Hubbard_Brook.pdf
PDF 816 KB Posted
- Attached to
- Hubbard Brook Insulated Pavement DemostrationProject Federal contract opportunity
- Solicitation number
- AG-91S8-S-17-0027
About this file
Attachment:
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WageDeterminationsNH29.txt | TXT text file | |
| SF_30-0001.pdf | ||
| SF_30-0001.pdf | ||
| SolicitationC517051713410.pdf | ||
| SolicitationC517051713410.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HUBBARD BROOK EXPERIMENTAL FOREST
INSULATED PAVEMENT PROJECT
WOODSTOCK, NH
Title Sheet Number
Cover Sheet 1
Project Location Map 2
Construction Notes 3
Plan and Profile Drawings 4
Typical Cross Sections 5-6
GENERAL CONSTRUCTION NOTES:
ITEMS 20407 SELECT BORROW-SAND AND 30103B CRUSHED BANK-RUN GRAVEL IS FROM A
COMMERCIAL SOURCE AS APPROVED BY THE ENGINEER AND MEASURED AS CONTRACT
QUANTITY IN HAULING VEHICLE AND REQUIRE LOAD SLIPS IN CUBIC YARDS.
ITEM 20407 SELECT BORROW-SAND IS TO BE PLACED AS NEEDED TO PROVIDE PADDING FOR
GOVERNMENT PROVIDED INSULATED PANELS.
ALL CRUSHED BANK-RUN GRAVEL PLACED ON GOVERNMENT FURNISHED INSULATED PANELS
SHALL BE PLACED IN 2 LIFTS WITH THE FIRST LIFT BEING 12-INCH COMPACTED DEPTH AND
SECOND LIFT BEING 6-INCH COMPACTED DEPTH. CONTRACTOR SHALL TAKE CARE NOT TO
DAMAGE OR MOVE PANELS WHEN PLACING CRUSHED BANK-RUN GRAVEL ON THEM. SOME
DELAY CAN BE EXPECTED WHILE GOVERNMENT FURNISHED PANELS ARE PLACED. AN
ADDITIONAL DELAY MAY OCCUR WHILE GOVERNMENT REPRESENTATIVES INSTALL
MONITORING INSTRUMENTATION AT TWO LOCATIONS TO MEASURE SUBSURFACE
TEMPERATURES, AS PART THE DEMONSTRATION PROJECT. THIS INSTALLATION IS NOT
EXPECTED TO TAKE MORE THAN A COUPLE HOURS AT EACH OF THE TWO LOCATIONS, AND
WITH COORDINATION BETWEEN GOVERNMENT REPRESENTATIVES AND CONTRACTOR,
INSTRUMENTATION CAN PROBABLY BE INSTALLED ON OPPOSITE END OF PROECT FROM AREA
IN WHICH THE CONTRACTOR IS WORKING, THEREBY MINIMIZING DELAYS.
ANY EXCESS EXCAVATION SHALL BE REMOVED FROM GOVERNMENT LAND AND DISPOSED OF
BY THE CONTRACTOR. PAYMENT FOR THIS WORK IS INCIDENTAL TO WORK ITEM 204.01.
Hubbard Brook Experimental Forest
Insulated Pavement Project
Sheet 3 of 6
File details come from the government source that posted it. Updated .