TrailBridgePlansMay2016.pdf
PDF 492 KB Posted
- Attached to
- Prefabricated Dry Fork Flum Trail Bridge Federal contract opportunity
- Solicitation number
- AG-84N8-S-16-0099
About this file
Standard Trail Plan - Dry Fork Flume Bridge (Lower) Vernal Utah
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG84N8S160099_Prefabricated_Bridge_-_Dry_Fork_Flume_Trail_Bridge_(Lower).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABUTMENT MATERIALES= SOUD SAWGLU GLULAMJCONC = CONCRETE
O +92 O
H—5 VEHICLE LOADING DIAGRAM
SHEET 1 OF 3
IIO’y ior) Flc T” I (Lc,we.) ((PREFABRICATED STEEL TRAIL BRIDGEFOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE’ ‘PROJECT NAME & LOCAOON ‘DRAWING NAME REVISION DATE DRAWING NO.
STANDARD TIL PLAN U +k 964- PREFABRICATED TRAIL BRIDGE PREJ OSAL
STD 964-10-01
SHEETSECOON PICAL ID II j OF ‘—I
= STEEL THROUGH TRUSS,)FRP = FIBER REINFORCED POLYMER THROUGH TRUSS,
RUNNING PLANK ABUTMENT BACKWALL APPROACHES
GEO—STRUCTURE TREATMENT TREATMENT LENGTH MATERIAL MATERIAL
SPECIES SIZE WIDTH TYPE SIZE — TYPE SPECIES SIZE WIDTH HEIGHT TREATMENT — — WIDTH SYNTHETIC COMMENTSNUMBER TYPE YES NO NEAR FAR TYPE DEPTH
TYPE
X Oor 2KIa 3” e€t2 — >( Pr Ske2) (cpl /U/A x x
X x x
Coa. l 2-3Z5’ +Y5/0Cf’1-€JL +0
I,rkL sLit pec.e.5,Sc +k re+— 2Tke kc.L( 6-SAFETY RAILING AS REQUIRED
SEE PROJECT DESIGN CRITERIA O...+ *L €(‘J .3 i
3.
IacL --
+o e s pii.ecL ‘110c e€ &ie*r
ELEVATION
5L4.ffll:e L7 Cf’5
INSIDE FACE
OF CURB OR
RUB RAIL
— MAXIMUM GRADE BEARING TO BEARING = 5%
— RUNNING PLANKS AND DECK PLANKS NOT SHOWN FOR
CLARITY
SUBSTRUCTURE SHOWN
FOR ILLUSTRATION ONLY.
SEE ABUTMENT DETAILS
RIPRAP ARMOR (TYP) AT
ABUTMENTS WHERE REQUIRED
SEE SHEET 2 FOR DETAILS 101
I0I
PROVIDE SAFETY RAILS
IN ACCORDANCE WITH
MSHTO REQUIREMENTS
SEE PROJECT DESIGN
CRITERIA
2” X 6” S4S HANDRAIL. RADIUS TOP EDGE AS SHOWN BLOCK
OUT 1 1/2” FOR KNUCKLE CLEARANCE BETWEEN RAILING AND
TRUSS MEMBERS. ALTERNATE HANDRAIL CONFIGURATIONS MAY
BE SUBMI1TED TO THE C.O. FOR REVIEW AND APPROVAL.
*CLEAR WIDTH
2” X 6” S4S
RUB RAIL WHEN
SPECIFIED
6” X 1/4” STEEL PLATE
OR 2” X 6” CONTINUOUS
TIMBER TOE KICK
3” X 8” MINIMUM,
ROUGH SAWN DECK
PLANKS
i— 3” X 8” MINIMUM (3” X
12” SHOWN) ROUGH
SAWN RUNNING PLANKS
8”
GENERAL NOTES: *IN5IDE FACE TO INSIDE FACE(RUB RAILS AND RAIL)
SPECIFiCATiONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATiON FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP—03) AND STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS,
PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE: PREFABRICATED STEEL SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN ON THE DRAWINGS. THE BRIDGE SHALL MAINTAIN THE CLEARANCES ABOVE HIGH WATER INDICATED ON THE BRIDGE ELEVATION. THE BRIDGE CROSS—SECTION SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE WIDTH AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTiON. THE CONTRACTOR SHALL DETERMINE TRUSS HEIGHT AND THE LOCATION OF THE DECK WITH RESPECT TO THE TOP AND BO1TOM CHORDS (U FRAME VS. H FRAME). OVERHEAD LATERAL BRACING IS UNACCEPTABLE. ALL RELATED DETAILS SUCH AS PROFILE, ABUTMENT DETAILS, BEARINGS, AND TIMBER DECKING SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO FINALIZE AND CONSTRUCT.
THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE, ABUTMENT FOUNDATIONS, AND ASSOCIATED DETAILS INCLUDING TIMBER COMPONENTS SHALL BE DESIGNED UNDER THE DIRECTION OF A REGISTERED PROFESSIONAL ENGINEER. THE COMPLETED DESIGN, DRAWINGS, AND SPECIFICATION PACKAGE SHALL BE SUBMITtED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL
DESIGN: THE DESIGN OF ALL PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE MSHTO LRFD GUIDE SPECIFICATION FOR DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION AND MSHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CURRENT EDITION. PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION PLUS 1% OF BRIDGE SPAN. SUBMIT SHOP
DRAWINGS AND CALCULATIONS FOR APPROVAL AND MUST BE APPROVED BEFORE FABRICATION.
MATERIALS: USE STEEL SHAPES, PLATES AND BARS OF WEATHERING STEEL CONFORMING TO MSHTO M27O, GRADE 50W (ASTM A588 OR ASTM A242) OR ASTM A847 FOR SQUARE AND RECTANGULAR TUBING. MINIMUM STEEL THICKNESS SHALL BE AS SPECIFIED IN THE GUIDE SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES. USE HIGH STRENGTH BOLTS CONFORMING TO MSHTO M164, (ASTM
A325), TYP 3, UNLESS NOTED OTHERWISE. USE MALLEABLE IRON WASHERS AGAINST WOOD.
STEEL FABRICATiON: THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE SHALL BE FABRICATED BY AN AISC CERTIFIED PLANT —
SIMPLE STEEL BRIDGES OR COMPLEX STEEL STRUCTURES. WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN ACCORDANCE WITH AWS D1.5 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND INTENDED USE OR SERVICE.
ERECTiON PLAN: THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS BEFORE ERECTION IS SCHEDULED. IF ALLOWED UNDER THE PROJECT DESIGN CRITERIA, TEMPORARY IN—STREAM SUPPORT BENTS MAY BE USED FOR THE ERECTION OF THE PREFABRICATED STEEL TRUSS BRIDGE. THE IN—STREAM BENTS SHALL BE CRIBBING, SILLS, CONCRETE BLOCKS OR OTHER SUPPORTS AND SHALL BE PLACED WITH MINIMAL DISTURBANCE WITHIN ThE STREAM. ALL MATERIALS TO CONSTRUCT THE TEMPORARY IN—STREAM BENTS SHALL BE REMOVED. THE SUBMITTALS SHALL INCLUDE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS AND DETAILS ALSO INCLUDED, THE CONTRACTOR SHALL INDICATE THE EQUIPMENT AND METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS AND ERECT THE NEW PREFABRICATED STEEL TRUSS
I IPRP’TRI ICTI IPR
RIPRAP ARMORING w/GE00ELL
TiMBER & LUMBER: SOLD SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE GRADING RULES
AGENCY FOR THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW.
DECK PLANKS AND BACKING PLANKS
— COASTAL REGION DOUGLAS FIR — LARCH ROUGH SAWN NO.1 GRADE, GRADING RULES AGENCY — WWPA, WCLIB
RUNNING PLANKS AND RUB RAIL
— COASTAL REGION DOUGLAS FIR — LARCH ROUGH SAWN NO.2 GRADE, GRADING RULES AGENCY — WWPA, WCLIB
RAILS, HANDRAILS UNTREATED
— REDWOOD, S4S, NO.2 GRADE GRADING RULES AGENCY — RIS
— WESTERN RED CEDAR, S4S, SELECT STRUCTURAL GRADE GRADING RULES AGENCY — WWPA, WCLIB
TREATED
— HEM — FIR/DOUGLAS FIR, S4S, NO.1 GRADE GRADING RULES AGENCY — WWPA, WCLIB
TREATMENT: SEE PROJECT CRITERIA FOR MEMBERS IDENTIFIED TO BE TREATED AND FOR TREATMENT TYPE.
PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) “BEST MANAGEMENT
PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS”.
DECKING, RUNNING PLANKS, IF TREATED
— AWPA USE CATEGORY SYSTEM (Ui) FOR USE CATEGORY 3B ABOVE GROUND — EXPOSED (UC3B)
— PENTACHLOROPHENOL IN LIGHT OIL (TYPE C SOLVENT)
— COPPER NAPHTHENATE (CuN) IN LIGHT OIL (TYPE C SOLVENT)
SILLS, BACKING PLANKS, CRIBS, TIMBER WALLS, IF TREATED
— AWPA USE CATEGORY SYSTEM (Ui) FOR USE CATEGORY 48 GROUND CONTACT — HEAVY DUTY (UC4B)
— PENTACHLOROPHENOL IN HEAVY OIL (TYPE A SOLVENT)
— COPPER NAPHTHENATE (CuN) IN HEAVY OIL (TYPE A SOLVENT)
FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED FOR FIELD TREATING OF WOOD. ALL ABRASIONS AND FIELD CUTS — APPROVED BY THE C.O.R. — SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE FASTENERS.
TOP OF TRUSS
PROVIDE ADA
HANDRAIL WHERE
REQUIRED. SEE
PROJECT DESIGN
CRITERIA
1 ‘—0” 1 ‘—0”
MINIMUM 1
RIPRAP
HIGH WATER
b.
F’) F’)
,.— GRADE BEAM
/ SEE SHEET 3
/ FOR DETAILS
ELEVATION
L
1,—O,, MINIMUM 1
RIPRAP
U) (I)
F-
-j LiJ U F- (I)
U
C)
UJ
a:::
a-
1 ‘—0”
HIGH WATER
ADE BEAM
:ET 3
AILS
ELEVATION
1.1 111111111111111111111111111111
LATERAL BRACING
AS REQUIRED
COMPETENT,
U N DISTURBED
BEARING MATERIAL
TYPICAL SECTION RIPRAP ARMORING
HON
COMPETENT,
U N DISTURBED
BEARING MATERIAL
MINIMUM
GRADE BEAM FOUNDATION GRADE BEAM FOUNDATION
(u.s. DEPARTMENT OF AGRICULTURE PROJECT NAME & LOCATION
1 iD ‘I’. Ffte Tv-c 1Sde (17)
FOREST SERVICE
STANDARDTILPLAN
TIMBER FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS (EXCEPT TIMBER RUNNING PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER. FIELD DRILLING OF
HOLES SHALL NOT BE ALLOWED UNLESS OTHERWISE NOTED ON THE PLANS.
964 - PREFABRICATED TRAIL BRIDGE
SHEET 2 OF 3
TRUSS END POST
3” X 10” OR
3” X 12”
TREATED TIMBER
ROUGH SAWN
BACKING
PLANKS
BACKWALL WIDTH OUT—TO—OUT
(BRIDGE TOTAL WIDTH + 2’—O” + 2*D)
BRIDGE TOTAL WIDTH
,r— (2)—ANCHOR BOLTS MINIMUM
/ AT EACH BEARING LOCATION
/ I I I
LI LI \Li
I t •4 J I I I I I I :“s.
I I I I L I l . 1 Iit
#4 HOOPS 44 CONTINUOUS EACH FACE
SPACE #4 HOOPS © 12” ±
OUT—TO—OUT CONCRETE GRADE BEAM
(BRIDGE TOTAL WIDTH + 3’—O”)
ELEVATION — GRADE BEAM
* 12” CAST—IN—PLACE ANCHOR OR 7” EPOXY
ANCHOR WHEN APPROVED BY CO.
BACKFILL W/SUITABLE —..,
MATERIAL
3” X 10” OR 3” X 12”
TREATED TIMBER ROUGH
SAWN BACKING PLANKS
TOTAL BACKWALL HEIGHT, “D”
— AND CONNECTION DETAILS TO
DETERMINED BY CONTRACTOR
(4)—#6 CONTINUOUS
TOP AND BOTtOM
3” DIMENSIONAL LUMBER
COMPRESSIBLE JOINT —h
FILLER AS REQUIRED
(2)—3/4”ø a3O7 ANCHOR BOLTS AT EACH
BEARING LOCATION MINIMUM. EMBED 12”
MINIMUM INTO GRADE BEAM. PLACEMENT
AND THREADED PROJECTION BY OTHERS.
SLOPE TOP SURFACE OF GRADE
BEAM AS REQUIRED FOR UNIFORM
BEARING. VERIFY CONFIGURATION
WITH TRUSS FABRICATOR.
SHEET 3 OF 3
1 ‘—0” 1 ‘—0”
STRUCTURE
2” X 12”
RUNNING PLANKS
ATtACH BACKING
PLANK TO
SUPERSTRUCTURE
FINISH GRADE
1 1/2
APPROACH
FILL SLOPE
*12” ANCHOR
zt3zzz —
TOE KICK
DECK PLANKS
STRINGER
BOTtOM CHORD
BEARING
ASSEMBLY
GRADE BEAM
1. 1/2
FILL SLOPE
:41
AT EXTERIOR
FACE OF BACKING PLANKS
ELASTOMERIC
BEARING PAD
(50 DUROMETER)
1/
BEARING DETAIL
3” — — — — 3”
NOTES:
SPECIFiCATiONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP—03) AND STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS,
CONCRETE: USE CLASS A(AE) FOR CONCRETE, f’c = 4000 PSI AT 28 DAYS WITH AN ENTRAINED AIR CONTENT OF 5% ±1%.
PROVIDE ALL CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. CHAMFER ALL EXPOSED EDGES OF CONCRETE 3/4—INCH.
REINFORCING STEEL: USE REINFORCING STEEL OF THE DEFORMED TYPE CONFORMING TO MSHTO M31 (ASTM A615), GRADE SO.
CONCRETE COVER SHALL BE AS SHOWN, WHERE NOT SHOWN IT SHALL CONFORM TO MSHTO. CUT AND BEND STEEL IN
ACCORDANCE WITH ACI 315.
CONCRETE GRADE BEAM: DETAILS SHOWN ON THIS SHEET PROVIDE MINIMUM SIZES AND REQUIREMENTS. THE CONTRACTOR SHALL PREPARE AND SUBMIT COMPLETE GRADE BEAM DETAILS WITH THE PROPOSED SUPERSTRUCTURE DESIGN AND SHOP DRAWINGS.
THREAD
PROJECTION
(4)—#6 CONTINUOUS
EQUALLY SPACED
2’—3”
#4 © 12” ±.:i1 tI4.I.
I •1I• :
1••‘ 4I •, #4 CONTINUOUS
AT EACH FACE
(‘I
4 1/2”
2’—6”
TYPICAL SECTION
( U.S. DEPARTMENT OF AGRICULTURE
F-k.. ELitwe jvc kSrc5f CLo’.f (1 PREFABRICATED STEEL TRAIL BRIDGE
REVISION DATE DRAWING ND.
ç> FOREST SERVICE
‘ SHEET
8 PROJECT NAME & LOCA11ON DRAWING NAME
STANDARD TRAIL PLAN ), Uk 964 - PREFABRICATED TRAIL BRIDGE PREJ
STD 964-10-03N SEC11DN TYPICAL ID
L3
OFL/
(4)—#6 CONTINUOUS
EQUALLY SPACED
HEAVY HEX NUT4
MALLEABLE
IRON WASHER
LI
H wr
METAL STRAP __\\ i —i
TACK
HEAVY HEX NUT
1 1/4” X 1/4” METAL STRAP ELEVATION—ANCHOR
*SILL MATERIAL AND DIMENSIONS WILL VARY. REFER
TO SUPERSTRUCTURE SHEETS FOR ACTUAL SILL
DIMENSIONS AND ADJUST GABION AS NEEDED.
FOUNDATION NOTES:
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS
STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD
SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON
FEDERAL HIGHWAY PROJECTS (FP—03) AND STANDARD
SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES
ON FEDERAL PROJECTS,
HARDWARE AND STRUCTURAL STEEL: SEE SUPERSTRUCTURE
DRAWINGS FOR PROJECT DESIGN CRITERIA AND GENERAL NOTES.
GABION ABUTMENT STABILIZATiON: REFER TO THE SPECIAL PROJECT
SPECIFICATIONS FOR A DESCRIPTION OF THE WORK, MATERIALS, AND
INSTALLATION PROCEDURES.
GABION FOUNDATiONS: REFER TO GABION FOUNDATION NOTES.
GABION FOUNDATION NOTES:
1. GABION BASKETS SHALL BE CONSTRUCTED USING WIRE MESH
(U.S. STANDARD GAGE 9). BASKETS CONSTRUCTED USING
TWISTED WIRE MESH WILL NOT BE ALLOWED. WELDED WIRE MESH
SHALL BE POLWINYL CHLORIDE COATED (PVC) WHERE BASKETS
ARE EXPOSED TO CORROSIVE SOILS.
2. MATERIAL USED TO FILL THE GABION SHALL BE 4—INCH TO
8—INCH HARD, DURABLE, ANGULAR ROCK.
3. ROCK MAY BE PLACED MECHANICALLY PROVIDED CARE IS TAKEN
TO ENSURE THAT IT IS TIGHTLY PACKED WITH A MINIMUM OF
VOIDS. FOR EXPOSED FACES, HAND LABOR SHALL BE USED TO
KEEP THE MESH VERTICAL, PREVENT BULGING, AND TO PRODUCE
AN AURACTIVE APPEARANCE.
4. ALL GABIONS SHALL BE PLACED ON UNDISTURBED SOIL OR A
FOUNDATION OF SUITABLE MATERIAL. REMOVE AND REPLACE
UNSUITABLE SOILS WITH A MINIMUM OF 12—INCHES OF COARSE
GRANULAR BACKFILL. COMPACT BACKFILL MATERIAL AT AN
OPTIMUM MOISTURE CONTENT WITH A VIBRATING COMPACTOR.
OPERATE COMPACTION EQUIPMENT OVER THE FULL WIDTH OF THE
FOUNDATION AREA UNTIL VISIBLE DEFORMATION OF THE BACKFILL
CEASES.
5. BACKFILL WITH SUITABLE MATERIAL BEHIND GABIONS
CONCURRENTLY WITH THE CELL FILLING OPERATION. BACKFILL
THE AREA BEHIND GABIONS WITH A COARSE GRANULAR MATERIAL.
COMPACT BACKFILL MATERIAL AT AN OPTIMUM MOISTURE
CONTENT WITH A VIBRATOR COMPACTOR. OPERATE COMPACTION
EQUIPMENT OVER THE FULL WIDTH OF THE IN—FILL AREA UNTIL
VISIBLE DEFORMATION OF THE BACKFILL CEASES.
SHEET 1 OF 1
( U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
STANDARD TRAIL PLAN
r PROJECT NAME & LOCA11ON
EXTERIOR FACE
OF OUTSIDE
STRINGER/SLAB
ABUTMENT ABUTM ENT
OUT—TO—OUT WIDTH OF STRINGERS/SLABS
(EXTERIOR FACE TO EXTERIOR FACE)
*OUT_TO_OUT SILL & METAL STRAP
SECTION B—BELEVATION — GABION FOUNDATION
ii 1 1/4” t
5/8”
Fr
TABLE—i: STANDARD GABION BASKET SIZES
13/16”ø
HOLE
SIZE NO. OF CAPACITY
)IAPHRAGMS CUBIC
LENGTH WIDTH HEIGHT YARDS
6F1 3FT 3F1 1 2
9Ff 3FT 3Ff 2 3
12Ff 3Ff 3Ff 3 4
6Ff 3Ff 1.5Ff 1 1
9Ff 3FT 1.5Ff 2 1.5
12Ff 3Ff 1.5FT 3 2
6Ff 3Ff 1Ff 1 0.67
9Ff 3FT 1Ff 2 1
12Ff 3Ff 1Ff 3 1.33
BOLT DETAIL
965 - TRAIL BRIDGE SUBSTRUCTURES GAB
File details come from the government source that posted it. Updated .