WD.docx
DOCX document 18 KB Posted
- Attached to
- Copper Canyon Entry Road and Parking Lot
- Solicitation number
- AG-94TZ-S-11-0025
About this file
Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30.pdf | ||
| Drawings_revised.pdf | ||
| Question_Response.docx | DOCX document | |
| Past Performance Form Questionaires.docx | DOCX document | |
| PRESCOTT NF FIRE PLAN.docx | DOCX document | |
| SF1442.pdf | ||
| 94TZ_S_11_0025.docx | DOCX document | |
| Specifications.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: AZ100009 02/04/2011 AZ9
Superseded General Decision Number: AZ20080009
State: Arizona
Construction Type: Heavy
Counties: Cochise, Gila, Graham, Greenlee, La Paz, Santa Cruz and Yavapai Counties in Arizona.
HEAVY CONSTRUCTION PROJECTS (excluding dam construction)
Modification Number Publication Date 0 03/12/2010 1 06/04/2010 2 07/02/2010 3 07/09/2010 4 07/23/2010 5 08/20/2010 6 09/24/2010 7 10/15/2010 8 11/05/2010 9 12/03/2010 10 02/04/2011
* ASBE0073-002 08/01/2010
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 37.66 11.52
ASBE0073-004 02/16/2001
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 20.18 5.87
BOIL0627-002 04/01/2010
Rates Fringes
BOILERMAKER (Including Containment Lining)..............$ 31.92 21.42
BRAZ0003-001 11/23/2009
GILA, LA PAZ, YAVAPAI, and the area of GRAHAM & GREENLEE COUNTIES located West and North of the San Francisco River to the Gila River
Rates Fringes
BRICKLAYER.......................$ 24.62 4.57
* BRAZ0003-013 11/23/2009
COCHISE and SANTA CRUZ COUNTIES; and the area of GRAHAM and GREENLEE COUNTIES located East and South of the San Francisco River to the Gila River
BRICKLAYER.......................$ 18.00 4.49
CARP1914-001 09/01/2009
Rates Fringes
MILLWRIGHT
Zone 1......................$ 23.29 13.92 Zone 2......................$ 24.67 13.92 Zone 3......................$ 27.79 13.92
ZONE DEFINITIONS FOR MILLWRIGHTS: Mileage shall be calculated from the construction site to the City Hall in Phoenix or Tucson, or to the workmen's residence, whichever is less:
Zone 1: 0-30 miles Zone 2: 31-49 miles Zone 3: 50 miles and over
ELEC0518-003 09/01/2010
GILA COUNTY
Rates Fringes
ELECTRICIAN......................$ 24.25 9.67
ELEC0570-005 12/01/2010
COCHISE, GRAHAM, LA PAZ, GREENLEE, AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN......................$ 22.90 18%+4.70
Zone Definitions
(b) ZONE PAY -Workmen employed in Zones B and C shall be paid Zone Pay as follows:
Zone B............an additional $ 1.25 per hour Zone C............an additional $ 3.75 per hour
SECTION 3.05 ZONES
(a) Zones shall be created in Tucson, Arizona, the headquarters of the Union. Zones may be established in other localities by mutual consent of the parties hereto (Section 1.03). Zones and the applicable rates of pay shall be the same for all Employers coming under the terms of this Agreement.
In Tucson, Zone A shall be the area within a twenty-nine (29) mile radius from a basing point at the City Hall.
Zone B shall be the area from the outer limits of the twenty-nine (29) mile radius, extending out another seventeen (17) miles (a 46 mile radius total).
Zone C shall be the area from the forty-six (46) mile radius, extending to the outside limits of the Local Union's jurisdiction.
If any owner's contiguous property falls within more than one Zone, it shall all be considered to be within the closer Zone.
ELEC0640-004 06/21/2010
YAVAPAI COUNTY
Rates Fringes
ELECTRICIAN......................$ 24.80 3%+7.14
ENGI0428-007 06/01/2010
Rates Fringes
Power Equipment Operator Group 1.....................$ 21.95 9.79 Group 2.....................$ 25.22 9.79 Group 3.....................$ 26.30 9.79 Group 4.....................$ 27.33 9.79
POWER EQUIPMENT OPERATORS CLASSIFICATIONS:
GROUP 1: Gin Truck; Loader 3.5 cu yd and under
GROUP 2: Backhoe, under 1 cu yd; ; Blade/Grader; Bulldozer;
Crane, under 15 tons; Driller; Field Equipment Service man; Loader over 3.5 cu yd but less than 6 cu yd; Oiler;
and Scraper
GROUP 3: Backhoe, up to 10 cu yd; Bending Machine; Crane, over 15 tons but less than 100 tons; Loader, over 6 cu yd but less than 10 cu yd; and Mechanic
GROUP 4: Backhoe, 10 cu yd and over; Crane, 100 tons and over; Loader, over 10 cu yd All Operators, Oilers, and Motor Crane Drivers on equipment with Booms, except concrete pumping truck booms, including Jibs, shall receive $0.01 per hour per foot over 80 ft in addition to regular rate of pay
IRON0075-005 08/01/2009
Rates Fringes
IRONWORKER, STRUCTURAL
Zone 1:.....................$ 26.52 17.59
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50
* LABO0383-003 06/01/2010
Rates Fringes
Laborers:
(1) General.................$ 17.61 4.35
(2) Concrete Worker;
Guinea Chaser...............$ 18.63 4.35
(4) Jackhammer; Pipelayer...$ 20.51 4.35
PLAS0394-006 07/01/2007
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 21.34 8.07
PLUM0469-003 07/01/2010
ZONE A: LA PAZ & YAVAPAI COUNTIES
ZONE B: COCHISE, GILA, GRAHAM, GREENLEE, AND SANTA CRUZ
COUNTIES
PLUMBER/PIPEFITTER
Zone A......................$ 31.65 14.90 Zone B......................$ 28.55 14.65
INDUSTRIAL WORK: Add $6.00 to basic hourly rate
SUAZ1994-004 02/01/1994
Rates Fringes
CARPENTER (Including form work)............................$ 14.83 3.11
Landscape Laborer................$ 7.25 .38
Power Equipment Operator Roller......................$ 13.64 1.59
SPRINKLER FITTER (Irrigation)....$ 7.25
TRUCK DRIVER
Water Truck.................$ 8.43 2.87
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION