SPECIFICATIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specification3301-Revised.pdf | ||
| Amd_3_AG-94TZ-S-15-0045.rtf | RTF text file | |
| ResponsesAmendmentOne.pdf | ||
| Amd_2_AG-94TZ-S-15-0045.rtf | RTF text file | |
| Amd_1_AG-94TZ-S-15-0045.rtf | RTF text file | |
| Wage_Determination.docx | DOCX document | |
| Solicitation.docx | DOCX document | |
| Drawings.pdf | ||
| SF_1442_AG_94TZ_S_15_0045.pdf | ||
| KAIBAB_FIRE_PLAN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSI SPECIFICATION INDEX
FOR
Kaibab National Forests North Kaibab Ranger District 2015 - Big Springs Fire Lookout Tower and Cabin Environmental and Renovation Work
| DIVISION 1 – GENERAL REQUIREMENTS | 3 |
| 01010 – SUMMARY OF WORK | 3 |
| 01030 – NOXIOUS WEED CONTROL | 14 |
| 01103 – MEASUREMENT AND PAYMENT | 16 |
| 01300 – SUBMITTALS | 17 |
| 01601 – MOBILIZATION | 19 |
| 01620 – STORAGE AND PROTECTION | 21 |
| 01710 – CLEANING | 23 |
| 01730 – OPERATIONS AND MAINTENANCE DATA | 25 |
| DIVISION 2 – SITE WORK | 30 |
| 02120 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 30 |
| 02201 – TRENCHING, BACKFILLING, AND COMPACTING FOR UNDERGROUND UTILITIES | 32 |
| 02220 – EXCAVATION AND BACKFILL FOR BUILDINGS | 38 |
| 02512 – CONCRETE SLAB | 40 |
| 02713 – WATERLINES AND APPURTENANCES | 42 |
| DIVISION 3 - CONCRETE | 45 |
| 03301 – CAST-IN-PLACE CONCRETE | 45 |
| DIVISION 6 – WOOD | 51 |
| 06100 – CARPENTRY | 51 |
| DIVISION 7 – THERMAL & MOISTURE PROTECTION | 56 |
| 07204 – BUILDING INSULATION | 56 |
| 07212 – VAPOR BARRIER, RADIANT BARRIER, AND REFLECTIVE INSULATION | 58 |
| DIVISION 8 – DOORS AND WINDOWS | 60 |
| 08100 – DOOR AND COUNTERBALANCE UNIT | 60 |
| 08561 – WINDOWS | 63 |
| DIVISION 9 – FINISHES | 69 |
| 09652 – FLOORING | 69 |
| 09771 – PLANK AND WOOD MOLDING WAINSCOT SYSTEM | 72 |
| 09900 – PAINTING AND GRAFFITI PROTECTION | 75 |
| DIVISION 10 – FURNISHINGS | 78 |
| 10800 – CABIN FURNITURE AND ACCESSORIES | 78 |
| DIVISION 13 – SPECIAL CONSTRUCTION | 80 |
| 13100 – LIGHTNING PROTECTION | 80 |
| 13120 – PUMP HOUSE BUILDING | 85 |
| 13281 – LBP/ACM ABATEMENT | 88 |
| DIVISION 15 - MECHANICAL | 102 |
| 15415 – LP GAS SYSTEM | 102 |
| DIVISION 16 – ELECTRICAL | 105 |
| 16100 – POWER DISTRIBUTION AND SERVICE | 105 |
| DIVISION 16 – ELECTRICAL | 108 |
| 16403 – ELECTRICAL DISTRIBUTION AND BUILDING ELECTRICAL SYSTEM | 108 |
END OF CSI SPECIFICATION INDEX
DIVISION 1 – GENERAL REQUIREMENTS
01010 – SUMMARY OF WORK
PART 1 - GENERAL
1.1 – Location
The Big Springs Fire Lookout Tower is an administrative site on the North Kaibab Ranger District, within the Kaibab National Forest. A fire lookout tower with steel cab and cabin quarter are the structures located at this site. The scope of work described within will describe the scope of work for each building.
A) Big Springs Fire Lookout Tower Administrative Site
This location is approximately 25 miles south of Jacob Lake, Arizona. From Jacob Lake, go south on Hwy 67 approximately 14 miles and turn west on FSR 429, continue on FSR 429 for approximately 8 miles and then continue straight on Lookout road (FSR 454) for approximately 3.7 miles to the lookout. Coordinates for the site are N36.593497 W112.33462. The elevation is approximately 7,894 feet.
1.2 – General
1. The intent of this project is to renovate the elevated fire lookout tower cab and replace existing electrical distribution and lighting for the cabin quarter, and additive work including removing and replacing existing pumphouse and concrete slab.
The renovation work includes demolition at the lookout tower cab. The cabin quarter will include removal and replacement of existing electrical and lighting systems with minor renovation. The government possessess documentation on presence of Lead Based Paint and Asbestos Containing Materials, therefore the following environmental work shall follow all proper environmental requirements. Work at each of the two buildings shall be organized and completed in two phases, Phase I and Phase II.
Phase I (Environmental Work) is primarily demolition involving the proper removal and disposal of Lead-Based Paint (LBP) and Asbestos Containing Material (ACM).
Phase II includes all of the improvements to the tower cab and the cabin quarter. The renovation and utility improvements include providing and installing new flooring, subfloor, walls, framing, insulation, windows, ceiling, electrical, painting, drywall repairs, propane lines, and all necessary accessories.
All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, supervision, testing, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.
The Contractor shall be responsible for any necessary site investigations for detailed and accurate material lists, and all field measurements necessary in order to complete the construction.
2. Attention to detail and accurate field measurements of the existing materials are the responsibility of the Contractor and will be critical for the proper reconstruction of the lookout tower cabin walls, floor, and windows.
3. The drawings which accompany this project are meant for reference and bidding purposes only. These drawings are not the original construction drawings, and although the requirements of these drawings are binding, the plans and elevations shown on them are not meant to be relied upon for construction.
1.3 – Big Springs Fire Lookout Cab
A. General:
Big Springs Lookout is located on the north rim of the Grand Canyon on the Kaibab National Forest. This 100’ Aermotor tower was constructed in 1934 and is listed on the National Register of Historic Places. The dimension of the tower cabin is approximately 7’x 7’.
Big Springs Fire Lookout Tower
B. The Big Springs Fire Lookout Tower is listed on the National Historic Lookout Register. As such, the existing appearance and construction of the lookout shall be maintained and preserved. The purpose of this project is to restore exterior wall finish, preserve the existing windows and completely renovate the interior of the lookout cabin.
Because this is a listed Historic structure, all materials, except as explicitly stated otherwise in these specifications, should be “replaced-in-kind” in terms of material dimensions and placement. The outward appearance of all details must match that which currently exists on the structure, except where explicitly stated otherwise in these specifications. (The type of material may differ from original construction).
As a result, the Contractor is responsible for any necessary site investigations, detailed and accurate material lists, and all field measurements necessary in order to replace-in-kind all features, including lumber and reconstruct-in-kind all finished details. Exceptions to this replace-in-kind requirement are listed in these specifications.
Attention to detail and accurate field measurements of the existing materials are the responsibility of the Contractor and will be critical for the proper renovation of the lookout cabin’s exterior appearance, which includes windows and exterior wall finish. Exceptions to the replace-in-kind requirements for the lookout cabin are listed in these specifications.
C. The drawings which accompany this project are meant for reference and bidding purposes only. These drawings are not the original construction drawings, and although the requirements of these drawings are binding, the plans and elevations shown on them are not meant to be relied upon for construction.
It is anticipated that the Contractor will field measure existing items and may field fabricate the replacement items on-site to the greatest extent possible in order to ensure accuracy and minimize fabrication errors.
1.4 – Big Springs Lookout – Cabin Quarter
The cabin quarter is a wood framed 1-bedroom residence, with corrugated metal roof. The building has a kitchen, bathroom, livingroom, dining room, bedroom, closet, attic, and crawl space. The building has available electricity, plumbing for potable water only, gray water system, hot water heater, active propane gas line to the stove/range, non-active propane gas lines to existing propane gas lanterns, source of water is a hauled water system with pressure pump system, and a wood stove. The building is approximately 546 square feet with approximate dimensions of 19’ x 29’.
Big Springs Lookout – Cabin Quarter
1.5 – Description of Work
A) Environmental Work (Phase I): Specification 13281 describes the environmental work in these Specifications.
The Environmental Work (Phase I) will be followed by Renovation Work (Phase II) to complete the work at both buildings and from general vicinity. Contractor shall coordinate both phases of the environmental and renovation work to minimize any time lapse. Weather will becomes a major factor affecting access to site, so renovationconstruction work shall start and continue until access is denied. Contractor shall provide and install plywood temporarily to seal the lookout cab, if winter shut down becomes necessary. All exposed openings shall be covered and attach to remaining structural components of the cabin to secure the lookout cab and protect the floor and interior of the lookout cab, prior to leaving site when access is no longer available.
Specification 13281 addresses the environmental work, including building utility disconnects, testing, proper removal and disposal of the lead-based paint and asbestos containing materials, required documentation and reporting.
All hazardous waste shall be manifested and delivered to an appropriate landfill for disposal. TCLP analysis shall be the responsibility of the Contractor as described within these Specifications.
1. Asbestos Containing Materials (ACM):
Lookout Tower Cab:
There is no data on ACM presence, but files found with chain of custody showing there was a sample from this tower cabin testing the window glazing compound in 1994. Contractor shall assume the glazing compound is positive and should be considered hazardous waste for bidding purposes.
Cabin Quarter:
The cabin quarter has no documentation on any sampling and testing. If there are any suspect ACM materials, the Contractor shall notify the COR or CO immediately. There are no results for this cabin quarter for ACM presence.
2. Lead-Based Paint
Lookout Tower Cab:
The lookout tower cab has been tested for Lead-Based Paint and the results are listed in Table 1. The Fire Finder Support Box was removed and disposed by a previous contract and a new fire finder support box was constructed and installed in 2013. The Fire Finder Support is no longer an issue for LBP.
The interior walls, corner shelf, hatch floor door, ceiling hinged platform, and the steel water storage tank shall be removed and disposed properly. The steel water storage tank and its supporting structure shall be tested for LBP content.
Cabin Quarter:
The cabin quarter has not been tested for Lead-Based Paint and shall be tested for suspect areas, if necessary, throughout the cabin.
Existing Elevated Steel Water Storage Tank
The elevated storage tank and its supporting steel structure is suspect for lead based paint presence. Contractor shall sample and test suspect exterior and interior surfaces of the water storage tank and the supportive steel structure. Results to determine the presence and amount of LBP to be abated and provide the cost for removal off National Forest Lands and taken to a certified hazardous waste site.
Photographs of the Existing Elevated Steel Water Storage Tank
3. Existing Utilities
There is electricity at this site. Contractor will be allowed to use source for construction activities.
Lookout Tower Cab: There are several existing utilities to be disconnected from the lookout tower cab prior to the removal and disposal of its interior components. Most of the work is described in detail in Specification 13281.
For the lookout tower cab, an existing electrical system is in place. Currently, the system consists of a panel with three circuit breakers. The panel consists of 100 Amp, 50 Amp, and 20 Amp breakers as shown in photos below. Contractor shall use appropriate means to disconnect existing electrical line to the tower prior to any demolition activities. The existing main panel is mounted to the communications building below the tower. Power is provided by Garkane Energy and coordination may be required.
Electrical Panel with Labeled Breakers Existing Electrical Panel Mounted on Communications Building Beneath Tower
An existing telephone LAN line extends from the communications building to the tower lookout cab. Disconnect the existing telephone line prior to any demolition activities and protect to reconnect.
An existing weather monitoring unit shall be removed and given to the FS. Salvage the weathervane, if any, and provide to the FS.
There is no water available at this site. Contractor is responsible for providing their own source of water.
All work shall be completed in accordance with project specifications and construction drawings. The work includes all supervision, environmental specialists, labor, material, testing, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.
The Contractor shall be responsible for any necessary site investigations for detailed and accurate material lists, and all field measurements necessary in order to complete the construction.
i) Environmental Work (Phase I) – Preservation Work, Lookout Cab
a) Existing Windows – The existing windows shall be completely refurbished, including all operable hardware and fasteners. The existing windows shall be carefully removed from the tower for complete refurbishing. All the existing glazing, glazing putty, hardware, fasteners, and any operable accessories shall be removed. The surfaces of the window frame, hardware, and all fasteners shall be stripped, properly prepared, then re-galvanized. The glazing shall be re-installed on site after the refurbished frame is secured to the tower cabin. Prior to reinstalling the glazing, place 1/8” diameter silicone bead between the frame and the new glazing for each installation. Then seal the glazing in place with the glazing putty. The hardware shall either be re-galvanized or replaced with new galvanized hardware. New galvanized hardware shall match existing.
b) High Stool – This bar type stool along with its glass bottom caps, shall be salvaged. Remove and carefully store.
ii) Environmental Work (Phase I) – Demolition Work, Lookout Cab Components
1) Corner shelves – These shall be removed and disposed.
2) Equipment – Forest Service Radio. Contractor shall disconnect the equipment and provide to the C.O.R.
3) Telephone jack – This shall be removed and disposed.
4) Floor – All components of the flooring shall be removed and disposed, including all sill, deck, subfloor, and carpet materials. Contractor is responsible to coordinate the reconstruction of the entire sub-floor, after the environmental work is complete. The sill, structural planks, deck, and subfloor shall be provided at minimum. Finish flooring can be installed at a later time during the contract.
5) Electrical – All faceplates and any wall assemblies shall be removed and disposed.
6) Ceiling storage shelves – All wood components used as shelving shall be removed and disposed.
7) Fire Finder Support – This component shall be temporarily removed and carefully stored. No work to be done on this. Prior to removal, Contractor is responsible for marking its location to be returned to its exact location.
8) Interior Wall Components - The existing wall has no insulation and/or framing. The exterior galvanized wall siding can be seen from the interior. Remove any remaining items attached to the wall for disposal.
Phase II – Renovation Work, Lookout Cab
a) Reconstruct the cabin’s interior walls, including installing refurbished windows, new electrical, new insulation, new framework, new interior finish, and all new required accessories and trim.
b) Refurbish the existing windows, including all operable hardware and fasteners. The existing windows shall be removed from the tower for complete refurbishing. All the existing glazing, glazing putty, hardware, fasteners, and any operable accessories shall be removed. The existing hardware, fasteners, and related operable components shall be re-used, if in good condition. These items shall receive new galvanized coatings, after the surfaces have been properly prepared. The hardware shall either be re-galvanized or replaced with new galvanized hardware. New galvanized hardware shall match existing.
The surfaces of the window frame shall be stripped, properly prepared, then re-galvanized. The glazing shall be re-installed on site after the refurbished frames have been returned securely to the tower cabin. Prior to reinstalling the glazing, place 1/8” diameter silicone bead between the frame and the new glazing for each installation. Then seal the glazing in place with the glazing putty. All areas of glazing putty shall have a smooth, finished appearance.
SUMMARY OF WORK – 01010 9
c) Construct or purchase new interior wood components, two new corner bookcases, and new shelves at ceiling area. Finish each component with paint as mentioned in these specifications. Replace all fasteners, hardware, and other type of components to make installations secure and functional.
d) Provide and install a new bamboo wide plank flooring system, including underlayment, and any manufacturer’s recommended components for a floating floor system. The interior side of the floor hatch shall receive all the same components to ensure the final grade inside the cabin is level throughout.
e) The new floor hatch door shall receive a galvanized metal cover on the exterior face and around the edges to prevent break-ins. The door shall also receive a new counterbalance system to assist in the push to open the hatch. The new counterbalance system should be designed to uplift the weight and require no more than 8 lbs of opening force. Counterbalance system shall be spring type, no pulley and/or hydraulic type systems. The spring system shall be intended for exterior exposure. The new hatch door shall be equipped with new hardware and all appropriate compatible fasteners. Locking system shall fit existing Yale padlocks to lock cabin entry. All new hardware shall either be vandal resistant or built within the flooring system and have corrosion resistant coating. All installations shall be completed per all applicable codes and manufacturer’s recommendations. .
f) Provide and construct new cathedral type ceiling using APA A-D or high grade quality plywood with sanded face for interior applications. Trim shall be provided at joints. Provide and install the insulation for metal roofing per manufacturer’s recommendations.
g) Prepare and paint all interior unpainted wood finished areas of walls, including interior wood trim, wood ceiling surfaces, ceiling wood shelves, and new wooden bookcases, as mentioned herein these specifications.
h) Provide and apply cold galvanizing compound product on entire exterior wall surfaces and any exposed interior galvanized surfaces of the lookout cabin. Provide and apply finish top coat to provide a consistent, smooth, matte galvanized steel finish to match existing.
i) Provide materials and services to patch/repair one approximate 4” diameter penetration through wall by welding a 20 ga or thicker galvanized steel plate. Burr edges for a flat exterior finish. Cover weld with cold galvanizing compound on inside and outside of wall.
j) Electrical connections correction and improvement. An existing junction box is lacking a cover plate on section going to cabin tower. Provide and install new cover plate. Provide and install three (3) new duplex receptacle outlets, with all necessary appurtenances, to be installed flushed with the new wall system. All new installations shall comply with the latest National Electrical Code. The electrical system shall be bonded to the lightning protection system.
k) Existing phone line is operational. Work shall include providing new phone jack to be installed flushed with new wall system. The phone line shall be bonded to the lightning protection system per code and tested to check for correct operation. Installation shall follow all applicable codes.
l) Remove and dispose the existing weather monitoring instrument. The existing weather monitoring unit shall be given to the FS. Salvage the weathervane, if any, and provide to FS.
1.5 – Examination of Sites
A. Bidders are encouraged to visit the site, compare the drawings and specifications with any work in place, and inform themselves of all conditions, including other work, if any, being performed. Failure to visit sites will in no way relieve the successful bidder from the requirement of furnishing matching materials or performing any work that may be required to complete work in accordance with drawings and specifications, without additional cost to the Government.
B. Information regarding the sites of the work provided in drawings or specifications is believed to be reasonably correct, but the Government does not warrant either the completeness or accuracy of such information, and it is the responsibility of the contractor to verify all information independently and to make other examinations of the conditions to be encountered during construction.
C. The contractor acknowledges that he/she has investigated and satisfied himself/herself as to the conditions affecting the work, including, but not restricted to, those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and conditions of the ground, the character of equipment and facilities needed prior to and during prosecution of the work. The contractor further acknowledges that he/she is satisfied as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the sites. Any failure by the contractor to acquaint himself/herself with the available information will not relieve him/her from the responsibility for estimating properly the difficulty or cost of successfully performing and completing the work.
D. Where Contractor bases his bid upon quantities scaled from Contract Drawings, he/she shall verify true scale with the COR prior to submitting his/her bid when scale is not shown or unclear.
1.6 – Timing of Work
Phase I, Environmental Testing work can start on September 8, 2015. The start date for demolition activities can begin on October 5, 2015. No restrictions are placed on weekend work.
The time to complete the work in this contract is set to be completed by April 30, 2016.
Weather normally starts impacting the road conditions in mid-november, which can prevent access to the lookout tower sites. Access to the lookout sites during bad road conditions is prohibited due to vehicles causing resource damage. Road conditions generally improve after winter in late March – early April to allow access to the lookout tower.
All work must be completed by April 30, 2016.
If work is not completed, the remaining work shall be left in a safe condition. Contractor will be allowed to return to complete the remaining items on October 1, 2016, after lookout employee has been released from tower duties for the season.
1.7 – Government – Furnished Facilities
The site is available to the Contractor for staging and storage during the project. The site offers very limited room for staging, storage, and stay. Any damage resulting from the Contractor’s use of the sites will be repaired or replaced at the Contractor’s expense at the direction of the Contracting Officer’s Representative
Electricity is available on site.
Water, and sanitary facilities are not available.
Cell phone operation may be possible at site.
All temporary services and use areas shall be completely removed and the areas restored upon completion of use. Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense.
1.8 – Material Sources
All materials shall be obtained from commercial sources unless noted otherwise. Materials referred to by trade name, make, or catalog number shall be regarded as establishing a standard of quality; substitutions of equal quality can be made by submitting a data sheet of the proposed substituted item to the Contracting Officer’s Representative, for approval.
1.9 – Clean up and Disposal – Non-Hazardous Waste
Waste accumulation in approved containers and material staging is allowed at the site. Disposal of non-hazardous waste material will be off National Forest Land and in compliance with local, state, and federal laws regarding disposal of construction waste. Before final acceptance of the project by the Government, the Contractor shall remove from Government land all waste materials and rubbish resulting from this work.
1.10 – Precautionary Measures
A. Protection of Work: The Contractor shall take precautions to protect all work during the construction period. The Contractor shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work, materials, and equipment. The existing elements of the lookout towers shall remain undamaged and structurally sound during all phases of this contract. Any damage to the towers, including site access gate, or any adjacent or related element(s) resulting from the Contractor’s work at the sites shall be immediately repaired at no additional cost to the Government.
B. Safety: The Contractor is responsible for safeguarding employees, public, existing facilities, and forest resources from his/her operations. All operations shall comply with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman’s Compensation Board. The Contractor shall erect temporary signs and barricades to make unguarded operations safe as required. Signs and barricades shall be maintained at night and on weekends. Precautions such as safely storing materials shall be practiced to prevent injury to others in the area.
C. Security: Security is not provided by the Government. The Contractor shall take all precautions deemed necessary to secure the worksites, improvements and equipment. This may include security fencing at the Contractor’s discretion. Lookout towers are often prone to vandalism. It is therefore recommended that the Contractor make every attempt to bar public access to the lookout tower during periods of construction inactivity such as nights and weekends.
1.11 – Applicable Codes and Standards
All work shall conform to the latest editions of the International Building Code, American Welding Society Code, American Water Works Association, National Electrical Code, and the American Institute of Steel Construction. All environmental codes including RCRA and NESHAP shall be adhered by the Contractor. The site shall be closed to the public during construction.
1.13 – Subsurface Soils and Investigations
No auger boring tests were made in the area. Under supervision of the Engineer, the Contractor shall undertake any site investigations necessary to ascertain subsurface conditions.
END OF SPECIFICATION 01010
DIVISION 1 - GENERAL REQUIREMENTS
01030 – NOXIOUS WEED CONTROL
PART 1 - GENERAL
1.1 – Description
This work consists of incorporating weed prevention and control within each of the project sites. The Contractor shall prevent new weed infestations and the spread of existing weed infestations within the project sites as specified herein.
PART 2 - PRODUCTS
All fill and/or borrow material needed to meet contract requirements shall be coordinated with the Forest Service. The Contractor shall inform the C.O.R. of the location of the purchased and/or borrowed material location. The Forest Service shall be given a minimum of 10 working days to provide time on inspecting the source of backfill for potential weed infestation. Contractor will receive a response (approval/rejection) on the intended source. The Contractor shall not bring any material on site, purchase, or haul any backfill, until approval is given by the Forest Service
PART 3 - EXECUTION
3.1 – Equipment
The Contractor shall ensure all equipment brought onto the forest is thoroughly washed/cleaned in order to remove all soil, vegetative matter, and other debris prior to entering the forest. Particular attention shall be given to the under carriage and any other surface where soil containing weed seed and propagules may exist. All equipment shall be inspected by the Forest Service. Only construction and maintenance equipment, and the equipment necessary to transport said equipment shall be allowed to operate within the project area after it has been cleaned by the Contractor and inspected by the Forest Service. All subsequent move-ins of equipment to the project area shall be treated in the same manner as the initial move-in.
The Contractor shall employ cleaning methods, approved by the Forest Service, to ensure that construction and maintenance equipment is free of noxious weeds. Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Equipment or component disassembly, or the need for specialized tools, are not required.
Unless otherwise agreed, the Contractor shall give the Forest Service at least 24 hour notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
3.2 – General Project Work
The Contractor shall minimize soil surface disturbance wherever possible.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the project site or on haul routes the Contractor plans to use, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or prevent the spread of hazardous, invasive, and noxious plant species when new infestations are found. A current list of hazardous, invasive, and noxious plant species is available at each Forest Service office. A copy of this list as well as the Forest Service’s Best Management Practices will be submitted to the contractor.
A Noxious Weed Summary (“standards and guides”) will be submitted to the Contractor by the Government providing information about hazardous, invasive, and noxious plant species that may be encountered at the project sites or haul roads.
PART 4 - MEASUREMENT AND PAYMENT
4.1 – Measurement
There will be no separate measurement of this item.
4.2 – Payment
This work is incidental to other items in the contract and direct separate payment will not be made.
END OF SPECIFICATION 01030
NOXIOUS WEED CONTROL – 01030 15
01103 – MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 – Requirements:
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.
1.2 – Measurement Terms and Definitions:
Unless otherwise specified, the following terms are defined as follows:
Each. One entire unit. The quantity is the actual number of units completed and accepted.
Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.
Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "1." Estimated quantities of lump sum work shown in the contract are approximate.
Square yard. 9 square feet. Longitudinal and transverse measurements for area computations will be made horizontally. No deductions from the area computation will be made for individual fixtures having area of 9 square feet or less.
1.3 – Units of Measurement
Payment will be by units defined and determined according to U.S. Standard measure.
END OF SPECIFICATION 01103
MEASUREMENT AND PAYMENT – 01103 16
MOBILIZATION – 01200 24
01300 – SUBMITTALS
PART 1 - GENERAL
1.1 – Requirements
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten (10) days for processing of submittals by the Government.
Submittals may also be referred to as SHOP DRAWINGS.
1.2 - Manufacturer's Literature and Shop Drawings
Submit two (2) copies to the Engineer for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
E. Shop drawings of submitted item(s) including wiring or layout diagrams.
If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed shall be submitted to the C.O.R.
If the specified item is to be accessible, the submittal item needs to meet current Americans with Disabilities Act Accessibility Guidelines (ADAAG) or Forest Service Accessibility Guidelines and show to be installed for accessibility on submitted drawings, not just state it is available as accessible.
Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
1. 01730 – Operations and Maintenance Data Manuals (2)
2. 06100 – Carpentry Lumber and Panel – Product Information, species, sizes, treatment, grade, stamp, and all lumber properties.
3. 07212 – Vapor Barrier, Radiant Barrier, and Reflective Insulation Product Data
4. 08100 – Doors and Frames Doors – all product information
5. 08561 – Windows Hardware, Fasteners Glazing, Glazing Compound, Silicon, all related accessories Galvanization
6. 09652 – Flooring Product Type, Samples, Product Data, Warranty, Installation information, Color, Finish
7. 09771 – Plank & Wood Molding System Color – Samples, texture Product Data, including all accessories Installation Information Warranty
8. 09900 – Painting Paint / color samples – Product Data Cold Galvanizing Compound – Product Data, Color Finish Top Coat – Exterior Metal Walls Specifications
9. 10800 – Furnishings Bookshelves, Shelves – Product Data, Color, Dimensions
10. 16403 – Electrical Distribution and Building Electrical System LED Fixture, Switches, Switch Plates, Telephone Jack Duplex Receptacles, plate covers, color, style, dimensions
Other required submittals include all those as specified in the referenced Forest Service Specifications for this project.
END OF SPECIFICATION 01300
SUBMITTALS – 01300 18
DIVISION 1-GENERAL REQUIREMENTS
01601 – MOBILIZATION
PART 1 – GENERAL
1.1 – Description This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various phases on the project site.
PART 2 – PRODUCTS
None
PART 3 – EXECUTION
None
PART 4 – MEASUREMENT AND PAYMENT
4.1 – Measurement Progress payments will be made as follows:
The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
There are TWO Phases within this contract. Phase I is the Environmental work and Phase II is the Reconstruction work. There will be Mobilization pay item for Phase I and Phase II.
(a) When 5 percent or more of the total amount of the relative phase is earned from other pay items within the relative phase, 50 percent of the amount for mobilization, or 5 percent of the total of the relative phase, whichever is less, will be paid.
(b) When 10 percent or more of the total amount of the relative phase is earned from other pay items within its relative phase, 100 percent of the amount for mobilization, or 10 percent of the relative phase, whichever is less, will be paid.
(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance, will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
The total of all payments shall not exceed the original contract amount for this item.
4.2 – Payment
Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01601(01) Mobilization – Renovation Work LS
** Other Mobilization Pay Item listed under Specification 13281
13281(01) Mobilization – Environmental Work LS
END OF SPECIFICATION 01601
MOBILIZATION – 01601 20
01620 – STORAGE AND PROTECTION
PART 1 – GENERAL
1.1 – Description This section of work covers storage and protection procedures for the products scheduled for use or items to be salvaged for re-installation.
1.2 – Related Work Specified Elsewhere 01730 – Operations and Maintenance Data, Manual
PART 2 – PRODUCTS
2.1 – Government Items to be Salvaged and Re-Installed If any items are damaged, the Contractor shall replace at no additional cost to the Government.
a) Big Springs Lookout –
1) Counter/Bar Stool with glass caps
PART 3 – EXECUTION
3.1 – Manufacturer’s Recommendations Except as otherwise approved by the Engineer, determine and comply with manufacturer’s instructions on product handling, storage and protection.
3.2 – Packing Deliver products to the job site in the manufacturer’s original container, with the labels intact and legible.
1. Maintain packaged materials with seals unbroken and labels intact until time of use.
2. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements at no additional cost to the Forest Service.
The Engineer may reject as non-complying such material and products that do not bear identification satisfactory to the Forest Service as to the manufacturer, grade, quality and other pertinent information.
All product literature, warranties and operating instructions must be intact and placed in a binder and transmitted to the Forest Service.
3.3 – Protection Protect finished surfaces, including jambs and soffits of openings used as passageways, through which equipment and materials are handled.
Provide protection for finished floor surfaces in traffic areas prior to allowing equipment and materials to be moved over such surfaces.
Maintain finished surfaces clean, unmarred and suitably protected until accepted by the Forest Service.
Provide protection for public for uncompleted stages of the construction. Provide appropriate means of protection by prohibiting traffic, locking all access areas and equipment, storing all material in approved temporary staging area.
3.4 – Repairs and Replacements
In event of damage, promptly make replacements and repairs to the approval of the Forest Service and at no additional cost to the Forest Service.
PART 4 – MEASUREMENT AND PAYMENT
4.1 – Measurement There will be no separate measurement for this section.
This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01620
STORAGE AND PROTECTION – 01620 21
01710 – CLEANING
PART 1 – GENERAL
1.1 – Description Throughout the construction period, maintain the construction site and facilities in an orderly and clean manner as described in this Section.
PART 2 – PRODUCTS
2.1 – Cleaning Materials and Equipment Provide required personnel, equipment and materials as needed to maintain the specified standard.
2.2 – Compatibility Use only the cleaning materials and equipment, which are compatible with the surface being cleaned, as recommended by the manufacturer of the cleaning material.
PART 3 – EXECUTION
3.1 – Progress Cleaning Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.
Do not allow accumulation of scrap, debris, waste material and other items not required for construction of this work.
At least twice each month, and more often if necessary, completely remove and properly dispose of all scrap, debris and waste material from the job site.
Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.
3.2 – Site Daily, and more often if necessary, inspect the site and pick up all scrap, debris and waste material. Remove such items to the place designated for their storage.
Maintain the site in a neat and orderly condition at all times.
Clean mud and debris from roadways or highways adjacent to the project site daily.
3.3 – Structure At least weekly, inspect the structures and pick up all scrap, debris and waste material and remove them to the place designated for their storage.
“Clean” for the purpose of this paragraph shall be interpreted as meaning free from material capable of being removed by reasonable effort with a handheld broom.
3.4 – Final Cleaning Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris and waste.
Structures:
| 1. | Exterior: |
| a. | Visually inspect exterior surfaces and remove all traces of soil, waste materials, smudges and other foreign matter. |
| b. | Remove all traces of splashed materials from adjacent surfaces. |
| c. | In the event of stubborn stains not removable with water, the Forest Service may require light sandblasting or other cleaning at no additional cost to the Forest Service. |
| 2. | Interior: |
| a. | Visually inspect interior surfaces and remove all traces of soil, waste materials, smudges and other foreign matter. |
| b. | Remove all traces of splashed material from adjacent surfaces. |
| c. | Remove paint drippings, spots, stains and dirt from finished surfaces. |
Final cleaning of the project site shall be approved by the Forest Service prior to final acceptance of the work.
END OF SECTION 01710
CLEANING – 01710 24
DIVISION 1 – GENERAL REQUIREMENTS
OPERATIONS AND MAINTENANCE DATA – 01730 25
01730 – OPERATIONS AND MAINTENANCE DATA
01730 -
PART 1 – GENERAL
1.1 – Requirements Included
Compile product data and related information appropriate for Government's maintenance and operation of products furnished under the contract. The Contractor will warranty all parts and labor associated with the project for one year at the minimum per FAR 52.246-21.
1.2 – Related Work Specified Elsewhere
01730 - 39 01300 – Submittals
1.3 – Quality Assurance
Preparation of data shall be done by personnel:
01730 - 34 a.) Trained and experienced in maintenance and operation of described products.
01730 -b.) Familiar with requirements of this Specification.
c.) Skilled as technical writer to the extent required to communicate essential data.
1.4 – Form of Submittals
Prepare data in form of an instructional manual for use by Government's personnel.
a.) Format:
Size: 8-1/2" x 11".
01730 - Paper: Manufacturer's original printed data, or neatly typewritten - no fax paper or copies thereof.
b.) Drawings:
1. Provide reinforced punched binder tab, bind in with text.
2. Fold larger drawings to size of text pages.
c.) Operating Equipment/Appliance:
1. Provide flyleaf for each separate product, or each piece of operating equipment.
2. Provide indexed tabs.
3. Provide typed description of product and major component parts of equipment.
d.) Cover:
Identify each volume with typed or printed title
"OPERATING AND MAINTENANCE INSTRUCTIONS".
List: 1.) Title of Project, Year.
OPERATIONS AND MAINTENANCE DATA – 01730 26
2.) Identity of separate structure as applicable.
3.) Identity of general subject matter covered in the manual.
e.) Binders:
1) Commercial quality, three-ring binders with durable and cleanable plastic covers.
2) Maximum ring size: 1”.
3) When multiple binders are used, correlate the data into related, consistent groupings.
1.5 – Content of Manual(s) a.) Neatly typewritten table of contents for each volume, arranged in systematic order.
01730 -b.) Contractor, name of responsible principal, address and telephone number.
01730 -c.) List of each product required to be included, indexed to content of the volume.
List, with each product, name, address and telephone number of:
Subcontractor or installer.
01730 -
| Maintenance Contractor, as appropriate. |
| Identify area of responsibility of each. |
| Local source of supply for parts and replacement. |
| Warranty Certificates |
Identify each product by name and other identifying symbols as set forth in Contract Documents.
Product Data: Include only those sheets which are pertinent to the specific product. Annotate each sheet to:
OPERATIONS AND MAINTENANCE DATA – 01730 28
OPERATIONS AND MAINTENANCE DATA – 01730
Clearly identify specific product or part installed.
01730 - 17
| Clearly identify data applicable to installation. |
| Delete references to inapplicable information. |
OPERATIONS AND MAINTENANCE DATA – 01730 27
Drawings: Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. Do not use project record documents or maintenance drawings. Supplement product data with drawings as necessary to clearly illustrate:
OPERATIONS AND MAINTENANCE DATA – 01730 27
Relations of component parts of equipment and systems.
01730 - 36 Control and flow diagrams.
Written Text: As required to supplement product data for the particular installation:
Organize in consistent format under separate headings for different procedures.
Provide logical sequence of instructions for each procedure.
01730 -
Copy of each warranty, bond and service contract issued. Provide information sheet for Government personnel to provide the following:
Proper warranty procedures to follow in the event of failure.
Instances which might affect validity of warranties or bonds.
1.6 – Manual for Materials and Finishes
Submit two (2) copies of each manual in final form.
Content for architectural products applied materials and finishes:
Manufacturer's data, giving full information on product:
Catalog number, size, and composition.
01730 -
| Color and texture designations. |
| Information required for re-ordering special manufactured products. |
Instructions for care and maintenance:
Manufacturer's recommendations for types of cleaning agents and methods.
| Cautions against cleaning agents and methods which are detrimental to |
| product. |
| Recommended schedule for cleaning and maintenance. |
OPERATIONS AND MAINTENANCE DATA – 01730 29
Content for moisture protection and weather exposed products:
01730 - 12
OPERATIONS AND MAINTENANCE DATA – 01730
Manufacturer's data giving full information on products.
01730 - 18
Applicable standards.
Chemical composition.
Details of installation.
Instructions for inspection, maintenance and repair.
Additional requirements for maintenance data: Respective Sections of the Specifications.
1.7 – Manual for Equipment and Systems
Submit two (2) copies of complete manual in final form.
Content (General, for all equipment and systems manuals):
Description of unit and component parts:
Function, normal operating characteristics and limiting conditions.
01730 -
| Performance curves, engineering data and tests. |
| Complete nomenclature and commercial number of replaceable parts. |
01730 - 37 Maintenance Procedures:
Routine operations.
01730 - Guide to trouble-shooting.
Disassembly, repair and re-assembly.
Alignment, adjusting and checking.
Manufacturer's printed operating and maintenance instructions.
01730 -
| List of original manufacturer's spare parts, current prices and recommended |
| quantities to be maintained in storage. |
| Prepare and include additional data when the need for such data becomes |
| apparent during instruction of government personnel. |
| Additional requirements for operating and maintenance data required in |
| respective sections of the specifications. |
Content (For each unit of equipment and system as appropriate):
Description of unit and component parts:
Start-up, break-in, routine and normal operating instructions.
01730 - 5
| Regulation, control, stopping, shut-down and emergency instructions. |
| Servicing and lubrication schedule. List of lubricants required. |
| Description of sequence of operation by control manufacturer. |
Original manufacturer's parts list, illustrations, assembly drawings and diagrams required for maintenance.
Predicted life of parts subject to wear.
Items recommended to be stocked as spare parts.
As-installed control diagrams by equipment manufacturer.
01730 - 5
Content (For each electrical and electronic system, as appropriate):
01730 - 29
Circuit directories of panel boards:
Electrical service.
01730 - Controls.
Communications.
As-installed Color coded wiring diagrams
Operating Procedures:
Routine and normal operating instructions.
Sequences required.
Special operating instructions.
1.8 – Submittal Schedule
Submit two (2) copies of preliminary draft of proposed formats and outlines of contents prior to start of work.
Engineer will review draft and return one copy with comments.
Submit one (1) copy of completed data in final form at Substantial Completion of the Work for Engineer’s review.
Copy will be returned after final inspection or acceptance with comments.
Submit specified number of copies of approved data in final form at Final Inspection or acceptance.
PART 2 – PRODUCTS
OPERATIONS AND MAINTENANCE DATA – 01730 30
NONE
01730 - 14
PART 3 – EXECUTION
NONE
PART 4 – MEASUREMENT AND PAYMENT
4.1 – Payment 01730 -
There will be no separate measurement for this section.
01730 - 30
OPERATIONS AND MAINTENANCE DATA – 01730 30
This work is incidental to other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .