communications exist between hot saw technology and active landing.
Otherwise, there shall be a tank truck or trailer at both the active landing and within one quarter mile of the operating hot saw technology.
4. (Additional restrictions specified by the forest.)
| C |
| 1. The following operations are prohibited from 1:00 PM until 8:00 PM |
local time:
a. Blasting
2. Operations using hot saw technology are prohibited between 1:00 PM and sunset local time. Hot saw technology operations may continue if Contractor provides a portable fire suppression system capable of extinguishing a 20-foot by 20-foot wild land fire within five (5) minutes of discovery. The following equipment will meet the requirements above:
a. Compressed Air Foam System with minimum requirements of 20 gallons stored energy, 100 feet of 1 inch hose and adjustable 1 inch nozzle, minimum discharge range of 60 feet and 1 spare air cylinder; or
b. All terrain tank truck or equivalent capable of…
This is the start of the file's text. The full file is on GovTribe.