About this file

Return Package- to Submit a Quotation

View the file

Other files

File Type Posted
Attachment_6_Experience_Questionnaire.pdf PDF
Bear Divide Sketches.pdf PDF
Roof Drawing.pdf PDF
Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION RFQ

AG-91T5-S-09-0002

Angeles National Forest

Bear Divide Roof Replacement

REQUEST FOR QUOTATION
See section I for Set-Aside information
PAGE OF PAGES

(THIS IS NOT AN ORDER)

FORMCHECKBOX

IS
FORMCHECKBOX
1
83
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
AG-91T5-S-09-0002
2/18/2009
241490
UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY
6. DELIVER BY (Date)
Angeles National Forest, 701 701 N. Santa Anita Ave, Arcadia, CA 91006
45 calendar days after Notice to Proceed
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FORMCHECKBOX

FOB DESTINATION

NAME
TELEPHONE NUMBER
FORMCHECKBOX

OTHER (See Schedule)

AREA CODE
NUMBER
9. DESTINATION
David Hallen, Contracting Officer
909
372-2635
a. NAME OF CONSIGNEE
8. TO:
a. NAME
b. COMPANY
b. STREET ADDRESS
c. STREET ADDRESS
c. CITY
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the

March 12, 2009, Close of

Business (4:30 pm) submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a)
(b)
(c)
(d)
(e)
(f)
Rood Replacement for Bear
Divide Fire Station
For Barracks, Messhall, and
Residence.
DUNS Number::
TIN Number:
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT

NUMBER
PERCENTAGE
NOTE: Additional provisions and representations
FORMCHECKBOX
are
FORMCHECKBOX

are not attached.

13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

AREA CODE

d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121
STANDARD FORM 18 (Rev. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

ITEM NO.
DESCRIPTION
METHOD OF MEAS.
ESTD. QTY.
UNIT
UNIT PRICE
AMOUNT
1
Provide and Install Metal Roof For Barracks

And Mess Hall

L.S.Q.
1
JOB
2
Provide and Install Metal Roof for One Residence
L.S.Q.
1
JOB

TOTAL BID PRICE:

One contractor will be awarded Items 1 and 2.

A prebid tour will be held on March 4, 2009 at 10 am at the project site.

Directions to Project Site:

Driving West on I210: Take the Osborne Street exit. Turn right on Foothill Boulevard and immediately turn left onto Osborne Street. Osborne Street becomes Little Tujunga Canyon Road in about 2 miles. Continue up Little Tujunga Canyon Road for about 15 miles. Turn left at Santa Clara Truck Trail and bear left again at the entrance to the Bear Divide Fire Station.

Driving East on I210: Take the Osborne Street exit. Turn left onto Foothill Boulevard and immediately turn left onto Osborne Street. Osborne Street becomes Little Tujunga Canyon Road in about 2 miles. Continue up Little Tujunga Canyon Road for about 15 miles. Turn left at Santa Clara Truck Trail and bear left again at the entrance to the Bear Divide Fire Station.

Driving North on State Route 14: Take the Placerita Canyon Road exit and turn right onto Placerita Canyon Road. Continue about 5 miles to Sand Canyon Road and turn right. Continue on Sand Canyon Road to the top of the ridge and turn right onto Santa Clara Truck Trail and bear left at the entrance to the Bear Divide Fire Station.

Driving South on State Route 14: Take the Placerita Canyon Road Exit and turn left on to Sierra Highway. Turn left onto Placerita Canyon Road. Continue about 5 miles to Sand Canyon Road and turn right. Continue on Sand Canyon Road to the top of the ridge and turn right onto Santa Clara Truck Trail and bear left at the entrance to the Bear Divide Fire Station.

Wes Hoffmaster will be the technical contact for this project and will be conducting the prebid tour. His telephone number is 626-574-5294.

To respond to this solicitation request, return this documents and the experience questionnaire.

File details come from the government source that posted it. Updated .