Iron Springs Creek Culvert and Trail Bridge - CONSTR_IFB - Full Solic Pkg - 1.pdf
PDF 451 KB Posted
- Attached to
- DAKOTA PRAIRIE GRASSLANDS - Iron Springs Creek Culvert and Trail Bridge - RESOLICITATION
- Solicitation number
- AG-87BJ-S-10-0022
About this file
Full Solicitation Package Attachments 1 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - IRON SPRINGS Culvert.pdf | ||
| Attachment 4 - IRON_SPRNGS_trail.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-87BJ-S-10-0022
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
8-20-10
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
412641 & 412641/1
6. PROJECT NO.
7. ISSUED BY CODE 0398 8. ADDRESS OFFER TO
Gallatin National Forest ATTN: Gary B. Stephens P.O. Box 130 Bozeman, MT 59771
Same as Item #7
9. FOR INFORMATION
CALL:
A. NAME
Gary B. Stephens – Contracting Curt Grudniewski – Engineering
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 406-587-6774 701-227-7856
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Iron Springs Creek Culvert & Trail Bridge Construction - Resolicitation Dakota Prairie Grasslands – Sheyenne Ranger District
1. SF1442, SF1442 Back
2. Part I The Schedule, Section B: Supplies or Services and Prices/Costs
3. Section C: Project Description, Specifications and Statement of Work
4. Section E: Inspection and Acceptance
5. Section F: Deliveries or Performance
6. Section G: Contract Administration Data
7. Section H: Special Contract Requirements
8. Part II Contract Clauses, Section I: Contract Clauses
9. Part III List of Documents, Exhibits, and Other Attachments, Section J: List of Documents, Exhibits, and Other Attachments
10. Part IV Representations and Instructions, Section K: Representations, Certifications, and Other Statements of Bidders
11. Section L: Instructions, Conditions, and Notice to Offerors
12. Section M: Evaluation Factors for Award
COMPETED UNDER FAR 19.10, SMALL BUSINESS COMPETITIVENESS DEMONSTRATION
PROGRAM – NAICS CODE 237310
Price Range:
The Government's estimate is between $100,000 and $250,000.
11. The Contractor shall begin performance within 10 calendar days and complete it within See Section F calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and one (1) copies to perform the work required are due at the place specified in Item 8 by 2PM (hour) local time 9-20-10 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
CONSTRUCTION IFB SOL# AG-87BJ-S-10-0022
Dakota Prairie Grasslands – Sheyenne RD Iron Springs Creek Culvert & Trail Bridge - Resolicitation
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
SHEYENNE RANGER DISTRICT
Dakota Prairie Grasslands Richland County, North Dakota
B- 1 – Schedule of Items
ITEM 1: IRON SPRINGS CREEK CULVERT
*METHOD ESTIMATED PAY UNIT AMOUNT
ITEM NO. ITEM DESCRIPTION OF MEAS. QUANTITY UNIT PRICE BID
15101 Mobilization LSQ 1 LS $____________$_______________
15713 Soil Erosion & Pollution Control LSQ 1 LS $____________$_______________
20411 Embankment Construction CQ 320 CY $____________$_______________
20806 Structure Excavation LSQ 1 LS $____________$_______________
25101a Placed Riprap, Class 3 CQ 64 CY $____________$_______________
25101b Placed Riprap, Class 4 CQ 45 CY $____________$_______________
25117 Grade Control Structure AQ 6 Each $____________$_______________
27250 Geocell Abutment Stabilization AQ 60 SY $____________$_______________ 6 inch Depth
30113 Aggregate Surface Course CQ 100 CY $____________$_______________
GFM
50101 Reinforced Portland Cement CQ 29 CY $____________$_______________ Concrete Pavement, 6” Depth
55207 Structural Concrete for Drop Wall CQ 13 CY $____________$_______________
553A01 Precast Concrete Member, LSQ 1 LS $____________$_______________ Footings
60205 30’ Span, 8’ Rise, AQ 25 LF $____________$________________ Precast Reinforced 3-Sided Concrete Box Culvert
62201 Hydraulic Excavator w/Thumb AQ 4 Hour $____________$_______________
62406 Place Conserved Topsoil CQ 150 CY $_____________$_______________
ITEM 1 TOTAL BID PRICE $__________________
ITEM 2: NORTH COUNTRY TRAIL BRIDGE
*METHOD ESTIMATED PAY UNIT AMOUNT
ITEM NO. ITEM DESCRIPTION OF MEAS. QUANTITY UNIT PRICE BID
15101 Mobilization LSQ 1 LS $____________$______________
20304 Removal, Salvage and Reset LSQ 1 LS $____________$______________ Timber Trail Bridge
20806 Structure Excavation LSQ 1 LS $____________$______________
25302 Gabions, Galvanized Or CQ 12 CY $____________$______________ Aluminized Coated
25307 Revet Mattress, Galvanized CQ 56 SY $____________$______________ Or Aluminized Coated
30809 Crushed Aggregate, Surfacing CQ 10 CY $___________ $______________
GFM
55704 Treated Structural Timber LSQ 1 LS $____________$______________ And Lumber
56901 Helical Anchors, Grouted AQ 4 Each $____________$______________ Pull Down, Cased
ITEM 2 TOTAL BID PRICE $__________________________
ITEM 1 AND 2 TOTAL BID PRICE $__________________________
* Designated method of measurement:
CQ – contract quantities AQ – actual quantities LSQ – lump sum quantities SQ – staked quantities GFM – Government Furnished Material
Iron Springs Creek Culvert & Trail Bridge - Resolicitation
SPECIAL NOTES:
a. The bidder must bid on all items. Round to the nearest cent.
b. In the event of an error in extending the bid prices, unit prices will govern unless otherwise determined by the Contracting Officer in accordance with applicable regulations.
c. Offers for quantities less than those listed in the numbered items may be rejected.
d. Payment for bond premiums in accordance with Clause 52.232-5. Payments under
Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
PART I - THE SCHEDULE
C-1 -
SECTION C - DESCRIPTION AND SPECIFICATIONS
PROJECT DESCRIPTION AND LOCATION
Description of Work
Item #1: IRON SPRINGS CREEK CULVERT
- Furnish and install Reinforced Concrete Box Culvert, minor grading, obstruction removal, minor concrete paving, place stream control structures, rip rap placing, GFM (government furnished material) aggregate surfacing and topsoiling.
Item #2: - IRON SPRINGS TRAIL BRIDGE - This work consists of removing the existing bridge from its current foundations, excavating the abutment fills to new abutment elevations, installing new foundations with helical pile supports, installing erosion control gabions, and re-setting existing bridge back onto the new foundations.
All work to be done as outlined in the Plans, Drawings, Specifications, Special Project Provisions and Construction Notes for this project.
(a) Project Location.
Item #1: The IRON SPRINGS CREEK CULVERT project is located approximately three (3) miles north of McLeod, ND in Section 19, Township 135 North, Range 52, Richland County, North Dakota.
Access to this site is on NFSR 1212. NFSR 1212 is currently under contract to be repaired with work starting the week of August 16, 2010.
Item #2: The IRON SPRINGS TRAIL BRIDGE project is located approximately five (5) miles north and one half (1/2) mile east of McLeod, ND in Section 17, Township 135 North, Range 52, Richland County, North Dakota. Access for construction will utilize existing FS roads thru sections 16, 17, Township 135 North, Range 52 West. An off road permit shall be required and be provided for the successful bidder.
(b) Price Range
. Between $100,000 – $250,000
(c) Pre-Bid Tour visit the site prior to preparing and submitting their bid. Bidders desiring to visit the
. No formal site tour is planned , however, bidders are strongly encouraged to site may contact Curt Grudniewski, Medora Ranger District office, Dickinson, N.D. telephone number 701-227-7856 for information.
(d) Government-Furnished Material:
Aggregate surfacing
(e) Estimated Start Date/Period of Performance:
Work shall be completed by October 1, 2011.
(f) Submittals:
Erionite is a naturally occurring, asbestiform microscopic, fibrous mineral. Erionite appears to be associated with geologic formations containing volcanic ash deposits (Arikaree, Brule, and Chadron). Prior to haul, the Contractor shall submit certified test results from an accredited testing laboratory that the aggregate surface material to be furnished for this project has a non-detect result when analyzed by either a combination of scanning electronic microscope (SEM) and energy dispersive x-ray spectroscopy (EDS) or SEM and x-ray diffraction (XRD). Samples tested must be representative of the material proposed for this project. Test results shall include a copy the sampling plan and a copy of the chain of custody for the sample.
At a minimum the sampling plan shall include the source location including GPS coordinates; the name and contact information for the person collecting the sample; a sketch showing specific sample locations; photographs of actual sample locations; the sampling equipment and method;
and the depths below grade before adding to the composite sample.
The following website contains sampling guidelines and contact information for laboratories that may be available to do SEM and EDS testing for the presence of the mineral erionite:
http://www.ndhealth.gov/EHS/Erionite/InformationForContractors.htm.
C-2 -
SPECIAL PROJECT SPECIFICATIONS
The following Special Project Specifications are applicable to this contract and are physically included:
SPS 101 Terms, Format & Definitions 3/09 DPG SPS 102-108 General Requirements 3/09 DPG SPS 109 Measurement and Payment 3/09 DPG SPS 151 Mobilization 5/10 DPG SPS 152 Construction Staking 5/10 DPG SPS 155 Schedules for Construction Contracts 3/09 DPG SPS 156 Public Traffic 5/10 DPG SPS 157 Soil Erosion Control 5/10 DPG SPS 203 Item #1
SPS 203
-Removal of Structures 5/10 DPG Item #2
SPS 204
-Removal of Structures 5/10 DPG
Item #1-
SPS 208
Excavation and Embankment 5/10 DPG Item #1-
SPS 251
Structure Excavation and Backfill 5/10 DPG
Item #1
SPS 272
-RipRap 5/10 DPG Item #1
SPS 301
-Geocell Abutment Stabilization 5/10 DPG
Item #1
SPS 308
-Untreated Aggregate Course GFM 5/10 DPG Item #2
SPS 553A
-Minor Crushed Aggregate GFM 5/10 DPG
Item #1
SPS 569
-Precast Concrete Structures 5/10 DPG Item #2
SPS 622
-Micropiles 5/10 DPG
Item #1
SPS 624
-Rental Equipment 5/10 DPG Item #1
SPS 703
-Placing Topsoil 5/10 DPG
Item #1
SPS 725
-Aggregate 5/10 DPG Item #1
SPS 736 Geocell 5/10 DPG -Miscellaneous Material 5/10 DPG http://www.ndhealth.gov/EHS/Erionite/InformationForContractors.htm�
C-3 - STANDARD SPECIFICATIONS” Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03” (2003) are included in this solicitation by reference only.
The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.The “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03” (2003) are available electronically from the Federal Highways website:
http://www.wfl.fha.dot.gov/design/specs/fp03.htm
The current version of the FP-03 is out of print and Federal Highways does not plan on printing more.
The following Standard Specifications are applicable to this contract.
101 Terms, Format and Definitions 2003 103-107 General Items 2003 109 Measurement and Payment 2003 151 Mobilization 2003 153 Contractor Quality Control 2003 156 Public Traffic 2003 201 Clearing and Grubbing 2003 211 Roadway Obliteration 2003 301 Aggregate Courses 2003 303 Road Reconditioning 2003 602 Culverts and Drains 2003 624 Topsoil 2003 625 Turf Establishment 2003 635 Temporary Traffic Control 2003 713 Erosion Control, Straw Wattles, Rolls 2003
Note:
applicable to this contract.
Any additional specifications referenced in the above standard specifications are also
C-4 PROJECT DRAWINGS
The following drawings are a part of this solicitation and any resulting contract:
Drawings
Item #1-Iron Springs Creek Culvert
Sheet No Description 1 Title Sheet
2 Typical Section & Estimated Quantities 3 Plan and Profile NFSR #1212 4 Plan and Profile Iron Springs Creek 5 Culvert and Footing Details 6 Miscellaneous Details 7 Grade Control Structure 8-9 Roadway Cross Sections http://www.wfl.fha.dot.gov/design/specs/fp03.htm�
Item #2-Iron Springs Trail Bridge
Sheet No Description 1 Title Sheet
2 Existing Conditions, Summary of Quantities & Notes 3 Plan and Profile 4 Bridge General Layout 5 Foundation Plan and Details
SPECIAL PROJECT SPECIFICATIONS
Preface
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,”.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction.
Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
Delete Sections 104.01, 104.02, and 104.04.
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02 Material Sources. deleted
106 - Acceptance of Work
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10 Environmental Protection.
Add the following:
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract.
Clean up spills or leaks to the satisfaction of the COR and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress Delete Section 108 in its entirety.
109 - Measurement and Payment Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
151 - MOBILIZATION
151.01 Description
Add the following requirements:
Noxious Weed Control Requirements:
All construction equipment to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance on to forest lands, whether they are owned, leased or borrowed by the Contractor or any subcontractors. “Construction equipment” does not include personal vehicles or support equipment that remains on the main travel route.
Cleaning shall occur off forest land.
Construction equipment shall be visually inspected by the COR and each one certified in writing to be reasonably clean and weed free. Inspections will take place at a forest administrative site with the Contractor providing at least 24 hours notice. The location of the administrative site is to be agreed upon in advance between the COR and the Contractor or Subcontractor. Equipment is expected to proceed directly to the job site following the inspection and to not leave the designated weed management district wherein the job site exists.
Certification shall remain valid for each identified piece of equipment for the duration of the specified project and only as long as the equipment remains at the job site or within the designated weed management district.
Equipment leaving the designated weed management district will need to be recertified as weed free before being allowed to return to the job site.
151.03 Payment
Include all costs associated with the cleaning of equipment in the unit price for Mobilization.
152 – CONSTRUCTION SURVEY AND STAKING
Delete Section 152 in its entirety and add the following.
152.03 Survey and Staking Requirements.
ROAD CLOSED
0.25 MILES AHEAD
Location of survey control points for the structure(s) are shown on the plans. The contractor shall set additional horizontal and vertical control and reference points as necessary to install the culvert and trail bridge helical piles to the location and elevations as shown on the plans, specifications and drawings. Costs for this work shall be considered incidental to other pay items.
The FS shall be responsible for staking of the roadway.
155 - Schedules for Construction Contracts
Delete Section 155 in its entirety.
156 - PUBLIC TRAFFIC
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
According to Subsection 106.07(b) Add the following project specific requirements:
The Contractor will be allowed to close Road No. 1212 during construction. It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the culvert can be substantially completed within the above specified contract time. The Contractor shall give the COR at least two weeks advanced written notice prior to any road closure. The Contractor shall be responsible for providing, installing, maintaining, and removal of warning signs and type 3 barricades required for the road closure period. At the Contractor’s written request, traffic delays up to one hour will be approved should the project work necessitate short traffic delays outside the closure period.
Contractor shall provide and install two road closed ahead signs for the duration of the project. The road closed signs are to be placed ¼ mile on each side of the project.
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
157 - SOIL EROSION CONTROL
157.02 Materials.
Provide bales, wattles, logs and rolls from a certified noxious weed free source.
157.03 General.
Add the following:
Prior to the start of construction, submit a plan for review that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Include methods to minimize disturbance to the stream and prevent runoff from the construction site entering directly into the stream. The “Soil Erosion Control Plan” must address construction activities that have the potential for stream sedimentation.
Prior to the start of construction, submit a stream diversion plan that outlines the methods and location to divert the stream around the work area.
ITEM #1 Iron Springs Culvert: 203 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.01 Delete and replace with the following:
The existing weir, cmp pipes and miscellaneous concrete shall be removed from the project site. The weir is sheet piling with an estimated length of 12 feet.
203.05 Disposing of Material.
Modify this subsection as follows:
(a) Remove from project. Add the following:
All materials designated for removal become property of the Contractor and are to be disposed of by removing off of Forest Service Lands in accordance with all local, state, and federal requirements.
(b) Burn. Delete this section.
(c) Bury. Delete this section.
Item #2 Iron Springs Trail Bridge - 203 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Description
203.01 This work consists of removing the existing bridge from its current foundations, supporting and storing the existing bridge while new foundations are constructed, and re-setting the bridge onto a new foundation system as shown on the drawings and according to these specifications. Salvaging and/or replacing hardware to reconnect the bridge to the new caps are included in this pay item.
Construction requirements
203.03 Replace this section with the following:
Removal, Salvage and Reset timber trail bridge.
Detach the existing timber trail bridge from its current foundation and secure it before lifting in a manner to prevent racking or timber surface damage from lifting straps.
Store on horizontally set blocking, located far enough from the active construction are to prevent equipment interference or damage.
Re-set the bridge on its new foundations and secure as shown on the drawings. Re-tighten any connections on the existing bridge which have loosened during construction. Any damaged elements of the existing bridge shall be replaced in-kind by the Contractor.
Remove and dispose of the existing geogrid and fabric materials.
203.06 Acceptance. Material will be evaluated under Section 106.03.
Measurement
203.07 Measure the Section 203 item listed in the bid schedule according to Subsection 109.02.
Payment
203.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 203 item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
See Subsection 109.05.
204 - EXCAVATION AND EMBANKMENT
204.05 Conserved Topsoil.
Delete and replace with the following:
Place conserved topsoil in accordance with Section 624 – Topsoil.
204.11 Compaction.
Delete the first paragraph and replace it with the following:
For compaction method D, no sieve test is required.
Add the following compaction method:
(D) Layer Placement Method - (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
204.13 Sloping, Shaping, and Finishing.
Delete section (d) and add the following:
d) Finishing. Finish the roadbed to be smooth and uniform utilizing a motor grader. The roadway shall be shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.
Ensure that the embankment material is visibly moist during shaping and dressing. Bring low sections, holes, cracks, or depressions to grade with suitable material. Maintain proper ditch drainage.
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph and substitute the following:
Dispose of unsuitable or excess material at designated sites or as directed by the COR.
208 - STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR
STRUCTURES
208.04 General.
Use all suitable material in the construction of the roadway embankment and for structural backfill. Field drain and dry excessively wet material that is otherwise suitable for embankment before placement. Place and shape unsuitable or excess material in the designated sites or as directed by the COR.
208.08 Dewatering.
Delete the subsection and add the following:
Submit a dewatering plan according to Section 157.03.
Construct diversion prior to performing any excavation and according to Sections 157.08 and 157.09.
Construct diversions using water tight, non-eroding methods. Employ settling basins or other methods so that muddy water is not returned to stream. Install, operate, and remove diversions in a manner that minimizes erosion and sedimentation.
208.11 Compacting.
Delete this section and add the following:
Controlled Compaction. Place embankment in horizontal layers not exceeding 12 inches (loose measure), and compact them. Use a vibratory compactor. Continue compacting until visual displacement ceases.
Ensure that the moisture content of material is suitable for attaining the required compaction.
208.12 Acceptance.
Delete reference to Table 208-1.
Delete Table 208-1.
251 - RIPRAP
251.01 Description.
Replace with the following:
This work consists of furnishing and placing riprap for bank protection, slope protection, drainage structures, erosion control, and grade control structures.
251.07 Acceptance.
Delete reference to Table 251-1.
Delete the fourth sentence and add the following:
Structure excavation and backfill will be evaluated under section 208.
Delete Table 251-1.
251.09 Payment.
Add the following:
The cost of excavation, embankment and haul required for placement of riprap is incidental to the riprap pay item.
272 - GEOCELL ABUTMENT STABILIZATION
272.01 This work consists of constructing geocell abutment stabilization at each abutment using a cellular confinement system such as Presto Geoweb Cellular Confinement System or Webtec TerraCell in accordance with the plans and manufacturers recommendations.
Materials
272.02 Requirements. Ensure that material conforms to specifications in the following subsections:
Granular Backfill Type (a) 703.03 Geotextile, Type II (A, B, C) 714.01 Geocell 736
Construction Requirements
272.03 General. Perform the work specified in Section 208 or 209. Use ditches, grading or similar methods to prevent surface runoff that may occur during inclement weather from ponding in the foundation excavation.
272.04 Storage and Handling of Material. During shipment and storage, wrap geotextile materials in heavy-duty protective covering. Protect the material from mud, soil, dust, debris and sunlight prior to installation.
272.05 Geotextile Installation. Place the geotextile according to Section 207. Have the surface approved by the COR prior to placing geotextile.
Sew or overlap adjacent strips a minimum of 12” at joints. Insert securing pins through both strips of overlapped geotextile at minimum intervals of 3 feet, but no closer than 2 inches to each edge, to prevent the geotextile from being displaced.
Have the installed geotextile approved by the COR prior to setting the geocells.
272.06 Geocell Installation. Furnish the COR with product literature and certification as required in Section
106.03 for review and approval 7 days prior to installation. When requested by the COR, furnish a sample of the geocell from each lot for verification testing.
Place the geocell sections directly on the prepared subgrade. Expand the geocell sections into position at the grades and lines as shown on the plans. Hold the expanded geocell sections with suitable “stretcher frames”, steel stakes driven inside selected outer cell walls, or other similar methods as allowed by the manufacturer prior to filling. Ensure that the individual cells have expanded to the minimum dimensions required by the manufacturer. If necessary field cut sections as per the manufacturer’s recommendations to the lines shown on the plans.
Connect geocell panels in accordance with the manufacturer’s recommendations.
272.07 Infill Placement. Furnish the COR with the manufacturer’s specific recommendations for backfilling 7 days prior to placement of the geocells.
Place coarse granular backfill meeting Subsection 703.03 into the expanded cells with equipment appropriate for the site conditions such as a backhoe or a front-end loader. Do not drop infill material more than 3 feet to avoid damage or displacement of the cell walls.
Overfill the geocell cells and level to a minimum of 2 inches above the top of the cell walls. A front-end loader may be used to place the infill provided that it only traffics above geocell sections that have been filled and covered with the minimum 2 inches of additional material. Compact the infill material with a vibratory plate compacter. Operate compaction equipment over the full width of the geocell. Make at least three complete passes or until visible deformation of the infill ceases. Grade the surface to be ½ inch above the top of the cells. Ensure that the cell walls are not exposed after fine grading is completed.
Use the geocell manufacturer’s specific recommendations for backfilling if they are more stringent than stated above.
272.08 Acceptance. Geotextile will be evaluated under Subsections 106.02 and 714.01.
Material for geocell will be evaluated under Subsections 106.2 and 106.03.
Granular backfill material will be evaluated under Section 106.02 and 106.04.
Measurement
272.09 Method. Measure the items listed in the bid schedule according to Subsection 109.02 and the following.
Measure geocell by the square yard in place, exclusive of wastage.
Payment
272.10 Basis. The accepted quantities will be paid for at the contract price per unit of measurement for the Section 272 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
The cost for furnishing and placing the granular backfill required in Sections 207, 208, and 209 for geocell infill is incidental to this pay item and no separate payment will be made. The cost for furnishing and placing geotextile for the geocell installation is incidental to this pay item and no separate payment will be made.
301 - Untreated Aggregate Courses
301 Title Change
Change the title to: Section 301 - Aggregate Courses
301.01 Description
The quantity listed in the Schedule of Items for each Site (as applicable) is for surfacing compacted in place at the depth and width as specified in the plans and drawings.
It shall be the contractor’s responsibility to haul Government Furnished Material from the stockpile site located in the south ½ of the south ½ of section 32, T134N, R54W, Rustad’s pit, to each ITEM and repair area. The GFM shall be placed and compacted with type A compaction. The phone number to make arrangements for pick up is 701-428-3896.
The contractor shall haul enough material to overcome the compaction factor to achieve the required thickness. The contractor shall spread and compact the material in accordance to the plans, drawings, special project specifications and specifications. Prior to any placing of aggregate surfacing on any site or repair are the subgrade shall be inspected and approved by the Engineer. The subgrade inspection shall include approaches and turnouts. Pay Item 301 shall be for this work in its entirety and no separate measurement shall be made.
301.02 Material – Government Furnished Material
301.03 General
Request written approval by the Contracting Officers Representative (COR) of the roadbed a minimum of forty-eight (48) hours before the placing of aggregate.
301.04 Mixing and Spreading
Delete the first sentence of the first paragraph and add the following:
Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness. Route and distribute hauling and leveling equipment over the width and length of each layer.
301.05 Compacting
Delete and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.
Compact the aggregate with the following method specified:
Compaction A: Operate spreading and hauling over full width of the travel way.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface.
301.06 Surface Tolerance
Delete the first paragraph and add the following:
Thickness and Width requirements:
The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness shall not be below the specified thickness and the average thickness of four (4) random measurements for the road segment is within + ¼ inch of the specified thickness.
The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.
Acceptance shall be in conformance with Contractor supplied documentation in accordance with Table 301-1
Table 301-1—Acceptance Sampling and Testing Requirements.
Table 301-1
301.09 Measurement.
Replace the second paragraph with the following:
Measure aggregate by cubic yard compacted in place when payment is by contract quantities.
301.10 Payment
Delete the following:
adjusted according to Subsection 106.
308 - Minor Crushed Aggregate
Delete section 308 in its entirety and replace with the following:
Description
308.01 This work consists of hauling and placing GFM (government furnished material) crushed aggregate for bedding, backfill and trail aggregate course.
Material
It shall be the contractor’s responsibility to haul Government Furnished Material from the stockpile site located in the south ½ of the south ½ of section 32, T134N, R54W, Rustad’s pit, to each ITEM and repair area. The GFM shall be placed and compacted with type A compaction. The phone number to make arrangements for pick up is 701-428-3896.
The contractor shall haul enough material to overcome the compaction factor to achieve the required thickness. The contractor shall spread and compact the material in accordance to the plans, drawings, special project specifications and specifications. Prior to any placing of aggregate surfacing on any site or repair are the subgrade shall be inspected and approved by the Engineer. The subgrade inspection shall include approaches and turnouts. Pay Item 301 shall be for this work in its entirety and no separate measurement shall be made.
Material or Product Acceptance Characteristic Sampling Frequency
Point of Sampling
Aggregate Width Measured and tested conformance (Subsection
106.04)
Width 4 per Each 0.5 mi
Roadbed after processing
Aggregate Thickness Measured and tested conformance (Subsection
106.04)
Thickness 4 per each 0.5 mi
Roadbed after processing
308.03 Preparing Surface. Prepare the trail surface on which aggregate course is placed as shown on the plans.
308.04 Placing Crushed Aggregate.
(a) Roadway aggregate. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for compaction. Spread and shape the mixture on the prepared surface in a uniform layer.
Do not place the mixture in a layer exceeding 6 inches in compacted thickness. When more than one layer is necessary, compact each layer according to Subsection 308.05(a) before placing the next layer.
(b) Bedding and backfill aggregate. Place and shape the mixture in layers that, when compacted, do not exceed 6 inches in depth.
308.05 Compacting and Finishing Crushed Aggregate.
(a) Roadway aggregate. Compact using the methods below, specified in the Schedule of Items.
(1) Method 1. Operate equipment over the full width of spread aggregate.
(b) Bedding and backfill aggregate. Compact in 6 inch lifts by using a Forest Service approved mechanical compactor until no visible deformation is observed over the entire area of aggregate.
308.06 Acceptance. Crushed aggregate will be evaluated under Subsections 106.02 and 106.03. Furnish a production certification including gradation and quality properties for each source.
Construction of roadway aggregate courses will be evaluated under Subsections 106.02 and 106.04. Method 2 compaction will be evaluated under Section 106.04.
Placement of bedding and backfill aggregate will be evaluated under Subsection 106.02 and Section 209.
Preparation of the surfaces on which crushed aggregate is placed will be evaluated under Section 303 and 209 as applicable.
Measurement
308.07 Measure the Section 308 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Measure crushed aggregate by the cubic yard in-place on the road.
Measure width horizontally to include the top of aggregate width including designed widening. Measure the length horizontally along the centerline of the roadway.
Payment
308.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 308 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
553A – PRECAST CONCRETE STRUCTURES
553A.01 Work. Construct precast concrete members. In addition, manufacture, test materials for, transport, store, and install all precast concrete portions except piling, and perform all necessary grouting, welding, or other connections. Furnish precast concrete members complete and in place, including all concrete reinforcing steel and incidentals connected therewith.
Materials
553A.02 Requirements. Provide materials that meet the requirements specified in the following subsections:
High-Strength Nonshrink Grout ……………………………… 725.40 Mortar ………………………………………………………… 725.40 Reinforcing Steel ……………………………………………… 709.01 Sealants, Fillers, Seals, & Sleeves …………………………….. 712.01 Structural Concrete ……………………………………………. 552 Structural Steel ………………………………………………… 717.01
Provide precast concrete members of the size, shape, strength, air content, and finish that are SHOWN ON
THE DRAWINGS.
Perform all sampling, testing, and inspection necessary to ensure quality control of the component materials and the concrete. Sample and test for quality control and acceptance testing in accordance with the AASHTO or ASTM test methods prescribed in Section 552.
Maintain adequate records of all inspections and tests. Keep records that indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected, and the nature of any corrective action taken.
Construction
553A.03 Performance. Construct precast concrete structural members in accordance with the following sections and subsections, as applicable:
Reinforcing Steel ………………………………………………... 554 Storing, Transporting, & Erecting ………………………………. 553.08 Structural Concrete ……………………………………………… 552
Submit four sets of shop drawings to the COR for approval, including the concrete mix design for each class of concrete proposed for use, a minimum of 21 days before fabrication of the precast member(s).
553A.04 Casting Yard. The precasting of concrete structural members may be done at a casting yard location selected by the Contractor.
553A.05 Handling, Transporting, & Erecting. Provide additional reinforcement, as needed, to meet the requirements of handling, transporting, and erecting precast members.
553A.06 Acceptance. Reinforcing steel, anchor devices, elastomeric bearings, and material for concrete and grout will be evaluated under Subsection 106.03. Furnish production certifications for hydraulic cement, and reinforcing steel.
Concrete for precast concrete members will be evaluated under Subsections 106.02, 106.03, and 106.04.
Construction of precast concrete members will be evaluated under Subsections 106.02 and 106.04.
Reinforcing steel will be evaluated under Section 554.
Falsework and forms will be evaluated under Section 562.
Measurement
553A.07 Measure the Section 553A items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Do not measure reinforcing steel, concrete, anchorages, plates, nuts, and other material contained within or attached to the unit for precast concrete structural members.
Payment
553A.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 553A pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Section 569. — Micropiles
569.01 This work consists of all necessary equipment, labor and materials needed to drill and install helical piles with 4 inch diameter grout filled casing to the depth and location shown on the drawings and in accordance with these specifications. All hardware associated with these helical micropiles, including the pier cap connection, are included in this pay item.
Material
569.02 Helical Pile Requirements
Helical piles may have a square steel shaft pulling down a steel casing or a tubular round shaft with attached helices. The helical pile shall have the required number of helical blades so as to provide for adequate load carrying capacity. The strength of the helical blades, shaft connections, bracket assembly, and the shaft itself shall be sufficient to develop the 50 kip ultimate bearing capacity and to reach the minimum tip elevation of
74.0 feet. Helical piles and bracket assemblies shall be designed in accordance with modern standards for steel construction. Helical piles, and/or casing may be bare steel but the pier cap connection assemblies shall be protected from corrosion by hot-dip galvanizing per ASTM A123 or A153, as applicable.
Bolts used to join helical anchor and helical pile sections at the shaft connections shall be the grade and size specified by the helical pile manufacturer. All helical pile bolts shall be securely snug tightened.
569.03 Grout Requirements
Grout mix shall be a neat cement grout with a water/cement ratio W/C= 0.40 – 0.5. The final grout shall have a minimum 28 day compressive strength of 3,000 psi (AASHTO T 106).
Water for mixing grout shall be potable, clean and free from impurities, which may be detrimental to grout or steel. Potable water shall be available in quantities sufficient to mix grout and for equipment clean-up.
Cement for grout shall be Portland cement conforming to ASTM C150 Type I or Type II. Pre-packaged, non-shrink cement grouts shall be subject to the review and acceptance of the Contracting Officer, and shall conform to the requirements of ASTM C1107.
569.04 Installation Equipment
Each helical pile shall be advanced into the ground by application of rotational force using a hydraulic torque converter. Installation equipment shall include a direct means of determining the installation torque being applied to the helical anchor and helical pile.
569.05 Installing Helical Piles
Manufacturer’s recommendations should be followed regarding the torque capacity relationship for the particular helical piles. The number and size of blades shall be determined by the Contractor so as to achieve the required ultimate bearing capacity for the soil conditions at the site.
Helical piles shall be advanced into the ground until the required depth is achieved. This site has not been drilled and test hole data is not available. However, it is anticipated that the sandy loam extends to or below the pile tip elevation.
Constant normal pressure shall be applied while screwing helical piles into the ground. The pressure applied shall be sufficient to ensure that, during each revolution, the helical anchor and helical pile progress into the ground a distance equal to at least 80% of the blade pitch. Rate of helical pile rotation shall not exceed 20 revolutions per minute.
569.06 Grout Mixing. Batch grout at a water/cement ratio of 0.4 to 0.5, Always place water before cement into mixer. The grout shall be mixed for a minimum of two minutes, or as directed by the cement supplier.
Thereafter, continuously agitate grout in the storage tank. Inject grout within 45 minutes after the water is initially added to the cement by Tremie to the bottom of the casing. When the ambient temperature is 90 degrees Fahrenheit, or higher, grout shall be injected within 15 minutes of mixing.
Do not allow grout to exceed a temperature of 90 degrees Fahrenheit. Add shaved ice to the water before mixing cement to control the grout temperature.
569.07 Construction Tolerances. Centerline of micropiles shall not be more than 1 inch from indicated plan location or ¼ inch from vertical elevation indicated.
569.08 Qualifications. The micropile contractor shall be experienced in the construction of micropiles.
569.09 Submittal. Submit a helical pile material, equipment and installation plan to the Contracting Officer, a minimum of 30 days before beginning pile installation. The plan must include a listing of all material to be used, the installation and grouting equipment to be used and a plan of installation.
569.10 Acceptance. Material for ground anchors will be evaluated under Subsections 106.02 and 106.03.
Installation of the helical pulldown Micropiles will be evaluated under Subsections 106.02 and 106.04.
Grouting will be evaluated under Subsections 106.02 and 106.04.
Measurement
569.11 Measure Pay Item 56901 in according to Subsection 109.02.
Payment
569.12 The accepted quantities will be paid at the contract price per unit of measurement for the Section pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
622 - RENTAL EQUIPMENT
622.02 Rental Equipment.
Delete the first two sentences of the first paragraph and add the following:
Hydraulic Excavator. Provide a track mounted hydraulic excavator, 15 years or newer. Bucket must be equipped with a hydraulic "thumb". It is anticipated that an excavator of a size capable of performing the excavation needs for the project, i.e.