GoldfieldSepticSystems_Specifications.doc
DOC document 348 KB Posted
- Attached to
- GOLDFIELD RANCH SEPTIC SYSTEM PROJECT Federal contract opportunity
- Solicitation number
- AG-94TZ-S-17-0047
About this file
SPECIFICATIONS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation.pdf | ||
| Drawings.pdf | ||
| Statement_of_Work.pdf | ||
| FirePlan.pdf | ||
| WageDetermination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION INDEX
FOR
Goldfield Septic Systems
DIVISION 1 - GENERAL REQUIREMENTS
01000 – Project Coordination
1 page 01010 – Summary of Work
2 pages
01101 – Abbreviations
4 pages
01102 – Definitions
01103 – Measurement and Payment
01300 – Submittals
01410 – Quality Control and Quantity Measurement
01601 – Mobilization
01720 – Project Record Documents
DIVISION 2 - SITE WORK
02110 – Clearing and Grubbing
02223 – Excavation and Backfill for Utilities
02610 – Pipe, Fittings, and Specialties
3 pages
02715 – Sanitary Sewer – Gravity
5 pages 02743 – Septic Tanks
02747 – Chamber Leachfields
02805 – Topsoil Salvage
DIVISION 3 - CONCRETE
03100 – Concrete Formwork
03201 – Concrete Reinforcement
03301 – Cast-in-Place Concrete
7 pages
03345 – Concrete Finishing
END OF SPECIFICATION INDEX
DIVISION 1 - GENERAL REQUIREMENTS
PROJECT COORDINATION - 01000
PART 1 - GENERAL
1.1 - Description This work shall consist of coordination with government agencies and the general public.
1.2 - Related Sections 01010 - Summary of Work
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Government Agencies All permits necessary for construction and occupancy of the project shall be obtained by the Contractor.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement Work under this section will not be measured for payment, but is included in all other items in the contract.
4.2 - Payment Separate payment will not be made.
END OF SPECIFICATION 01000
DIVISION 1 - GENERAL REQUIREMENTS
SUMMARY OF WORK - 01010
PART 1 - GENERAL
1.1 - Location The project is located on the Mesa Ranger District of the Tonto National Forest. The address is 40202 N. Cave Creek Road, Scottsdale, Arizona. The Site is located 20 miles east of Mesa, AZ on the Mesa Ranger District, one mile north of the Bush Highway and Usery Pass Road Intersection, T3NR7E, SE ¼ Section 34.
1.2 - Site Work and Utilities All work shall be completed in accordance with the project specifications and drawings. The work includes all labor, materials, and equipment necessary to perform all operations for the work specified.
The Contractor shall be responsible for the layout survey, construction control, and establishing and maintaining all horizontal and vertical control required.
The objective is install two new septic systems for 5 existing RV pads. Construction shall include clearing, excavating and backfill for sewer line, 2 septic tanks and 2 chamber leach fields and installation of sewer hookups and cleanouts.
1.3 - Facilities and Services A construction work camp will not be allowed. A Contractor’s staging and storage area will be allowed where approved by the CO. Transportation to and from the work site for personnel and materials will be at Contractor’s expense.
Electricity and potable water are not available at the site. Water for construction and dust control is not available from National Forest lands. Development, hauling and placement of water shall be considered incidental to other pay items.
1.4 - Material Sources
All materials are available from commercial sources.
1.5 - Subsurface Soils and Investigations No auger borings were made in the area. Contractor shall undertake any site investigations necessary to ascertain the subsurface conditions.
1.6 - Clean-up and Disposal Disposal of construction debris and waste shall be off National Forest land and in compliance with local laws regarding disposal of waste material.
1.7 - Precautionary Measures Protection of Work:
The Contractor shall take precautions necessary to protect all work during the construction period and shall maintain adequate protection during severe weather conditions to prevent damage to the work or materials.
Safety:
The Contractor is responsible for safeguarding the public, the Contractor's employees, existing facilities, and Forest resources from contract operations. Signs, lights, barricades and other devices, as necessary, shall be erected and maintained during operations and at night and weekends as necessary. Precautions such as lowering tractor blades and safely storing materials shall be practiced to prevent injury to others in the area.
Security:
No security shall be provided by the government. The contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment.
END OF SPECIFICATION 01010
DIVISION 1 GENERAL
ABBREVIATIONS - 01101
Organizations & Standards Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows. Reference to a specific standard of specification shall mean the latest edition or amendment in effect on date of invitation to bid.
AASHTO--American Association of State Highway and Transportation Officials
ACI--American Concrete Institute
AISC--American Institute of Steel Construction
AISI--American Iron and Steel Institute
AITC--American Institute of Timber Construction
ANSI--American National Standards Institute
APA--American Plywood Association
API--American Petroleum Institute
ASME--American Society of Mechanical Engineers
ASTM--American Society for Testing and Material
ATCC--American Type Culture Collection
AWPA--American Wood Preservers Association
AWPB--American Wood Preservers Bureau
AWS--American Welding Society
AWWA--American Water Works Association
CFR--Code of Federal Regulations
CRSI--Concrete Reinforcing Steel Institute
CS--Commercial Standard issued by U.S. Department of Commerce
DEMA--Diesel Engine Manufacturers Association
FAR--Federal Acquisition Regulation
FED SPEC. or FS-- Federal Specifications
FSS--Federal Specifications and Standards
GSA--General Services Administration
MIL--Military Specifications
MSHA--Mine Safety and Health Administration
MUTCD--Manual on Uniform Traffic Control Devices
NBFU--National Board of Fire Underwriters
NBS--National Bureau of Standards
NEMA--National Electrical Manufacturers Association
NESC--National Electrical Safety Code
NFPA--(Fire)--National Fire Protection Association
NFPA--(Forest)--National Forest Products Association
NWMA--National Woodwork Manufacturers Association
OSHA--Occupational Safety and Health Administration
PCA--Portland Cement Association
PCI--Prestressed Concrete Institute
PS--Product Standard issued by the U.S. Department of Commerce
PTI--Post-Tensioning Institute
RIS-Redwood Inspection Service
SAE--Society of Automotive Engineers
SF--Standard Form
SSPC--Steel Structures Painting Council
UL--Underwriter's Laboratories, Inc.
USASI--United States of America Standards Institute
WCLIB--West Coast Lumber Inspection Bureau
WWPA--Western Wood Products Association
Pay Items & Pay Units
ABBREVIATIONS
Aluminum
AL.
Asphalt
ASP.
Barbed Wire
B.W.
Bituminous Coated Corrugated Steel Pipe . . . . B.C.C.S.P. OR B.C.C.S. PIPE
Bituminous Surface Treatment
BST
Cement
CEMT.
Cement Treated
CEMT.-T.
Cement Treated Base
CTB
Clearing & Grubbing
CLEAR & GRUB
Compaction
CMPCT.
Concrete
CONC.
Corrugated Metal Pipe
CMP
Corrugated Steel Pipe
C.S.P.
Corrugated Steel Pipe Arch
C.S.P. ARCH
Cubic Yard
C.Y.
Cubic Yard Mile
C.Y.MI.
Diameter
DIA.
Each
EA.
Emulsified
EMLSFD.
Erosion and Pollution Control
E&P CONTROL
Fabricated
FABR.
Finish Floor Elevation
F.F.E.
Foundation
FOUND.
Furnished
FURN.
Gallon
GAL.
Grade
GR.
Height
HT.
High Strength
H. STRENGTH
Horizontal
HOR.
Hour
HR.
Linear Foot
L.F.
Liquid
LIQ.
Loading
LD.
Lump Sum
L.S.
Material
MAT'L
Maximum
MAX.
Method
M.
Mile
MI.
Minimum
MIN.
One Thousand Feet Board Measure . . . . . . . . MFBM
One Thousand Gallons
M.GALS.
One Thousand Gallons Mile
M.GALS.MI.
One Thousand Square Feet M.S.F.
Polyvinylchloride
PVC
Pounds
LBS.
Reflectorized
REFLECT.
Section
SEC.
Square Foot
S.F.
Square Yard
S.Y.
Station
STA.
Station Yard
STA. YD.
Strand
S.
Structural
STRUCT.
Structural Steel
S. STEEL
Stump
STMP
Target Value
TV
Thickness
TH.
Ton Mile
T.M.
Tops and Limbs
T&L
Utilization of Timber
UOT
Vertical
VERT.
Welded Wire Fabric W.W.F.
White
WH.
Width
W.
With
W/
Without
W/O
Woven wire
W.W.
Yellow
YE.
END OF SPECIFICATION 01101
DIVISION 1 - GENERAL
DEFINITIONS - 01102
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Adjustment in Contract Price. "Adjustment in contract price" shall mean "equitable adjustment" as used in the Federal Acquisition Regulations.
Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.
Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.
Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.
Berm. Curb or dike constructed to control runoff water or traffic flow.
Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations.
Clearing Limits. The limits of clearing as designated on the ground or on the drawings.
Conduit. A natural or artificial channel for carrying fluids, as water pipes, canals, and aqueducts.
Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.
Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Controlled Felling. Directing the placement of trees in felling by wedges, jacks, cable tension, or distribution of holding wood or any combinations of these which will ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.
Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.
Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.
Defect. A failure to meet a requirement with respect to a single quality characteristic.
Drawings. The documents, including plan and profile sheets, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.
Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.
Engineer. The Contracting Officer's Representative (COR) responsible for onsite administration of the contract.
Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.
Excess Excavation. Material from the excavation in excess of that needed for construction of designed roadways and facilities.
Forest Service. The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Gauge. The term "gauge" when used in connection with the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.
Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other Federal agencies.
Inspector. The Government-authorized representative designated in writing by the CO or COR responsible for detailed inspection.
Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.
Laboratory. A testing laboratory of the Government or any other testing laboratory approved by the Contracting Officer.
Materials. Any substance specified for use in the construction of the project and its appurtenances.
Maximum Density. The highest density that can be obtained under stated conditions.
Measurement. Determining and expressing the quantities of work or materials.
Multi-Beam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.
Neat Line. A line defining the proposed or specified limits of an excavation or structure.
Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.
Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.
Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.
Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.
Pipe. A culvert that is circular (round) in cross-section.
Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).
Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.
Random Sampling. Sampling at times or locations determined in advance by the use of a table of random numbers.
Reasonably Close Conformity. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding.
Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Second Samples. A sample taken when the initial sample indicates that the material is defective.
Sidewalk. The portion of the roadway constructed primarily for pedestrian use.
Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determination whether these requirements are met.
Standard Specifications. Specifications approved for general application and repetitive use.
Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.
Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
Tackifier. Binder for vegetative mulch.
Target Value. The percentage of each material in a mixture intended for a particular use from which allowable variations are measured.
Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.
Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.
END OF SPECIFICATION 01102
DIVISION 1 - GENERAL
MEASUREMENT AND PAYMENT - 01103
PART 1 - GENERAL
1.1 – Requirements Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.
1.2 – Payment One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.
(a) Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:
(1) As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.
(2) As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.
(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
Final payment will be made for the designed quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.
(b) Actual Quantities (AQ): These quantities are determined from measurements of completed work.
(c) Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
1.3 - Units of Measurement:
Payment will be by units defined and determined according to U.S. Standard measure.
END OF SPECIFICATION 01103
DIVISION 1 - GENERAL
SUBMITTALS - 01300
PART 1 - GENERAL
1.1 - Requirements
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten days for processing of submittals by the Government.
Submittals may also be referred to as shop drawings.
1.2 - Manufacturer's Literature and Shop Drawings Submit two (2) copies to the Engineer for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
E. Shop drawings of submitted item(s) including wiring or layout diagrams.
If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.
If the specified item is to be handicapped accessible the submittal item needs to show handicapped access on submitted drawings, not just state it is available as handicapped accessible.
Submittals will be waived if contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
1. 01410 – Quality Control and Quantity Measurement
Contractor's Representative Designation
Quality Control Plan
Project Schedule
As-built Drawings
Certificates-of-Compliance
Quantity Measurements
Test Results
Operation and Maintance Manuals
2. 02223 – Excavation and Backfill for Utilities
Washed Sand Shading Material Delivery Tickets
Select Backfill Material Delivery Tickets
3. 02610 – Pipe, Fittings and Specialties
Product Data for SDR35 Sewer Pipe, ASTM D3034
4. 02715 – Sanitary Sewer – Gravity
Product Data for Cleanout Valve Box
Product Data for Cleanout Plugs
Product Data for Cleanout Chain
5. 02743 – Septic Tanks
Product Data for Septic Tanks and Risers
Product Data for Manhole Covers
Catalog Cuts / Shop Drawings / Salient Characteristics
6. 02747 – Chamber Leachfields
Product Data for Chambers
Product Data for Chamber End Caps
Catalog Cuts / Shop Drawings / Salient Characteristics
7. 03301 – Cast-in-Place Concrete
Mix Design
Admixtures
Delivery Tickets
END OF SPECIFICATION 01300
DIVISION 1 - GENERAL
QUALITY CONTROL AND QUANTITY MEASUREMENT - 01410
PART 1 - GENERAL
1.1 - Description This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 - Related Work Specified Elsewhere General Provisions FAR 52.236-5, Material and Workmanship
General Provisions FAR 52.236-6, Superintendence by the Contractor
General Provisions FAR 52.246-12, Inspection of Construction
1.3 - Submittals Submittals under this section shall be furnished to the Engineer. Submittals include, but are not limited to the following:
Contractor's Representative Designation
Project Schedule
Quality Control Plan As Built Drawings
Certificates-of-Compliance Quantity Measurements Test Results
Operation and Maintenance Manuals
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Contractor's Representative Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.
3.2 - Project Schedule Submit a project schedule stating information such as proposed dates of completion of various elements of construction.
3.3 - Quality Control Plan The Quality Control Plan shall consist of the following:
(1) Authorities and responsibilities of inspection and testing personnel.
(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.
The Contractor's proposed quality control plan for all items requiring quality control shall be submitted to the CO for review prior to the Contractor commencing work. Within 10 days of receipt of the plan, the CO shall notify the Contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to Contractor's receipt of written approval of the proposed plan. The Contractor shall submit to the CO, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the CO.
All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.
3.4 - Sampling, Testing, Inspection, and Measurement of Quantities The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be specified in the related section.
The Contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:
PROJECT NAME:________________________CONTRACT No._____________________
Pay Item No.
Test Date Location Standard Results Test By
(Initials)
The Contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be preformed.
The Contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies. The Contractor is responsible for repair and protection of inspected work, whether inspection is performed by the Contractor or by the Government.
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
The contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
3.5 - As-Built Drawings The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted by the Contractor.
3.6 - Certificates and Measurements Certification:
The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor.
Measurements:
The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress payments; the Engineer will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
PROJECT NAME:_______________________CONTRACT No.__________________
Quantity or
Pay Item
Date
Measurement
Test By
(Initials)
3.7 - Materials The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.
When the material sources are not designated as Government-furnished or the Contractor elects not to use designated sources, the Contractor shall be responsible for furnishing materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement for this section.
4.2 - Payment This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01410
DIVISION 1 - GENERAL
MOBILIZATION - 01601
PART 1 - GENERAL
1.1 - Description This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
PART 2 - PRODUCTS
NONE
PART 3 - EXECUTION
NONE
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement Progress payments will be made as follows:
The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
(a) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
(b) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
The total of all payments shall not exceed the original contract amount for this item.
4.2 - Payment Payment will be made under:
PAY ITEM
DESCRIPTION
PAY UNIT
01601(01)
Mobilization (Including Bonding Cost) . . . . . . . .L.S.
END OF SPECIFICATION 01601
DIVISION 1 - GENERAL
PROJECT RECORD DOCUMENTS - 01720
PART 1 - GENERAL
1.1 - Requirements Include
Maintain at the site one record copy of:
Working Drawings.
Specifications.
Addenda.
Work Orders, Notices of Noncompliance, Contract Modifications.
Approved shop drawings, product data and samples.
Field test records.
1.2 - Related Sections Contract Provisions: Fiscal provisions, legal submittals and other administrative requirements.
01300 - Submittals
1.3 - Maintenance Of Documents And Samples Maintain documents in a clean, dry, legible condition and in good order. Do not use record documents for construction purposes.
Make documents and samples available at all times for inspection by the Engineer.
1.4 - Working Drawings Record information concurrently with construction progress.
Do not permanently conceal any work until required information has been recorded.
Drawings - legibly mark to record actual construction:
Depths of various elements of foundation in relation to finish first floor datum.
Horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
Location of internal utilities and appurtenances concealed in the construction, referenced to visible and accessible features of the structure.
Field changes of dimension and detail.
Changes made by Field Order or Change Order.
Details not on original Contract Documents.
In showing changes or additions, use the same legends as used on the contract drawings.
Mechanical and electrical Record Drawings shall indicate routing of piping, duct work, power and control wiring, etc., location, operation (manual or automatic) and function of all controls, normal amperage readings for all motors taken at the equipment under normal load conditions, final air quantities at each air outlet and at each air return.
Specifications and Addenda - legibly mark each Section to record:
Manufacturer, trade name, catalog number and supplier of each product and item of equipment actually installed.
Changes made by Work Order or Change Order.
1.6 - Submittals Upon substantial completion of the work, transfer the information from the paper prints of drawings kept at the site to a clean set of Record Drawings.
Indicate names, addresses and phone numbers of the subcontractors and sign the Record Drawings.
Upon substantial completion, submit one copy of the Record Drawings to the Contracting Officer for approval. Upon receipt of Notice Of Approval, deliver the Record Drawings, together with two sets of prints, with alterations highlighted in yellow highlight marker to the Engineer. Unacceptable documents will be returned for correction and resubmitted.
At Contract closeout, submit documents with transmittal letter containing date, project title and Contracting Officer's Project number, Contractor's name and address, list of documents by title and number and signature of Contractor.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
END OF SECTION - 01720
DIVISION 2 - SITE WORK
CLEARING AND GRUBBING - 02110
PART 1 - GENERAL
1.1 - Description This section specifies clearing, grubbing, removing, and disposing of vegetation and debris. Work includes the protection from injury or defacement of trees and other objects designated to remain, and treatment or removal of damaged trees. This section covers work associated with roads and facilities construction such as buildings, utilities, etc.
1.2 - Clearing Limits Clearing limits are the construction limits unless otherwise staked on the ground or SHOWN ON THE DRAWINGS.
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Clearing Clear all trees, shrubs, brush and other objects within the clearing limits except the following:
(1) Saguaro Cacti
(2) Live, sound, and firmly rooted trees which are designated to remain.
(3) Live brush and herbaceous plants which are designated to remain.
(4) Other objects designated to remain.
Do not remove any trees or other vegetation outside the clearing limits without the approval of the CO.
3.2 - Grubbing
Grub stumps and roots within the clearing limits.
3.3 - Tree Removal and Preservation Falling of Trees: Fall trees toward the center of the area to be cleared. Use controlled falling to prevent injury or defacement to structures, other trees, or property.
Treatment of Trees and Shrubs Damaged by Contractor: Trim branches flush with tree. If damage occurs to standing trees, the injured area shall be treated with a coat of tree-surgery asphalt-based paint. Trees with major roots exposed by construction and that are rendered unstable shall be felled and disposed of.
3.4 - Debris Disposal All debris shall be removed from National Forest land and disposed of in accordance with local regulations regarding disposal of construction waste unless otherwise SHOWN ON THE DRAWINGS.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement Measurement will be the number of units completed and accepted, including removal, backfill, and disposal.
Measurement for Removal of Obstructions shall include all items SHOWN ON THE DRAWINGS.
4.2 - Payment The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.
All work required for the complete removal and disposal of items SHOWN ON THE DRAWINGS or listed in the Specifications is included. Separate payment will not be made under other items.
Payment will be made under:
Description
Pay Unit
02110(01)
Clearing and Grubbing ……………..……….. L.S.
END OF SPECIFICATION 02110
DIVISION 2 - SITE WORK
EXCAVATION AND BACKFILL FOR UTILITIES - 02223
PART 1 - GENERAL
1.1 - Scope This section covers excavation; furnishing, hauling, and placing backfill material; disposal of excess or unsuitable material; and grading for utilities.
1.2 - Related Work Specified Elsewhere 02715 - Sanitary Sewer - Gravity
1.3 - Class of Material Material to be excavated is unclassified. Contractor may expect to encounter boulders of varying size during any excavation below existing grade.
1.4 - Approvals Required Excavation: Notify CO when excavation is completed. Do not place pipe, bedding, or backfill until the excavation is approved by the CO.
Backfill: Do not place backfill until installation of pipe has been approved by the CO.
1.5 - Backfill Time Limit Backfill and restore surface materials of utility line trenches located in existing roadways or parking areas within seven days after approval to place backfill by the CO.
PART 2 - PRODUCTS
2.1 - Backfill Materials Backfill shall contain no frozen or organic material.
(a) Select Excavated Material:
Backfill for Utilities: Excavated material containing no rocks larger than 4 inches in largest dimension. Imported material shall be select MAG Aggegate Base Course / Pipe Backfill with no rocks larger than 4 inches in largest dimension.
Backfill for Septic Tank and Chambers: Excavated material containing no rocks larger than 3 inches in largest dimension or as recommended by the tank Manufacturer.
(b) Bedding/Shading Material: Fine sand or soil with a maximum P.I. of 10, 100% passing the 3/8” sieve, without sharp chips or points.
2.2 - Water Water shall be reasonably clean and free of hazardous substances. Water is not available at the site. Water shall be obtained from a commercial source.
PART 3 - EXECUTION
3.1 - Excavation No excavated material shall be placed in lakes or live streams.
Excavation shall not begin until all clearing and/or grubbing work has been completed. Operations shall be in compliance with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman's Compensation Board.
All trenches shall be excavated in reasonably close conformity with the lines and grades shown on the drawings. Any shifting or change from the alignment and grade shown on the drawings must receive prior approval by the CO in writing.
Lay utilities in continuous open trench. Short tunnel sections or boring may be used in special locations with the approval to the CO.
Trim roots flush with trench wall.
3.2 - Overexcavation Restore to grade any overexcavation by backfilling with bedding material.
3.3 - Wet Excavation If water is encountered during trench excavation, provide adequate pumping equipment and piping to keep trench free from water and dispose of the water without damage to adjacent property. Separate payment will not be made for pumping of water from trenches or for excavation of material rendered unsuitable as a result of water encountered.
3.4 - Backsloping, Sheeting and Shoring Backsloping of trench walls will be allowed only upon prior written approval of the CO.
Remove all shoring and sheeting when construction is completed. Withdraw shoring in such a manner as to prevent trench wall from caving in while backfilling.
3.5 - Excavated Material Pile excavated material at the side of the trench where it will provide the best protection for the work. Leave adequate space between the toe of the spoil pile and edge of trench, to prevent material from falling into the trench.
3.6 – Backfill Before compacting backfill other than rock or sand, prepare material to a water content that will permit proper compaction by either aerating the material if it is too wet, or spraying the material with water if it is too dry. Thoroughly mix each lift before compaction to assure uniform distribution of water content. Do not compact material above pipe until there are 6 inches of cover over the pipe.
Compact each lift to the required density.
(a) Bedding and Shading: Place in lifts 6 inches or less and compact with a minimum of 3 passes over the entire lift surface. Compact around pipe barrel and bells by hand tamgraveling.
(b) Select Excavated Material: Distribute large rocks so they are individually surrounded by fine materials. Place 6-inch lifts or less and compact to at least 95% of the maximum dry density as determined by AASHTO T-99, Method C or D.
(c) Surface Restoration: Mound final compacted lift above grade, except in roadways, where the final surface shall be even with the surrounding roadway.
(d) Final Finish: After the utility installation and backfill have been completed, finish all disturbed areas, except trench area required to be mounded, to a smooth , uniform grade and texture, well blended to the original contours, showing minimum evidence of construction activity.
3.7 – Backfill Adjacent to Concrete Remove all forms and clean the excavated area of all debris. Remove any standing water from excavation. Obtain approval from CO prior to placement of backfill. Do not backfill until concrete has been in place for a minimum of 7 days and has attained sufficient strength to withstand imposed loads.
Backfill adjacent to concrete shall be compacted to at least 95 percent of the maximum density as determined by AASHTO T 99, Method C or D. Compaction shall be done with mechanical tampers only.
3.8 - Grading All areas covered by the project shall be uniformly graded so that finished surfaces are at elevations indicated and approved by the CO. Slope grade away from structures a minimum of ¼-inch per foot unless otherwise indicated to provide drainage away from structures.
3.9 - Disposal of Excess Excavation and Unsuitable Material Any excess excavation shall be used where needed by other parts of the contract.
Excess excavation containing rocks and boulders too large to be incorporated as backfill material shall be stockpiled at locations in the vicinity of the construction area AS SHOWN ON THE DRAWINGS.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
The work specified herein will not be measured for payment.
4.2 - Payment This work is incidental to other items in this contract and direct, separate item payment will not be made.
END OF SPECIFICATION 02223
DIVISION 2 - SITE WORK
PIPE, FITTINGS, AND SPECIALTIES - 02610
PART 1 - GENERAL
1.1 - Scope This section specifies the furnishing of pipe, fittings, and specialties. Installation of these items is covered in other sections of the specifications
All references to pipe sizes refer to the nominal diameter.
1.2 - Related Work Specified Elsewhere 02715 - Sanitary Sewer - Gravity
1.3 - Submittals Submit sufficient descriptive literature to demonstrate compliance with these specifications for the following:
Gravity sewer pipe and fittings
Specialties
1.4 - Single Manufacturer
All pipe of a given type, material, and size shall be the product of a single manufacturer.
1.5 - Applicable Codes
AWWA
ASTM
Uniform Plumbing Code
PART 2 - PRODUCTS
2.1 - Bushings Where reducing fittings are as SHOWN ON THE DRAWINGS, bushings of the same material as the fitting may be approved by the CO, if space is available.
2.2 - Joints Between Dissimilar Materials Use flanges or couplings manufactured specifically for the types of pipe being joined and having a minimum pressure rating, or pressure class (as applicable) equal to or greater than the lower pressure rating or class of the pipes being joined. If PVC fitting is used to connect PVC pipe to threaded metallic pipe, use PVC male adapter to female metallic fitting. For threaded PVC and fittings use Schedule 80.
2.3 - Pressure Pipe and Fittings Pressure water lines and fittings shall conform to the following unless otherwise SHOWN ON THE DRAWINGS.
Pipe and Fittings, 1" - 3" diameter Polyvinyl Chloride: Pipe, couplings and fittings shall be Schedule 40, manufactured of material conforming to ASTM D 1784, Class 12454B, designated as PVC 1120 in ASTM D 1785. Threaded joints and fittings shall meet Schedule 80 requirements of ASTM D 1785.
High Density Polyethylene (PE): Pipe shall comply with requirements of ANSI/AWWA C901-88. Joining methods and fittings shall be per approved submittal. Flare, insert, compression and fusion type fittings can be employed. If compression fittings are used, they shall be a type with a split clamp.
Galvanized Steel: Pipe shall comply with ASTM A 120, Schedule 40, threaded and coupled. Threaded fittings shall comply with ANSI B16.3.
Pipe and Fittings, 4" and greater diameter Polyvinyl Chloride: Pipe and fittings shall be elastomeric joint or flanged and shall comply with requirements of ANSI/AWWA C900-89.
2.4 - Gravity Sewer Pipe and Fittings Gravity sewer pipe and fittings shall conform to the following unless otherwise noted on the drawings:
Polyvinyl Chloride (PVC) ASTM D3033 or ASTM D3034, with rubber ring gasket joints.
2.5 - Specialties Saddles - Cast Iron, Steel and Asbestos Cement Pipe Double strap service saddle with, brass or forged steel-galvanized straps.
Saddles - Plastic Pipe, 1 Inch Through 4 Inch - Two piece polypropylene body which surrounds pipe, with two stainless steel straps and stainless steel reinforcing cap.
Pipe Supports - Cast iron saddle, locknut nipple and reducer to provide vertical adjustment.
Thread Compound and Tape - A lead-free, anti-seize sealing compound or tape approved for use in joints and threaded parts of potable water systems.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement The work specified herein will not be measured for payment.
4.2 - Payment This work is incidental to other items in this contract and direct separate item payment will not be made.
END OF SPECIFICATION 02610
DIVISION 2 - SITE WORK
SANITARY SEWER - GRAVITY - 02715
PART 1 - GENERAL
1.0 - Description This section specifies construction of gravity sanitary sewer lines, manholes, cleanouts, and hookups.
1.1 - Related Work Specified Elsewhere 02223 - Excavation and Backfill for Utilities
02610 - Pipe, Fittings, and Specialties
03301 - Cast-In-Place Concrete
PART 2 - PRODUCTS
2.0 - Marking Tape
Metallic core, plastic marking tape, printed with the words "Buried SewerLine" or similar wording; Trumbull, Terra-Tape, or approved equal.
2.1 - Cleanout Cleanout valve box shall be VB-0029 with Sewer LID as supplied by 5 Star Pipe Products or approved equal. Material shall be cast iron per ASTM A48 Class 30B.
Cleanout plug for Sewer Hookups shall be threaded with a raised squre head and secured by a durable chain to prevent loss. Cleanout plugs shall comply with the applicable standards listed in Table 702.4 of the International Plumbing Code, 2009.
Cleanout plug and cleanout cover products for Sewer Cleanouts shall be in accordance with Plumbing Code and Maricopa County Regulations.
PART 3 - EXECUTION
3.0 - Fine Grading of Bedding Material Fine grade the pipe bedding with hand tools, using lines, straight edges and templates. Provide support for pipe on at least the bottom quarter of the circumference and throughout its length. Tool bell holes no larger than necessary to permit making the joint.
3.1 - Pipe Installation Placement of Pipe: Lower pipe lengths carefully into the trench. Do not drop pipe during unloading or placement. Dropped pipe sections will be subject to rejection by the CO.
Insert spigot end to the depth mark. Support pipe to insure true alignment and an invert which is smooth and free from roughness or irregularity. When the pipe is in place, support pipe barrel by placing and tamping sufficient pipe bedding along side of pipe to prevent movement.
Grade and Alignment: Install pipe so grade and alignment are within the following tolerances:
Grade of pipe 2% or less:
Alignment - 0.02 foot maximum deviation off true center line.
Grade - 0.005 foot maximum deviation above or below true grade.
Grade of pipe greater than 2%:
Alignment - 0.l0 foot maximum deviation off true center line.
Grade - 0.02 foot maximum deviation above or below true grade.
Protection and Cleaning of Pipe Interior: Close the pipe end with a watertight stopper at the end of each days work. Clean sewer lines of all rocks, sticks, and other debris at the completion of construction.
Manhole Connection: Connection shall be watertight. Contractor must insure manhole gasket is uniformly seated around structure adapter. Extra precautions must be taken to prevent differential settlement between pipe and manhole.
Approval: Do not begin backfill until pipeline installation is approved in writing by the CO.
3.2 - Installation of Cleanouts Install cleanouts flush with surrounding ground as SHOWN ON DRAWINGS.
3.3 - Testing - Low Pressure Air Test Test all sections of the gravity sewer line, using the low pressure air test described below. Perform test in the presence of the CO.
Test Sections: Test sections from manhole to manhole, or manhole to cleanout for line ends. Include all laterals in the test of the section. Test laterals entering manholes separately.
Equipment: Supply all test equipment required including air test stand, test plugs, stop watch, calibrated test gage reading 0 to 15 psi maximum with 1/4 or 1/2 psi divisions, hoses and air compressor. Calibrate test gage with a standardized test gage and maintain calibration record for all gages in the test kit.
Timing of Test: Perform final acceptance air test after trench has been backfilled sufficiently to provide a minimum of 3 feet of cover over the pipe, or backfill is completed, whichever is less. Leave lateral ends exposed for testing prior to completing service connections.
Performance Required for Acceptance: Perform low pressure air test on plugged section of sewer line to determine the time required to lose 1.00 psi air pressure. To be acceptable, the time required to lose 1.00 psi must be equal to or greater than the time computed using the table and instructions below.
CONSTANTS "K" AND MAXIMUM COMPUTED
TEST PERIODS FOR VARIOUS DIAMETERS OF PIPE
Pipe Size
K
Maximum Computed
Time
Inches
(Seconds/foot of Pipe)
Seconds
0.18
0.40
0.70
1.10
1.58
Determine computed time by multiplying the constant K by the length of the test section. It must not exceed the maximum computed time. If the test section consists of pipe of different sizes, the total computed time will be the sum of the computed times of each individual section.
Ground Water Allowance: Increase the required test pressure to account for the level of the ground water adjacent to pipe. The ground water allowance is the average of the heights from invert to water level of each end of the test section multiplied by 0.433.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .