AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable) Amendment #01 03/04/2016 789711
6. ISSUED BY
CODE
84N8
7. ADMINISTERED BY (If other than Item 6)
CODE
84N8 U.S. Department of Agriculture – Forest Service Utah Acquisition Support Center 2222 W. 2300 S.
Salt Lake City, UT 84119 U.S. Department of Agriculture – Forest Service Utah Acquisition Support Center 2222 W. 2300 S.
Salt Lake City, UT 84119
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X)
9A. AMENDMENT OF SOLICITATION NO.
X AG-84N8-s-16-0036
9B. DATED (SEE ITEM 11)
02/25/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers___ is extended,_XX__is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor ___ is not, _XX_ is required to sign this document and return__1_ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This amendment:
-adds a reference drawing titled “Suggested Bill of Materials” that may aid vendors to visualize the materials requirements. The suggested bill of materials documents was created for a project called “Gibson Jack Trail Bridge,” but the materials shown are similar to those in this solicitation with some adjustments based on bridge length. This document is only an aid. Offerors are still required to follow the plans and submit shop drawings per the solicitation specifications.
-responds to questions submited in regards to this solicitation (see attached page). Note that Item #2 in the attached questions list call for an extra hand rail in addition to what is shown on the drawings/specifications. Question #3 changes the rail post blocking from planed to rough. Questions #1 and #4 clarify solvent and hand rail screw requirements.
-This amendment does not extend the quote due date as these changes are minor in nature. All offerors for this solicitation will be required to return a signed copy of this amendment notice along with any offer submitted.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Tamera Draper, Contracting Specialist
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable 30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation: AG-84N8-S-16-0036
Solicitation Clarification Questions and Responses
Can Type A solvent be used on the stringer? Yes, they can use type A solvent on the stringers.
The Snowslide Canyon Trail Bridge needs an extra hand rail in addition to what the plans show. The total additional material for the extra rail is: Four 12’-4” 2x6 S4S rail, treatment and grade the same as the other rails, with 24 additional wood screws and 8 additional 16d nails.
Another change for the rails is that the rail post blocking should be 4x6 rough (the same dimension as the rail posts) for both bridges. The plans indicate 4x6 S4S. The ¾” post bolts must be long enough to accommodate the ½” larger size. (The district had some issues with clearance for some legal UTVs that rub the rails when passing between.)
Finally, hand rail screws should be self-drilling, square or star drive.
Other files
| File | Type | Posted |
|---|---|---|
| CanyonSnowslide_Southern_Pine_Species_Substitution.pdf | ||
| sf-30.rtf | RTF text file | |
| Gibson_Jack_Suggested_Bill_of_Materials.pdf | ||
| ATTACH_1-6067-0.01_Canyon_Creek_Trail_Bridge_02162016.pdf | ||
| S-16-0036.docx | DOCX document | |
| ATTACH_2-502-3.7_Snowslide_Canyon_Trail_Bridge_01222016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .