35_ Attach 1 Project Drawings.pdf
PDF 1 MB Posted
- Attached to
- RECOVERY Orr Lake Campground Rehab
- Solicitation number
- AG-9702-10-S-0235
About this file
Project Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 38_ Special Notice Orr Lake Sign-in.PDF | ||
| Amdmt1.pdf | ||
| 35_Attachment 5 Wage Determination.pdf | ||
| 35_Attachment 4 Payment Bond Form.pdf | ||
| 38_Solicitation.docx | DOCX document | |
| Attachment 6 Standard Form 24.pdf | ||
| 34_Attach 3 Special Project Specifications.docx | DOCX document | |
| 35_ Attach 2 Fire Plan | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Somes Bar
Macdoel
Montague
Grenada
Weed
Mt
McCloud
YREKA
Fort Jones
Etna
Callahan
Cecilville
Forks of
Salmon
Happy Camp
Oregon
California
APPROVED
BY ZONE ENGINEER DATE DISTRICT RANGER DATE DATEFOREST ENGINEER FOREST SUPERVISOR DATE
PROJECT LOCATION
NATIONAL FOREST
KLAMATH
VICINITY
SAN DIEGO
BLYTHE
NEEDLES
SAN BERNARDINO
PASADENASANTA BARBARA
GOLETA
BAKERSFIELD
PORTERVILLE
FRESNO
BISHOP
STOCKTON
SONORA
PLACERVILLE
SACRAMENTO
MONTEREY
SAN
FRANCISCO
SANTA ROSA
TRUCKEE
NEVADA CITY
QUINCY
SUSANVILLE
REDDING
RED BLUFF
EUREKA
FORT BRAGG WILLOWS
WILLITS
UKIAH
ALTURAS
YREKA
CRESENT
CITY
MEXICO
NEVADA
OREGON
PACIFIC OCEAN
LEGEND
INTERSTATE HIGHWAYS
U.S. HIGHWAYS
STATE HIGHWAYS
FOREST HIGHWAYS
SCALE
0 50 100 150 200
MILES
N
W E
INDEX MAP
STATE OF CALIFORNIA
GOOSENEST RANGER DISTRICT
PLANS FOR PROPOSED
FOREST SERVICE - REGION FIVE
UNITED STATES DEPARTMENT OF AGRICULTURE
KLAMATH NATIONAL FOREST
SISKIYOU COUNTY, CALIFORNIA
Dorris
DRAWING INDEX
ORR LAKE CAMPGROUND
LOS ANGELES
TITLE SHEET No. TITLESHEET No.
1. COVER SHEET/DRAWING INDEX
2. LOCALITY MAP
3. SUMMARY OF ESTIMATED QUANTITIES (1)
4. SUMMARY OF ESTIMATED QUANTITIES (2)
5. ORR LAKE PROJECT PLAN VIEW
6. EAST/NORTH TIE ROAD(1)- PLAN & PROFILE
7. EAST/NORTH TIE ROAD(2)- PLAN & PROFILE
8. EAST/NORTH TIE ROAD(3)- PLAN & PROFILE
9. EAST/NORTH TIE ROAD(4)- PLAN & PROFILE
10. NORTH END CAMPGROUND LOOP ROAD(1)- PLAN & PROFILE
11. NORTH END CAMPGROUND LOOP ROAD(2)- PLAN & PROFILE
12. NORTH END CAMPGROUND LOOP ROAD(3)- PLAN & PROFILE
13. NORTH END CAMPGROUND LOOP ROAD(4)- PLAN & PROFILE
14. NORTH END CAMPGROUND "A" AND "B" SPURS- PLAN & PROFILE
15. NORTH END CAMPGROUND "C" AND "D" SPURS- PLAN & PROFILE
16. NORTH END CAMPGROUND "E" SPUR- PLAN & PROFILE
17. NORTH END CAMPGROUND "A","B" AND "C" CAMPSITE PLAN
18. NORTH END CAMPGROUND "D" AND "E" CAMPSITE PLAN
19. INDIVIDUAL TREE REMOVAL
20. REHABILITATION AND SCARIFY PLAN (NORTH END)
21. WHEEL STOP AND WASTE RECEPTACLE PLAN (NORTH END)
22. BOULDER PLACEMENT PLAN (NORTH END)
23. SIGN PLAN (NORTH END)
24. EAST END CAMPGROUND PLAN
25. EAST END CAMPGROUND ROAD- PLAN AND PROFILE
26. EAST END CAMPGROUND "F" AND "G" SPURS- PLAN & PROFILE
27. EAST END CAMPGROUND "H" AND "J" SPURS- PLAN & PROFILE
28. EAST END CAMPGROUND "F" AND "G" CAMPSITE PLAN
29. EAST END CAMPGROUND "H" AND "J" CAMPSITE PLAN
30. SIGN PLAN (EAST END)
31. WHEEL STOP AND WASTE
RECEPTACLE PLAN (EAST END)
32. BOULDER PLACEMENT PLAN (EAST END)
33. TRAIL CONSTRUCTION PLAN VIEW
34. TRAIL CONSTRUCTION STRAIGHT LINE
35. FISHING PLATFORM "A", "B" AND"D"
DESIGN PLAN AND PROFILE
36. FISHING PLATFORM "C"
DESIGN PLAN AND PROFILE
37. FISHING PLATFORM APPROACH RAMP
38. FISHING PLATFORM "A"- PLAN & PROFILE
39. FISHING PLATFORM "B"- PLAN & PROFILE
40. FISHING PLATFORM "C"- PLAN & PROFILE
41. FISHING PLATFORM "D"- PLAN & PROFILE
42. FISHING PLATFORM DETAILS AND NOTES
43. FISHING ACCESS RAMP- PLAN & PROFILE
44. BOAT RAMP- PLAN & PROFILE
45. INFORMATION/PAY STATION DETAILS
46. NORTH END CAMPGROUND
WELL DRILLING PLAN
47. ROAD OBLITERATION PLAN
48. ROAD CONSTRUCTION TYPICALS
49. TRAIL TYPICAL SECTIONS
50. WASTE RECEPTACLE AND BENCH
MOUNTING PAD DETAILS
51. CAMPSITE HARDWARE DETAILS
52. CAMPSITE HARDWARE AND
MISCELLANEOUS DETAILS
53. MISCELLANEOUS DETAILS
Shasta
Dave Seiler 2/1/2010 2/1/20102/1/20102/1/2010Laura Allen Ken Stagg Patricia Grantham
ORR LAKE CAMPGROUND
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
N
21 D
44N93
44N93
N97
F
44N98
B
44N92
44N06X
AA
N3 6Y
44N36Y
44N15
45N94
45N18
N
Y
N09
Y
45N
44N28
N3
0X
A
36YA
36YA
B
44N30X
44N10Y
E
44N95
6P01
N
Y
8Q01
43N
8Q01
44N8244N32
44N14
5Q003
Orr Mtn
Cedar^M^JMtn
Leaf
Round^M^JValley
Bray
Shafter
Kegg
Garner Ranch
Landing^M^JStripPollic^M^J Flat
Dry Lake
Orr Lake
Cre ek
4 3
9 11
33 35
28 27
Dead Steer Flat
LEGEND
PROJECT AREA
MATERIAL SOURCE
(BORROW PIT)
T 44 N
R 1 W
LOCALITY MAP
DAVE SEILER 1/25/2010 2
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FORESTER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:
DRAWN:
CHECKED:
DATE:
DATE:
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
ORR LAKE CAMPGROUND SUMMARY OF ESTIMATED
QUANTITIES (1)
ITEM
NO. DESCRIPTION
METHOD
OF
MEASURE-
MENT
PAY
UNIT
C.Y.
EACH
EACH
EACH
L.S.
L.S.
C.Y.
C.Y.
C.Y.
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
207(01) CQ S.Y.
CQ
CQ
ALL
ALL
AGGREGATE BASE, GRADING (D),
COMPACTION METHOD (C)
TOTALS
CQ
CONCRETE, METHOD A601(01) CQ
157(14)
ORR LAKE
CAMPGROUND
201 (04) ACRE
ACRE
201(52) REMOVE TREES
204(01) C.Y.
204(04) C.Y.
204(97) EXCAVATION, COMPACTION METHOD (E) L.S
L.S
ALL
ALL
FOREST SERVICE
DESIGNED:
SHEET
DRAWING NAME
EARTHWORK GEOTEXTILE , TYPE III-A
PLACED RIPRAP, CLASS 2
251(60)
251(61)
MACHINE PLACED BARRIER BOULDERS
(PLACEMENT ONLY)
MACHINE PLACED BARRIER BOULDERS
301(03)
651(02) PIT AND QUARRY DEVELOPMENT
EROSION CONTROL AND POLLUTION
PREVENTION PLAN
1.4
251(01)A
251(01)B PLACED RIPRAP, CLASS 3
SEEDING, FERTILIZING AND MULCHING,
HYDRAULIC METHOD
1.35625 (28)
CLEARING AND GRUBBING, DISPOSAL OF TOPS
AND LIMBS (K), LOGS (K), AND STUMPS (K).
ROADWAY EXCAVATION, COMPACTION
METHOD (E), FINISHING METHOD (A)
UNCLASSIFIED BORROW, COMPACTION
METHOD (E), FINISHING METHOD (A)
151(01) MOBILIZATION
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FORESTER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:
DRAWN:
CHECKED:
DATE:
DATE:
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
ORR LAKE CAMPGROUND
ITEM
NO. DESCRIPTION
METHOD
OF
MEASURE-
MENT
PAY
UNIT
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
CQ
TOTALS
ORR LAKE
CAMPGROUND
FOREST SERVICE
DESIGNED:
SHEET
DRAWING NAME
SUMMARY OF ESTIMATED
QUANTITIES (2) 4
10600(01) WASTE RECEPTACLE HB1
10600(02) WASTE RECEPTACLE HB2
10700 S.F.
10800 FISHING PLATFORM AND GANGWAY 4
10300(01) PICNIC TABLE
10300(02) LANTERN HANGER
10510(01) SINGLE PEDESTAL GRILL
10510(02)
10510(03) UNIVERSAL ACCESS FIRE RING
10510(04) LARGE FIRE RING
DRILLING L.F.
L.F.
L.F.PVC WELL CASING
PVC WELL SCREEN
GRAVEL PACK (IF REQUIRED) L.S.
L.S.
SANITARY SEAL L.S.
WELL DEVELOPMENT L.S.
WELL PERFORMANCE TESTING L.S.
WELL SAMPLING AND TESTING L.S.
L.S.WELL ABANDONMENT
FURNISH AND INSTALL HAND PUMP EACH 1
ALL
ALL
ALL
ALL
ALL
ALL
ALL
10300(03) BENCH 9
10300(04) REMOVE AND RE-SET LANTERN HANGER 3
10300(05) REMOVE AND DISPOSE EXISTING GRILL OR TABLE 4
COVERED PEDESTAL GRILL
10900 SIGNS
11000 INFORMATION BOARDS
ARTICULATED CONCRETE BLOCK
11100 PRECAST CONCRETE WHEEL STOP 11
EACH 2
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
GENERAL NOTES
(1 0)
S
TA
0+
EAST/NORTH TIE ROAD
(NEW CONSTRUCTION)
(4
) S
TA
0+
EQ
ORR LAKE TRAIL
(NEW CONSTRUCTION)
NORTH CAMPGROUND
LOOP ROAD
(NEW CONSTRUCTION)
ORR LAKE
(T 1)
S
TA
0+
(T
ST
A
+1
(400) STA 28+89
(530) STA 14+84
N
W
E
EAST END
CAMPGROUND ROAD
(NEW CONSTRUCTION)
(1
0)
0+
ORR LAKE PROJECT
PLAN VIEW
BRAY(44N30X)
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010
1. SLOPE STAKING SHALL BE COMPLETED BY THE FOREST SERVICE
PRIOR TO CONSTRUCTION.
2. CONSTRUCTION TOLERANCE CLASS "C".
3. IN ACCORDANCE WITH SECTION 157 AN EROSION CONTROL PLAN
SHALL BE SUBMITTED PRIOR TO COMMENCEMENT OF WORK.
4. WORK SHALL BE CONDUCTED IN A MANNER THAT WILL LEAVE ALL
EXISTING TREES AND VEGETATION OUTSIDE THE CLEARING LIMITS
UNDISTURBED.
5. ALL FINISHED SLOPES FROM ROAD CONSTRUCTION AND REHABILITATION
AREAS SHALL BE HYDROSEEDED BETWEEN SEPT. 1 AND OCT.15.
6. BARRIER BOULDERS AND RIPRAP SHALL BE COMMERCIAL SOURCE UNLESS OTHERWISE
NOTED.
7. DUE TO WILDLIFE CONCERNS WORK SHALL NOT COMMENCE UNTIL AFTER JULY 31.
Mass Haul (Cu. Yd.)
00 11
-150
-100
-50
0 100
11' 11' 11' 11'
(1 0)
0+
(2 0)
0+
(3 0)
0+
(40) 11+41
(50) 11+90
(60) 12+39
(70) 12+87
(80) 13+36
(1
) 1 4+
(1
) 1 4+
( 9 0)
1 3 +7
L LINE
P LINE
FINISHED
ROADBED
WIDTHS
CL
EXISTING ROAD
(EAST CAMPGROUND)
+4%
+8%
+7%
GROUND
L - STATION
+4% +2%
+4%
+7%
+8%
+6%
ORR LAKE CAMPGROUND EAST/NORTH TIE ROAD
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
NOTE - CLEARING FOR THE EAST/NORTH TIE ROAD
ROAD SHALL BE BY THE ACRE N
W E
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010PLAN AND PROFILE (1) 6
SUBGRADE
11'
FINISHED
ROADBED
WIDTHS
CL
-100
0 100
GROUND
P LINE
L LINE
(1
) 1 5+
(1
) 1 5+
(1
) 1 6+
(1
) 1 6+
(160) 17+23
(170) 17+58 (1
) 1 8+
(1
) 1 8+
(2
) 1 9+
04 (210) 19+52
(220) 20+00
+8%
+6% +8%
L-STA
+7%
+8%
+7% +2% -1% -3%
-8%
11' 11' 11' 11' 11' 11'
19' 19'
Mass Haul (Cu. Yd.)
ORR LAKE CAMPGROUND EAST/NORTH TIE ROAD
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE:
REVISIONDATE BY DRAWING NAME
N
W E
PLAN AND PROFILE (2)
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
7SHEET
11'
FINISHED
ROADBED
WIDTHS
CL
EAST/NORTH TIE ROAD
11' 11'
L LINE
P LINE
Mass Haul (Cu. Yd.)
0 100
(2
) 2 0+
(2
) 2 0+
(2
) 2 1+
(2
) 2 1+
(2
) 2 2+
(2
) 2 3+
(2
) 2 3+
(300) 24+03
(310) 24+52
(320) 25+01
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
-8%
-5%
0%
-3% +1% -4%
-7%
L-STA
GROUND
N
W E
PLAN AND PROFILE (3)
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
DAVE SEILER 1/25/2010 8
ORR LAKE CAMPGROUND EAST/NORTH TIE ROAD
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
11' 11'
FINISHED
ROADBED
WIDTHS
CL
11' 11'
-20
-10
0 100
(3
) 2 5+
(3
) 2 5+
(3
) 2 5+
(3
) 2 6+
(3
) 2 6+
(3
) 2 7+
(380) 27+94
(390) 28+43
40' R
EQ (400) STA 28+89
(530) STA 14+84
40'R
NORTH CAMPGROUND
LOOP ROAD
40' 40'
L LINE
P LINE
-7% -9% -7%
-4%
TOTAL EXCAVATION QUANTITY = 1843 CUBIC YARDS
TOTAL BORROW QUANTITY = 2084 CUBIC YARDS
TOTAL AGGREGATE BASE QUANTITY = 827 CUBIC YARDS
N
W
E
PLAN AND PROFILE (4)
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
1/25/2010DAVE SEILER 9
Mass Haul (Cu. Yd.)
L -STA
GROUND
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMENORTH END CAMPGROUND
LOOP ROAD
FINISHED
ROADBED
WIDTHS
CL
Mass Haul (Cu. Yd.)
0 100
EXISTING ROAD - 44N06X
6' 6'
JC
T
EA
ST
/N O
R
TH
TI
E
R O
AD
11' 26'
11' 26'
P LINE
L LINE
(4
) 1 0+
(4
) 1 0+
(4
) 1 0+
(450) 11+36
(460) 11+79
(470) 12+28
(480) 12+76 (4
) 1 3+
(5
) 1 3+
(5
) 1 4+
(5
) 1 4+
-30
-10
-20
-1% -2% 0% -1%
-1% -2%
GROUND
-3%
-1%
L - STA
N
W E
NOTE - CLEARING FOR THE NORTH END CAMPGROUND
ROAD AND SPURS SHALL BE INDIVIDUAL TREE REMOVAL
(INCLUDES REMOVING LIMBS OF EXISTING TREES WITHIN
THE CLEARING LIMITS AND DISPOSAL OF TOPS, LIMBS,LOGS
AND STUMPS IN DISPOSAL AREA ADJACENT TO THE PROJECT)
PLAN AND PROFILE (1)
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 10
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMENORTH END CAMPGROUND
LOOP ROAD
FINISHED
ROADBED
WIDTHS
CL
6' 6' 6' 6'
11' 26'
11' 11' 11' 26'
P LINE
L LINE
GROUND
0 100
(400) STA 28+89
(530) STA 14+84
EQ
Mass Haul (Cu. Yd.)
-50
(480) 12+76
(490) 13+26
(500) 13+75
(510) 14+24
(520) 14+55
JC
T. EAST/ N
O R
TH
TIE R
O
AD
(540) 15+34
(550) 15+83
(560) 16+31
(570) 16+47
(580) 16+68
(5
) 1 6+
(600) 16+97
(610) 17+03
(620) 17+26
(630) 17+48(650) 17+70
11' 11'
-10 -20 -30 -40
-2%
-3%
-1% -1% +1% -2%
-1%
L- STA
SEE DETAIL FOR CONSTRUCTION
OF INFORMATION STATION
PARKING AREA
N
W E
"A " S
PU
R
PLAN AND PROFILE (2)
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 11
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMENORTH END CAMPGROUND
LOOP ROAD
FINISHED
ROADBED
WIDTHS
CL
6' 6'
11' 11' 11' 11'
Mass Haul (Cu. Yd.)
-80
-70
-60
-50
(620) 17+26
(6
) 1 7+
(6
) 1
7+
(6
) 1 7+
(6
) 1
8+
(6
) 1 8+
(6
) 1
8+
(6
) 1 9+
01 (6
) 1 9+
(7
) 2 0+
(710) 20+49
(720) 20+90
(730) 21+20
(740) 21+65
(750) 21+84 (760) 22+30 22+52
(770) 22+71
P LINE
L LINE
L-STA
-1% 0% +1% 0% +1%
0%
GROUND
N
WE
"B" SPUR
"C
" SPU
R
"D" SPUR
"E" SPU
R
PLAN AND PROFILE (3)
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMENORTH END CAMPGROUND
LOOP ROAD
FINISHED
ROADBED
WIDTHS
CL
6' 6'
11' 11' 11' 11'
0 100
Mass Haul (Cu. Yd.)
-50
(7
) 2 1+
(7
) 2 2+
5+
EQ
(7
) 2 2+
(7
) 2 3+
(790) 23+32
(800) 23+60
(810) 23+86
(820) 23+99
(830) 24+13
(8
) 2 4+
(850) 24+60
(860) 24+85
(870) 25+16
(880) 25+51 CONSTRUCT 36' WIDE X 18' DEEP PARKING AREA
P LINE L LINE
0% -2%
-3%
+1%
+5%
+2%
GROUND
6' 6' 6' 6' 6' 6' 6' 6'6'
12' 12' 12' 12'12'12' 24'24'
6'
L-STATION
TOTAL EXCAVATION QUANTITY = 320 CUBIC YARDS
TOTAL AGGREGATE BASE QUANTITY = 562 CUBIC YARDS
NOTE: EXCESS EXCAVATION OF 50 CUBIC YARDS SHALL BE USED
IN THE REHAB. AREA ADJACENT TO THE ROAD CONSTRUCTION
N
W
E
PLAN AND PROFILE (4)
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 13
SUBGRADE
"E " S
PUR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN AND PROFILE
FINISHED
ROADBED
WIDTHS
FINISHED
ROADBED
WIDTHS
C CL L
6' 6' 6' 6'
-20
-10
SCALE
0 100
SCALE
0 100
-10
-5
Mass Haul (Cu. Yd.)Mass Haul (Cu. Yd.)
+7%
(A 5) 10+06 (A
) 1 0+
LO
O
P R O
AD
LO
O
P R
O
AD
C
C
L
L
(A
0)
0+
0%
N
W E
N
W E(A
0)
0+
( B
0)
0+
( B 20 ) 10 +4 2
(B 30) 10+ 75
0%-2%
L-STATIONL-STATION
P LINE
P LINE
"A" SPUR
GROUND
GROUND
L LINE
L LINE
10' 10' 10' 10'
"B" SPUR
NORTH END CAMPGROUND
"A" AND "B" SPURS
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
TOTAL EXCAVATION QUANTITY = 9 CUBIC YARDS
TOTAL BORROW QUANTITY = 19 CUBIC YARDS
TOTAL AGGREGATE BASE QUANTITY = 21 CUBIC YARDS
TOTAL EXCAVATION QUANTITY = 1 CUBIC YARDS
TOTAL BORROW QUANTITY = 16 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 13 CUBIC YARDS
DAVE SEILER 1/25/2010 14
SUBGRADE SUBGRADE
N
W E
N
W E
ORR LAKE CAMPGROUND
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN AND PROFILE
10' 10'
10' 10'
FINISHED
ROADBED
WIDTHS
CL
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
NORTH END CAMPGROUND
"C" AND "D" SPURS
SCALE
0 100
0.5
1.0
Mass Haul (Cu. Yd.)
FINISHED
ROADBED
WIDTHS
CL
-50
Mass Haul (Cu. Yd.)
SCALE
0 100
+1% 0%
L-STATION
LO
O
P R O
AD
LO
O
P R
O
AD
C
C
L
L
(D
10) 10+28 (D
0)
0+
(D
0)
0+
(C
0)
0+
(C
0)
0+
(C
30) 10+93
0.0
L-SATION
0%-2%
GROUND
GROUND
10' 10' 10' 10'
"D" SPUR
P LINE
L LINE
P LINE
L LINE
TOTAL EXCAVATION QUANTITY = 5 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 29 CUBIC YARDS
"C" SPUR
TOTAL BORROW QUANTITY = 86 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 43 CUBIC YARDS
NOTE: EXCESS EXCAVATION OF 2 CUBIC YARDS
SHALL BE USED IN THE REHAB. AREA ADJACENT
TO THE ROAD CONSTRUCTION
DAVE SEILER 1/25/2010
(C 40) 11+14
SUBGRADE
E
ORR LAKE CAMPGROUND
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN AND PROFILE
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
FINISHED
ROADBED
WIDTHS
CL
10' 10'
10' 10'
NORTH END CAMPGROUND
"E" SPUR
0.
Mass Haul (Cu. Yd.)
SCALE
0 100
P LINE
L LINE
GROUND
(E 10) 10+37 (E
0)
0+
(E
0)
0+
LO
O
P R O
AD
CL
-5% 0%
TOTAL EXCAVATION QUANTITY = 32 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 29 CUBIC YARDS
NOTE: EXCESS EXCAVATION OF 21 CUBIC YARDS SHALL
BE USED IN THE REHAB. AREA ADJACENT TO THE ROAD
CONSTRUCTION
L-STATION
DAVE SEILER 1/25/2010
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
INI_4REVISION_4DTREV4
INI_3REVISION_3DTREV3
INI_2REVISION_2DTREV2
INI_1REVISION_1DTREV1
8"
8"
18"
24"
18"
6"
40"
12"
48"
40"36" 36"
1,578 sq ft
18"
24" 36"
PINE TREE
JUNIPER
AGGREGATE
9' PICNIC TABLE
COVERED PEDESTAL GRILL
LARGE FIRE RING
BOULDER
LEGEND: NOTES:
30"
1. Square footage shown for each site is approximate to identify scope of work.
2. Construction limits will be staked on the ground by the Forest Service.
3. Table anchor, covered pedestal grill, and large fire ring shall be installed as per typical drawings.
4. Final placement of site furniture and site furniture anchors will be designated on the ground by the Forest Service.
5. Edge of camping area to match elevation of spur edge and shall be sloped to drain 2% maximum.
6. Boulder locations are approximate.
7. Aggregate shall be placed 4" deep in camping area.
NORTH END CAMPGROUND
"A" , "B" & "C" CAMPSITE PLAN 17
TOTAL BORROW QUANTITY = 134 CUBIC YARDS
TOTAL AGGREGATE BASE CUANTITY = 22 CUBIC YARDS
1,816 sq ft
TOTAL BORROW QUANTITY = 82 CUBIC YARDS
TOTAL AGGREGATE BASE QUANTITY = 19 CUBIC YARDS
"A" CAMPSITE PLAN
"B" & "C" CAMPSITE PLAN
"B" SPUR"C" SPUR
"A" SPUR
ROBERT C. TALLEY
ROBERT C. TALLEY
1/25/2010
1/25/2010
1/25/2010DAVE SEILER
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
INI_4REVISION_4DTREV4
INI_3REVISION_3DTREV3
INI_2REVISION_2DTREV2
INI_1REVISION_1DTREV1
PINE TREE
JUNIPER
AGGREGATE
9' PICNIC TABLE
COVERED PEDESTAL GRILL
LARGE FIRE RING
BOULDER
LEGEND: NOTES:
10"
36"
24"
30"
1,032 sq ft
6"
5"
3"
1,041 sq ft
1. Square footage shown for each site is approximate to identify scope of work.
2. Construction limits will be staked on the ground by the Forest Service.
3. Table anchor, covered pedestal grill, and large fire ring shall be installed as per typical drawings.
4. Final placement of site furniture and site furniture anchors will be designated on the ground by the Forest Service.
5. Edge of camping area to match elevation of spur edge and shall be sloped to drain 2% maximum.
6. Boulder locations are approximate.
7. Aggregate shall be placed 4" deep in camping area.
"D" CAMPSITE PLAN "E" CAMPSITE PLAN
"D" SPUR
"E" SPUR
TOTAL BORROW QUANTITY = 8 CUBIC YARDS
TOTAL AGGREGATE BASE CUANTITY = 13 CUBIC YARDS
TOTAL BORROW QUANTITY = 46 CUBIC YARDS
TOTAL AGGREGATE BASE CUANTITY = 13 CUBIC YARDS
NORTH END CAMPGROUND
"D" & "E" CAMPSITE PLAN
ROBERT C. TALLEY
ROBERT C. TALLEY
DAVE SEILER
1/25/2010
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMENORTH END CAMPGROUND
LOOP ROAD
INDIVIDUAL TREE REMOVAL
8" JUNIPER
4" JUNIPER
6" JUNIPER
10" JUNIPER
6" JUNIPER
12" JUNIPER
20" JUNIPER
12" JUNIPER
20" JUNIPER
12" JUNIPER
4" JUNIPER
8" JUNIPER
14" JUNIPER
16" JUNIPER
5" JUNIPER
12" JUNIPER
24" JUNIPER
RESTROOM
RESTROOM
"A" SPUR
"B" SPUR
"C " S
PU
R
"D" SPUR
"E" SPU
R
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 19
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMEREHABILITATION AND
SCARIFY PLAN
(NORTH END)
AREA REQUIRING SCARIFICATION TO 6" DEPTH
EXCLUDED
AREA
EXCLUDED
AREA
EXCLUDED
AREA
12' WIDTH
12' WIDTH
12' WIDTH
12' WIDTH
12' WIDTH
10' WIDTH
14' WIDTH
NOTES
AREA REQUIRING REHAB. TO 24" DEPTH
AREA= .05 ACRES, BORROW = 174 CY.
AREA REQUIRING REHAB. TO 12" DEPTH
AREA= .88 ACRES, BORROW= 1371 CY.
EXISTING
15 CY. STOCKPILE
TO BE REMOVED AND
USED IN THE PROJECT
EXISTING
STOCKPILE
TO BE REMOVED AND
USED IN THE PROJECT
N
W E
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 20
1. AREAS REQUIRING REHABILITATION TO COVER EXPOSED ROOTS
SHALL BE COVERED TO THE SPECIFIED DEPTHS WITH BORROW MATERIAL.
REQUIRED COMPACTION SHALL BE BY HAULING AND SPREADING EQUIPMENT
EXCEPT AREAS UNDERLYING TRAIL CONSTRUCTION.
THE LIMITS OF REHAB. SHALL BE STAKED BY THE ENGINEER PRIOR TO
CONSTRUCTION.
2. THE LEADING EDGES OF THE REHAB. AREA SHALL BE FEATHERED INTO
THE EXISTING CONTOURS.
3. SCARIFICATION SHALL BE CONSIDERD INCIDENTAL TO ITEM 204(01) ROADWAY EXCAVATION.
4. ENTIRE REHABILITATION AREA SHALL BE HYDROSEEDED.
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
RESTROOM
RESTROOM
NORTH END CAMPGROUND
CONSTRUCT MOUNTING PAD AND
INSTALL HB1 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB1 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB1 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB1 WASTE RECEPTACLE
CONSTRUCT MOUNTING
PAD AND INSTALL HB2
WASTE RECEPTACLE
CONSTRUCT MOUNTING
PAD AND INSTALL HB2
WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB2 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB2 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB2 WASTE RECEPTACLE
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
DAVE SEILER 1/25/2010
PLACE (4) WHEEL STOPS AT END OF PARKING AREA
PLACE (2) WHEEL STOPS AT THE END OF SPUR
PLACE (2) WHEEL STOPS AT THE END OF SPUR
PLACE (2) WHEEL STOPS AT THE END OF SPUR
PLACE (2) WHEEL STOPS AT THE END OF SPUR
"E" SPU
R
"C
" SPU
R
"D" SPUR
"B" SPUR
"A"SPUR
PLACE (1) WHEEL STOP AT THE END OF SPUR
WHEEL STOP AND
WASTE RECEPTACLE PLAN 21
NOTES
1. WASTE RECEPTACLES ARE AS MANUFACTURED BY BEAR SAVER,
1390 S. MILLIKEN AVE., ONTARIO, CA 91761 PHONE (909) 605- 7780
2. WASTE RECEPTACLES SHALL BE INSTALLED ACCORDING TO THE
MANUFACTURERS INSTRUCTIONS WITH THE FINAL LOCATIONS
AS STAKED BY THE ENGINEER.
3. FINAL WHEEL STOP LOCATIONS TO BE APPROVED BY THE ENGINEER.
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
(75 0)
+8
(690) 19+50
RE-LOCATE 5 BOULDERS AS DIRECTED
BY THE ENGINEER
RESTROOM
PLACE 60 BOULDERS FROM STATION (750) 21+84 TO
THE END OF THE PARKING AREA AS SHOWN
PARKING
AREA
PLACE 92 BOULDERS FROM THE END OF THE
"A" SPUR TO STATION (690) 19+50 AS SHOWN
NOTES
NORTH END CAMPGROUND
BOULDER PLACEMENT PLAN
PLACE 8 BOULDERS AT THE DIRECTION OF
THE ENGINEER TO BLOCK ACCESS TO THE
ABANDONED ROAD
PLACE 8 BOULDERS AT THE DIRECTION OF
THE ENGINEER TO BLOCK ACCESS TO THE
ABANDONED SECTION OF ROAD
PLACE 10 BOULDERS AT THE DIRECTION
OF THE ENGINEER BETWEEN THE PARKING
AREA AND THE RESTROOM
PARKING
AREA
RE- LOCATE 2 BOULDERS AT THE
DIRECTION OF THE ENGINEER
RESTROOM
RE-LOCATE 25 BOULDERS TO THE INSIDE OF
THE CAMPGROUND ROAD AS DIRECTED BY THE ENGINEER
FROM STATION (690) 19+50 TO STATION (750) 21+84
DAVE SEILER 1/25/2010
PLACE 29 BOULDERS FROM STATION (690) 19+50
TO EXISTING LINE OF BOULDERS ADJACENT TO
THE RESTROOM AS SHOWN (TIE INTO EXISTING
BOULDERS AT 19+50)
1. BOULDERS SHALL BE PLACED WITH A MAXIMUM 5' SPACE BETWEEN EDGE OF
EACH UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
2. FINAL PLACEMENT OF ALL BOULDERS SHALL BE AS APPROVED BY THE ENGINEER.
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMENORTH END CAMPGROUND
DAVE SEILER 1/25/2010
SIGN PLAN
BOB TALLEY 1/25/2010
1/25/2010ROBERT C. TALLEY
"E" SPU
R
"C
" SPU
R
"D" SPUR
"B" SPUR
"A"SPUR
INSTALL STOP SIGN
RESTROOM
INSTALL SITE IDENTIFICATION SIGN
INSTALL ONE WAY SIGN
RESTROOM
INSTALL HIKING LOGO SIGN
INSTALL SITE IDENTIFICATION SIGN
NOTES
D
INSTALL DIRECTIONAL
SIGN #1
INSTALL DIRECTIONAL
SIGN #2
INSTALL SITE
IDENTIFICATION SIGN
C
INSTALL SITE
IDENTIFICATION SIGN
A
B
DIRECTIONAL SIGN #1
INSTALL NO PARKING
LOADING ZONE SIGN
INSTALL NO PARKING
LOADING ZONE SIGN
Orr Lake
GROUP CAMPS
INSTALL DRINKING
WATER LOGO SIGN
INSTALL DIRECTIONAL
SIGN #3
DIRECTIONAL SIGN #3
DIRECTIONAL SIGN #2
INSTALL RECREATION
SITE IDENTIFICATION SIGN
INSTALL HAND LAUNCH
LOGO SIGN
GROUP CAMPS
INFORMATION
DAY USE PARKING
DRINKING WATER
EAST SIDE CAMPGROUND
BOAT RAMP
GROUP CAMPS
EAST SIDE CAMPGROUND
DRINKING WATER
1. SIGNS TO CONFORM TO "MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" 2009 EDITION.
2. DIRECTIONAL AND RECREATION SITE IDENTIFICATION SIGNS
TO USE TWO 4" X 4" POSTS. ALL OTHERS USE ONE 4" X 4" POST.
3. FINAL SIGN LOCATIONS TO BE APPROVED BY THE ENGINEER.
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN
EAST/NORTH TIE ROAD
(1030) 10+00
EXISTING BOAT DOCK AND RAMP
PLACE BENCH
PLACE BENCH
SEE DETAIL FOR CONSTRUCTION
OF PAY STATION
EAST END CAMPGROUND
"J" SPUR
"F" SPUR
"G
" SPU
R
"H" SPUR
24'
14' 16'
14'10'
12'
NOTES
N
W E
RESTROOM
EAST END
CAMPGROUND ROAD
5'R 30'R
30'R
5'R
30'R 5'R
30'R
5'R 5'R30'R
30'R
15'R
15'R
5'R
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
1. AREAS REQUIRING REHABILITATION TO COVER EXPOSED ROOTS AND
EXISTING ROAD SHALL BE COVERED TO THE SPECIFIED DEPTH WITH
BORROW MATERIAL. REQUIRED COMPACTION SHALL BE BY HAULING
AND SPREADING EQUIPMENT.THE LIMITS OF REHAB. SHALL BE STAKED
BY THE ENGINEER PRIOR TO CONSTRUCTION.
2. THE LEADING EDGES OF THE REHAB. AREA SHALL BE FEATHERED INTO
THE EXISTING CONTOURS.
3. ALL EXCESS EXCAVATION FROM CAMP SPUR AND CAMP SITE EXCAVATION
SHALL BE UTILIZED IN THE REHABILITATION AREA.
4. REHABILITATION AREA SHALL BE HYROSEEDED.
CONSTRUCT LEVEL PAD FOR PICNIC
TABLE TO MATCHGRADE OF ROAD,
PLACE 4" AGGREGATE BASE
CONSTRUCT LEVEL PAD TO MATCH
GRADE OF EXISTING ROAD FOR
INFORMATION SIGN,
PLACE 4" AGGREGATE BASE
AREA REQUIRING REHAB. TO 12" DEPTH
AREA= .07 ACRES, BORROW= 107 CY.
(QUANTITY INCLUDES EXCESS EXCAVATION
FROM SPUR AND CAMPSITE CONSTRUCTION)
E
ORR LAKE CAMPGROUND
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN AND PROFILE
FINISHED
ROADBED
WIDTHS
CL
6' 6'
6' 6' 6' 6' 6'
6' 6'6' 6'
6'
EAST END CAMPGROUND
ROAD
Mass Haul (Cu. Yd.) Mass Haul (Cu. Yd.)
-100
-50
-15
-10
-5
7SCALE
0 100
(1
0)
0+
(1
0)
0+
(1
0)
0+
(1
0)
1+
(1
0)
1+
(1
0)
2+
+3
(1090) 12+62 (1100) 12+90
(1110) 13+05
10+00
(1110) 13+05 10+00
(1110) 13+05 10+00
EQ
EQ
EQ
(1120) 13+31 13+43
(1130) 13+51
(1140) 13+59
(1150) 10+16
(1
0)
0+
(1
0)
0+
(1
0)
0+
L-STATIONL-STATION
-2% -1%
-2% -1%
-1% +2% -1% +1% +5%
+7%
0% +2% +1%
EXISTING ROAD
30' R
5' R
30' R
EXISTING ROAD
SEE DETAIL FOR CONSTRUCTION
OF INFORMATION/PAY STATION
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
GROUND
GROUND
L LINE
P LINE
"J" SPUR
14' 14' 12' 12'
TOTAL BORROW QUANTITY = 124 CUBIC YARDS
TOTAL AGGREGATE BASE QUANTITY = 119 CUBIC YARDS
15' R
5' R
5' R
30' R 30' R
NOTE - CLEARING FOR THE EAST END CAMPGROUND
ROAD AND SPURS SHALL BE INDIVIDUAL TREE REMOVAL
(INCLUDES REMOVING LIMBS OF EXISTING TREES WITHIN
THE CLEARING LIMITS AND DISPOSAL OF THE TOP, LIMB,LOG
AND STUMP IN DISPOSAL AREA ADJACENT TO THE PROJECT)
REMOVE 10" JUNIPER
DAVE SEILER 1/25/2010
SUBGRADE
E
N
W
E
ORR LAKE CAMPGROUND
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN AND PROFILE
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
FINISHED
ROADBED
WIDTHS
CL
EAST END CAMPGROUND
"F" AND "G" SPURS
-20
-10
LO
OP R
OAD
CL
(F
) 1
0+
LOOP ROAD
LO
O
P R O
AD
C
C
L
L
(F
0)
0+ 45 (F 30) 10+75
(F 40) 11+03
(F 50) 11+31
+8%
0%
GROUND
0 100
SCALE
"F" SPUR
P LINE
L LINE
P LINE
L LINE
FINISHED
ROADBED
WIDTHS
CL
6' 6'
6' 6' 6' 6' 6' 6'
Mass Haul (Cu. Yd.)
Mass Haul (Cu. Yd.)
L-STATION
L-STATION
TOTAL EXCAVATION QUANTITY = 8 CUBIC YARDS
TOTAL BORROW QUANTITY = 29 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 35 CUBIC YARDS
SCALE
0 100
GROUND
0%
-9%
"G" SPUR
(G
10) 10+11
(G
20) 10+30
(G
0)
0+
.4
(G
0)
1+
DAVE SEILER 1/25/2010
SUBGRADE
SUBGRADE
TOTAL EXCAVATION QUANTITY = 51 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 24 CUBIC YARDS
NOTE: EXCESS EXCAVATION OF 38 CUBIC YARDS
SHALL BE USED IN THE REHAB. AREA ADJACENT
TO THE ROAD CONSTRUCTION
EN
W
E
ORR LAKE CAMPGROUND
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN AND PROFILE
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
FINISHED
ROADBED
WIDTHS
FINISHED
ROADBED
WIDTHS
CC LL
-50
+6% 0%
-6%
GROUND
6'6' 6'6'
6'6' 6'6'
Mass Haul (Cu. Yd.)Mass Haul (Cu. Yd.)
L-SATIONL-SATION 10
EAST END CAMPGROUND
"H" AND "J" SPUR
0 100
LO
O
P RO
AD
LO
O
P R O
AD
C
C
L
L
(J 10) 10+17
(J 20) 10+40 (J
0)
0+
(J
0)
0+
(J
0)
1+
LO
O
P
RO
AD
C L
P LINEP LINE
L LINEL LINE
SCALE
REMOVE 1O" JUNIPER
"J" SPUR
SCALE
0 100
TOTAL BORROW QUANTITY = 66 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 31 CUBIC YARDS
(H
10) 10+12
(H
20) 10+40
(H
0)
0+
"H" SPUR
-8%
0%
GROUND
(H
0)
0+
TOTAL EXCAVBATION QUANTITY = 18 CUBIC YARDS
TOTAL AGG. BASE QUANTITY = 19 CUBIC YARDS
NOTE: EXCESS EXCAVATION OF 9 CUBIC YARDS
SHALL BE USED IN THE REHAB. AREA ADJACENT
TO THE ROAD CONSTRUCTION
DAVE SEILER 1/25/2010
SUBGRADE
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
INI_4REVISION_4DTREV4
INI_3REVISION_3DTREV3
INI_2REVISION_2DTREV2
INI_1REVISION_1DTREV1
1,007 sq ft
1,225 sq ft
LEGEND: NOTES:
24"
6"
5"
6"
18"
18" 20"
36"
36" 6"
12"
12"
PINE TREE
JUNIPER
AGGREGATE
9' PICNIC TABLE
SINGLE PEDESTAL GRILL
UNIVERSAL ACCESS FIRE RING
BOULDER
LANTERN HANGER
TOTAL EXCAVATION QUANTITY = 96 CUBIC YARDS
TOTAL AGGREGATE BASE CUANTITY = 15 CUBIC YARDS
TOTAL EXCAVATION QUANTITY = 22 CUBIC YARDS
TOTAL AGGREGATE BASE CUANTITY = 12 CUBIC YARDS
EAST END CAMPGROUND
"F" & "G" CAMPSITE PLAN
"F" CAMPSITE PLAN "G" CAMPSITE PLAN
"F" SPU
R
"G " S
PUR
1. Square footage shown for each site is approximate to identify scope of work.
2. Construction limits will be staked on the ground by the Forest Service.
3. Lantern hanger, table anchor, covered pedestal grill, and large fire ring shall be installed as per typical drawings.
4. Final placement of site furniture and site furniture anchors will be designated on the ground by the Forest Service.
5. Edge of camping area to match elevation of spur edge and shall be sloped to drain 2% maximum.
6. Boulder locations are approximate.
7. Aggregate shall be placed 4" deep in camping area.
8. Excess excavation to be utilized in the rehabilitation area.
ROBERT C. TALLEY
ROBERT C. TALLEY
DAVE SEILER
1/25/2010
1,210 sq ft
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
INI_4REVISION_4DTREV4
INI_3REVISION_3DTREV3
INI_2REVISION_2DTREV2
INI_1REVISION_1DTREV1
738 sq ft
LEGEND: NOTES:
PINE TREE
JUNIPER
AGGREGATE
9' PICNIC TABLE
COVERED PEDESTAL GRILL
LARGE FIRE RING
BOULDER
LANTERN HANGER
4" 30"
12"
5"
18" 30"
12"
12"
12"30" 18"
20"
TOTAL EXCAVATION QUANTITY = 10 CUBIC YARDS
TOTAL AGGREGATE BASE CUANTITY = 9 CUBIC YARDS
TOTAL EXCAVATION QUANTITY = 10 CUBIC YARDS
TOTAL AGGREGATE BASE CUANTITY = 15 CUBIC YARDS
"H" CAMPSITE PLAN "J" CAMPSITE PLAN
EAST END CAMPGROUND
"H" & "J" CAMPSITE PLANS
"J" SPUR
"H " S
PUR
ROBERT C. TALLEY
ROBERT C. TALLEY
DAVE SEILER
1/25/2010
1/25/2010
1/25/2010
1. Square footage shown for each site is approximate to identify scope of work.
2. Construction limits will be staked on the ground by the Forest Service.
3. Lantern hanger, table anchor, covered pedestal grill, and large fire ring shall be installed as per typical drawings.
4. Final placement of site furniture and site furniture anchors will be designated on the ground by the Forest Service.
5. Edge of camping area to match elevation of spur edge and shall be sloped to drain 2% maximum.
6. Aggregate shall be placed 4" deep in camping area.
7. Excess excavation to be utilized in the rehabilitation area.
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMEEAST END CAMPGROUND
DAVE SEILER 1/25/2010
SIGN PLAN
BOB TALLEY 1/25/2010
ROBERT C. TALLEY 1/25/2010
EAST/NORTH TIE ROAD
"J" SPUR
"F" SPUR
"G
" SPU
R
"H" SPUR
N
W E
RESTROOM
NOTES
INSTALL (4) NO CAMPING LOGO SIGNS
INSTALL SITE IDENTIFICATION SIGN
INSTALL SITE IDENTIFICATION SIGN
INSTALL SITE IDENTIFICATION SIGN
INSTALL SITE IDENTIFICATION SIGN
INSTALL ONE WAY SIGN
INSTALL STOP SIGN
INSTALL TWO
DAY USE
PARKING
SIGNS
INSTALL DIRECTIONAL SIGN
INSTALL HIKER
LOGO SIGN
INSTALL (2) ONE
WAY SIGNS
INSTALL DIRECTIONAL SIGN
1. SIGNS TO CONFORM TO "MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" 2009 EDITION.
2. DIRECTIONAL AND SITE IDENTIFICATION SIGNS TO USE TWO
4" X 4" POSTS. ALL OTHERS USE ONE 4" X 4" POST.
3. FINAL SIGN LOCATIONS TO BE APPROVED BY THE ENGINEER.
GROUP CAMPS
DRINKING WATER
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
EAST/NORTH TIE ROAD
EAST END CAMPGROUND
"J" SPUR
"F" SPUR
"G
" SPU
R
"H" SPUR
N
W E
RESTROOM
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
PLACE (1) WHEEL STOP AT THE END OF SPUR
PLACE (1) WHEEL STOP AT THE END OF SPUR
CONSTRUCT MOUNTING PAD AND
INSTALL HB2 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB2 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB2 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB1 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB1 WASTE RECEPTACLE
CONSTRUCT MOUNTING PAD AND
INSTALL HB1 WASTE RECEPTACLE
WHEEL STOP AND
WASTE RECEPTACLE PLAN 31
NOTES
1. WASTE RECEPTACLES ARE AS MANUFACTURED BY BEAR SAVER,
1390 S. MILLIKEN AVE., ONTARIO, CA 91761 PHONE (909) 605- 7780
2. WASTE RECEPTACLES SHALL BE INSTALLED ACCORDING TO THE
MANUFACTURERS INSTRUCTIONS WITH THE FINAL LOCATIONS
AS STAKED BY THE ENGINEER.
3. FINAL WHEEL STOP LOCATIONS TO BE APPROVED BY THE ENGINEER.
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
EAST/NORTH TIE ROAD
EXISTING BOAT DOCK AND RAMP
EAST END CAMPGROUND
"J" SPUR
"F" SPUR
"G
" SPU
R
"H" SPUR
N
W E
RESTROOM
BOULDER PLACEMENT PLAN
NOTES
1. BOULDERS SHALL BE PLACED WITH A MAXIMUM 5' SPACE BETWEEN EACH UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
2. FINAL PLACEMENT OF ALL BOULDERS SHALL BE AS APPROVED BY THE ENGINEER.
(T34) 3 3+87
PLACE 166 BOULDERS AROUND THE INSIDE PERIMETER
OF THE CAMPGROUND AS SHOWN
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010 32
PLACE 20 BOULDERS FROM THE EDGE OF
ORR LAKE PERPENDICULAR TO THE TRAIL
AT STATION (T34) 33+87
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
ORR LAKE
TRAIL CONSTRUCTION
PLAN VIEW
(T11) STA 16+65
(T16) 20+32
(T26) STA 26+07
(T
ST
A
+1 2(T
ST
A
+5
(T1)
STA 10
+0
(T4)
STA 11
+9
STA 15+59
STA 19+75
CONSTRUCT 230 ' OF TRAIL FROM LAKE TRAIL JCT. (STA 19+75)
TO PAY STATION AND BATHROOM
NOTES
CONSTRUCT 335' OF TRAIL BETWEEN THE BATHROOM,
PARKING AREA AND LOOP ROAD JUNCTION
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/10
1/15/10
1/25/10
INSTALL 6" X 10' CMP AS DIRECTED BY
THE ENGINEER. COST IS CONSIDERED INCIDENTAL
TO ITEM 204(97).
1. LOCATION STAKING SHALL BE COMPLETED BY THE FOREST SERVICE
PRIOR TO CONSTRUCTION.
2. TRAILS SHALL BE CONSTRUCTED TO ALLOW A SMOOTH TRANSITION
AT ALL JUNCTIONS WITH ROADS, BATHROOMS, ETC.
3. WORK SHALL BE CONDUCTED IN A MANNER THAT WILL LEAVE ALL
EXISTING TREES AND VEGETATION OUTSIDE THE CLEARING LIMITS
UNDISTURBED.
4. ALL TRAIL EXCAVATION SHALL BE PAID FOR UNDER ITEM 204(97) EXCAVATION,
COMPACTION METHOD (E).
5. TOTAL AGGREGATE BASE QUANTITY = 328 CUBIC YARDS
TOTAL BORROW QUANTITY = 172 CUBIC YARDS
N
W
E
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
(T2) 10+32 TRAIL CONSTRUCTION - 5' WIDTH
(T5) 12+36 TRAIL CONSTRUCTION - 5' WIDTH
(T4) 11+97 TRAIL CONSTRUCTION - 12 WIDTH
REFERENCE FISHING PLATFORM "B" (SEE DETAIL)
INSTALL BENCH
(T1) 10+00 BEGIN TRAIL CONSTRUCTION - 9' WIDTH
BEGIN 6" DEPTH BORROW
BEGIN 6" DEPTH AGGREGATE BASE
REFERENCE FISHING PLATFORM "A" (SEE DETAIL)
(T6) 14+02 END 6" DEPTH BORROW
(T9) 15+59 JCT. CAMPGROUND LOOP ROAD
BEGIN TRAIL CONSTRUCTION - 5' WIDTH
BEGIN 6" DEPTH AGGREGATE BASE
15+59 JCT. CAMPGROUND LOOP ROAD
END TRAIL CONSTRUCTION
END 6" DEPTH AGGREGATE BASE
TRAIL CONSTRUCTION
STRAIGHT LINE PLAN
(T16) 20+32 REFERENCE FISHING PLATFORM "C" (SEE DETAIL)
(T19) 22+85 INSTALL BENCH
(T20) 23+52 BEGIN "FULL BENCH" TRAIL CONSTRUCTION
WASTE EXCAVATION ON THE ADJACENT ROAD BELOW
(T24) 25+19 END "FULL BENCH" TRAIL CONSTRUCTION
BEGIN 6" DEPTH BORROW
(SEE DETAIL FOR ROAD/TRAIL OBLITERATION)
(T26) 26+07 REFERENCE FISHING PLATFORM "D"
(SEE DETAIL)
(T33) 32+33 END 6" BORROW
(T36) 35+12 END TRAIL CONSTRUCTION
END 6" AGGREGATE BASE
REFERENCE EXISTING BOAT DOCK AND RAMP
(T27) 26+24 INSTALL BENCH
19+75 JCT. TRAIL TO BATHROOM AND PARKING
(T11) 16+55 JCT. TRAIL TO FISHING ACCESS RAMP
1/15/2010
DAVE SEILER 1/25/2010 34
30'-0"
4'-0"
2' TYP.
3'-6"
1'-7"
4'-0"
CIRA MRPED T AFOTNE G
ERUTLU
1-1/4" CAP WELD IN PLACE
1-1/4" STEEL PIN
1-1/4" REMOVABLE CAP
4" ALUM. INTERLOCKING
SKID RESISTANT DECK SLABS
ALUM. CROSS MEMBER
7-1/2" R
CROSS LINKED POLYETHYLENE FLOATATION
TUBS WITH POLYSTYRENE FOAM BILLET
8" 8" 8"
6"
1-1/4"U+2205 GALV. PIANO HINGE
END LEG ASSEMBLY
VINYL FENDER/BUMPER
HENDERSON NO. 301 OR EQ.2" X 4" POLYETHYLENE GRAY LUMBER CURB
2" X
" C
U R
B
8" CAST GALV. MOORING CLEAT (5 REQ'D)
HENDERSON MARINE 503D OR EQ.
6" A
LU
M
IN
U
M
IN
TE
R
LO
C
KI
G
D
EC
K
SL
AT
S
W /S
AN
D
BL
AS
T
FI
N
IS
H
ALUM. TUBULAR RECTANGULAR BEAM
'-0
6'-0"
1.5"U+2205x0.125 ALUM. HANDRAILING
12" 12" 12" 6"
DOCK ANCHOR ASSEMBLY CENTER ON FRAME DOCK ANCHOR ASSEMBLY CENTER ON FRAME
GALVANIZED STEEL DECK FRAME
8"8"
4'-0 1/4 "
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010
ORR LAKE CAMPGROUND
FISHING PLATFORM
"A" , "B" AND "D"
DESIGN PLAN AND PROFILE 35
4'-0"
CIRA MRPED T AFOTNE G
ERUTLU
4" ALUM. INTERLOCKING
SKID RESISTANT DECK SLABS
ALUM. CROSS MEMBER
ALUM. TUBULAR RECTANGULAR BEAM
7-1/2" R
CROSS LINKED POLYETHYLENE FLOATATION
TUBS WITH POLYSTYRENE FOAM BILLET
GALVANIZED STEEL DECK FRAME
1.5"U+2205x0.125 ALUM. HANDRAILING
8" 8" 8" 6"
ANCHOR ASSEMBLY CENTER ON FRAME
DOCK ANCHOR ASSEMBLY
1-1/4"U+2205 GALV. PIANO HINGE
6" ALUMINUM INTERLOCKING DECK SLATS W/SANDBLAST FINISH
END LEG ASSEMBLY
END LEG ASSEMBLY
8" CAST GALV. MOORING CLEAT (6 REQ'D)
HENDERSON MARINE 503D OR EQ.
VINYL FENDER/BUMPER
HENDERSON NO. 301 OR EQ.
2" X 4" POLYETHYLENE GRAY LUMBER CURB
2" X 4" CURB
20'-0"
6"-0"
2' TYP.
3'-6"
1'-7"
12" 12" 12"
4'-0"
30'-0"
6" 8"8"
1-1/4" CAP WELD IN PLACE
1-1/4" STEEL PIN
1-1/4" REMOVABLE CAP
4'-0 1/4 "
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
ORR LAKE CAMPGROUND FISHING PLATFORM "C"
DESIGN PLAN AND PROFILE 36
8"
12"
12"
6'-0"
8"
2"
4"
6'-0"
8"
ORR LAKE CAMPGROUND
CIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMEFISHING PLATFORM
APPROACH RAMP
DETAIL
2" EYE BOLT
1-1/4" CONT. GALV.
PIANO HINGE
11-1/2" 12-1/2" 11-1/2"
L4x4x1/4 GALVANIZED
NOSING - FULL LENGTH
GANGWAY
6"x2"x1/4" GALV.
STUDS 12" O.C. FULL
PENETRATION WELD TO ANGLE
1-1/4"U+2205 HINGE PIN
1-1/4" CONT. GALV. PIANO
HINGE TO GANGWAY FULL
LENGTH WELD EA. SEGMENT
#4-24" O.C.E.W.
2%
ORIGINAL GROUND
PERIMETER FOOTING
EXCAVATION LINE
CONSTRUCTION JOINT (TYP.)
BURKE "KOLD KEY" OR EQUAL
NO SCALE
#4@24" O.C.E.W.
NATIVE BACKFILL
6"
MEAN WATER LEVEL ELEV. 82.4'
2" U+2205 EYE BOLT - CENTER ON FOOTING
NATIVE BORROW BACKFILL
6"
6"
6"
4"
6" AGGREGATE BASE
FOOTING ELEV. 82.4'
2"x4" CURB
EACH SIDE
FOOTING ELEV. 82.4'
L 4 X 4 X 1/4 GALVANIZED
NOSING- FULL LENGTH
CONCRETE ON-SHORE APPROACH RAMP
CONCRETE ON-SHORE APPROACH RAMP - FRONT ELEV.
4' x 30'
HINGE DETAIL
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010
PIANO HINGE TO GANGWAY
(SUPPLIED BY MANUFACTURER)
NOTES
1. CONCRETE APPROACH RAMP SHALL BE PAID UNDER ITEM 601(01).
2. POLYETHYLENE CURB AND REBAR SHALL BE CONSIDERED
INCIDENTAL TO ITEM 601.
3. FINAL LOCATION SHALL BE APPROVED BY THE ENGINEER.
4" X 4" POLYETHYLENE GRAY LUMBER CURB, ATTACH
WITH 1/2" DIA X 6" CONCRETE ANCHORS SPACED 18" APART
PLAN AND PROFILECIR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMEFISHING PLATFORM "A"
6'
30'
6'
GANGWAY
FISHING PLATFORM
20'
CONCRETE APPROACH RAMP
ADJUSTMENT
CHAIN
6'
NO SCALE
GANGWAY
FISHING
PLATFORMCONCRETE APPROACH RAMP
6" AGGREGATE BASE
ORIGINAL
GROUND
MEAN WATER ELEVATION = 82.4'
PLATFORM ANCHOR CHAIN
-2%
NOTE - ANY LARGE ROCK ENCOUNTERED
DURING EXCAVATION SHALL BE
PLACED AGAINST THE COMPLETED
APPROACH RAMP
TRAIL
FINISHED GRADE = 86.4'
ELEVATION
BACKFILL WITH NATIVE BORROW MATERIAL
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 38
OFFSHORE
ANCHOR
(SEE SHEET 42
FOR DETAILS)
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
PLAN AND PROFILE
FISHING PLATFORM "B"
TRAIL
PLACE 6" AGGREGATE BASE
FINISHED GRADE = 87.8'
ELEVATION
FINISHED GRADE = 86.9'
ELEVATION
TRAIL
GANGWAY
FISHING PLATFORM
ADJUSTMENT
CHAIN
GANGWAY FISHING
PLATFORM
ORIGINAL
GROUND PLATFORM ANCHOR CHAIN
MEAN WATER ELEVATION = 82.4'
CONCRETE
APPROACH
RAMP
14'
11'
6'
-8% -2%
30'
6'
6'
EXCAVATE EXISTING ROCKS AND CONSTRUCT
ACCESS TO THE CONCRETE APPROACH RAMP
UTILIZING BORROW MATERIAL
20'
BACKFILL WITH NATIVE BORROW MATERIAL
ARMOR FILL WITH CLASS 3 OR LARGER RIPRAP,
FINISHED SLOPE SHALL BE 1 1/2:1
RIPRRAP AVAILABLE AT SITE
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
1/25/2010DAVE SEILER 39
OFFSHORE
ANCHOR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
TRAIL
PLACE 6" AGGREGATE BASE
GANGWAY
FISHING PLATFORM
ADJUSTMENT
CHAIN
GANGWAY FISHING
PLATFORM
ORIGINAL
GROUND PLATFORM ANCHOR CHAIN
MEAN WATER ELEVATION = 82.4'
CONCRETE
APPROACH
RAMP
-6%
FINISHED GRADE = 85.4'
ELEVATION
-2%
FINISHED GRADE = 84.4'
ELEVATION
19'
TR
AI
L
13.5' 3'
6'
6' 30'
GEOTEXTILE
20'
6'
FILL SLOPE 1 1/2:1
FISHING PLATFORM "C"
CONSTRUCT ACCESS TO THE CONCRETE APPROACH
RAMP UTILIZING BORROW MATERIAL, PLACE GEOTEXTILE
UNDER ENTIRE ACCESS AREA BACKFILL WITH NATIVE BORROW MATERIAL
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 40
OFFSHORE
ANCHOR
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAMEFISHING PLATFORM "D"
TRAIL
PLACE 6" AGGREGATE BASE
GANGWAY
FISHING PLATFORM
ADJUSTMENT
CHAIN
GANGWAY
FISHING
PLATFORM
ORIGINAL
GROUND
PLATFORM ANCHOR CHAIN
MEAN WATER ELEVATION = 82.4'
CONCRETE
APPROACH
RAMP
-8% -2%
TRAIL
12' 6.5'
15' 6'
6'
30'
FINISHED GRADE = 87.2'
ELEVATION
FINISHED GRADE = 86.2
ELEVATION
FINISHED GRADE = 86.2
ELEVATION
6'
EXCAVATE EXISTING ROCKS AND CONSTRUCT
ACCESS TO THE CONCRETE APPROACH RAMP
UTILIZING BORROW MATERIAL
20'
BACKFILL WITH NATIVE BORROW MATERIAL
ARMOR FILL WITH CLASS 3 OR LARGER RIPRAP,
FINISHED SLOPE SHALL BE 1 1/2:1,
EXTEND RIPRAP A MINIMUM OF 6" ABOVE
AGGREGATE SURFACE,
RIPRRAP AVAILABLE AT SITE
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 41
OFFSHORE
ANCHOR
(SEE SHEET
42 FOR
DETAILS)
CIRA MRPED T AFOTNE G
ERUTLU
FISH PLATFORM DETAILS
AND NOTES
2"U+2205 RING 3/8" CHAIN SHACKLE
2" EYEBOLT
3/8" CHAIN SHACKLE
HENDERSON MARINE OR EQ.
PRECAST CONCRETE BLOCK
1200 LB. APPROX. WEIGHT
2'
2'
ANCHOR ASSEMBLY
C4x5.4 BRACE
C4x5.4 LEG
POLYETHYLENE
FLOATATION TUB
OFFSHORE CONCRETE ANCHOR
1-1/2"
4-1/2"
3"
1/2"
1-1/2"
C4x5.4 WELD ALL CONTACTS
TO FLOAT FRAME
ANCHOR ASSEMBLY DETAIL
6'x20' FISHING
PLATFORM
1/4 " FOOT PLATE
END LEG ASSEMBLY DETAIL
CONCRETE OFFSHORE ANCHOR
2'
2" GALVANIZED EYEBOLT CHICAGO
G-9 OR EQUAL
NOTES
NOTES:
1.
2.
3.
4.
5.
6.
9.
10.
11.
12.
3/8" P 30 CHAIN
HENDERSON MARINE OR EQ.
1. FISHING PLATFORM AND GANGWAY ARE AS
MANUFACTURED BY HALLSTEN CORPORATION
6944 34TH STREET, NORTH HIGHLANDS, CA 95660
PHONE (916) 331-7211.
2. SHOP DRAWINGS FOR FISHING PLATFORMS AND
GANGWAYS ARE REQUIRED.
3. FRAMING AND DECKING MATERIALS SHALL BE
FABRICATED FROM GALVANIZED STEEL OR
ALUMINUM MATERIALS UNLESS OTHERWISE APPROVED.
4. GANGWAY SHALL BE EQUIPPED WITH HANDRAILS ON BOTH
SIDES OF THE WALKING SURFACE AND SHALL BE THE SAME
LENGTH AS THE WALKING SURFACE.
5. ALUMINUM UTILIZED IN FABRICATION OF BOARDING FLOATS
AND GANGWAYS SHALL BE ALLOY 6061-T 6 OR 6063-T 6
MATERIALS SHALL BE NEW AND OF FIRST QUALITY.
6. ANY FASTENERS BETWEEN ALUMINUM COMPONENTS SHALL
BE STAINLESS STEEL. FASTENERS BETWEEN ALUMINUM AND
GALVANIZED STEEL COMPONENTS SHALL BE HOT DIPPED
GALVANIZED OR STAINLESS STEEL.
7. ALL STEEL ACCESSORIES OR COMPONENTS SHALL BE HOT
DIPPED GALVANIZED WITH A MINIMUM OF 2 OZ. OF ZINC
PER SQUARE FOOT OF SURFACE.
8. ALL WELDS SHALL BE MADE OF A FILLER METAL ALLOY
WHICH WILL PRODUCE A WELD WHICH IS COMPATIBLE
IN CORROSION RESISTANCE WITH THE BASE METAL.
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE DATE:
DRAWN:
CHECKED:
DATE:
DATE:
DESIGNED: STEVE RENNER
SHEET
DRAWING NAME
1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010 42
9. BOARDING FLOAT AND GANGWAY DECK AND STRUCTURAL COMPONENTS
SHALL SUPPORT THE STRUCTURE DEAD WEIGHT PLUS A UNIFORM
DISTRIBUTED LIVE LOAD OF 40 POUNDS PER SQUARE FOOT.
10. MINIMUM FREE BOARD UNDER COMBINED DEAD AND LIVE
LOADING CONDITIONS SHALL NOT BE LESS THAN 8 INCHES.
FREE BOARD UNDER DEAD LOAD ONLY SHALL BE BETWEEN
16 AND 22 INCHES.
11. SUFFICIENT ANCHOR CHAIN SHALL BE PROVIDED TO ALLOW A 2'
FLUCTUATION IN WATER DEPTHS.
12. DECKING MATERIALS SHALL BE ALUMINUM DECK SLATS 6" WIDE
BY 1.61" DEEP WITH RIBBED NON-SKID SURFACE.
13. FLOATATION TUBS SHALL BE CROSS LINKED POLYETHYLENE
HAVING A WALL THICKNESS OF 0.125 MIN. TUBS SHALL CONFORM
TO ATM D 124 B AND BE MANUFACTURED TO BE UV RESISTANT
FOR A PERIOD OF 20 YRS. TUBS SHALL BE COMPLETELY FILLED
WITH POLYSTYRENE FOAM. FOAM SHALL HAVE A MINIMUM
DENSITY, IN PLACE OF 0.9 LB PER CUBIC FOOT AND A
MAXIMUM DENSITY OF 1.2 LB PER CUBIC FOOT.
14. ALL EXCAVATION NECESSARY FOR THE CONCRETE APPROACH
RAMP SHALL BE PAID FOR UNDER ITEM 204(97) EXCAVATION,
COMPACTION METHOD (E).
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
SPU
R
E
(T
) S
TA
6+
FISHING ACCESS RAMP
CONSTRUCT 60' OF TRAIL, 6' WIDTH AND 6" DEPTH AGGREGATE BASE
PLACE DRAIN ROCK, GEOTEXTILE AND 6' WIDE X 30' LONG SECTION
OF ARMORTEC "CLASS 45S" ARMORFLEX
TRAIL
MEAN WATER ELEVATION
30'
CLASS 45S ARMORFLEX
NOTES
PLACE 3" MINUS DRAIN ROCK FOR
6" DEPTH X 8' WIDTH X 30' LENGTH
RESTROOM
COMPLETELY ENCASE DRAIN ROCK
WITH "PROPEX 2X2 HF" OR EQUAL
GEOTEXTILE FABRIC (58 S.Y.)
1) FISH ACCESS RAMP (ARMORTECH "CLASS 45S ARMORFLEX" IS AS MANUFACTURED BY
CONTECH CONSTRUCTION PRODUCTS INC., 6001 RICH HILL DRIVE, ORANGEVALE, CA 95662
PHONE (916) 871-2595.
2) "ARMORFLEX" SHALL BE INSTALLED ACCORDING TO THE MANUFACTURERS INSTRUCTIONS.
3) DRAIN ROCK (5 C.Y.) SHALL BE COMMERCIAL SOURCE AND IS CONSIDERED INCIDENTAL TO ITEM 10700.
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010 43
PLACE BENCH
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
BOAT RAMP
(T36) STA 35+12
EAST END CAMPGROUND
EXISTING BOAT RAMP
NOTES
1) BOAT RAMP (ARMORTECH "CLASS 45S ARMORFLEX" IS AS MANUFACTURED BY
CONTECH CONSTRUCTION PRODUCTS INC., 6001 RICH HILL DRIVE, ORANGEVALE, CA 9566
PHONE (916) 871-2595.
2) "ARMORFLEX" SHALL BE INSTALLED ACCORDING TO THE MANUFACTURERS INSTRUCTIONS
MEAN WATER ELEVATION
3'
CLASS 45S ARMORFLEX
PRIOR TO PLACING ARMORFLEX MAT, BACKFILL THE EXISITNG
GEOGRID WITH 3/4 " CRUSHED AGGREGATE TO THE TOP OF
ALL CELLS (APPROX 3 C.Y.)
EXISTING GEOGRID BOAT RAMP
PLACE 10' WIDE X 26 ' LONG SECTION
OF ARMORTEC "CLASS 45S" ARMORFLEX
OVER EXISTING GEOGRID BOAT RAMP
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
6'
PLACE AGGREGATE BASE TO SUFFICIENT DEPTH
TO PROVIDE A SMOOTH TRANSITION ONTO THE
ARMORFLEX MAT
DAVE SEILER 1/25/2010 44
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE:
REVISIONDATE BY DRAWING NAME
INFORMATION/PAY STATION
DETAILS
15R
15R
12'
EAST EN
D
C
AM
PG
R
O U
N D
EN
TR
AN
C
E
R O
AD
44N
30X
(550) 15+83
18'
30'
27'
7'
48'
RESTROOM
EXISTING BOULDERS
8'
12'
26'
CONSTRUCT LEVEL PAD TO MATCH GRADE
OF CAMPGROUND ROAD FOR INFORMATION /
PAY STATION AREA, PLACE 6" AGGREGATE BASE
CONSTRUCT CONCRETE PAD
FOR STEEL PAY STATION
CONSTRUCT CONCRETE
PAD FOR STEEL PAY
STATION
COMPACTED CRUSHED AGGREGATE
- FLUSH WITH CONCRETE
CONCRETE PAD FOR
STEEL PAY STATION
3' SQUARE BY 1' DEEP CONCRETE PAD WITH
(4) #4 REBAR, 2 EACH WAY
SHEET
STEVE RENNER
STEVE RENNER
DAVE SEILER
1/15/2010
1/15/2010
1/25/2010
PLACE CLASS 2 RIPRAP ON THE
ENTIRE CUT SLOPE AROUND THE
PERIMETER OF THE INFO/PAY
STATION AREA
INSTALL INFORMATION
SIGN BOARDS
INSTALL
INFORMATION
SIGN BOARDS
NOTES:
1. INSTALL (4) "J" BOLTS IN A SQUARE
PATTERN 3-3/4" ON CENTERS
2. INSTALL "J" BOLTS LEAVING A MINIMUM
OF 1" ABOVE CONCRETE SURFACE
3. ROUGH BROOM FINISH.
4. STEEL PAY STATION WILL BE PROVIDED
BY THE FOREST SERVICE
CONSTRUCT LEVEL PAD TO MATCH GRADE OF
EXISTING ROAD FOR INFORMATION / PAY STATION AREA,
PLACE 6" AGGREGATE BASE
1/2" DIA X 6" GALVANIZED "J" BOLTS, WASHERS, NUTS
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
RESTROOM
"A" SPUR
"B" SPUR
NORTH END CAMPGROUND
WELL DRILLING PLAN
PROPOSED WELL DRILLING LOCATION
6" W
EL
L
C
AS
IN
G
34"
INSTALL ADA 100 HAND PUMP ACCORDING
TO MANUFACTURERS INSTRUCTIONS
NO SCALE
STEVE RENNER 1/15/2010
STEVE RENNER 1/15/2010
DAVE SEILER 1/25/2010
20'
TRAIL
TR
AI
L
PARKING
PAR
KIN
G
PLACE 4" DEPTH 3/4" CRUSHED AGGREGATE UNDERLYING
THE CONCRETE SLAB WITH TRAILS CONSTRUCTED TO
PROVIDE A SMOOTH TRANSITION TO THE HAND PUMP
2%
SLO
PE
CONSTRUCT A CONCRETE SLAB CENTERED
ON THE WELL HEAD BETWEEN THE TRAILS
TO THE APPROXIMATE DIMENSIONS SHOWN.
SLOPE 2% TO PROVIDE DRAINIAGE
13'
4" CONCRETE SLAB
WITH #4 REBAR SPACED
12" ALL DIRECTIONS
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
DATE:
DATE: SHEET
REVISIONDATE BY DRAWING NAME
ORR LAKE
N
(T16) 20+32
(T
ST
A
+5
STA 19+75
NOTES
ROAD OBLITERATION PLAN
OBLITERATION SITE
(T27) 26+24
(T26) STA 26+07
(T24 ) 25+19
22'
13'
ROUND OFF ANY EXISTING CUT SLOPES AND
RANDOMLY PLACE ON-SITE ROCKS OVER THE
ENTIRE AREA NO MORE THAN 3' APART
STEVE RENNER
STEVE RENNER
1/15/2010
1/15/2010
DAVE SEILER 1/25/2010 47
1. ALL ROCKS SHALL BE A MINIMUM OF 1 CUBIC FOOT IN SIZE.
2. WORK SHALL BE CONSIDERED INCIDENTAL TO ITEM 204(97).
A
MR
PE
D
T AFOTNE G
YREKA, CALIFORNIA
KLAMATH NATIONAL FOREST
FOREST SERVICE
ER
U TL
U
U.S. DEPARTMENT OF AGRICULTURE DATE:DESIGNED:
DRAWN:
CHECKED:
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .