SPECIAL PROJECT SPECIFICATION
Section 101 – Terms, Format and Definitions
101.03
Abbreviations
Available Avail
Coating Coat
Construction Const
Contracting Officer Representative COR
Government Gov’t.
Includes Culvert Excavation Incl Culv Exc
Individual Removal of Trees Ind Removal/Trees
Large Lg
Left Lt
Logs Log
Medium Med
Millimeter Mil
One Thousand Gallons Mile M.Gals.MI. or MGM
Options Opt
Placement Method P.M.
Right Rt
Slash Treatment S.T.
Small Sm
Steel Stl
Structure Str
Timber Tbr
Treatment Treat
Typical Typ
03 SPS 101 - 1 DPG (3/05)
Section 101 – Terms, Format, and Definitions
101.04
Definitions
Add the following:
”Noxious Weeds or Weeds. Any exotic plant species established or that may be introduced in the
State which may render land unfit for agriculture, forestry, livestock, wildlife or other beneficial uses and which is designated by the State’s Department of Agriculture, or by the County’s weed management district, or by other appropriate agencies having jurisdiction.
Weed Management District. A weed management district is any area of land identified for the purpose of weed management or control. Such an identified land area may be, but is not limited to one of the following: a project or job site, a County, two or more Counties or a National Grassland.”
Section 102 – Bid, Award and Execution of Contract
Delete entire section
Section 103 – Scope of Work
Delete Subections 103.02 – 103.05
Section 104 – Control of Work
Delete Subsections 104.03 and 104.04
03 SPS 101, 102, 103, 104 - 2 DPG (3/05)
Section 106 – Acceptance of Work
106.05
Statistical Evaluation of Work and Determination of Pay Factor (Value of Work)
Delete this subsection
106.07
Partial and Final Acceptance
Section 107 – Legal Relations and Responsibility to the Public
107.04
Railroad Protection
107.05
Responsibility for Damage Claims
Section 108 – Prosecution and Progress
Delete entire section
03 SPS 106, 107, 108 -1 DPG (3/05)
Section 109 - Measurement and Payment
109.02
Measurement Terms and Definitions
Under “(b) Cubic yard”
(1) Cubic Yard in place, “ add the following:
”(d) Aggregate Base or Surfacing, Compacted in Place. The measurement computed using measurements of material in the compacted state on the project.
109.06
Pricing of Adjustments
109.07
Eliminated Work
109.08
Progress Payments
109.09
Final Payment
03 SPS 109 – 1 DPG (3/05)
Section 153 – Contractor Quality Control & Quantity Measurement
CONSTRUCTION
153.02
Contractor Quality Under “ Contractor Quality Control Plan”, add the following:
Control Plan
(3) Production Phase
(d) Random sampling and/or measurement plan prepared in accordance with requirements in Table 153.”
A log of all samples that are taken by the Contractor shall be maintained for the duration of the contract, and provided to the Contracting Officers Representative
(COR) upon request.
TABLE 153
SAMPLING, TESTING AND MEASUREMENT REQUIREMENTS
Key to symbols used in table:
CT: Sampling and testing by contractor’s personnel identified by name on the approved contractor’s Q/C plan. Interim approval of personnel submitted will be based on specified training or experience requirements.
Final approvalwill be based on observation of work performance on the project.
FS: Sampling, testing, measuring and/or data furnished by the Forest Service.
Note: The minimum frequency shown in this table is for contractor Quality Control sampling and testing. The contractor can run additional samples over the minimum number specified in the table. These additional samples can be taken in any manner, at any time desired by the contractor. Quality assurance sampling and testing by the Forest Service may be done at any time or location.
SUBSECTION REFERENCE
REQ’D SAMPLING, TESTING RESPONSIBILITY FOR MINIMUM FREQUENCY
AND MEASUREMENTS SAMPLING/TESTING
204.17 Construction Tolerances
Measurement of Construction Tolerances CT/CT For Roads, Parking Lot and
Width and Grade Camping Spurs:
10 random samples
03 SPS 153-1 DPG (4/06)
Section 204 - Excavation and Embankment
204.10
Embankment Construction.
(a) General.
Delete the third paragraph and add the following:
Compact embankment layers for the campground roads and parking lots with hauling equipment as construction progresses by Compaction Method D.
204.11
Compaction.
Delete the first paragraph and replace it with the following:
For compaction method D, no sieve test is required.
Add the following compaction method:
(D) Layer Placement Method - (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
204.13 Sloping, Shaping, and Finishing.
(a) Sloping.
Slope rounding is not required on construction tolerance class E roads.
03 SPS 204-1 DPG (4/06)
204.13 Sloping, Shaping, and Finishing.
Delete section (d) and add the following:
(d) Finishing. For surfaced roads, parking lots, camping spurs and campsite pads, remove all rock larger than six (6) inches from the top six (6) inches of the subgrade. For all roads, parking lots and camping spurs finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the construction tolerance class E.
Ensure that the subgrade for the roads is visibly moist during shaping and dressing. Bring low sections, holes, cracks, or depressions to grade with suitable material. Maintain proper ditch drainage.
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph:
Table 204-1 Sampling and Testing Requirements.
Add the following note to the table:
(2) Using compaction Method (D), AASHTO M 145, T 99, T 180, and T 310 are not required for earth embankment test methods.
204-2—Construction Tolerances:
Tolerance Class E allowable maximum deviations are:
- Roadbed width - maximum deviation shall be +1.0 foot
- Subgrade elevation - maximum deviation shall be +0.5 feet
- Centerline Alignment - maximum deviation shall be + or – 1.0 foot
- Slopes, Excavation & Embankment (% slope) – maximum deviation shall be + or – 5%
03 SPS 204-2 DPG (4/06)
Section 301 - Untreated Aggregate Courses
301 Title Change.
Change the title to: Section 301. Aggregate Courses
301.01 Description
The Contractor shall maintain haul routes to pre hauling condition or better. The haul routes shall be inspected by the Forest Service and the Contractor prior to hauling aggregate material. The Contractor is responsible for loading, hauling, placing and compacting the aggregate required for the campground access and loop roads, camping spurs, campsite pads, trails and parking lots. The quantity of Aggregate Courses in the
Summary of Quantities is compacted in place on the campground roads, camping spurs and parking lots. Loose quantity furnished, placed and compacted shall include additional material necessary to overcome the compaction effort.
301.03 General.
Request written approval by the Contracting Officers Representative (COR) of the roadbed, camping spurs, parking lots, trails and campsite pads a minimum of forty-eight
(48) hours before placing aggregate.
301.04 Mixing and Spreading.
Delete the first sentence of the first paragraph and add the following:
Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.
Route and distribute leveling equipment over the width and length of each layer.
03 SPS 301-1 DPG (7/13)
301.05 Compacting.
Delete the first and third paragraphs and add the following:
Compact the aggregate on the roads and parking lots using the following method:
Compaction A. Layer Placement (Hauling & Spreading Equipment)
Place aggregate by end dumping to the minimum depth needed for operation of the spreading equipment. Adjust the moisture content of the aggregate to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Compact the aggregate on the roads and parking lots by operating spreading and hauling equipment over the full width of each layer of the aggregate.
For the compaction method, blade the surfaces of each layer during the compaction operations to remove irregularities and produce a smooth surface.
301.06 Surface Tolerance.
Delete the first paragraph and add the following:
Thickness and Width requirements:
The maximum variation from the compacted specified thickness is one (1) inch. The compacted thickness shall not be below the specified thickness and the average thickness of four (4) random measurements for the road segment, camping spurs, parking lots, trails or campsite pads is within + 1 inch of the specified thickness.
The maximum variation from the specified width will not exceed +12 inches at any point.
301.08 Acceptance.
Delete subsections (a) and (b)
301.09 Measurement.
The quantity of 301 in the Schedule of Items is compacted in place on the roadways, camping spurs, parking lots, trails and campsite pads. Loose quantity furnished, loaded, hauled, placed and compacted shall include such additional material necessary to overcome the compaction factor. Contractor shall take precautions in loading of aggregate from stockpiles to prevent segregation of material.
03 SPS 301-2 DPG (7/13)
Table 301-1: Delete Table 301-1 in FP-03 and replace with the following:
Table 301-1—Acceptance Sampling and Testing Requirements to be done by Contractor.
Material or
Product
Type of
Acceptance
(Subsection)
Characteristic Category Test Methods
Specifications
Sampling
Frequency
Point of
Sampling
Split
Sample
Aggregate
Width
Measured and tested conformance
(Subsection
106.04)
Width - - 10 random locations on the road, spurs, parking lot and pads.
Roadbed after processing
Aggregate
Thickness
Measured and tested conformance
(Subsection
106.04)
Thickness - - 10 random locations on the road, spurs, parking lot and pads.
Roadbed after processing
03 SPS 301-3 DPG (7/13)
Section R972– Concrete Picnic Tables
DESCRIPTION
R972.01 This work shall consist of furnishing and installing ten (10) accessible, Work precast concrete picnic tables.
MATERIALS
R972.02 The picnic tables shall be accessible tables – precast concrete, eighty-four
Requirements (84”) inches long, sixty-two (62”) inches wide, Model RT-H-84, Lite Brown colored table tops and benches, Dura Brite exposed aggregate legs as manufactured by Petersen Manufacturing Co. Inc. OR EQUAL as approved by the Contracting Officers Representative (COR).
CONSTRUCTION
R972.03 Tables shall be of the accessible, step thru design constructed of precast
Performance concrete, 8-foot long tops and benches. Tables shall be installed per manufacturers instructions at locations as designated by the Contracting
Officers Representative (COR).
PAYMENT
R972.04 Payment will be made under:
Pay Item Pay Unit
R972 Concrete Picnic Table Each
Furnished & Installed
Picnic Tables as Manufactured by: OR APPROVED EQUAL
Petersen Manufacturing Co., Inc.
P.O. Box 664.
Denison, Iowa 51442
(800) 832-7383
FAX (712) 263-5090
www.petersenmfg.com
Petersen Manufacturing Co. Inc is under a GSA contract
SPS R972 DPG (7/13)
To mitigate the anticipated impacts of spreading noxious weed species, the following precautions will be used:
All equipment and vehicles to be used at the job site shall be steam cleaned and free of noxious weeds and their seeds prior to entrance onto the project site. The restriction shall include equipment and vehicles intended for off-road as well as on-road use, whether they are owned, leased, or borrowed by the contractor or any subcontractor.
Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. Cleaning shall occur off the National Grasslands.
Equipment, materials, and vehicles shall be visually inspected by the Contracting Officers Representative
(COR), or other designated Forest Service official, and certified in writing by the contractor to be reasonably clean and weed free. Inspections will take place at a location agreed to by the Contracting Officers
Representative (COR) and Contractor in advance of delivery to the job site. Equipment and vehicles shall proceed directly to the job site following the inspection. Materials, including delivery vehicles, delivered to the project site will also be inspected prior to entering the area.
The contractor shall protect all existing vegetation from the introduction of noxious weeds (1) at or near the work site and (2) on adjacent property. The contractor shall treat any introduced weeds resulting from failure to exercise reasonable care in performing the work. If the contractor fails or refuses to treat such weeds, the Contracting Officer may have the necessary work performed and charge the cost to the contractor.
Certification of each piece of equipment or vehicle shall remain valid for the duration of the project as long as the identified subjects remain solely on the project. Equipment that leaves the job site shall be recertified before being allowed to return. Individual workers’ vehicles shall be parked at a staging area that will be designated by the Contracting Officers Representative (COR).