TrailBridgePlansMay2016.pdf

PDF 492 KB Posted

Attached to
Prefabricated Dry Fork Flum Trail Bridge Federal contract opportunity
Solicitation number
AG-84N8-S-16-0099
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Standard Trail Plan - Dry Fork Flume Bridge (Lower) Vernal Utah

View the file

Other files for this federal contract opportunity

Other files attached to Prefabricated Dry Fork Flum Trail Bridge, newest first.
File Type Posted
AG84N8S160099_Prefabricated_Bridge_-_Dry_Fork_Flume_Trail_Bridge_(Lower).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABUTMENT MATERIALES= SOUD SAWGLU GLULAMJCONC = CONCRETE

O +92 O

H—5 VEHICLE LOADING DIAGRAM

SHEET 1 OF 3

IIO’y ior) Flc T” I (Lc,we.) ((PREFABRICATED STEEL TRAIL BRIDGEFOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE’ ‘PROJECT NAME & LOCAOON ‘DRAWING NAME REVISION DATE DRAWING NO.

STANDARD TIL PLAN U +k 964- PREFABRICATED TRAIL BRIDGE PREJ OSAL

STD 964-10-01

SHEETSECOON PICAL ID II j OF ‘—I

= STEEL THROUGH TRUSS,)FRP = FIBER REINFORCED POLYMER THROUGH TRUSS,

RUNNING PLANK ABUTMENT BACKWALL APPROACHES

GEO—STRUCTURE TREATMENT TREATMENT LENGTH MATERIAL MATERIAL

SPECIES SIZE WIDTH TYPE SIZE — TYPE SPECIES SIZE WIDTH HEIGHT TREATMENT — — WIDTH SYNTHETIC COMMENTSNUMBER TYPE YES NO NEAR FAR TYPE DEPTH

TYPE

X Oor 2KIa 3” e€t2 — >( Pr Ske2) (cpl /U/A x x

X x x

Coa. l 2-3Z5’ +Y5/0Cf’1-€JL +0

I,rkL sLit pec.e.5,Sc +k re+— 2Tke kc.L( 6-SAFETY RAILING AS REQUIRED

SEE PROJECT DESIGN CRITERIA O...+ *L €(‘J .3 i

3.

IacL --

+o e s pii.ecL ‘110c e€ &ie*r

ELEVATION

5L4.ffll:e L7 Cf’5

INSIDE FACE

OF CURB OR

RUB RAIL

— MAXIMUM GRADE BEARING TO BEARING = 5%

— RUNNING PLANKS AND DECK PLANKS NOT SHOWN FOR

CLARITY

SUBSTRUCTURE SHOWN

FOR ILLUSTRATION ONLY.

SEE ABUTMENT DETAILS

RIPRAP ARMOR (TYP) AT

ABUTMENTS WHERE REQUIRED

SEE SHEET 2 FOR DETAILS 101

I0I

PROVIDE SAFETY RAILS

IN ACCORDANCE WITH

MSHTO REQUIREMENTS

SEE PROJECT DESIGN

CRITERIA

2” X 6” S4S HANDRAIL. RADIUS TOP EDGE AS SHOWN BLOCK

OUT 1 1/2” FOR KNUCKLE CLEARANCE BETWEEN RAILING AND

TRUSS MEMBERS. ALTERNATE HANDRAIL CONFIGURATIONS MAY

BE SUBMI1TED TO THE C.O. FOR REVIEW AND APPROVAL.

*CLEAR WIDTH

2” X 6” S4S

RUB RAIL WHEN

SPECIFIED

6” X 1/4” STEEL PLATE

OR 2” X 6” CONTINUOUS

TIMBER TOE KICK

3” X 8” MINIMUM,

ROUGH SAWN DECK

PLANKS

i— 3” X 8” MINIMUM (3” X

12” SHOWN) ROUGH

SAWN RUNNING PLANKS

8”

GENERAL NOTES: *IN5IDE FACE TO INSIDE FACE(RUB RAILS AND RAIL)

SPECIFiCATiONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATiON FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP—03) AND STANDARD SPECIFICATIONS FOR

CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS,

PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE: PREFABRICATED STEEL SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN ON THE DRAWINGS. THE BRIDGE SHALL MAINTAIN THE CLEARANCES ABOVE HIGH WATER INDICATED ON THE BRIDGE ELEVATION. THE BRIDGE CROSS—SECTION SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE WIDTH AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTiON. THE CONTRACTOR SHALL DETERMINE TRUSS HEIGHT AND THE LOCATION OF THE DECK WITH RESPECT TO THE TOP AND BO1TOM CHORDS (U FRAME VS. H FRAME). OVERHEAD LATERAL BRACING IS UNACCEPTABLE. ALL RELATED DETAILS SUCH AS PROFILE, ABUTMENT DETAILS, BEARINGS, AND TIMBER DECKING SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO FINALIZE AND CONSTRUCT.

THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE, ABUTMENT FOUNDATIONS, AND ASSOCIATED DETAILS INCLUDING TIMBER COMPONENTS SHALL BE DESIGNED UNDER THE DIRECTION OF A REGISTERED PROFESSIONAL ENGINEER. THE COMPLETED DESIGN, DRAWINGS, AND SPECIFICATION PACKAGE SHALL BE SUBMITtED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL

DESIGN: THE DESIGN OF ALL PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE MSHTO LRFD GUIDE SPECIFICATION FOR DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION AND MSHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CURRENT EDITION. PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION PLUS 1% OF BRIDGE SPAN. SUBMIT SHOP

DRAWINGS AND CALCULATIONS FOR APPROVAL AND MUST BE APPROVED BEFORE FABRICATION.

MATERIALS: USE STEEL SHAPES, PLATES AND BARS OF WEATHERING STEEL CONFORMING TO MSHTO M27O, GRADE 50W (ASTM A588 OR ASTM A242) OR ASTM A847 FOR SQUARE AND RECTANGULAR TUBING. MINIMUM STEEL THICKNESS SHALL BE AS SPECIFIED IN THE GUIDE SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES. USE HIGH STRENGTH BOLTS CONFORMING TO MSHTO M164, (ASTM

A325), TYP 3, UNLESS NOTED OTHERWISE. USE MALLEABLE IRON WASHERS AGAINST WOOD.

STEEL FABRICATiON: THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE SHALL BE FABRICATED BY AN AISC CERTIFIED PLANT —

SIMPLE STEEL BRIDGES OR COMPLEX STEEL STRUCTURES. WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN ACCORDANCE WITH AWS D1.5 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND INTENDED USE OR SERVICE.

ERECTiON PLAN: THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS BEFORE ERECTION IS SCHEDULED. IF ALLOWED UNDER THE PROJECT DESIGN CRITERIA, TEMPORARY IN—STREAM SUPPORT BENTS MAY BE USED FOR THE ERECTION OF THE PREFABRICATED STEEL TRUSS BRIDGE. THE IN—STREAM BENTS SHALL BE CRIBBING, SILLS, CONCRETE BLOCKS OR OTHER SUPPORTS AND SHALL BE PLACED WITH MINIMAL DISTURBANCE WITHIN ThE STREAM. ALL MATERIALS TO CONSTRUCT THE TEMPORARY IN—STREAM BENTS SHALL BE REMOVED. THE SUBMITTALS SHALL INCLUDE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS AND DETAILS ALSO INCLUDED, THE CONTRACTOR SHALL INDICATE THE EQUIPMENT AND METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS AND ERECT THE NEW PREFABRICATED STEEL TRUSS

I IPRP’TRI ICTI IPR

RIPRAP ARMORING w/GE00ELL

TiMBER & LUMBER: SOLD SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE GRADING RULES

AGENCY FOR THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW.

DECK PLANKS AND BACKING PLANKS

— COASTAL REGION DOUGLAS FIR — LARCH ROUGH SAWN NO.1 GRADE, GRADING RULES AGENCY — WWPA, WCLIB

RUNNING PLANKS AND RUB RAIL

— COASTAL REGION DOUGLAS FIR — LARCH ROUGH SAWN NO.2 GRADE, GRADING RULES AGENCY — WWPA, WCLIB

RAILS, HANDRAILS UNTREATED

— REDWOOD, S4S, NO.2 GRADE GRADING RULES AGENCY — RIS

— WESTERN RED CEDAR, S4S, SELECT STRUCTURAL GRADE GRADING RULES AGENCY — WWPA, WCLIB

TREATED

— HEM — FIR/DOUGLAS FIR, S4S, NO.1 GRADE GRADING RULES AGENCY — WWPA, WCLIB

TREATMENT: SEE PROJECT CRITERIA FOR MEMBERS IDENTIFIED TO BE TREATED AND FOR TREATMENT TYPE.

PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) “BEST MANAGEMENT

PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS”.

DECKING, RUNNING PLANKS, IF TREATED

— AWPA USE CATEGORY SYSTEM (Ui) FOR USE CATEGORY 3B ABOVE GROUND — EXPOSED (UC3B)

— PENTACHLOROPHENOL IN LIGHT OIL (TYPE C SOLVENT)

— COPPER NAPHTHENATE (CuN) IN LIGHT OIL (TYPE C SOLVENT)

SILLS, BACKING PLANKS, CRIBS, TIMBER WALLS, IF TREATED

— AWPA USE CATEGORY SYSTEM (Ui) FOR USE CATEGORY 48 GROUND CONTACT — HEAVY DUTY (UC4B)

— PENTACHLOROPHENOL IN HEAVY OIL (TYPE A SOLVENT)

— COPPER NAPHTHENATE (CuN) IN HEAVY OIL (TYPE A SOLVENT)

FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED FOR FIELD TREATING OF WOOD. ALL ABRASIONS AND FIELD CUTS — APPROVED BY THE C.O.R. — SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE FASTENERS.

TOP OF TRUSS

PROVIDE ADA

HANDRAIL WHERE

REQUIRED. SEE

PROJECT DESIGN

CRITERIA

1 ‘—0” 1 ‘—0”

MINIMUM 1

RIPRAP

HIGH WATER

b.

F’) F’)

,.— GRADE BEAM

/ SEE SHEET 3

/ FOR DETAILS

ELEVATION

L

1,—O,, MINIMUM 1

RIPRAP

U) (I)

F-

-j LiJ U F- (I)

U

C)

UJ

a:::

a-

1 ‘—0”

HIGH WATER

ADE BEAM

:ET 3

AILS

ELEVATION

1.1 111111111111111111111111111111

LATERAL BRACING

AS REQUIRED

COMPETENT,

U N DISTURBED

BEARING MATERIAL

TYPICAL SECTION RIPRAP ARMORING

HON

COMPETENT,

U N DISTURBED

BEARING MATERIAL

MINIMUM

GRADE BEAM FOUNDATION GRADE BEAM FOUNDATION

(u.s. DEPARTMENT OF AGRICULTURE PROJECT NAME & LOCATION

1 iD ‘I’. Ffte Tv-c 1Sde (17)

FOREST SERVICE

STANDARDTILPLAN

TIMBER FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS (EXCEPT TIMBER RUNNING PLANKS). SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER. FIELD DRILLING OF

HOLES SHALL NOT BE ALLOWED UNLESS OTHERWISE NOTED ON THE PLANS.

964 - PREFABRICATED TRAIL BRIDGE

SHEET 2 OF 3

TRUSS END POST

3” X 10” OR

3” X 12”

TREATED TIMBER

ROUGH SAWN

BACKING

PLANKS

BACKWALL WIDTH OUT—TO—OUT

(BRIDGE TOTAL WIDTH + 2’—O” + 2*D)

BRIDGE TOTAL WIDTH

,r— (2)—ANCHOR BOLTS MINIMUM

/ AT EACH BEARING LOCATION

/ I I I

LI LI \Li

I t •4 J I I I I I I :“s.

I I I I L I l . 1 Iit

#4 HOOPS 44 CONTINUOUS EACH FACE

SPACE #4 HOOPS © 12” ±

OUT—TO—OUT CONCRETE GRADE BEAM

(BRIDGE TOTAL WIDTH + 3’—O”)

ELEVATION — GRADE BEAM

* 12” CAST—IN—PLACE ANCHOR OR 7” EPOXY

ANCHOR WHEN APPROVED BY CO.

BACKFILL W/SUITABLE —..,

MATERIAL

3” X 10” OR 3” X 12”

TREATED TIMBER ROUGH

SAWN BACKING PLANKS

TOTAL BACKWALL HEIGHT, “D”

— AND CONNECTION DETAILS TO

DETERMINED BY CONTRACTOR

(4)—#6 CONTINUOUS

TOP AND BOTtOM

3” DIMENSIONAL LUMBER

COMPRESSIBLE JOINT —h

FILLER AS REQUIRED

(2)—3/4”ø a3O7 ANCHOR BOLTS AT EACH

BEARING LOCATION MINIMUM. EMBED 12”

MINIMUM INTO GRADE BEAM. PLACEMENT

AND THREADED PROJECTION BY OTHERS.

SLOPE TOP SURFACE OF GRADE

BEAM AS REQUIRED FOR UNIFORM

BEARING. VERIFY CONFIGURATION

WITH TRUSS FABRICATOR.

SHEET 3 OF 3

1 ‘—0” 1 ‘—0”

STRUCTURE

2” X 12”

RUNNING PLANKS

ATtACH BACKING

PLANK TO

SUPERSTRUCTURE

FINISH GRADE

1 1/2

APPROACH

FILL SLOPE

*12” ANCHOR

zt3zzz —

TOE KICK

DECK PLANKS

STRINGER

BOTtOM CHORD

BEARING

ASSEMBLY

GRADE BEAM

1. 1/2

FILL SLOPE

:41

AT EXTERIOR

FACE OF BACKING PLANKS

ELASTOMERIC

BEARING PAD

(50 DUROMETER)

1/

BEARING DETAIL

3” — — — — 3”

NOTES:

SPECIFiCATiONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP—03) AND STANDARD SPECIFICATIONS FOR

CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS,

CONCRETE: USE CLASS A(AE) FOR CONCRETE, f’c = 4000 PSI AT 28 DAYS WITH AN ENTRAINED AIR CONTENT OF 5% ±1%.

PROVIDE ALL CONCRETE IN ACCORDANCE WITH AN APPROVED MIX DESIGN. CHAMFER ALL EXPOSED EDGES OF CONCRETE 3/4—INCH.

REINFORCING STEEL: USE REINFORCING STEEL OF THE DEFORMED TYPE CONFORMING TO MSHTO M31 (ASTM A615), GRADE SO.

CONCRETE COVER SHALL BE AS SHOWN, WHERE NOT SHOWN IT SHALL CONFORM TO MSHTO. CUT AND BEND STEEL IN

ACCORDANCE WITH ACI 315.

CONCRETE GRADE BEAM: DETAILS SHOWN ON THIS SHEET PROVIDE MINIMUM SIZES AND REQUIREMENTS. THE CONTRACTOR SHALL PREPARE AND SUBMIT COMPLETE GRADE BEAM DETAILS WITH THE PROPOSED SUPERSTRUCTURE DESIGN AND SHOP DRAWINGS.

THREAD

PROJECTION

(4)—#6 CONTINUOUS

EQUALLY SPACED

2’—3”

#4 © 12” ±.:i1 tI4.I.

I •1I• :

1••‘ 4I •, #4 CONTINUOUS

AT EACH FACE

(‘I

4 1/2”

2’—6”

TYPICAL SECTION

( U.S. DEPARTMENT OF AGRICULTURE

F-k.. ELitwe jvc kSrc5f CLo’.f (1 PREFABRICATED STEEL TRAIL BRIDGE

REVISION DATE DRAWING ND.

ç> FOREST SERVICE

‘ SHEET

8 PROJECT NAME & LOCA11ON DRAWING NAME

STANDARD TRAIL PLAN ), Uk 964 - PREFABRICATED TRAIL BRIDGE PREJ

STD 964-10-03N SEC11DN TYPICAL ID

L3

OFL/

(4)—#6 CONTINUOUS

EQUALLY SPACED

HEAVY HEX NUT4

MALLEABLE

IRON WASHER

LI

H wr

METAL STRAP __\\ i —i

TACK

HEAVY HEX NUT

1 1/4” X 1/4” METAL STRAP ELEVATION—ANCHOR

*SILL MATERIAL AND DIMENSIONS WILL VARY. REFER

TO SUPERSTRUCTURE SHEETS FOR ACTUAL SILL

DIMENSIONS AND ADJUST GABION AS NEEDED.

FOUNDATION NOTES:

SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS

STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD

SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON

FEDERAL HIGHWAY PROJECTS (FP—03) AND STANDARD

SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES

ON FEDERAL PROJECTS,

HARDWARE AND STRUCTURAL STEEL: SEE SUPERSTRUCTURE

DRAWINGS FOR PROJECT DESIGN CRITERIA AND GENERAL NOTES.

GABION ABUTMENT STABILIZATiON: REFER TO THE SPECIAL PROJECT

SPECIFICATIONS FOR A DESCRIPTION OF THE WORK, MATERIALS, AND

INSTALLATION PROCEDURES.

GABION FOUNDATiONS: REFER TO GABION FOUNDATION NOTES.

GABION FOUNDATION NOTES:

1. GABION BASKETS SHALL BE CONSTRUCTED USING WIRE MESH

(U.S. STANDARD GAGE 9). BASKETS CONSTRUCTED USING

TWISTED WIRE MESH WILL NOT BE ALLOWED. WELDED WIRE MESH

SHALL BE POLWINYL CHLORIDE COATED (PVC) WHERE BASKETS

ARE EXPOSED TO CORROSIVE SOILS.

2. MATERIAL USED TO FILL THE GABION SHALL BE 4—INCH TO

8—INCH HARD, DURABLE, ANGULAR ROCK.

3. ROCK MAY BE PLACED MECHANICALLY PROVIDED CARE IS TAKEN

TO ENSURE THAT IT IS TIGHTLY PACKED WITH A MINIMUM OF

VOIDS. FOR EXPOSED FACES, HAND LABOR SHALL BE USED TO

KEEP THE MESH VERTICAL, PREVENT BULGING, AND TO PRODUCE

AN AURACTIVE APPEARANCE.

4. ALL GABIONS SHALL BE PLACED ON UNDISTURBED SOIL OR A

FOUNDATION OF SUITABLE MATERIAL. REMOVE AND REPLACE

UNSUITABLE SOILS WITH A MINIMUM OF 12—INCHES OF COARSE

GRANULAR BACKFILL. COMPACT BACKFILL MATERIAL AT AN

OPTIMUM MOISTURE CONTENT WITH A VIBRATING COMPACTOR.

OPERATE COMPACTION EQUIPMENT OVER THE FULL WIDTH OF THE

FOUNDATION AREA UNTIL VISIBLE DEFORMATION OF THE BACKFILL

CEASES.

5. BACKFILL WITH SUITABLE MATERIAL BEHIND GABIONS

CONCURRENTLY WITH THE CELL FILLING OPERATION. BACKFILL

THE AREA BEHIND GABIONS WITH A COARSE GRANULAR MATERIAL.

COMPACT BACKFILL MATERIAL AT AN OPTIMUM MOISTURE

CONTENT WITH A VIBRATOR COMPACTOR. OPERATE COMPACTION

EQUIPMENT OVER THE FULL WIDTH OF THE IN—FILL AREA UNTIL

VISIBLE DEFORMATION OF THE BACKFILL CEASES.

SHEET 1 OF 1

( U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

STANDARD TRAIL PLAN

r PROJECT NAME & LOCA11ON

EXTERIOR FACE

OF OUTSIDE

STRINGER/SLAB

ABUTMENT ABUTM ENT

OUT—TO—OUT WIDTH OF STRINGERS/SLABS

(EXTERIOR FACE TO EXTERIOR FACE)

*OUT_TO_OUT SILL & METAL STRAP

SECTION B—BELEVATION — GABION FOUNDATION

ii 1 1/4” t

5/8”

Fr

TABLE—i: STANDARD GABION BASKET SIZES

13/16”ø

HOLE

SIZE NO. OF CAPACITY

)IAPHRAGMS CUBIC

LENGTH WIDTH HEIGHT YARDS

6F1 3FT 3F1 1 2

9Ff 3FT 3Ff 2 3

12Ff 3Ff 3Ff 3 4

6Ff 3Ff 1.5Ff 1 1

9Ff 3FT 1.5Ff 2 1.5

12Ff 3Ff 1.5FT 3 2

6Ff 3Ff 1Ff 1 0.67

9Ff 3FT 1Ff 2 1

12Ff 3Ff 1Ff 3 1.33

BOLT DETAIL

965 - TRAIL BRIDGE SUBSTRUCTURES GAB

File details come from the government source that posted it. Updated .