Drawings_Notes.pdf
PDF 143 KB Posted
- Solicitation number
- AG-87BJ-S-15-0017
About this file
Drawings Notes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sf_30_amend.doc | DOC document | |
| VICINITY_Maps.pdf | ||
| Construction_Limits.pdf | ||
| AG87BJS150017.pdf | ||
| AreaMap.pdf | ||
| ND15.txt | TXT text file | |
| VicinityWA.pdf | ||
| Vicinity_MAPS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bjugstad North Dugout Reclamation
SE 31-T135N-R53W
Lat. 46°27’28.63” Long. 97°23’31.38”
Water 115’
40’
6’
90’
170’
Spoil Pile
Drawing Not To Scale
CONSTRUCTION NOTES
Topsoil. Remove and conserve 4” of topsoil from the spoil piles and other areas within the construction limits. Do not disturb material and vegetation outside the construction limits. Stockpile conserved topsoil in approved location. Spread topsoil evenly over completed slopes.
Break clods and lumps with appropriate equipment to provide a uniform textured soil. Do not place topsoil when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work.
Excavation and Embankment. Restore the dugout to approximate original ground contours. All material, including spoil piles, used to fill the dugout shall come from within the original construction limits as shown on the drawings and staked on the ground. The dimensions on the drawings are approximate and for information only. Compact the fill by operating spreading and hauling equipment over the full width and length of each layer of material. Place material in horizontal layers not exceeding 24 inches in compacted thickness. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Leave earth slopes with uniform roughened surfaces. An on site inspection will be made by the COR prior to acceptance of the work.
Dewatering. Remove water as necessary to perform the work. Dispose of water according to Federal, state, and local regulations.
N
5’
Spoil Pile
40’
200’
Bjugstad South Dugout Reclamation
SE 5-T134N-R53W
Lat. 46°26’43.04” Long. 97°22’17.90”
Water 160’ 130’
50’ 55’
5.5’ 5.5’
120’
180’
Spoil Pile Spoil
Pile
Drawing Not To Scale
CONSTRUCTION NOTES
Topsoil. Remove and conserve 4” of topsoil from the spoil piles and other areas within the construction limits. Do not disturb material and vegetation outside the construction limits. Stockpile conserved topsoil in approved location. Spread topsoil evenly over completed slopes.
Break clods and lumps with appropriate equipment to provide a uniform textured soil. Do not place topsoil when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work.
Excavation and Embankment. Restore the dugout to approximate original ground contours. All material, including spoil piles, used to fill the dugout shall come from within the original construction limits as shown on the drawings and staked on the ground. The dimensions on the drawings are approximate and for information only. Compact the fill by operating spreading and hauling equipment over the full width and length of each layer of material. Place material in horizontal layers not exceeding 24 inches in compacted thickness. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Leave earth slopes with uniform roughened surfaces. An on site inspection will be made by the COR prior to acceptance of the work.
Dewatering. Remove water as necessary to perform the work. Dispose of water according to Federal, state, and local regulations.
N
Owego North Dugout Reclamation
NW 17-T134N-R53W
Lat. 46°25’35.49” Long. 97°22’45.41”
Water 90’ 120’
40’ 40’
7.5’ 6.5’
90’
140’
Spoil Pile Spoil
Pile
Drawing Not To Scale
CONSTRUCTION NOTES
Topsoil. Remove and conserve 4” of topsoil from the spoil piles and other areas within the construction limits. Do not disturb material and vegetation outside the construction limits. Stockpile conserved topsoil in approved location. Spread topsoil evenly over completed slopes.
Break clods and lumps with appropriate equipment to provide a uniform textured soil. Do not place topsoil when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work.
Excavation and Embankment. Restore the dugout to approximate original ground contours. All material, including spoil piles, used to fill the dugout shall come from within the original construction limits as shown on the drawings and staked on the ground. The dimensions on the drawings are approximate and for information only. Compact the fill by operating spreading and hauling equipment over the full width and length of each layer of material. Place material in horizontal layers not exceeding 24 inches in compacted thickness. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Leave earth slopes with uniform roughened surfaces. An on site inspection will be made by the COR prior to acceptance of the work.
Dewatering. Remove water as necessary to perform the work. Dispose of water according to Federal, state, and local regulations.
Owego South Dugout Reclamation
SW 17-T134N-R53W
Lat. 46°24’54.87” Long. 97°22’49.95”
Water 170’ 125’
25’ 40’
5’ 5.5’
110’
240’
Spoil Pile Spoil
Pile
Drawing Not To Scale
CONSTRUCTION NOTES
Topsoil. Remove and conserve 4” of topsoil from the spoil piles and other areas within the construction limits. Do not disturb material and vegetation outside the construction limits. Stockpile conserved topsoil in approved location. Spread topsoil evenly over completed slopes.
Break clods and lumps with appropriate equipment to provide a uniform textured soil. Do not place topsoil when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work.
Excavation and Embankment. Restore the dugout to approximate original ground contours. All material, including spoil piles, used to fill the dugout shall come from within the original construction limits as shown on the drawings and staked on the ground. The dimensions on the drawings are approximate and for information only. Compact the fill by operating spreading and hauling equipment over the full width and length of each layer of material. Place material in horizontal layers not exceeding 24 inches in compacted thickness. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Leave earth slopes with uniform roughened surfaces. An on site inspection will be made by the COR prior to acceptance of the work.
Dewatering. Remove water as necessary to perform the work. Dispose of water according to Federal, state, and local regulations.
Evanson Dugout Reclamation
NE 23-T135N-R54W
Lat. 46°29’50.36” Long. 97°26’14.33”
Water 125’ 100’
40’ 40’
8.5’ 6.5’
110’
175’
Spoil Pile Spoil
Pile
Drawing Not To Scale
CONSTRUCTION NOTES
Topsoil. Remove and conserve 4” of topsoil from the spoil piles and other areas within the construction limits. Do not disturb material and vegetation outside the construction limits. Stockpile conserved topsoil in approved location. Spread topsoil evenly over completed slopes.
Break clods and lumps with appropriate equipment to provide a uniform textured soil. Do not place topsoil when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work.
Excavation and Embankment. Restore the dugout to approximate original ground contours. All material, including spoil piles, used to fill the dugout shall come from within the original construction limits as shown on the drawings and staked on the ground. The dimensions on the drawings are approximate and for information only. Compact the fill by operating spreading and hauling equipment over the full width and length of each layer of material. Place material in horizontal layers not exceeding 24 inches in compacted thickness. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Leave earth slopes with uniform roughened surfaces. An on site inspection will be made by the COR prior to acceptance of the work.
Dewatering. Remove water as necessary to perform the work. Dispose of water according to Federal, state, and local regulations.
West A North Dugout Reclamation
NW 26-T136N-R53W
Lat. 46°33’59.27” Long. 97°18’43.58”
Water 140’ 200’
40’
40’
5’ 7’
110’
160’
Spoil Pile
Spoil Pile
Drawing Not To Scale
CONSTRUCTION NOTES
Topsoil. Remove and conserve 4” of topsoil from the spoil piles and other areas within the construction limits. Do not disturb material and vegetation outside the construction limits. Stockpile conserved topsoil in approved location. Spread topsoil evenly over completed slopes.
Break clods and lumps with appropriate equipment to provide a uniform textured soil. Do not place topsoil when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work.
Excavation and Embankment. Restore the dugout to approximate original ground contours. All material, including spoil piles, used to fill the dugout shall come from within the original construction limits as shown on the drawings and staked on the ground. The dimensions on the drawings are approximate and for information only. Compact the fill by operating spreading and hauling equipment over the full width and length of each layer of material. Place material in horizontal layers not exceeding 24 inches in compacted thickness. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Leave earth slopes with uniform roughened surfaces. An on site inspection will be made by the COR prior to acceptance of the work.
Dewatering. Remove water as necessary to perform the work. Dispose of water according to Federal, state, and local regulations.
Spoil Pile
Wall South Dugout Reclamation
SE 33-T135N-R53W
Lat. 46°27’38.24” Long. 97°20’57.78”
Water 140’ 125’
35’ 35’
5’ 6’
110’
205’
Spoil Pile Spoil
Pile
Drawing Not To Scale
CONSTRUCTION NOTES
Topsoil. Remove and conserve 4” of topsoil from the spoil piles and other areas within the construction limits. Do not disturb material and vegetation outside the construction limits. Stockpile conserved topsoil in approved location. Spread topsoil evenly over completed slopes.
Break clods and lumps with appropriate equipment to provide a uniform textured soil. Do not place topsoil when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work.
Excavation and Embankment. Restore the dugout to approximate original ground contours. All material, including spoil piles, used to fill the dugout shall come from within the original construction limits as shown on the drawings and staked on the ground. The dimensions on the drawings are approximate and for information only. Compact the fill by operating spreading and hauling equipment over the full width and length of each layer of material. Place material in horizontal layers not exceeding 24 inches in compacted thickness. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Leave earth slopes with uniform roughened surfaces. An on site inspection will be made by the COR prior to acceptance of the work.
Dewatering. Remove water as necessary to perform the work. Dispose of water according to Federal, state, and local regulations.
| ConstNotesBJN |
| Bjugstad North Dugout Reclamation�SE 31-T135N-R53W �Lat. 46°27’28.63”�Long. 97°23’31.38” |
| ConstNotesBJS |
| Bjugstad South Dugout Reclamation�SE 5-T134N-R53W �Lat. 46°26’43.04”�Long. 97°22’17.90” |
| ConstNotesON |
| Owego North Dugout Reclamation�NW 17-T134N-R53W �Lat. 46°25’35.49”�Long. 97°22’45.41” |
| ConstNotesOS |
| Owego South Dugout Reclamation�SW 17-T134N-R53W �Lat. 46°24’54.87”�Long. 97°22’49.95” |
| ConstNotesEva |
| Evanson Dugout Reclamation�NE 23-T135N-R54W �Lat. 46°29’50.36”�Long. 97°26’14.33” |
| ConstNotesWA |
| West A North Dugout Reclamation�NW 26-T136N-R53W �Lat. 46°33’59.27”�Long. 97°18’43.58” |
| ConstNotesWS |
| Wall South Dugout Reclamation�SE 33-T135N-R53W �Lat. 46°27’38.24”�Long. 97°20’57.78” |